    Supply, Processing & Distribution February 2010

    TABLE OF CONTENTS

    Section 1 Foreword &AcknowledgmentsIntroductionAbbreviationsLegend of Symbols

    Section 2 NarrativeGeneral ConsiderationsTechnical Considerations

    Architectural ConsiderationsEngineering ConsiderationsConcerns Specific to Supply,Processing & Distribution

    Section 3 Functional DiagramsRelationship Diagrams andGeneric Layout

    Section 4 Guide Plates (typical order)Floor PlanReflected Ceiling PlanDesign StandardsEquipment Guide List

    Section 5 AppendixGlossary of TermsSEPS / Cross-ReferenceGuide Plate Index

    TABLE OF CONTENTS

  • 7/24/2019 dgSPD-01

    3/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    TABLE OF CONTENTS

  • 7/24/2019 dgSPD-01

    4/43

    Supply, Processing & Distribution February 2010

    Section 1

    Foreword & Acknowledgements

    Page

    Foreword..1-1

    Acknowledgements1-3

    Abbreviations..1-7

    Introduction.............1-5

    Legend of Symbols....1-9

    FOREWORD & ACKNOWLEDGEMENTS CONTENTS SECTION 1

  • 7/24/2019 dgSPD-01

    5/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    FOREWORD & ACKNOWLEDGEMENTS CONTENTS SECTION 1

  • 7/24/2019 dgSPD-01

    6/43

    Supply, Processing & Distribution February 2010

    Foreword

    The material contained in the Supply, Processing & Distribution Department Design Guide is theculmination of a partnering effort within the Department of Veterans Affairs by the VeteransHealth Administration and the Office of Construction & Facilities Management, StrategicManagement Office. The goal of this Design Guide is to facilitate the design process and toensure the quality of VA facilities while controlling construction and operating costs.

    This document is intended to be used as a guide and to supplement current technical manualsand other VA criteria in planning Supply, Processing & Distribution Departments. The DesignGuide is not to be used as a standard design. Use of the Design Guide does not preclude theneed for a functional and physical design program for each specific project. It is theresponsibility of the Project Architect and the Project Engineer to develop a complete andaccurate project design that best meets the users needs and applicable code requirements.

    Lloyd H. Siegel, FAIADirector, Strategic Management OfficeOffice of Construction & Facilities ManagementWashington, DC

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-1

  • 7/24/2019 dgSPD-01

    7/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-2

  • 7/24/2019 dgSPD-01

    8/43

    Supply, Processing & Distribution February 2010

    Acknowledgements

    Credit is due to the following individuals whose guidance, advice, and effort made thispublication possible:

    Office of Construction & Facilities Management

    Donald H. Orndoff Director, Office of Construction & Facilities Management

    Lloyd H. Siegel, FAIA Director, Strategic Management Office

    Kurt Knight, PE Chief, Facilities Quality Service, FQS

    Donald L. Myers, AIA, NCARB Senior Architect, Consulting Support Service

    Satish Sehgal, PE Senior Mechanical Engineer, FQS

    Mulraj Dhokai, PE Senior Mechanical Engineer, FQS

    Alejandra De La Torre Architect, Facilities Quality Service

    Advisory Group

    Bobby Osburn SPD Executive Program Director

    Tommy C. Stewart Director, Clinical Programs

    Consultants

    N.K. Bhandari Architecture & Engineering, P.C.

    James Resig, PE, LEED AP

    Jennifer Thayer, AIA

    Francis Cauffman RAM-TECH Engineers, P.C.

    Stephen Hegeman, AIA Ravi Raman, PE

    Catherine Gow, AIA Tim Myers, PE, LEEDAP

    Sharon Doyle Fred Sanczawa, PE

    Gloria Cascarino

    Suzanne Campano

    Jessica Hawk

    Gina DeMatteis

    Erin Disbrow

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-3

  • 7/24/2019 dgSPD-01

    9/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-4

  • 7/24/2019 dgSPD-01

    10/43

    Supply, Processing & Distribution February 2010

    Introduction

    The Supply, Processing, & Distribution Department Design Guide was developed as a design

    tool to assist the medical center staff and the contracting officers in better understanding thechoices that designers ask them to make, and to help designers understand the functionalrequirements necessary for proper operation of Supply, Processing, & Distribution (SPD)Departments based in a VA Hospital.

    The Design Guide is intended to be a graphic consolidation of existing Department of VeteransAffairs standards and criteria. It contains data from the following sources:

    ADA Standards for Accessible DesignInternational Building Code, 2006

    NFPA 101Barrier-Free Design Guide PG-18-13

    Design and Construction Procedures PG-18-3Equipment Guide List PG-18-5Equipment Reference Manual PG-18-6Fire Protection Design ManualMaster Construction Specifications PG-18-1National CAD Standards and Details PG-18-4Physical Security Design Manual (Final Draft)Room Finishes, Door Hardware Schedules PG-18-14Seismic Design Requirements H-18-8Signage Design GuideSpace Planning Criteria for VA FacilitiesSustainable Design and Energy Reduction Manual (Final Draft)

    VA Technical Criteria (PG-18-10 Design Manuals) pertaining to Architectural,Interior Design, HVAC, Plumbing, and Electrical

    2006 AIA Guidelines for Design and Construction of Health Care FacilitiesHVAC Design Manual for Hospital ProjectsEmergency Power & Water Supply During Natural Disasters, Phase 2Energy Conservation (EPACT 2005 and DOE Final Rule)Energy Conservation (Executive Order No. 13423 Dated January 24, 2007:

    Strengthening Federal Environmental, Energy and TransportationManagement)

    Memorandum of Understanding (MOU): Federal Leadership in High Performanceand Sustainable Buildings.

    Commissioning Guidelines (issuance pending)

    The Design Guide refers to the above mentioned sources when data is either too detailed or toobroad to be included in this guide. These sources can be accessed at www.cfm.va.gov/til.

    This Design Guide is not intended to be project-specific. It addresses the general functional andtechnical requirements for typical VA SPD Departments. While this Guide contains informationfor the vast majority of space types required in an SPD Department, it is not possible to foreseeall future requirements. The project-specific space program is the basis for an individual projectdesign. It is important to note that the guide plates in Section 4 are generic graphic

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-5

    http://www.cfm.va.gov/tilhttp://www.cfm.va.gov/til
  • 7/24/2019 dgSPD-01

    11/43

    Supply, Processing & Distribution February 2010

    representations intended as illustrations of VAs furniture, equipment, and personnel spaceneeds. They are not meant to limit design opportunities.

