A Presentation on Solar Power Plant 100 KW Grid-Tie Installed at DG Vaishnav College, Chennai Project Designed, Installed and Implemented by M/S. Solkar Solar Industry Limited Chennai.

Upload: others

Post on 22-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

A Presentation on

Solar Power Plant 100 KW – Grid-Tie

Installed at

DG Vaishnav College, Chennai

Project Designed, Installed and Implemented by

M/S. Solkar Solar Industry Limited Chennai.

Page 2: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 3: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

The College was founded in the year 1964.

The College now has 7 UG and 6 PG (Aided), 12 UG and 11 PG (Self- Supporting) programmes The Campus spread over 25 acres of land spacious and green provides an ambience conducive for higher learning. In the past four decades , the college has seen tremendous growth in its infrastructure and now in the threshold of a massive expansion The college has a dedicated Green initiative team and supports various initiatives for the incorporation of Renewable Energy in the campus.

Page 4: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 5: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Electricity

Page 6: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Diesel Generator

Page 7: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 8: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

10 KW Solar Power Plant installed in the Library Block

Page 9: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Solar Inverter and Battery Bank for

10 KW Solar Power Plant

Page 10: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

1000 LPD Solar Water Heating System – 2 Nos installed in

the Hostel Block

Page 11: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

50 Solar Street Lights in different models around the Campus.

Page 12: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Hon’ble Minister for Electricity Thiru. Natham R. Viswanathan

inaugurating the Solar Systems at the College campus

Page 13: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

DGV College initiative to be the

Pioneering Institution

to follow the directions of

Hon’ble Chief Minister

to Meet

6% Solar Purchase Obligations

Page 14: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

3000 MW by 2015

Solar Purchase Obligation (SPO)

The State will mandate 6% SPO (starting with 3% till

December 2013 and 6% from January 2014) for all

the HT Users (All colleges) and all Commercial LT

Users.

Rooftop ( 350 MW )

Power Purchase – TANGEDCO

( 1000 MW )

REC/SPO ( 1650 MW )

TN Solar Policy

Page 15: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Energy Consumption at DGVC

Particulars

CONNECTED

LOAD (KW)

CONNECT

ED LOAD

(KVA)

MAXIMUM

DEMAND

(KW)

MAXIMUM

DEMAND

(KVA)

Main MV panel 1475.85 1844.81 1033.10 1353.76

Current Connected Load - 1475.85 KW

SPO Obligation 6% - 88.55 KW

Proposed Solar Power Plant - 100.00 KW

Page 16: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 17: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 18: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 19: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 20: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 21: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 22: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 23: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 24: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 25: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 26: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 27: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 28: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 29: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 30: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 31: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 32: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 33: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 34: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 35: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 36: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 37: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 38: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 39: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 40: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 41: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 42: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 43: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 44: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 45: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 46: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 47: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 48: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 49: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 50: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 51: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 52: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 53: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 54: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 55: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 56: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 57: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 58: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 59: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 60: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 61: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 62: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 63: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 64: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 65: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 66: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load
Page 67: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Particulars 100 KW

Solar Module 30 V 250 W 400 Nos

Inverter 100 KW 1 Nos

System Volt 600 V

Output Volt Three Phase 50 Hz

230 – 440 V

System Specification

Page 68: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Particulars 100 KW

Price (in Rs.) 1,40,00,000.00

VAT @ 5% 7,00,000.00

Price after VAT and

Erection Charges 1,47,00,000.00

Less : Subsidy@30% 42,00,000.00

Total System Cost 1,05,00,000.00

Cost Of the Solar Power Plant

Page 69: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Particulars 100 KW

System Cost Rs. 1,05,00,000.00

Maintenance Cost1 Rs. 31,50,000.00

Total Cost Rs. 1,36,50,000.00

Units generated per year2 1,50,000 Units

Generation in 20 Years3 27,00,000 Units

Solar Generation Cost Rs. 5.00

(Rounded Off)

Cost of Generating Electricity from Solar

1 Maintenance cost is worked out at 30% of the System cost including replacement of Inverters in next 20 years. 2 Units generated is calculated at 5 units per day per KW for 10 months in a year. 3 Generation for next 20 years is taken with 10% decrease of output over the years.

Page 70: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Year Solar EB DG

2013 Rs. 5/- Rs. 8/- Rs. 18/-

2014 Rs. 5/- Rs. 9/- Rs. 21/-

2015 Rs. 5/- Rs. 10/- Rs. 24/-

2016 Rs. 5/- Rs. 12/- Rs. 28/-

2017 Rs. 5/- Rs. 14/- Rs. 32/-

Estimated Cost Comparison in next 5 years

Page 71: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Year Units

Generated

from Solar in

a year

Cost Saving

with EB per

unit

Savings

2013 1,50,000 Rs. 8/- Rs.12,00,000/-

2014 1,50,000 Rs. 9/- Rs. 13,50,000/-

2015 1,50,000 Rs. 10/- Rs. 15,00,000/-

2016 1,50,000 Rs. 12/- Rs. 18,00,000/-

2017 1,50,000 Rs. 14/- Rs. 21,00,000/-

Total Savings in 5 Years Rs. 79,50,000/-

The Savings in next 5 years with Electricity

Page 72: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Year Units

Generated

from Solar in

a year

Cost Saving

with DG per

unit

Savings

2013 1,50,000 Rs. 18/- Rs. 27,00,000/-

2014 1,50,000 Rs. 21/- Rs. 31,50,000/-

2015 1,50,000 Rs. 24/- Rs. 36,00,000/-

2016 1,50,000 Rs. 28/- Rs. 42,00,000/-

2017 1,50,000 Rs. 32/- Rs. 48,00,000/-

Total Savings in 5 Year Rs. 1,84,50,000/-

The Savings in next 5 years with DG

Page 73: DG Vaishnav College, Chennai - Solkar · LOAD (KW) CONNECT ED LOAD (KVA) MAXIMUM DEMAND (KW) MAXIMUM DEMAND (KVA) Main MV panel 1475.85 1844.81 1033.10 1353.76 Current Connected Load

Thank You…