dfw airport – elevated water tower addendum one dated …...jul 11, 2013  · the pre bid meeting...

34
DFW Airport – Elevated Water Tower Addendum One Dated 7/10/2013 The documents are changed as follows; 1. Section 1 – Instruction to Bidders – Bid Date Thursday, July 18 th , 2013 at 3pm. This is changed from 11:00 am. 2. Bid Forms, Page 2 of 30 states that the Deadline for Questions is 7/10/2013 at 4 pm; this is changed to Friday, July 12 th , at 1 pm. All questions should still be forwarded to Carlos House at [email protected] 3. During the Pre-bid meeting, Bonds were stated as not required, this was in reference to Bid Security. Payment and Performance bonds are required on the bid form. If a contractor or subcontractor cannot provide bonds at this time then that line in the Bid Form should be left blank. TOH and DFW will work with contractors to help them become bondable in the future through the NICI / DFW Insurance education and assistance program. 4. Bidding contractors are encouraged to visit and register on the Turner Construction Company prequalification website http://www.turnerconstruction.com/sub-contractors to expedite the contract award. This is not a requirement for bidding. 5. The MBE paperwork requirements have caused confusion among many previous bidders. Bidding contractors are encouraged to contact Carol Stephens (See PowerPoint slides) for questions or concerns about the MBE process and reminded that the 25% MBE level is a goal and not a mandatory requirement but that GFE (Good Faith Effort) documentation is required when subcontracting opportunities are available if the goal is not achieved. GFE documentation is not required only when no subcontracting opportunities are available. 6. The pre bid meeting PowerPoint Presentation is included for review. 7. The pre bid meeting “Sign In” sheet is included in scanned and typed formats.

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW Airport – Elevated Water Tower

Addendum One Dated 7/10/2013

The documents are changed as follows;

1. Section 1 – Instruction to Bidders – Bid Date Thursday, July 18th, 2013 at 3pm. This is changed from 11:00 am.

2. Bid Forms, Page 2 of 30 states that the Deadline for Questions is 7/10/2013 at 4 pm; this is changed to Friday, July 12th, at 1 pm. All questions should still be forwarded to Carlos House at [email protected]

3. During the Pre-bid meeting, Bonds were stated as not required, this was in reference to Bid Security. Payment and Performance bonds are required on the bid form. If a contractor or subcontractor cannot provide bonds at this time then that line in the Bid Form should be left blank. TOH and DFW will work with contractors to help them become bondable in the future through the NICI / DFW Insurance education and assistance program.

4. Bidding contractors are encouraged to visit and register on the Turner Construction Company prequalification website http://www.turnerconstruction.com/sub-contractors to expedite the contract award. This is not a requirement for bidding.

5. The MBE paperwork requirements have caused confusion among many previous bidders. Bidding contractors are encouraged to contact Carol Stephens (See PowerPoint slides) for questions or concerns about the MBE process and reminded that the 25% MBE level is a goal and not a mandatory requirement but that GFE (Good Faith Effort) documentation is required when subcontracting opportunities are available if the goal is not achieved. GFE documentation is not required only when no subcontracting opportunities are available.

6. The pre bid meeting PowerPoint Presentation is included for review. 7. The pre bid meeting “Sign In” sheet is included in scanned and typed formats.

Page 2: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW Airport

SA03 Elevated Storage Water TankSA03 Elevated Storage Water Tank

Bid date:  July 18, 2013

Bid time:  11:00 AM 3:00 PM Addendum One

Page 3: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

Project Team• Gary Ralls – Project Executive• Gary Ralls – Project Executive

• Jeff Heimer – Operations Manager

• Carlos House – Project Manager

• Alan Gray – Project Engineer 

• Vincent Gallagher – Estimator

• Kurt Diedrich – Superintendent

• John Cairasco – Safety Manager

• Jennifer Elsner – Contract Administrator

• Katrina Keyes – MBE Program Director• Katrina Keyes – MBE Program Director 

• Carol Stephens – MBE Program Manager

• Grant Mendelijian – Purchasing Manager

Page 4: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW Team

• Jack Zill – AVP Project Administration

• Felix Galan – DMWBE Business Specialist

• Cathleen Baulish – Contract Manager

• Ruth Dornier – Capital Assistance & Bonding Program

St t J k A dit M• Stuart Jackson – Audit Manager

• Anthony Andrews– Project Manager

• Ben King – Contract AdministratorBen King  Contract Administrator

Page 5: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

h ll ll l d

Project Overview

• The project is a new 2.5 Million Gallon Elevated Water Storage Tank, Precast Communication Building, Underground Electrical, Concrete Access Road, Underground Telecom Ductbanks, and gNetwork Fiber. 

