dfma alliance launching & citac conference · 2019-03-27 · dfma alliance launching &...

54
DfMA Alliance Launching & CITAC Conference DESIGN FOR MANUFACTURE AND ASSEMBLY A NEW MODEL FOR CONSTRUCTION 19 MARCH 2019 ALAN CLUCAS FICE. DIRECTOR EXPLORE MANUFACTURING

Upload: others

Post on 04-Jul-2020

9 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

DfMA Alliance Launching & CITAC Conference

DESIGN FOR MANUFACTURE AND ASSEMBLY

A NEW MODEL FOR CONSTRUCTION

19 MARCH 2019

ALAN CLUCAS FICE. DIRECTOR EXPLORE MANUFACTURING

Page 2: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

A New Model for Construction

2

Page 3: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

• Collaborative early engagement into projects to influence solutions upstream

• Deploy a consistent operating model & management system to guide delivery methodology

• Drive four key enablers:

o Design for Manufacture and Assembly (DfMA) & Offsite

Manufactureo Direct Deliveryo Digital Engineeringo Excellence in Engineering

The Laing O’Rourke Approach – Our Operating ModelDriving Certainty Into Construction – Delivering Unique Solutions As An Engineering Enterprise

3

Page 4: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

4

Construction Becomes AssemblyA “Kit of Parts” Approach

• Delivery programme reductions• Reduced workforce required on site

Additionally….• Improved safety• Factory quality control delivered• Risk & uncertainty reduced• Construction waste control &

reduction• Reduced on-site noise & disruption• A positive shift to factory based jobs• Distribution of economic activity

away from major cities & hubs• Reduced water consumption

Driving DfMA & Offsite Advantages onto Projects

4

Page 5: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

DfMA – A Kit of Parts Approach Enabling Bespoke Outcomes

5

A wide array of manufactured building products to suit all sectors – growing to suit emerging demands

Page 6: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

6

Our manufacturing capabilityPortfolio of innovative brands

Page 7: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Explore ManufacturingLocations and capability

Comprises 5 businesses

• Explore Manufacturing, Steetley:

Structural and architectural concrete

solutions

• Explore Transport, Steetley: JV

between LOR and Stobarts for logistics

• Smartwall, Worksop: Modular serviced

internal serviced partitions

• Crown House Manufacturing, Oldbury:

Offsite manufactured MEP modules

• GRCUK, Sheffield: Glass fibre

reinforced concrete lightweight

facades

• All Midlands located to ensure delivery

in one day to all major conurbations

Sm a rtw a llWorks op ,Nottinghams hire

S M A R T W A L L

Exp lo re Ind u s tria l P a rkS tee tley, Nottinghams hire

Cro w n Ho us e Ma nu fa c tu ringOldbury, Wes t Mid land s

GRC UKShe f e ld , South Yorks hire

T R A N S P O R T

7

Page 8: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Explore Industrial Park

30 acres developed on 215 acre site

Most modern concrete products factory in Europe opened in 2009

400+ jobs created since opening

85% of workforce recruited locally

75% of raw materials sourced within 50 miles of plant

Investment to date exceeds £150m

Manufacturing apprentices recruited annually

Excellent relationships with local schools

8

Page 9: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

9

Innovation and excellence in the construction industryExplore Industrial Park

Facades Columns Beams TwinWall Lattice

Explore Industrial Park Fly through

Page 10: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Smartwall.

10

Modular internal walling products

Page 11: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

CHtM and Smartwall

11

Bathroom pods – Residential, Medical, Industrial

Page 12: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

CHtM and Smartwall

12

Services / Utility Cupboards

Page 13: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

CHt Manufacturing.

13

Plant rooms, boiler skids, pump assemblies, distribution & bathroom pods

CHt Manufacturing established March 1995.

Page 14: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

The Implementation of Laing O’Rourke’s Offsite Manufacturing Strategy

Page 15: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Product Documentation

15

Supports consistent design & delivery

• Product catalogues • Technical guidance • FAQs & Support

15

Page 16: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Product Development and Testing

16

Trials, prototypes and systems tests underpinning confidence

SuperstructureNuclear industry

Fire performanceManufacturing trialsJoint strength

Page 17: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Digital Engineering Enables the Operating Model

17

A Single Central Digital Asset

Construction Innovation and DfMA

Design Coordination

Through-life Component

TrackingCosting Visualisation

Quality & Commission-

ing

Construct-ability

Logistics Planning and

Tracking

Health and Safety

Installation Sequencing

Operational Efficiency

Central Digital Engineering Asset

Page 18: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

A Total Logistics Solution

18

Explore Transport Ensures Timely Delivery to all Projects

Customised fleet carries bespoke products

Digitised component tracking

Nationwide logistics command centre

Page 19: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Our Operating Model in DeliveryConstruction case studies

Page 20: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Residential DevelopmentsNew Mid-Market Solutions

Page 21: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Two Fifty One, Southwark – Optimising DfMA on Mid-Rise, City Centre Residential

Developments

21

Delivering high quality projects at significant scale with high proportion of manufactured products

41 storey residential tower

• GIFA 36,500m2

• 335 apartments

Project Value: £120m

Programme: 176 weeks

Client: Oakmayne/ECA Developments

Architect: Allies & Morrison

SMEP Engineer: Waterman

Page 22: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Two Fifty One, Southwark

22

Component count

Page 23: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

23

Two Fifty One, Southwark

Page 24: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Two Fifty One, Southwark

24

Driving the vision into reality

The vision The input The output

70 : 60 : 30 70% of the Frame

is manufactured

off site

Description Floorcycle

Total man days

Men per week

Total days

DfMA soln 40 floors 6 day 5,280 22 240

Insitu soln 40 floors 9 day 13,320 37 360

Varinace 8,040 15 120

Reduction/saving 60% 41% 33%

70: 60: 30

Page 25: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Oxford Westgate

25

Twinwall core / hollowcore plank

Page 26: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Oxford Westgate

26

Brick slip facade

Page 27: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Oxford Westgate

27

Brick Slip Facade

Page 28: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Oxford Westgate

28

Productivity

38,000t

embodied

carbon saving

• 4 times the size

• 3 operatives

• 1 crane driver

• no scaffolding

• 40% faster

completion

24 bricklayers, full

scaffold

Page 29: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Grange University Hospital

29

Cymbran, Wales

Page 30: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Grange University Hospital

30

Structure

800 single storey columns

reduced to 614

• Double height

• 140 casting drawings

• 20 main column types

All collaboration and

approvals executed in

digital BIM environment.

