DDeep Geologic Repository Joint Review Panel
DGR Joint Review Panel Project Site Visit (June 7, 2012) Report
TUESDAY JUNE 5, 2012 – Surrounding Area
Attendees: Panel Members Stella Swanson, Gunter Muecke, Jamie Archibald; Secretariat Members Kelly McGee, Debra Myles, David Haddon
Purpose: Introduction of Panel Members to the area south, surrounding and north of the Bruce Nuclear site
Chronology: The attendees departed Kincardine in the mid-afternoon and travelled in a single passenger van to view the following locations:
1. Through Tiverton to Inverhuron Provincial Park 2. Area directly surrounding the Bruce Nuclear site3. Brucedale Conservation Area 4. MacGregor Point Provincial Park5. Port Elgin
THURSDAY JUNE 7, 2012 – Project Site
Attendees: See Attachment 1 – Itinerary
Purpose: Introduction of Panel Members to the Bruce Nuclear Site; orientation to the proposed project site and proposed location of project components; viewing of core samples (see Attachment X – Core Intervals Requested for Viewing); viewing of Baie de Doré
Chronology: See Attachment 1 – Itinerary
REPORT ATTACHMENTS
Attachment 1 – ItineraryPage 3-4
Prepared by OPG based on the standard for DGR Project site tours with modification to some stop intervals at the request of the Panel (i.e. extend core storage facility stop time)
DGR JRP Project Site Visit Report
Page 1 of 19
Attachment 2 – Tour StopsPage 5
Figure showing tour stops and other features on the site provided by OPG
Attachment 3 – OPG PresentationPage 6-13
Slides from the presentation delivered by OPG prior to core sample viewing
Attachment 4 – Core SamplesPage 14
Table of core intervals requested by the Panel for viewing; revised list provided to OPG on June 1, 2012.
Attachment 5 – StratigraphyPage 15
Bruce Nuclear Site Stratigraphic Overview; figure provided as a handout to the Panel by OPG
Attachment 6 – PhotographsPage 16-19
Photographs taken by the Panel
DGR JRP Project Site Visit Report
Page 2 of 19
1
OPG’s L&ILW Deep Geologic Repository ProjectJoint Review Panel Member Site Tour
June 7, 2012(8:15 am – 1:30 pm)
Meet at Bruce Power’s Visitor’s Centre, 3394 Bruce Road 20, Tiverton, ON
Itinerary
Stop # Time Location Feature1. 8:15 Bruce Power Visitor’s
CentreWelcome and IntroductionsOverview of Bruce nuclear siteSecurity clearance
2. 8:45 Stream C Point at which Stream C enters the Bruce nuclearsite
3. 9:00 Core Storage Facility Viewing of core samplesPreview of Western Waste Management Facilitytour
4. 10:15 Western WasteManagement Facility
Low level storage buildingsCrossing point to DGR site locationILW In ground containersQuadricellsSteam generator storage buildingRefurbishment waste storage building
5. 11:30 DGR Surface Facilities Locations of future buildings and waste rock pilePast uses of site locationCurrent site activitiesNorth wetland
6. 11:45 Stormwater managementpond
Location of stormwater management pondDitches and site drainage
7. 12:05 Macpherson’s Bay DGR site drainage point to Lake Huron
8. 12:20 Stream C/Railway ditchesintersection
Point at which the north and south railway ditchesjoin with Stream CSouth wetland
9. 1:00 Drill Site #1 Drill site for boreholes DGR 1, DGR 2 and DGR 5
10. 1:15 Baie du Doré Exit point for Steam C into Lake Huron
11. 1:30 Bruce Power Visitor’sCentre
End of tour
Notes:a) Please ensure you bring government issued photo identificationb) Please dress weather appropriate with appropriate footwear (hardhats, safety glasses and vests
will be provided)c) Photos are permitted with some restrictions
DGR JRP Project Site Visit Report APPENDIX 1 - Itinerary
Page 3 of 19
2
Participants:
Joint Review PanelStella SwansonJames ArchibaldGunter Muecke