• The elevated water tank work is not within the secure area of DFW Ai tDFW Airport.  

• The fiber installation is inside the secure area of DFW Airport.

• Drawings are 100%Drawings are 100% 

Page 6: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

• MapMap

Page 7: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

Scopes of Work

01 Elevated Water Tank

02 G l T d02 General Trades

03 Network Fiber

Page 8: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

Bid Forms to be Submitted with Proposal• Bid Form• Bid Form• Additional Provisions• Minority Business Participation  Forms

• Commitment to MBE ParticipationCommitment to MBE Participation• Preliminary Schedule of Subcontractors

• D/S/M/WBE Good Faith Effort Plan (and supporting documentation)• Required with bid submission if 25% MBE Goal is not met • Not Required if bid meets 25% MBE Goal 

• MBE Certification Certificates• Intent to Perform Contract as a D/S/M/WBE Subcontractor

L i i 3 f EMR• Letter stating previous 3 years of EMR• Sample Insurance Certificate• List of other similar projects 

Page 9: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

iCommitment Letter

Commitment to Minority Business Enterprise (MBE) Participation Form (This form is required as part of the bid/proposal submission.)

The MBE goal for Solicitation/Contract #___9500496 SA 03 Water Tower______ is_25____%. NOTE: BDDD will only credit MBE participation by a firm that is certified by an approved certification entity at the time of bid/proposal submission. The undersigned Contractor has satisfied the requirements of the bid/proposal specifications in the following manner (Please check () the appropriate space):

2____ The Contractor is committed to a minimum of _ __% MBE utilization on this contract. ____ The Contractor is unable to meet the MBE goal of _____% and is committed to a minimum of

_____% MBE utilization on this contract and submits documentation demonstrating good faith efforts.

____ The Contractor is unable to meet the MBE goal of _____% and submits documentation

demonstrating good faith efforts.

X 25

Name of Prime Contractor: __________________________________ __________Vice President________________________________________ Signature Title __John Smith______________________________ __________July 18, 2013__________________________________ P i t d N D t

Landslide, Inc.

Printed Name Date

Page 10: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

f

1

Intent to Perform

INTENT TO PERFORM CONTRACT AS A D/S/M/WBE SUBCONTRACTOR1

The Airport requires that disadvantaged, small, minority and woman-owned businesses be c ertified as D/S/M/WBEs by BDDD or an approved certification agency as defined in the DBE, SBE, and M/WBE Policy and Administrative Procedures.

1. Contract / Solicitation Number:____9500496 SA -03 Water Tower____________________________________

2. Name of Prime Contractor:______Landslide Inc._________________________________________________

3. Address, City, State and Zip:_______123 One Way Drive_Dallas Texas 75111_________________________

4. E-Mail Address:[email protected]________________________________________________

5. The Prime Contractor designates the following person as their high-level official designated to administer and coordinate the efforts to carry out the D/S/M/WBE policy on behalf of the Prime Contractor:

_____John Smith Vice President _____________________214 123-4567___________________ (Name and Title -Please Print) (Phone)

The undersigned subcontractor is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify "supply" or "install" or both):

1. Scope of Work:____Electrical_____________________Supply & Install______________________________

2 Price: $ $270 000 002. Price: $ ___$270,000.00__________________________________________________________________

3. D/S/M/WBE Certification # ____BMDB57709N0614_____________________________________________

4. 2nd Tier Subcontracting: _____% of the proposed subcontract described above will be sublet and/or awarded to Non-D/S/M/WBE contractor(s).

