development proposal tp - mornpen.vic.gov.au

6
PLAN KEY 01 ENTRY AIRLOCK 02 TAKE-AWAY PREPARATION 03 SERVERY - PUBLIC 04 SERVERY - FERRY PASSENGER 05 STORE 06 STAFF TOILET 07 SEATING AREA M1 M1 M1 M7 M7 M7 M4 M9 M9 M3 M9 M9 M7 M4 M2 M2 M4 M7 M7 M1 Door view panel Toilet window MATERIALS LEGEND M1. STEEL CLADDING 445M2 Grade Stainless Steel Low Reflectivity Finish M2. ALUMINIUM WINDOW FRAME Black Anodised. Coastal Grade M3. GLASS Grey Tinted M4. GLASS Clear Toughened M5. GANTRY by Manufacturer M6. CONCRETE Dark Grey Textured M7. ALUMINIUM CLADDING Dark Grey. Coastal Grade M8. CONCRETE Natural Concrete M9. ALUMINIUM CLADDING Light Grey Anodised Coastal Grade M10. TIMBER DECK Natural M11. TIMBER Solid Timber Plank (match existing) M12. ALUMINIUM CLADDING Black Anodised. Coastal Grade M12 M12 M12 Floor Plan Elevation A Elevation B Elevation C Roof Plan Key Plan 01 02 03 04 05 05 06 07 Ferry vehicles Seating Area Seating Area Roof RL 5.35 Grd FFL RL 1.75 Soffit RL 5.05 A B C FFL 1.75 Servery window Window frame Window frame Servery window Drawn Date Page FF | GO | JD Revision Scale: 16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright 1:250 @ A3 TP.31 DEVELOPMENT PROPOSAL Peak Season Kiosk - Plans & Elevations P1 20.10.2017 N

Upload: others

Post on 14-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

PLAN KEY

01 ENTRY AIRLOCK

02 TAKE-AWAY PREPARATION

03 SERVERY - PUBLIC

04 SERVERY - FERRY PASSENGER

05 STORE

06 STAFF TOILET

07 SEATING AREA

M1 M1 M1M7 M7 M7

M4 M9M9 M3

M9 M9 M7

M4 M2 M2 M4M7 M7

M1

Door view panel

Toilet window

MATERIALS LEGEND

M1. STEEL CLADDING 445M2 Grade Stainless Steel Low Reflectivity Finish M2. ALUMINIUM WINDOW FRAME Black Anodised. Coastal Grade

M3. GLASS Grey Tinted M4. GLASS Clear Toughened

M5. GANTRY by Manufacturer

M6. CONCRETE Dark Grey Textured

M7. ALUMINIUM CLADDING Dark Grey. Coastal Grade

M8. CONCRETE Natural Concrete

M9. ALUMINIUM CLADDING Light Grey Anodised Coastal Grade

M10. TIMBER DECK Natural

M11. TIMBER Solid Timber Plank (match existing)

M12. ALUMINIUM CLADDING Black Anodised. Coastal Grade

M12 M12 M12

Floor Plan

Elevation A Elevation B Elevation C

Roof Plan Key Plan

01

02

0304

0505

06 07

Ferry vehicles

Seating Area Seating Area

Roof RL 5.35

Grd FFL RL 1.75

Soffit RL 5.05

A

B

C

FFL 1.75

Servery window

Window frame

Window frame

Servery window

Drawn18.10.2017

Date PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright1:250 @ A3 TP.31DEVELOPMENT PROPOSAL

Peak Season Kiosk - Plans & Elevations P1 20.10.2017

N

Page 2: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

Ferry Upper Deck

Terminal Building L1

Water Line

1

1

2

3

4

2

4

3

TIDE LEVEL VARIANCE

Mean High Tide = +0.376 mMean Low Tide = -0.324 mVariance = 0.700 m

WATER LEVEL VARIANCE

Present Day = RL 0.850 mYear 2030 = RL 1.000 mYear 2070 = RL 1.320 mVariance = 0.470 m