    Equipment manufacturers should be consulted for actual dimensions and utility requirements.

    Use of this Design Guide does not supersede the project architects and engineersresponsibilities to develop a complete and accurate design that meets the users needs and theappropriate code requirements within the budget constraints.

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-6

  • 7/24/2019 dgSPD-01

    12/43

    Supply, Processing & Distribution February 2010

    Abbreviations

    A Amperes

    ABA American Barriers ActAC/HR Air Changes per Hour

    ADA Americans with Disabilities Act

    AFF Above Finished Floor

    AI Acquisition and Installation

    AIDS Acquired Immune DeficiencySyndrome

    A & MM Acquisition and MaterialManagement

    AR As Required

    AT Acoustical Ceiling Tile

    AT (SP) Acoustical Ceiling Tile(with Sprayed Plastic Finish)

    BC Base Cabinet

    C Degrees Celsius

    CB Circuit Breaker

    CBOC Community Based OutpatientClinic

    CC Contractor FurnishedContractor Installed

    CF Construction Funds For VAFurnishing of Equipment and/orInstallation

    CFM Cubic Feet per Minute

    CLG Ceiling

    OCFM Office of Construction & FacilitiesManagement

    CMU Concrete Masonry Unit

    CPT Carpet Tile

    CRS Corrosion Resisting Steel (SS)

    CS Construction Standard

    CT Ceramic Tile

    CT Computerized Tomography

    DG Design Guide

    DS Door Switch

    EMS Environmental ManagementService

    ER Emergency Room

    ETM Exam Treatment Module

    EtO Ethylene Oxide Gas

    EXH Exhaust

    F Degrees Fahrenheit

    FC Foot-candle

    FD Floor DrainFIXT Fixture

    FLUOR Fluorescent

    GFI Ground Fault Circuit Interrupter

    GWB Gypsum Wallboard Systems

    HAC Housekeeping Aides Closet

    HIV Human Immunodeficiency Virus

    HP Horsepower

    HR Hour

    HVAC Heating, Ventilating, and AirConditioning

    ICU Intensive Care Unit

    K Kelvin

    KW Kilowatt

    LB Pound/Pounds

    LLTS Lockers, Lounges, Toilets &Showers

    MCS Master Construction Specifications

    MOHS Mohs Chemosurgery

    MTDD Mounted

    NA Not Procured with Activation Funds

    NSF Net Square Feet

    NSM Net Square Meters

    OSD Open Site Drain

    P Paint (Exterior and Interior;Transparent, Semi-Transparent, andOpaque Finishes)

    PACS Picture Archiving andCommunication System

    PCP Portland Cement Plaster

    PEC Primary Engineering ControlPG Program Guide

    PH Phase

    PL PlasterPPE Personal Protective Equipment

    PREP Preparation

    PT Porcelain Tile (Floor and Base)

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-7

  • 7/24/2019 dgSPD-01

    13/43

    Supply, Processing & Distribution February 2010

    PSIG Pounds per Square Inch Gauge

    QT Quarry Tile

    RB Resilient Base

    RES Resinous FlooringRES-W Resinous/ Epoxy Wall/ Ceiling

    RSF Resilient Sheet Flooring

    SC High Build Glazed Coating(Special Coating)

    SD Standard Detail

    SF Square Feet, Square Foot

    SOPC Satellite Outpatient Clinic

    SP Special Faced

    SPD Supply, Processing and

    DistributionSVT Solid Vinyl Floor Tile (Luxury Vinyl

    Tile)

    SRC Semi-Restricted Corridor

    SS Stainless Steel

    TELEC Telecommunications

    UC Urgent Care

    UFAS Uniform Federal AccessibilityStandards

    UPS Uninterruptible Power Supply

    V VoltsVA Department of Veterans Affairs

    VACO Veterans Affairs Central Office

    VAMC Veterans Affairs Medical Center

    VC VA FurnishedContractor Installed

    VCT Vinyl Composition Tile

    VHA Veterans Health AdministrationVV VA Furnished and Installed Medical

    Care Application for Equipment andInstallation

    W Watts

    WSF Welded Seamless Flooring (HeatWelded with Rod)

    W/SF Watts per Square Foot

    W/m2

    Watts per Square Meter

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-8

  • 7/24/2019 dgSPD-01

    14/43

    Supply, Processing & Distribution February 2010

    Legend of Symbols

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-9

  • 7/24/2019 dgSPD-01

    15/43

    Supply, Processing & Distribution February 2010

    Legend of Symbols

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-10

  • 7/24/2019 dgSPD-01

    16/43

    Supply, Processing & Distribution February 2010

    Legend of Symbols

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-11

  • 7/24/2019 dgSPD-01

    17/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    FOREWORD & ACKNOWLEDGEMENTS SECTION 1-12

  • 7/24/2019 dgSPD-01

    18/43

    Supply, Processing & Distribution February2010

    Section2

    Narrative

    Page

    GeneralConsiderations....2-1

    TechnicalConsiderations.2-3

    ArchitecturalConsiderations2-5

    ConcernsSpecifictoSupply,

    EngineeringConsiderations.......2-11

    Processing&Distribution...2-15

    NARRATIVE CONTENTSSECTION2

  • 7/24/2019 dgSPD-01

    19/43

    Supply, Processing & Distribution February2010

    Thispageintentionallyleftblank.

    NARRATIVE CONTENTSSECTION2

  • 7/24/2019 dgSPD-01

    20/43

    Supply, Processing & Distribution February2010

    General Considerations

    General Planning Concepts

    Flow with Sequence: Supply,Processing,andDistribution(SPD)areorganizationallyalignedundertheNurseExecutive/ChiefNurse.ThemissionofSPDistoprovideasteadyflowofpatientcaresuppliesandequipmenttopointsofneed,andtoreturncontaminateditemstoacentraldecontaminationareaforcleaning.

    SPDisthefirstlineofdefenseagainstharmfulmicroorganisms.Contaminationpreventionisachievedbycloselymonitoringthefollowingelements:

    Air Flow: Tominimizemicroorganismmovementfromdirtytocleanareas.Incleanareasthereisapositiveairflow.

    Staff Flow: PersonnelworkeitheronthecleansideorthedirtysideoftheSPDunittoavoidcrosscontamination.

    Work Flow:Referstothemovementofclean(sterile)suppliesandthereturnofcontaminateditemsfordecontaminationandsterilization.