__R. D. Howard ____________________________ _456 The Other Way Drive, Fort Worth Texas 75222 _214-555-5555_ (Name of D/S/MWBE Subcontracting Firm) (Address, City, State and Zip) (Telephone) __________________________________________ __Bob Johnson_________________________ _07____/__18___/__2013___ (Signature of Owner, President or Authorized Agent) (Printed name) (Date)

DECLARATION OF PRIME CONTRACTOR I HEREBY DECLARE AND AFFIRM that as a duly authorized representative of the Prime Contractor stated above, I have personally reviewed the material and facts set forth in this form. To the best of my knowledge, information and belief, the facts and representations contained in this form are true and the owner or authorized agent of the D/S/M/WBE firm stated above signed this form in the place indicated, and no material facts have been omitted. The undersigned affirms that the Prime Contractor has no ownership or financial interest in the D/S/M/WBE subcontracting firm stated above. Except as authorized by the Vice President of Business Diversity & Development Department or his designee, the undersigned shall enter into a formal agreement with the listed D/S/M/WBE firm for work as indicated by this form within ten (10) business days after receipt of the contract executed by the Airport. The undersigned will, if requested, provide said Vice President or his designee a copy of that agreement within five (5) business days of the written request. Pursuant to State Law, any person [entity] who makes a false or fraudulent statement in connection with the participation of a D/S/M/WBE in any locally funded project or otherwise violates applicable program requirements may be referred for prosecution. _______John Smith, Vice President ______________________________________________________________________________________

MBE Page 4 of 9

(Name of Owner, President or Authorized Agent and Title)

______________________________________________________________________________________________ ___07__/__18__/___2013___ (Signature) (Date) 1 Any named person, firm, partnership, corporation, association or joint venture as herein provided identified as providing work, labor, services, supplies, equipment, materials or any combination of the foregoing, under contract to a prime contractor on an Airport contract at any tier.

Page 11: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

li i h d l f bPreliminary Schedule of Subcontractors

SCHEDULE OF SUBCONTRACTORS1 (PRELIMINARY)SCHEDULE OF SUBCONTRACTORS (PRELIMINARY) Prime Bidder/Contractor:_____LANDSLIDE INC.______________________________________________ DBE SBE MBE WBE NON-D/S/M/WBE Contract Name:___ WATER TOWER_____________________________________________ Contract/Solicitation Number:___9500496 SA -03_________________________________________________ As part of the procedures for the submission of a completed bid/proposal, all bidders/proposers are required to identify ALL participating subcontractors applicable to the above project and include this form as part of the bid. Check all Certification Status categories that apply to each subcontractor; however, only the shaded category shall be credited towards the established diversity goal. The submission of thisshaded category shall be credited towards the established diversity goal. The submission of thisinformation is considered an issue of responsiveness, and the Airport Board will not award a contract to any Contractor who has not supplied this documentation. Use additional sheets if necessary.

Name of Subcontractor(s)

Certification Status2 (check the applicable)

Description of Material or Service Being Provided or

Performed

Dollar Amount ($) and Percentage (%)

of Work DBE SBE MBE WBE NON

R.D. Howard X Electrical $270,000 / 25%

$ /Dollar Amount & Percentage of Work to be completed by Non-MBE SubcontractorsDollar Amount & Percentage of Work to be completed by MBE Subcontractors Dollar Amount & Percentage of Work to be self-performed by the Prime Total Dollar Amount & Percentage of Work (The Total Amount shall equal the amount proposed on summary of bid/proposal page).

NOTE: Certification certificate or letter MUST be attached to this form or bid/proposal will be deemed non-responsive.

PRIME CONTRACTOR’S CERTIFICATION

The above information is true and complete to the best of my knowledge and belief. I further understand and agree that if awarded the contract, this certification shall be attached thereto and become a part thereof. Failure to provide accurate and complete information or exercise positive, good fai th efforts (as defined by the Board’s D/S/M/WBE Program) in

t f th B d’ di d t d/ ll/ i it / d b i i t t d bj ti lt i b i

$1,080,000.00

$270,000 / 25%$810,000 / 75%

$0

support of the B oard’s disadvantaged/small/minority/woman-owned business intent and obj ective may result in beingconsidered non-responsive to the Board’s requirements. F urthermore, it is understood and agr eed that, i f awarded a contract by the Airport Board, the Contractor will not m ake additions, deletions or substitutions to thi s certified list of D/S/M/WBE subcontractors without the consent of the Board’s Vice President of Business Diversity & Development Department (BDDD) or designee through the submittal of the D/S/M/WBE Form 102, Request for Approval of Change to Final Schedule of Subcontractors if this is determined to be the final schedule. The BDDD reserves the right to ensure compliance with the Board’s D/S/M/WBE programs as deemed necessary including but not limited to audits of submitted D/S/M/WBE information applicable to the Contractor/subcontractors participating on the contract. Name and Title of Authorized Representative____John Smith Vice President_____________________________________

(Please print or type) Signature:_________________________________________________ Date:_____July 18, 2013_______________________

MBE Page 2 of 9

1 Any named person, firm, partnership, corporation, association or joint venture as herein provided identified as providing work, labor, services, supplies, equipment, materials or any combination of the foregoing, under contract to a prime Contractor on an Airport contract at any tier.