JRP SecretariatKelly McGeeDebra MylesDavid HaddonRobyn Lynne Virtue
Ontario Power GenerationGord SullivanLise Morton
Nuclear Waste Management OrganizationFrank KingDerek WilsonDiane BarkerMark JensenMarie Wilson
DGR JRP Project Site Visit Report APPENDIX 1 - Itinerary
Page 4 of 19
DG
R JR
P P
roject Site V
isit Report A
ppendix 2 - Tour Stops
Page 5 of 19
DGR Joint Review Panel Site Tour of OPG’s Western
Waste Management
Facility (WWMF)
June 7, 2012
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 6 of 19
NO
TE-P
hotosin
thispresentation
donotrepresentthe
sitesorcom
ponentsview
edby
theJointR
eviewP
anel
2
WWMF Overview• Established in 1974 as a centralized site for
processing and storage of all OPG’s L&IL radioactive waste
• Also hosts Western Used Fuel Dry Storage Facility
• WWMF (L&ILW) currently consists of:• A radioactive waste incinerator and low-force compactor• 12 low level storage buildings (LLSBs)• Various in-ground storage structures• 1 steam generator storage building• 1 refurbishment waste storage building
2
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 7 of 19
3
Low Level Waste
• Consists of contaminated materials which can be handled without shielding• Contact dose rates up to 10 mSv/hr on receipt, but generally much lower
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 8 of 19
4
Intermediate Level Waste
• Consists of spent ion-exchange resins, spent filters, irradiated core components which require shielding to minimize occupational dose• Contact dose rates above 10 mSv/hr on receipt
• In-ground containers for IX resin containers
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 9 of 19
5
Refurbishment Waste• Refurbishment waste consists of sectioned pressure tubes, calandria tubes, end fittings and shield plugs removed from Bruce reactors• Photo shows stainless steel containers with refurbishment waste at WWMF
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 10 of 19
6
Steam Generator Waste
• Steam generators removed from Bruce reactors during reactor refurbishment• Photo shows inside of Steam Generator Waste Storage Building at WWMF
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 11 of 19
7
Western Waste Management Facility
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 12 of 19
8
WWMF Tour Safety Briefing
DG
R JR
P P
roject Site V
isit Report A
PP
EN
DIX
3 - OP
G P
resentation
Page 13 of 19
Formation Drill Hole Core Box Core Interval(mBGS)
Georgian Bay DGR-4 CR-175 551.90 - 555.03" DGR-4 CR-192 600.78 - 603.83" DGR-5 CR-128 581.45 - 584.50" DGR-5 CR-148 642.45 - 645.50
Blue Mountain(upper member)
DGR-4 CR-201 625.18 - 628.23
" DGR-5 CR-153 657.70 - 660.75
Blue Mountain(lower member)
DGR-4 CR-210 649.58 - 652.46
" DGR-5 CR-162 685.15 - 688.20
Cobourg(Collingwood Member)
DGR-4 CR-211 652.46 - 655.51
" DGR-4 CR-213 655.68 - 658.73" DGR-5 CR-168 700.40 - 703.45" DGR-5 CR-169 703.45 - 706.50
Cobourg(Lower Member)
DGR-4 CR-216 664.83 - 667.88
" DGR-4 CR-221 680.08 - 683.13" DGR-5 CR-171 709.55 - 712.60" DGR-5 CR-177 727.85 - 730.90
DGR 4 vertical 143 mm DGR 5 inclined 60-65 degrees 143 mm
Please also put out boxes of typical runs of the younger formations, so we can see them if time permits.
June 1, 2012 REVISED TABLE
DGR JRP Project Site Visit Report APPENDIX 4 - Core Samples
Page 14 of 19
DGR JRP Project Site Visit Report APPENDIX 5 - Stratigraphy
Page 15 of 19
DGR JRP Project Site Visit Report APPENDIX 6 - Photos
Page 16 of 19
DGR JRP Project Site Visit Report APPENDIX 6 - Photos
Page 17 of 19
DGR JRP Project Site Visit Report APPENDIX 6 - Photos
Page 18 of 19
DGR JRP Project Site Visit Report APPENDIX 6 - Photos
Page 19 of 19