    Adjacencies: SPDmustbecloselyaffiliatedwithsurgicalproceduresuites.SPDmaybedirectlyconnectedtothesterilesupportcorefortheSurgicalSuite,ormaybelocatedwithconvenientanddirectaccessviacartliftsand/orstaffcirculation.

    Processing and Distribution Methods

    SPDisdividedintothreemainunits/areas.ThefirstunitisDecontamination,whereallreusablemedicalandsurgicalitemsaresentforcleaning.Itisessentialthatcontaminatedmaterialsdonotusethesamepathasthecleanmaterials.ThesecondunitisPreparation.Inthisunit,itemsareinspectedandpackagedforsterilization.Moststerilizationisaccomplishedbyusingsteam;or,inthecaseofmaterialsthatcannotwithstandintensetemperatures,ethyleneoxide(EtO)gas(oranothersuitablegas)isused.MaterialsundergoingEtOsterilizationmustbeadequatelyaeratedtoensurethatnohazardoustracesareleftondevices.ThefinalunitinSPDinvolvestheDistributionProcess,includingdistributingsurgicalcasecarts.ThisunitisfurthersubdividedintoPrimaryStockandSecondaryStock.PrimaryStockreferstothesuppliesthatarestoredwithintheconfinesoftheSPDdepartment.SecondaryStockmaterialsarethoseinuserareas

    suchasclinics,nursingcareunits,andintensivecareunits.

    NARRATIVE SECTION2-1

  • 7/24/2019 dgSPD-01

    21/43

    Supply, Processing & Distribution February2010

    Current Trends

    AcurrenttrendimpactingSPDistheincreasingcomplexityofmanysurgicalproceduressuchaslaparoscopy,endoscopy,laser,micro-vascular,andmorecomplexsurgeries.These

    complicatedsurgeriesrequiremorecomplicatedinstrumentation.ThiscomplexinstrumentationhasledtothetrendforSPDtechnicianstobecertified,thusrequiringthestafftohaveacertainlevelofcompetencyandtokeepupwithperiodic/annualcontinuingeducation.

    AnothercurrenttrendinSPDisinstrumenttracking.Thiscaneliminatehoursofsearchingforlostinstruments,locationofkeyassets,trackingloanerequipment,andensuringpatientsafetyandthequestforzeronevereventsthroughthevalidationofsterilizationprocesses.

    Future SPD Trends

    AnanticipatedfutureSPDtrend,sustainabledecontaminationandsterilizationequipmenthas

    beenembracedbymanymanufacturerswhoarereviewingtheenvironmentalimpactoftheproductlines,anddevelopingmachinesthataresaferforthestaffandkindertotheenvironment.Examplesincludeequipmentfeaturesthatyieldsignificantwatersavings,theuseoffewertoxicorless-toxicchemicals,etc.

    Otherfuturetrendsincludestricterprotectionofhealthcareworkers,sincepathogenicorganisms(HepatitisBorC,andHumanImmunodeficiencyVirus(HIV))havebecomeknown.

    Special Considerations

    EtO: Theprovisionofethyleneoxide(EtO)gas(oranothersuitablegas)mayberequiredto

    sterilizeselectedinstrumentationthatisunabletosustainthehighheatofsteam-basedsterilizationprocessing.Becauseofthehightoxicityofthesterilizingagentusedinthisprocess,EtOsterilizationmustbesustainedinafullycontainedroomthatispartofthePrep,Assembly,andSterilizationspace.

    Location of Bulk Storage: Bulkstorageiswheresuppliesarereceivedincaselotsfromthewarehouse,primevendorandothersources.TheBulkStorageshouldbelocatedneartheSPDClean/SterileStorageareaandconnectedtotheSPDBreakout.Nosuppliesaretobeinthisarea;lowunitofmeasure.(Note:Hospitalsterilizeditems,includinginstrumentsets,willnotenterthisarea.)

    Endoscope Processing: Endoscopesmayberigidorflexible.RigidEndoscopesaretypically

    sterilizedwiththesamevigorandcareasthesurgicalinstrumentation.FlexibleEndoscopestypicallyrequireminimumhigh-leveldisinfectionandoccurincloseproximitytowheretheprocedureisperformed(i.e.,GISuite).However,someSPDsuitesmayneedtoaccommodatethereprocessingofFlexibleEndoscopes.ThiswillrequirededicatedEndoscopeReprocessors.

    NARRATIVE SECTION2-2

  • 7/24/2019 dgSPD-01

    22/43

    Supply, Processing & Distribution February2010

    Technical Considerations

    Natural Disasters

    Hurricanes,tornados,earthquakes,andfloodsarenaturalphenomenathatoccurwithinregionalareasofdesignatedprobability.Designsolutionsshouldaddresstheseprobabilitieswheretheyoccurtomitigatebuildingdamageandlossoflifewhereverpossible.Selectionofbuildingsitesshouldavoidfloodplainsorfloodproneareas.Regionalareassusceptibletohurricanesshouldincorporatedesignfeaturesthatmitigatedamageassociatedwithhighwinds,wind-drivenrainandprojectiles.Tornadodesignmitigationissimilartohurricanes;however,muchmorelocalizedandintensiveinnature.BuildingsinareaswithprobabilityofearthquakesneedtobeseismicallyrestrainedinaccordancewithH-18-8SeismicDesignRequirements.

    Becauseofitscriticalmissioninsupportingsurgicalprocedures,theSPDshouldbeplannedtoallowascontinuousanoperationaspossibleduringandimmediatelyafternaturaldisasters.

    Interior Materials, Finishes and Doors

    Theinteriormaterials,finishesanddoorsshallfollowguidanceinPG-18-10,ArchitecturalDesignManualandPG-18-14,RoomFinishes,DoorandHardwareSchedule.TheGuidePlateforeachspaceincludesalistingofdesigncriteriaapplicabletothatspace.

    Contemporary Advancements/Evidence Based Design

    Accessibility:AccessibilityisaccommodatedbytheapplicationofPG18-13,VABarrierFree

    DesignGuide;ArchitecturalBarriersActAccessibilitystandards(ABAAS),AppendicesCandDto36CFR,andADAStandardsforAccessibleDesign(28CFRpart36)tospaceandfixedequipmentlayouts.

    NARRATIVE SECTION2-3

  • 7/24/2019 dgSPD-01

    23/43

    Supply, Processing & Distribution February2010

    Thispageintentionallyleftblank.

    NARRATIVE SECTION2-4

  • 7/24/2019 dgSPD-01

    24/43

    Supply, Processing & Distribution February2010

    Architectural Considerations

    Location of SPD

    SeveralfactorsinfluencethelocationoftheSPD.Theseinclude:

    Access to the OR: Insomecircumstances,thesteriledeliverysideoftheSPDcanbedirectlylinkedwithasterilecoreoftheOR,allowingadirecttransferofmaterialsandinstrumentationandminimizingtransporttime.