2 In order to credit the participation of disadvantaged/small/minority and woman-owned businesses, firms must be certified as D/S/M/WBEs by a certification agency approved by the Airport Board as defined in the D/S/M/WBE Policies and Administrative Procedures.

Form 90_Updated 10/1/2012

Page 12: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

D/S/M/WBE Good Faith Effort Plan Checklist

D/S/M/WBE GOOD FAITH EFFORT PLAN

NOTE: Complete form and attach support documentation only if the D/S/M/WBE goal is not achieved. The following factors are taken into account when assessing a good faith effort response. These factors are minimally considered as good faith efforts and demonstrate specific initiatives made in attempting to achieve the contract-specific D/S/M/WBE goal. These factors should not be considered as a template, checklist or some quantitative formula.

Identify all D/S/M/WBE support agencies/associations contacted for D/S/M/WBE assistance or solicitation (minority chambers of commerce, purchasing councils, contractor associations, etc.) (Please attach copies of solicitation letters of assistance and/or describe, as an attachment to this section, the contact efforts made)

Discuss any other effort(s) aimed at involving D/S/M/WBEs (Include as an Attachment):

Identify any specific efforts to divide work, in accordance with normal industry practices, to allow maximum D/S/M/WBE participation.

Proposers are required to meet all factors outlined below and provide support documentation in order for the good faith effort plan to be assessed. CHECKING THE BOXES ONLY AND NOT SUBMITTING PROPER SUPPORT DOCUMENTATION IS NOT EVIDENCE OF A PROPER DEMONSTRATION OF GOOD FAITH EFFORT. SUBMITTAL OF THE CHECKLIST, WITH NO ADDITIONAL DOCUMENTATION, WILL NOT BE CONSIDERED ADEQUATE DEMONSTRATION OF GOOD FAITH EFFORT. Proposers are not limited to these particular areas and may include other efforts deemed appropriate.

GOOD FAITH EFFORT QUESTIONS

Yes (! ) No

If applicable, did you attend the pre-bid/pre-proposal conference? (Include copy of sign-in sheet as an attachment)

Discuss joint venture initiatives, second- and third-tier D/S/M/WBE subcontracting, etc., if any.

List all other good faith efforts employed, please elaborate.

AFFIRMATION I HEREBY AFFIRM THAT THE ABOVE INFORMATION IS TRUE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I FURTHER UNDERSTAND AND AGREE THAT, THIS DOCUMENT SHALL BE ATTACHED THERETO AND BECOME A BINDING PART OF THE CONCESSION CONTRACT. NAME AND TITLE OF AUTHORIZED OFFICIAL:

Did you obtain a current list of D/S/M/WBE firms? (Include list(s) as an attachment and source of information) Was direct contact made with the BDDD office? If yes, identify date/person contacted and assistance sought.

Did you advertise in general circulation, trade association, and/or D/S/M/WBE focus media concerning subcontracting and supplier opportunities? (Include copy(ies) of advertisement or detail the name of the publication(s), advertisement date and describe the solicitation)

Were D/S/M/WBE firms contacted or solicited for subcontracting and supplier opportunities? (Attach listing of solicited D/S/M/WBE firms with whom contact was made. Identify name of

SIGNATURE: _________________________________________________________ DATE: FOR DFW BUSINESS DIVERSITY & DEVELOPMENT DEPARTMENT USE ONLY: Plan Reviewed by: Date:

(Attach listing of solicited D/S/M/WBE firms with whom contact was made. Identify name ofcompany, contact person, date, phone number and briefly describe nature of solicitation)

Did you provide written notice to prospective D/S/M/WBE firms and follow up via telephone? (Attach copes of emails and supporting documentation.)

Did you solicit D/S/M/WBE firms at least seven (7) calendar days prior to bid opening?

Discuss efforts made to define additional elements of the work proposed to be performed by D/S/M/WBEs in order to increase the likelihood of achieving the D/S/M/WBE goal.