(Building Information

Modelling)

• BDP Architects

• WSP Engineers

• EIP PDET (Precast Design

& Engineering Team)

1200 Twinwall panels

216 Solid walls1590 Lattice planks

Delta beam and hollowcore

Page 31: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Grange University Hospital

31

Facades

774 Sandwich panels

3 types by mix & finish

20 types by geometry

and window openings

Design complete and

fully integrated before

manufacture.

8 panels per day.

Page 32: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Sir Henry Royce Institute, Manchester‘The Crick’ of the North.

Client: University of Manchester,

completion Feb 2020 £225m

Post doctoral research facility. 16000m² building.Laboratories - M4DE, AMP, 2D Nano,

Biomedical, Chemical & Nuclear Materials, and 3D Printing

Early Engagement with the client from RIBA Stage 2.

EACH HORIZONTAL TEXT BOX

TO ITS MINIMUM WIDTH

TYPE IN YOUR TEXT RESIZE BOX ACCORDINGLY

Page 33: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Early engagement and collaborative

working with Ramboll has delivered

highly coordinated optimised ‘product

led’ design:

• 323 columns, rebar reduced by 30t,

58 unique column drawings,

manufactured from 7 mould types.

• 906 Lattice planks, 12 approval

drawings

• 586 Twin wall units for 3 cores.

Detailing completed in 2 weeks,

previously 5 months.

34

Pre-cast manufactured frame – Product led design

Sir Henry Royce Institute, Manchester

Page 34: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Fully integrated Structure and MEP programme

Sir Henry Royce Institute, Manchester

Page 35: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

150 distribution modules, 3 ‘mega’ risers, plant skids

Integrated MEP delivery

Sir Henry Royce Institute, Manchester

Page 36: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Advanced MEP Product Sets

37

AMEP Programme – Parametric Design & Manufacture of Packaged Mechanical & Electrical Plant &

Distribution Modules

• Domestic hot water (DHW) plant rooms

• Chilled water (CHW) plant rooms

• Low temp hot water (LTHW) plant rooms

• Horizontal distribution modules

• Vertical distribution modules (risers)

Page 37: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Modular Service Risers- Manchester Airport

38

Installation of the mega service risers on Manchester Airport transformation programme taking tens of

thousands of man hours offsite into a controlled factory environment

Click on image to play video

Manchester Airport Service Risers

Page 38: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Our Operating Model in DeliveryInfrastructure case studies

Page 39: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Case study – Manchester Metro

40

The first fully DfMA platform and station design.

Page 40: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

41

Case study – Manchester MetroFully DfMA tram stop.

Five weeks traditional construction; Four days DfMA

Page 41: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Case Study – Liverpool St Crossrail station

42

Process engineered precast solution

Page 42: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Case Study – Liverpool St Crossrail station

43

Page 43: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Case Study – Liverpool St Crossrail station

44

Page 44: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Case Study – Liverpool St Crossrail station

45

Page 45: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail – DfMA Platforms for an underground station

46

Liverpool Street vs Tottenham Court Road

DfMA installation team = 7 Insitu installation team = 57

2973 Man hours 36882 Man hours

617mm of platform per hour 152mm of platform per hour

0 safety

accident

s

3 safety

accidents

12 outstanding

Snags

2973 Man hours

617mm of platform per hour

0 safety

accidents

0 outstanding

Snags

Liverpool Street Station Tottenham Court Road

Page 46: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail – Liverpool St Station

47

MEP Mega Risers

Page 47: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

48

Manufacture

Page 48: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

49

Transport

Page 49: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

50

Pitching & Lifting

Page 50: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

51

Lifting

Page 51: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

52

Lifting

Page 52: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Crossrail Liverpool St. – MEP Mega Risers

53

Assembly

Crossrail Liverpool St service mega riser

Page 53: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

Driving Industry Leading Productivity – A Summary

• A team with a broader set of skills & a more diverse background

• In a supportive culture

• Embracing offsite manufacture of an established kit of parts

• Enabled by digital technologies and data

• Engaging at the earliest point in projects as a fully integrated design & delivery team - incl supply chain

• Facilitated by new Delivery Partner procurement models

• Delivered to new but consistent design & delivery processes

• With good team-based governance

• Cross-team shared knowledge & expertise

• And a commitment to continuous learning & improvement

54

Our Lessons Learned & The Key Issues

Disruption

PartnershipImprovement

DfMA,Manufacturin

g and Assembly

Digital Tech and Data

People and Culture

Early

Engagement

KnowledgeEnterprise

Smart Systems

and Processes

Delivery Partner Models

Productivity

Page 54: DfMA Alliance Launching & CITAC Conference · 2019-03-27 · dfma alliance launching & citac conference design for manufacture and assembly a new model for construction 19 march 2019

www.laingorourke.com

Thank youAll materials contained in this presentation are copyright of Laing O’Rourke.

55