    Asanalternative,theSPDcanbelocatedonanotherlevel.TheSPDmaybelinkedviacleanandsoiledcartlifts.DedicatedcleanandsoiledcartliftsneedtoarriveandleaveatappropriatelocationswithintheSPD,andcannotbeusedforanyotherfunction,norcanasingleliftbeusedforbothcleanandsoiledtransport.Cleanandsoileddumbwaitersmaybeanalternative,but

    arenotanidealsolutioninnewconstructionastheyrequirethetransferofitemsontothedumbwaiter,thenoffatthepointofdestination,whilethecartliftallowsforthetransportofafullyloadedcart.

    Access to Loading Dock: TheSPDreceivesfreshsuppliestostore,inventory,anddistributetoaugmentinstrumentationthatisthenusedtostocksupplyorcasecarts.Accesstotheloadingdockneedstobestraightforwardandsimpletoallowtherepeatedandconsistentdeliveryofmaterial.Iftheloadingdockisonadifferentlevelofthefacility,caremustbetakentoplantheentireroutefromthedocktotheSPD,confirmingcorridorwidth,elevatorsize,etc.

    Environmental Requirements

    EnvironmentalconsiderationsmostcriticaltoSPDare:temperature,humidity,ventilation,light,andprotectionfromcontaminants.

    Facilitydesigniscrucialtotheefficiencyandeffectivenesswithwhichtheseneededenvironmentalconditionsaremet.Designfeaturesdeservingparticularattentioninclude:

    Separationofsoiledareasfromcleanareas Restrictedareas ContainmentareaforEtOgas Heating,ventilation,andairconditioning(HVACSystems) Roomrelationships(regardingfunctionandstaffutilization)

    Modularityofdesign/flexibility Interiorsurfacesandfinishes

    NARRATIVE SECTION2-5

  • 7/24/2019 dgSPD-01

    25/43

    Supply, Processing & Distribution February2010

    Space Planning Criteria

    SpaceplanningcriteriaforSPDincludesthefollowingconsiderations:

    Quantity of Space:Thequantityofspacewillbedrivenbythetotalthrough-putneedsoftheSPD,whichis,inturn,drivenbythesurgicalvolumesandsurgicalproceduremix.Keyfactorsindeterminingtotalsizewillbethetotalnumberofsterilizersneededandthetotaldailythroughputofinstrumentationcarts.TherelationshipbetweensurgicalvolumesandSPDthrough-putisdirect;iftheORsareplannedtoexpand,theSPDneedstohavecorrelativecapacity.

    Location of Space: TherelationshipbetweenSPDandtheORSuitesiscritical,aspreviouslynoted.Inaddition,aclearpathfromloadingdockstotheSPDisessential.

    Quality of Space: Thespaceitselfmustbeabletoprovideanappropriatelycleanenvironmentforthehandlingofsoiledinstrumentationandsterileinstrumentationandsupplies.Mechanical,

    electrical,andplumbingrequirementsaredefinedunderEngineeringConsiderations.Inaddition,finishesmustrespondtotheneedtobeabletocleantheenvironmentappropriately.

    Room Relationships & Adjacencies

    OneoftheprimarypurposesoftheSPDistodeliverclean/sterilesuppliesandinstrumentationtotheOR.Itdoessobyreceivingandcleaningsoiledinstrumentationandbystagingandassemblingsterileinstrumentationandclean/sterilesuppliesfordeliverytosurgicalsitesandotherareasthatrequiresterileimplementationwithinthehospital.Indoingso,itmustpromoteefficientdeliveryofmaterialwhilemaintainingthecleanandsterilestatusofinstrumentationandsupplies.Thefourkeyspacesaresequentiallylinked,andinclude:

    Decontamination: SoiledinstrumentationarriveshereasthefirststageintheSPDprocess.Soiledinstrumentationisreceivedviaclosedcasecartsthatmayreturnviaelevators,dedicatedcartlifts,ordumbwaitersdirectlytotheSoiledReceivingandDecontaminationRoom.

    Preparation, Assembly, and Sterilization Area:ThisroomisdirectlyconnectedtoDecontamination.Equipmentpassesthroughawasherdecontaminatorthatallowsthetransferofinstrumentationthroughthewasher/disinfectororsterilizertothePreparation,Assembly,andSterilizationArea.Accessforsterilizermaintenancemustbeprovided,andtheremaybeapass-throughwindowforsmallitems.

    Clean and Sterile Storage: ThisroomisdirectlyconnectedtothePrep,Assembly,and

    SterilizationRoomandisusedtostoreandpicksterilizedinstrumentationandsterilesuppliesfordeliverytothepointofuse.

    Staff Support:ThesespacesservetoprovideadministrativeandbreaksupportforSPDstaff.

    ItiscriticaltothefunctionalefficiencyandsafetyoftheSPDthatthesespacesaresequentiallylinkedforone-wayflow-throughofinstrumentationandcarts.Thispromotesthemaintainingofthesterilestateofinstrumentationasitiscleanedforre-use.

    NARRATIVE SECTION2-6

  • 7/24/2019 dgSPD-01

    26/43

    Supply, Processing & Distribution February2010

    Functions of Areas within SPD

    Clean Receiving and Breakout Area: Thisspaceservesasanareatoreceiveandbreakoutdisposablesuppliesreceivedfromthewarehouse,primevendor,ormanufacturers.Thisareais

    alsowherespecialtycartssuchascrash/codecartsandisolationcartsarereturnedafteruseforthesuppliestoberemovedbeforetheemptycartistakentotheDecontaminationAreaforcleaning.Thisareaisalsousedtoreceiveloanerinstrumentsandequipmentandforthemtobepickedup.Consignmentsuppliesandimplantsaretobereceivedhere,aswell.

    Anteroom: Thisspaceservestomaintainproperairpressurerelationshipswhenpersonnelmovebetweenadjacentspaces.

    Decontamination Area:Thisincludesstagingspaceandcirculationspacedesignedtoallowforthegrossdecontaminationofinstrumentation,followedbytheplacementoftheinstrumentationonawasherdecontaminatorthatwilldelivercleaninstrumentationtothePrep,Assembly,andSterilizationRoom.Inaddition,thereisapass-throughwindowforselecteditemsthatareeithertoodelicateorwillnotfitwillbedirectedtotheEtOSterilizerinthePrep,Assembly,andSterilizationroom.