Signature of Diversity Business Specialist: _______________________________________________ Recommendation: Approval: Denial:

Were copies of bid/proposal documents furnished to D/S/M/WBEs? (Provide documentation and dates documents were provided)

List, as an Attachment, all D/S/M/WBE negotiations and/or bids received but rejected. Identify company name, contact person, telephone number, date, trade area and the reason for rejecting the proposal or bid.

Identify efforts made to assist interested D/S/M/WBEs in obtaining bonding, insurance, or line of credit. (Detail any assistance that was provided or if they were referred, to whom)

GFE Page 1 of 2

Identify efforts made to assist interested D/S/M/WBEs in obtaining necessary equipment, supplies, materials or related assistance or services.

GFE Page 2 of 2

Page 13: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 14: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

MBE P• SA ‐03

• 25% MBE Goal

MBE Program

25% MBE Goal • MBE Classifications : Asian American, Black, Hispanic, American Indian, Indo 

Asian• A certified MBE Prime Contractors self‐performance counts towards meeting 

the 25% MBE goal (MBE Certificate must be submitted with bid )the 25% MBE goal.  (MBE Certificate must be submitted with bid.)

• Valid MBE certification certificates required with bid submittal:• North Central Texas Regional Certification Agency (NCTRCA)• D/FW Minority Supplier Diversity Council (DFW MSDC)

• MBE must have an office in one of DFW Airport’s relevant market areas:Dallas Collin Delta DentonDallas Collin Delta DentonEllis Hunt Johnson KaufmanParker Rockwall Wise Tarrant

• Review DFW Airport Business Diversity Department web page:• Review DFW Airport Business Diversity Department web page: ww.dfwairport.com/bdd

Page 15: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

MBE Program Assistance

Carol Stephens , MBE Program Manager 

Office: 214‐599‐9766     Cell: 972‐984‐0718    Email: [email protected]

• Provide assistance to MBE firms

P id MBE b t t d li li t t i bidd• Provide MBE subcontractors and suppliers list to prime bidders

• Verify valid MBE certificates

• Assist with questions  on MBE program and forms required  for bid submission

Page 16: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

Safety

• John Cairasco – TOH Safety Manager

Page 17: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

INSURANCE – CCIP not ROCIP

SCHEDULE

September 2013 – April 2015September 2013  April 2015

Page 18: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

QUESTIONS?

• Carlos House ‐ Project Manager

• Alan Gray – Project EngineerAlan Gray  Project Engineer 

• Vincent Gallagher ‐ Estimator

E‐mail all questions to: [email protected]

Page 19: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 20: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 21: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 22: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 23: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 24: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 25: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 26: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 27: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 28: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer
Page 29: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

James Sutherland Skye Building Services Grapevine, TX [email protected] GC Prime

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (  ) Plan Room Notice

Jason Rodgers Native Nations 11245 Indian Trail, Dallas, TX [email protected] Electrical Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Michael Boodo Caldwell Tanks Lewisville, TX [email protected] Elevated Tank Sub

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

Mike Lewis Phillips/May Corp. 4861 Sharp St., Dallas, TX [email protected] MBE GC Prime

(  ) Newspaper Ad                 (X) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Lonnie Freeman Burleson Electric625 East Renfro, Burleson, TX, 76028

[email protected] WBE Electrical Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Kory Peterson RAMA1333B Oak Lawn, Dallas, TX, 75207

kory@rama‐ent.com DBE/MBEGC, Miscellaneous 

Works, FiberPrime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Bob Werling Landmark Structures1665 Harmon Rd., Fort Worth, TX, 76177

[email protected] Elevated 

Water TankPrime

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (  ) Plan Room Notice

Page 30: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

Hotch Van Blarcum Premier Communications10485 Olympic Dr., Suite 102, Dallas, TX 75220

[email protected] MBE/HUB Network Fiber Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Gave Garez Premier Communications10485 Olympic Dr., Suite 102, Dallas, TX 75220

[email protected] MBE/HUB Network Fiber Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Jim Cole Lantek2780 N. West SW Pkwy., Grand Prairie, TX

james@lantek‐communications.com

MBE/HUB27000 

CommunicationsPrime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Ken Jonne 3i400 N. St. Paul, Suite 300, Dallas, TX 75201

[email protected] MBE Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Brian Walker GNS Electric430 W. Jefferson Blvd., Dallas, TX 75208

[email protected] WBE/HUB 16000 Electrical Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Evelyn Gorman GNS Electric430 W. Jefferson Blvd., Dallas, TX 75208