FERRY LEVEL VARIANCE

Unloaded = 7.400m above water lineFully Loaded = 7.200m above water lineVariance = 0.200 m

DESIGN CONDITIONS (1 + 2 + 3)

Ferry Upper DeckMaximum Level = RL 9.096 m• Mean High Tide (0.376)• Year 2070 (1.320)• Ferry unloaded (7.400)

Ferry Upper DeckMinimum Level = RL 7.726 m• Mean Low Tide (-0.324)• Present Day (0.850)• Ferry fully loaded (7.200)

SOURCETide levels and water levels advised by AW Maritime Pty Ltd (Maritime Engineers)Ferry levels advised by the Searoad Ferries

Drawn18.10.2017

Date PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright1:200 @ A3 TP.32DEVELOPMENT PROPOSAL

Ferry & Sea Levels Analysis P1 20.10.2017

Page 3: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

Section Diagram Benchmark Images

Plan Diagram(Gantry Stall Position)

Plan Diagram(Gantry Open Position)

TERMINAL BUILDING

TERMINAL BUILDING TERMINAL BUILDING

FERRY FERRY

FERRY DOCKING

FFL Grd RL 2.40

FFL L1 RL 6.90

FFL L1 RL 6.90 FFL L1 RL 6.90

Water levels variesRL 0.526 ~ RL 1.696

Ferry access levels variesRL 7.726 ~ RL 9.096

Ferry access levels (upper deck)RL 7.726 ~ RL 9.096

Ferry access levels (upper deck)RL 7.726 ~ RL 9.096

Fender FenderFender Fender

Fender Fender

Fender Fender

Fender Fender

Fender Fender

Gantry gradient variesRamp gradient 1:38.5 ~ 1:14.5

Access Access16m

16m16m

16m

FerryAccess

FerryAccess

Minimum level = 7.726 - 6.90 = 0.826mHGantry ramp length = 32mGantry ramp gradient = 32 / 0.826 = 1:38.5

Maximum level = 9.096 - 6.90 = 2.196mHGantry ramp length = 32mGantry ramp gradient = 32 / 2.196 = 1:14.5

Drawn18.10.2017

Date PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright1:500 @ A3 TP.33DEVELOPMENT PROPOSAL

Gantry Concept Diagrams P1 20.10.2017

Page 4: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

Section Diagram(Gantry Open Position)

Elevation Diagram(Gantry Open Position)

Section Diagram(Gantry Stall Position)

Elevation Diagram(Gantry Stall Position)

TERMINAL BUILDING

TERMINAL BUILDING

FERRY DOCKING

FERRY DOCKING

FFL Grd RL 2.40

FFL Grd RL 2.40

FFL L1 RL 6.90

FFL L1 RL 6.90

Water levels variesRL 0.526 ~ RL 1.696

Ferry access levels variesRL 7.726 ~ RL 9.096

Ferry access levels variesRL 7.726 ~ RL 9.096

Adjustable gantry Adjustable gantry

Gantry stalled below building canopy

Ferry at foreground

Ferry at foreground

Gantry stalled below building canopy

Gantry shown indicatively only.

Assumptions:• 1m internal clear width• 2.2m ceiling height• 300mm thick floor structure zone• 300mm thick roof structure zone• Steel frame system - black• Glass cladding

Drawn18.10.2017

Date PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright1:500 @ A3 TP.34P1

DEVELOPMENT PROPOSALGantry Design Concept 20.10.2017

Page 5: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

View 1 - Key plan

N

DrawnDate PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright

T +613 9867 2233

NTSP1 TP.3520.10.2017 PERSPECTIVE VIEW 1

Page 6: DEVELOPMENT PROPOSAL TP - mornpen.vic.gov.au

View 2 - Key plan

N

DrawnDate PageFF | GO | JD

Revision Scale:16 07 02 SEAROAD FERRIES - PROPOSED FERRY TERMINAL 10 Esplanade, Sorrento © copyright

T +613 9867 2233

NTSP1 TP.3620.10.2017 PERSPECTIVE VIEW 2