    Automatic Cart Washer: Thisroomhousestheequipmentthatreceivessoiledcarts,washesthem,anddeliversthemtotheCleanandSterileStorageRoom.

    Detergent/Water Treatment Room: Supportsthewasherdisinfectors,sterilizers,andcartwashers.

    Decontamination HAC:Inordertomaintainclarityofcleanliness,theDecontaminationAreahasadedicatedHousekeepingAidesCloset,accessedonlyfromtheDecontaminationArea

    andusedonlyforcleaninginthatspace

    Staff Lockers/Showers: One-wayflow-throughstafflockersareprovidedtoensurethatDecontaminationstaffarrive,dressandworkwithintheDecontaminationareawithoutcross-contaminatingotherspacesorpubliccorridors.SeparatelockersaretobeprovidedforstaffworkinginthePrep,Assembly,andClean/SterileStorageRooms.

    Manual Equipment Washer Room:Spaceformanualcleaningofreusableequipment.

    Soiled Cart Lift: Ifaliftisusedforthemovementofsoiledcarts,thesoiledcartliftmustdeliverthesoiledcartdirectlytotheDecontaminationarea.Soiledcartsmustberestrictedtothesoiled

    cartlift.

    Clean Cart Lift: Ifaliftisusedforthemovementofcleancarts,thecleancartliftmustdeliverthecleancartdirectlytotheSurgerysuitesterilestoragespace.Cleancartsmustberestrictedtothecleancartlift.

    Prep, Assembly, and Sterilization:Thisroompreps,assembles,andsterilizesequipmentandinstrumentation.Instrumentationarrivesthrough-wallwasher/sterilizersorsterilizers;other

    NARRATIVE SECTION2-7

  • 7/24/2019 dgSPD-01

    27/43

    Supply, Processing & Distribution February2010

    selecteditemsmayarriveviaawindowpass-through.TheroomdecantspreppedandpackedsterilizedinstrumentsintotheClean/SterileStorageRoom.Aspartofitsfunction,thePrep,Assembly,andSterilizationRoomhasanEtOSterilizer,usedfordevicesthatcannotwithstandsteamsterilizationduetotemperatureormoisture.

    Clean/Sterile Storage: Thisroomcontainsanumberoffunctionsthatsupportthestagingandstorageofcleanandsterilesuppliesfordistributiontopointofservice.Thosefunctionalzonesinclude:

    Case Cart Holding:ThisareaispositionedimmediatelyadjacenttothedeliverydoorfromPrep,Assembly,andSterilizationtofacilitatetheassemblyofcasecartswithspecificsterilepacksforcasecarts.

    Equipment Storage and Testing: Thisarea,positionedtoreceivecleanedcartsandcleanedmedicalequipment,accommodatesthetestingandstorageofequipmentandthetemporaryqueuingofcarts.

    Case Cart Area:ThisareastoresandstockscleansupplydedicatedforORuse.Thesesupplieshavebeenbrokenouttoaccommodatefinalstockingoncasecartsorotherdedicatedcartdeliverysystems.

    Dispatch/Control:Theseworkstationsaccommodatestaffthatdirecttheflowofcasecartsandcleaned/testedequipmenttopointofuse.

    Inaddition,thereareseveralroomsthathaveadirectrelationshiptoClean/SterileHoldingwithallofitsworkzones.Theseinclude:

    Receiving and Breakout Room:Thisroomallowsforthearrivalofcleansuppliesandthebreakingoutofthosesuppliesfromshippingcartonsandboxes.PackingdebrisshouldberemovedwithoutenteringtheClean/SterileHoldingRoom.Spaceforinventorymanagementisprovidedinthisspace.

    Bulk Storage:ThisroomallowsforthequeuingofthestorageReceivingandBreakoutRoompriortounpackingandstockingshelvingintheClean/SterileStorageRoom.

    Staff Lockers: DedicatedlockersandatoiletareprovidedforstaffworkingwithinthePrep,Assembly,andSterilizationRoomandtheClean/SterileSupplyStorageArea.Thisdedicatedone-wayflowthroughlockerroomisdesignedtopromotethemaintenanceofthecleanenvironmentinbothmajorrooms.

    Support Spaces: ThereareseveralfunctionsthatsupportthecoremissionoftheSPD.Theseinclude:

    Staff Break Room/Conference Room: TheStaffBreakRoom/ConferenceRoomisdesignedtoservestaffworkingwiththeSPD.StaffusingthisBreakRoom/ConferenceRoommustreturntotheirrespectiveworksiteswithattentiontocleaningandgowningprotocolssuitableforeachkeyspace.

    NARRATIVE SECTION2-8

  • 7/24/2019 dgSPD-01

    28/43

    Supply, Processing & Distribution February2010

    Administrative Space:ThreeofficesareprovidedforSPDstaff.Theseofficesareaccessedfromthepubliccorridor.Asadministrativestaffmoveintospecificrooms,theymustdosothroughtherespectiveone-wayflow-throughlockers.

    NARRATIVE SECTION2-9

  • 7/24/2019 dgSPD-01

    29/43

    Supply, Processing & Distribution February2010

    Thispageintentionallyleftblank.

    NARRATIVE SECTION2-10

  • 7/24/2019 dgSPD-01

    30/43

    Supply, Processing & Distribution February2010

    Engineering Considerations

    Mechanical (Heating, Ventilating, and Air Conditioning)

    Anadequateheatingandventilatingandairconditioning(HVAC)systemisacriticalelementinplanningforSPDandrequirescarefulevaluation.Maintenanceofspaceairflowsandrelativeairpressurizationstocontaincontaminationandtomaintaincleanenvironmentsisacriticalaspectofthesystem.TheMechanicalEngineershouldcoordinatewiththeArchitectandequipmentspecialistsinordertoaccommodatesterilizingequipmentspecifiedfortheproject.AnyrequestfordeviationfromHVACdesigncriteriamustbeapprovedbytheVAandoccurnolaterthanthedesigndevelopmentstage.ThefollowingrepresentsthehighlightsofthemechanicalsystemdesignforSPD.RefertotheVAHVACDesignManualforadditionaldesignrequirements.

    HVAC System: ThecleanportionsoftheSPDareamustbepositivelypressurizedwithrespecttoadjoiningareasandthedirtyportionsoftheSPDareamustbeundernegativepressurewithrespecttoadjoiningareas.WithintheSPD,thefollowingrelativeairpressurizationsforeachofthespaceslistedmustbemaintained.