[email protected] WBE/HUB 16000 Electrical Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Victoria Johnson Manning Concrete 4425 W. Airport Fwy., Irving, [email protected]

WBE/DBE/HUB Concrete Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Page 31: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

Kevin Atkinson ABLe Communications 1413 Avenue H, Grand Prairie, TX [email protected] MBECommunication 

CircuitsSub

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (X) Plan Room Notice

Byron Eldredge ABLe Communications 1413 Avenue H, Grand Prairie, TX [email protected] MBE Low Voltage Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Maurice Lopez DFW Airport DFW Airport [email protected]

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Cyrus Irani ADE DFW Airport [email protected]

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

Felix Galan DFW BDDD DFW Airport

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

Allen Steffler Wunderlich‐Malec2855 Trinity Square Dr., Carrollton, TX

[email protected] Controls Sub

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

Donny ArmstrongJND Construction Consultants

1707 Chatham Ln., Keller, [email protected]

DBECivil Construction; 

Construction Management

Sub

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (  ) Plan Room Notice

Page 32: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

Elberto Acosta Civil Works Inc.12200 Ford RR, Suite 484, Dallas, TX 75234

[email protected] MBE Drainage/Utilities Prime/Sub

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

Jerry McDaniel MDI General Contractors1225 Lakeshore, Coppell, TX 75019

[email protected] GC Orime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Pete Michalski The Blue Book Network1333 Corporate, Suite 245, Irving, TX 75039

[email protected]

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (X) Plan Room Notice

Randy Morris Vanguard Electric13663 Jupiter Rd., Suite 408, Dallas, TX 75238

[email protected] MBE Electrical Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Robert Taylor Pontchartrain Partners LLC3102 Maple Ave., Suite 400, Dallas, TX 75201

[email protected]

MBE/DBE/8a Misc. Concrete Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Eugene Walker EJ Smith Construction 828 Stella Ave., Dallas, TX 75216 [email protected] MBE/DBE GC/CM Concrete Prime/Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Steven Hallman EJ Smith Construction 828 Stella Ave., Dallas, TX 75216 [email protected] MBE/DBE GC/CM Concrete Prime/Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Page 33: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

Kurt Dfewski Solaris Technologies1624 W. Walnut Hill Ln., Irving, TX 75038

[email protected]/WBE/DBE/H

UBFiber Optic Cable Manufacturer

Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Christine Jacoby CB&I12005 Ford Rd., Suite 600, Dallas, TX 75234

[email protected] N/A Storage Tank Prime/Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Charley Mock CB&I12005 Ford Rd., Suite 600, Dallas, TX 75234

[email protected] N/A Storage Tank Prime

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Frank Parra Carrco Painting10944 Alder Circle; Cell 214‐279‐2711

[email protected] MBE/DBE Painting Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Rocky Withers Gentzler Electric 11545 Page Mill Rd., Dallas, TX  [email protected] MBE/WBE Electrical Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Jeff Heimer Turner‐Omega Howard [email protected]

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Brian Yancy DFW Airport [email protected]

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (  ) Plan Room Notice

Page 34: DFW Airport – Elevated Water Tower Addendum One Dated …...Jul 11, 2013  · The pre bid meeting PowerPoint Presentation is included for review. ... • Alan Gray – Project Engineer

DFW AIRPORT CMAR #3Pre‐Bid Conference SA‐03Tuesday, July 9, 2013

NAME COMPANY ADDRESS EMAILCERTIFICATION (MBE, WBE, DBE)

SCOPE OF WORKPRIME OR SUB?

HOW DID YOU HEAR ABOUT THE PRE BID?

Maqsood Khan 2CMD Inc1420 N. Cooper, Suite 110, Arlington, TX 76011

[email protected] MBE/DBE Grading Concrete Sub

(  ) Newspaper Ad                 (X) DFW Website                  (  ) TOH Invite/K Strategies   (  ) Plan Room Notice

Craig Francisco MC DeanDFW Airport, 3000 SW Construction Trailer 514

[email protected] Electrical Sub

(  ) Newspaper Ad                 (  ) DFW Website                  (X) TOH Invite/K Strategies   (  ) Plan Room Notice

Joe Swinnea Axis Construction, LPP.O. Box 77916, Fort Worth, TX 76177

[email protected] Tank Foundation

Sub

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice

(  ) Newspaper Ad                 (  ) DFW Website                  ( ) TOH Invite/K Strategies       (  ) Plan Room Notice