    1. SoiledReceivingandDecontaminationRoom NegativeAirPressure

    2. Preparation,Assembly&SterilizationArea PositiveAirPressure3. EtOGasEnclosure NegativeAirPressure4. SteamSterilizerandEquipmentServiceAreas NegativeAirPressure5. PreparationandInspectionofSurgicalLinensandPacks PositiveAirPressure6. Clean/SterileStorage PositiveAirPressure

    Separatededicatedexhaustsystemsshouldbeprovidedforthefollowingspaces;constant

    volumeexhaustsystemsarerequired:

    1. EtOSterilizers(separatededicatedexhaustsystemsfortheroomandthesterilizer).2. Automaticand/orManualEquipmentwasharea.3. GeneralExhaustofentireSPDSuite,includingsteamsterilizersequipmentareas.

    Adedicated100%outsideairhandlingunitmustbeprovidedfortheentireSPDSuite.Theunitmustbeconstantvolume.Theunitshouldincludethenecessaryprimaryairheating,cooling,humidification,dehumidification,andfiltrationprovisions.

    Sinceairisaverygoodcarrierofcontaminatingagents,airintheSoiledReceivingandDecontaminationunitshouldnevermixwithairinthePreparationandInspectionunit.Itis

    imperativethatthesoiledareashaveanegativeairpressureandthecleanareashaveapositiveairpressure.

    IndividualsupplyairterminalsshouldbeprovidedforindividualSPDareas.Supplyairterminalsshouldbeconstantvolumetypewithairflowvolumecontrolcapabilityandincludeareheatcoil.Individualareaexhaustairterminalswithairflowvolumecontrolcapabilityarenotmandatory,butshouldbeconsideredonanasneededpressurizationcontrolbasis.

    NARRATIVE SECTION2-11

  • 7/24/2019 dgSPD-01

    31/43

    Supply, Processing & Distribution February2010

    Reconditioningofthemedicalandsurgicalinstrumentsandutensilsisdependentuponthetemperatureandhumidity. TheSoiledReceivingandDecontaminationArea,andthePreparation,Assembly&SterilizationAreashouldhaveindividualroomtemperatureandhumiditycontrols.

    Controls and Monitoring:

    AllSuiteairsystemsaretooperatecontinuouslyinordertomaintainroompressurizationrelationships.

    Provideroompressurizationmonitors,withalarms,atPreparationRoom(relativetotheDecontaminationRoom)andatClean/SterileStorageRoom(relativetothesurroundingcorridor)andatDecontaminationRoom(relativetothesurroundingcorridor).

    EtOgasreleasemonitorsshouldbeplacedwithintheEtOSterilizerRoomandoutsideoftheEtOSterilizerRoominthePreparation/PackRoom,asawarningsystemforpotential

    EtOleaks. Inaddition,eachoftheEtOexhaustsystemsshouldbemonitoredandalarmed.

    Utilities

    Equipment:Coordinateallutilitieswithspecifiedequipmentutilityrequirements.

    SteamSterilizers EtOSterilizers HydrogenPeroxideSterilizers Washer/Decontaminator

    CartWasher SonicCleaner ManualCleaningandWashStations

    Floor Drains:

    Decontamination Room:Locateinvicinityofwashstationsandequipmentloading/unloadingareas.Locatefloordrainsandslopefloortodraintopreventwaterfrompoolingonfloor.

    Equipment Service Areas: Locateasrequiredforequipmentdrainageandprovidefunnelforindirectdrainageconnection.

    Manual Equipment Wash Area: Afloordrainfortheareashouldhaveaminimum100mm(4inch)diameteroutlet,andbecoveredbyagridorstrainer.Locationofthedrainshouldbeatthecenteroftheroomwiththefloorslopingtowardthedrainatarateofnolessthan3mmper25mm(1/8inchperfoot),andnomorethan6mmper25mm(1/4inchperfoot).ThefloorsoutsidebothdoorsoftheManualEquipmentWashAreashouldslopebacktowardthedrain.

    NARRATIVE SECTION2-12

  • 7/24/2019 dgSPD-01

    32/43

    Supply, Processing & Distribution February2010

    Non-Patient Medical Air: TheuseofamedicalairsystemmeantforpatientcareinSPDisnotpermittedunderNFPA99.AnNFPA99CLevel3medicalairsystem,separatefromanypatientcaremedicalairsystem,shouldbeprovidedforSPD.

    Electrical

    FollowcriteriaasprescribedinPG-18-10,theElectricalandTelecommunicationsDesignManualforNewHospitals,ReplacementHospitals,AmbulatoryCare,ClinicalAdditions,EnergyCenters,andOutpatientClinics.

    Lighting:Illuminationistypicallyprovidedutilizingrecessedfluorescentluminarieswithacrylicprismaticlensesinworkflowareas.Recessedfluorescentdirect/indirectluminairesmaybeusedintheadministrativeareastocontrolglareonmonitorscreens.Surfacemountedfluorescentfixturesmaybeprovidedforundercabinettasklightingandabovemirrorsinrestrooms.Attentionshouldbegiventoselectingfixtures,lamps,andcontrolsthatbestmeettheneedsoftheSPDstaff.ThefixturestypicallyuseF32T8lampsincompliancewiththe

    EnergyPolicyAct(EPACT2005).Lampsshallhaveaminimumcolorrenderingindex(CRI)of70andacolortemperatureof3500degreesKelvin(K).Lightingistypicallycontrolledbywallmountedswitcheslocatedattheentrancetotheroom.Largerspacesmayutilizemultipleswitchingbyseparateswitchesforilluminatingaselectedareaormultilevellampingcontrol.Theuseofoccupancysensorsisrecommendedforadministrativeareas,restrooms,showerrooms,andlockerroomstohelpreduceenergyconsumption

    UselightfixturesratedforwetlocationsinareasspecifiedontheGuidePlates.

    Lightingloaddensitiesshouldbeverifiedfortheactualdesign,astheymayvarydependingontheroomconfiguration,fixturetypes,lampsandballastsused.

    Serveselectedlightfixturesfromtheemergencyelectricalpowersystemtoallowforcontinuedoperationduringapoweroutage.Forfacilitiesthatdonotrequireemergencygenerators,provideselectedlightfixtureswithbatteryballast.

    Power: GeneralpurposeduplexreceptaclesaretypicallyprovidedoneachwallinadministrativeareasandwherepowerisrequiredforgivenareasofSPD.Multipleoutletassemblies(plugmold)shallbeprovidedinEquipmentTestingandStorageandareasthatperformequipmenttestingandbatterycharging.Dedicatedduplexorspecialreceptaclesareprovidedforselectedpiecesofequipment.Workstationswithpersonalcomputers(PC's)aretypicallyprovidedwithquadruplexreceptaclesforthePC,monitorandprinter.Junctionboxesareprovidedforequipmentrequiringahardwiredconnection.

    Emergency Power:SinceventilationandadequatetemperatureareintegralinthefunctionofSPD,thefollowingmechanicalsystemsmustbeconnectedtoemergencypowersystemandmustremainoperationalduringpoweroutages:SupplyAirSystem,GeneralExhaustSystem,WashAreaExhaustSystem,EtOSterilizerExhaustSystem,EtOGasReleaseMonitors,SteamSterilizers,andallDDCcontrolsforthesesystems.Additionally,thechilledwatersystemservingtheSPDSupplyAirSystemmustbeconnectedtotheemergencypowersystem.Allsterilizationequipmentisrecommendedtobeconnectedtotheemergencyelectricalpowersystemifpossible.Steamsterilizersmustbeconnectedtotheemergencypowersystem.The

    NARRATIVE SECTION2-13

  • 7/24/2019 dgSPD-01

    33/43

    Supply, Processing & Distribution February2010

    emergencyelectricalpowersystemshouldbereviewedtodetermineifsufficientcapacityisavailableforconnectionofallothersterilizersandotherSPDequipment.

    Communications/Special Systems

    FollowcriteriaasprescribedinPG-18-10,ElectricalandTelecommunicationsDesignManualforcommunicationsandspecialsystems.

    Telephone: OutletsaretypicallyprovidedinadministrativeareasandinproximitytoworkstationsatselectedlocationswithintheSPDworkareas

    Automatic Data Processing (ADP): Computeroutletsaretypicallyprovidedateachworkstationwithapersonalcomputer(PC)and/oraprinter.

    Intercom:AninterdepartmentalintercomsystemshouldbeprovidedtoallowcommunicationbetweenthevariousdepartmentswithintheSPDarea.Intercomstationsshouldbeplacedin

    theSoiledReceivingandDecontaminationArea;Preparation,Assembly,andSterilizationArea;andDispatchArea.ExactlocationsandquantitiesofintercomstationsshouldbecoordinatedwiththeChiefofSPD.

    Public Address: Thedepartmentshouldbeincludedaspartofthehospital-widePAsystem.Thepublicaddresssystemistypicallypartofthetelephonesystemandinstallationshallbecoordinatedaccordingly.SpeakersshallbelocatedinselectedareasasdeterminednecessarybytheSPDstaff.

    Life Safety and Fire Protection

    AsstatedintheVAFireProtectionDesignManual,thePublicBuildingsAmendmentAct(PL

    100-678)requiresallFederalagenciestofollowthelatesteditionsofnationallyrecognizedfireandlifesafetycodes.VAhasadoptedtheNationalFireCodes(NFC),exceptNFPA5000,publishedbytheNationalFireProtectionAssociation(NFPA).LifesafetyrequirementsarespecificallyaddressedintheLifeSafetyCode,NFPA101.FireprotectionfeaturesnotaddressedbytheNFCshouldbedesignedtocomplywithrequirementsofthelatesteditionoftheInternationalBuildingCode(IBC).ForguidanceoncompliancewithotherCodesandStandards,refertoPG-18-3DesignandConstructionProcedures,Topic1.

    NARRATIVE SECTION2-14

  • 7/24/2019 dgSPD-01

    34/43

    Supply, Processing & Distribution February2010

    Concerns Specific to Supply, Processing &Distribution

    Equipment: EquipmentmaybepurchasedbyeithertheVA(Owner)orthecontractorandinstalledbythecontractor(CC),orpurchasedbytheVA(Owner)andinstalledbytheVAortheVendor(VV). Ifpurchasedbythecontractor,specificationsmustbeclearlywritten.

    TheChiefofSPDoperationsateachVAmedicalcenterisknowledgeableaboutequipmentstylesandtypesthatbestmeettheneedsofthefacility,andshouldguidetheselectionofequipment. IfpurchasingequipmentnotlistedinGSAcatalogs,specificationsmustbesufficientlydetailedtoassurequalityacquisition.

    Theselectionofequipmentshouldbefullycoordinatedwiththefacilitysdesigninorderthatutilityandspacerequirementsareconsideredduringdesigndevelopment.Itisimperativethat

    allpowerandwaterresourcesbefullyaccommodated,andthatthemechanicalandventilationsystemsaredesignedtoberesponsivetoheatloadscreatedbyspecificequipment.Thus,thespecificchoiceofequipmentmustbeestablishedearlyontopromoteaconsistentandcoordinatedplan.Carefulattentionmustbegiventothelocationandcapacityofelectricoutlets,waterandsteamsupply,drains,vacuum,exhaustductsandotherutilities,toinsurecapacityandcompatibilitywiththeequipmenttobeinstalled.UtilitiesandtheirlocationsareshownontheGuidePlatesandarenotprojectspecific.Itistheresponsibilityofthepersonselectingtheequipmentandtheprojectdesignerstodeterminetheadequacyofutilitiesineachspace.

    Sanitation Equipment:Frequentandthoroughcleaningofshelvesandroomsurfacesisessentialtopreventbuildupofdustandunwantedparticleswhichmaycontaminatemedicalandsurgicalsupplies.

    Roomwallsaremanuallyscrubbedwitheitheradetergentand/ordisinfectant.Thus,tofacilitatecleaning,wallsaretypicallyspecifiedwithawashablesurface.FloorsintheSoiledReceivingandDecontaminationroommaybedampmoppedorcleanedwithanelectricfloorscrubber.IntheSterile/Non-SterileStorageRoom;however,cleaningwithadampmopwillsuffice.Generally,storageshelvesintheSterile/Non-SterileStorageRoomarekept200to250mm(8to10inches)abovethefloortofacilitatecleaning.

    Ultrasonic Cleaners: Ultrasoniccleanersareoftenusedasaninitialstepintheprocessofcleaningsurgicalinstruments.Ultrasoniccleanersareamechanicalsystemthatusessoundwavesalongwithwateranddetergenttoremovesoilfrominstruments.Bothtabletopandfloorunitsareavailable.Full-sizeultrasoniccleanerisneededandrequiredTabletopunitscanalsobepurchasedspecificallyforcleaningdelicateinstrumentswithlonglumens.Floorunitsare

    designedtoaccommodatelargequantitiesofinstrumentsatonetimeandcanhaveeithersingleordoublechambers.

    Washer/Disinfectors: Followingtheultrasoniccleaningprocess,instrumentsareplacedintowasher/disinfectors.InstrumentsandtraysareloadedintotheunitontheDecontaminationsideofSPD,andremoveduponcompletionofthecycleonthePrep/PacksideofSPD.Washer/Disinfectorsareheatedbyeitherelectricorsteam.Automationsystemsforloadingandunloadingwasher/disinfectorsarehighlyrecommendedfordepartmentsthatprocesslarge

    NARRATIVE SECTION2-15

  • 7/24/2019 dgSPD-01

    35/43

    Supply, Processing & Distribution February2010

    volumesofinstruments.Washer/disinfectorsaretypicallyrecessedbetweentheDecontaminationareaandthePrep/PackareaofSPD.

    Scope Washers: Thesefreestandingmechanicalwashersareusedtoeffectivelyprocess

    flexiblescopeswithlumenssuchasendoscopesorcolonoscopes.Somewashersareequippedwithacyclethatprovidesafinalhigh-leveldisinfectionflush.ThesewillalsobeintheDecontaminationArea.

    Drying Cabinets: Thesefreestandingcabinetsareusedtodryequipmenteitheronracksorhooks.Dryingcabinetsaredesignedtohaveaconstantairflowandvariabletemperaturesettings.Therearesingledoorandpass-thrudoorunitsavailable.

    Steam Gun: Steamgunsarepoweredbysteamandaretypicallyusedtocleancartsandothermovableequipmentthatcanwithstandwaterandsteamtemperaturesupto270degreesFahrenheit.Asteamgunshouldalwaysbeusedinadedicatedequipmentwashroomwithnon-slipflooringandafloordrain.

    Automatic Endoscope Reprocessors (AER): Mechanicalunitstowashanddisinfectimmersibleendoscopes,theseunitswillhavewaterhookupsanddrains.TheseunitsuseanFDA-approvedhigh-leveldisinfectionsolutiontodisinfectthesemi-criticalscopesaftercleaningthatdonotrequiresterilizationforuse.TheseunitswillalsobeintheDecontaminationArea.

    Sterilizers

    Steam:Steamsterilizersareusedtosterilizesurgicalinstrumentsandequipmentthatcanwithstandatemperatureof270degreesFahrenheit.Sterilizersareavailableinbothcart-loadingandfloor-loadingmodels.Singledoororpass-thruunitscanbeuseddependingonthedepartmentworkflow. Steamsterilizerscanbeeitherfreestandingorrecessed.

    Ethylene Oxide:EthyleneOxide(EtO)sterilizersareusedtosterilizeitemsthatcannotwithstandhightemperaturesterilization.Theyaredesignedwithbothasterilizationcycleof130degreesFahrenheit,andanaerationcycle.ItemsshouldneverberemovedfromanEtOsterilizeruntilanaerationcycleiscomplete.EtOSterilizersaregenerallysmallandcanbeloadedbycartorbyhand.AseparateroomshouldbededicatedforEthyleneOxidesterilizersandnootheractivityshouldoccurintheroomexcepttoloadandunloadtheunits.EthyleneOxideisacarcinogenicgasthatcancausedifficultybreathing,dizziness,andconvulsions.ContactwithliquidEtOcancausesevereskinburns.EtOsterilizerscanbeeitherfreestandingorrecessed.AdedicatedexhaustsystemisrequiredforEthyleneOxide.ConsulttheVAHVACDesignManualforEtOexhaustsystemdesignrequirements.

    Gas Plasma:Gasplasmasterilizationuseshydrogenperoxidetosterilizeinstrumentsandequipmentthatcannotwithstandhightemperaturesterilization.Thesesterilizersarepoweredbyelectricandareeitherfloororcountermounted.Therearenoplumbingorsteamrequirements,sothesterilizerscanbeeasilyrelocated.

    Scope Sterilizer:Scopesterilizersusealiquidchemicaltosterilizeimmersiblescopesthatcannotwithstandhightemperaturesterilization.Thesesterilizersrequireelectricandplumbing.Unitscanbeeithermobileorcountermounted.

    NARRATIVE SECTION2-16

  • 7/24/2019 dgSPD-01

    36/43

    Supply, Processing & Distribution February 2010

    Section 3

    Functional Diagrams

    Page

    Net and Departmental GrossArea..3-1

    Functional Relationship Diagram.3-2

    Work Flow RelationshipDiagram.....................3-3

    Material Flow RelationshipDiagram.....................3-4

    Personnel CirculationRelationship Diagram3-5

    Air Flow Relationship Diagram........3-6

    FUNCTIONAL DIAGRAMS CONTENTS SECTION 3

  • 7/24/2019 dgSPD-01

    37/43

    Supply, Processing & Distribution February 2010

    This page intentionally left blank.

    FUNCTIONAL DIAGRAMS CONTENTS SECTION 3

  • 7/24/2019 dgSPD-01

    38/43

    Supply, Processing & Distribution February 2010

    Net and Departmental Gross Area

    Net Area (Net Square Feet, NSF; or Net Square Meters, NSM) is the actual floor area in a roomor functional area (finish to finish) that can be used by people, furnishings, or equipment.Department Gross Square Feet (DGSF) includes, in addition to the Net Area, partitions andcirculation internal to the functional area of the department. The net to department gross factor(NTDG factor) adopted by VA for SPD is 1.30. The 1.30 factor anticipates that the internalcirculation must be added to connect functional areas and individual rooms.

    FUNCTIONAL DIAGRAMS SECTION 3-1

  • 7/24/2019 dgSPD-01

    39/43

    Supply, Processing & Distribution February 2010

    Functional Relationship Diagram

    FUNCTIONAL DIAGRAMS SECTION 3-2

  • 7/24/2019 dgSPD-01

    40/43

    Supply, Processing & Distribution February 2010

    Relationship Diagram

    Work Flow

    FUNCTIONAL DIAGRAMS SECTION 3-3

  • 7/24/2019 dgSPD-01

    41/43

    Supply, Processing & Distribution February 2010

    Relationship Diagram

    Material Flow

    FUNCTIONAL DIAGRAMS SECTION 3-4

  • 7/24/2019 dgSPD-01

    42/43

    Supply, Processing & Distribution February 2010

    Relationship Diagram

    Personnel Circulation

    FUNCTIONAL DIAGRAMS SECTION 3-5

  • 7/24/2019 dgSPD-01

    43/43

    Supply, Processing & Distribution February 2010

    Relationship Diagram

    Air Flow