Greens Creek Mining Company
Kennecott Minerals Company
DPM Workshop
June 5 - 6, 2007Elko, Nevada
Diesel Particulate Filter ApplicationCase Study
Mark L. GoodSr. Mining Engineer
Kennecott Greens Creek Mining Company
-
Greens Creek Mining Company
Kennecott Minerals Company
Kennecott Greens Creek Mining Company
Multi pronged approach for DPM control– Corrective Measures for Existing Ventilation– Engine Replacement– Exhaust Filtration– Upgrade Mine Ventilation Volumes– Alternative Fuel Trials
-
Greens Creek Mining Company
Kennecott Minerals Company
Exhaust Filtration
Assess equipment fleet as to primary sources for DPMMSHA listing for Particulate Index (P.I.)P.I. is based on Ventilation Rate to normalize emissions to 1000 μg/m3
Some of your larger engines may not be your biggest polluters
-
Greens Creek Mining Company
Kennecott Minerals Company
Diesel ParticulateMAJOR EQUIPMENT FLEET
40D Truck 6 475 HP450/1250 Loader 4 300 HP420 Teletram 6 225 HP436 Teletram 2 375 HPWagner ST3.5D 4 200 HPElphinstone Loader 1 165 HPGetman Carriers 11 150 HPNormet Carrier 2 150 HPJumbos 10 75 HPTractors 25 53 HP
-
Greens Creek Mining Company
Kennecott Minerals Company
Exhaust Filtration
Target Equipment Requirements for Passively Regenerated Filters– 4 Cycle Engines– High Duty Cycle– High Exhaust Gas Temperatures
-
Greens Creek Mining Company
Kennecott Minerals Company
Exhaust Filtration
• Temperature profiling is imperative• Data logging over several days to gain a good
perspective of operating conditions• Test each piece of equipment in a given
production cycle– Eg; Two LHD’s, similar configuration, one in remote
mucking, the other in manual mucking– One configuration was successful, the other, marginal
-
Greens Creek Mining Company
Kennecott Minerals Company
4 Channel Data Logger
-
Greens Creek Mining Company
Kennecott Minerals Company
6” K type Thermocouple
-
Greens Creek Mining Company
Kennecott Minerals Company
Data Logger, Probe and Case
-
Greens Creek Mining Company
Kennecott Minerals Company
Toro 40 D Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Toro 40 D Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Getman A64 Scissors Truck
-
Greens Creek Mining Company
Kennecott Minerals Company
Getman A64 Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Getman A64 Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Getman A64 Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Kubota M5030 Tractor
-
Greens Creek Mining Company
Kennecott Minerals Company
Kubota M5030 Tractor
-
Greens Creek Mining Company
Kennecott Minerals Company
Kubota M5030 Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Profile
35
40
45
100
200
300
400
6AM15 Sun Sep 2002
9AM 12PM 3PM 6PM 9PM 16 Mon 3AM 6AM
LR 46 Temperature 09/11/02
Deg
CD
eg C
LR460913.PL1
LR46 Exhaust deg C
325
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Profile
0
10
20
30
40
0
100
200
300
29 TueOct 2002
30 Wed 31 Thu 1 Fri 2 Sat 3 Sun 4 Mon
HT 39 Backfill Truck
Deg
CD
eg C
ht391005.PL1
Ambient Compensation Exhaust Temp
325
-
Greens Creek Mining Company
Kennecott Minerals Company
Diesel Particulate FilterSelection Criteria
Catalyzed Cordierite Filter– 20 % Duty Cycle exceeds 325 Degrees F
NIOSH Filter Guide
– http://www.msha.gov/nioshmnmfilterselectionguide/MNM_DPF_Questions.htm
– http://www.msha.gov/nioshmnmfilterselectionguide/temp_analysis.htm
http://www.msha.gov/nioshmnmfilterselectionguide/MNM_DPF_Questions.htmhttp://www.msha.gov/nioshmnmfilterselectionguide/temp_analysis.htm
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Histogram10-degree C increments
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
Temperature, Deg C
Perc
ent
0
200
400
600
800
1000
1200
Coun
t
Count=Num of times exhaust is within T 10-deg "bins" Percent of time that exhaust is greater than T
Temperature Histogram
LR46
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Histogram10-degree C increments
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
Temperature, Deg C
Per
cent
0
500
1000
1500
2000
2500
3000
3500
Cou
nt
Count=Num of times exhaust is within T 10-deg "bins" Percent of time that exhaust is greater than T
Temperature Histogram
HT37
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Histogram10-degree C increments
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
Temperature, Deg C
Per
cent
0
100
200
300
400
500
600
Coun
t
Count=Num of times exhaust is within T 10-deg "bins" Percent of time that exhaust is greater than T
Temperature Histogram
HT39
-
Greens Creek Mining Company
Kennecott Minerals Company
Temperature Histogram
Temperature HistogramPT14 - Mercedes 904 LA
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
300
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480
490
500
Temperature, Deg C
Per
cent
0
200
400
600
800
1000
1200
Cou
nt
Count=Num of times exhaust is within T 10-deg "bins" Percent of time that exhaust is greater than T
PT 14
-
Greens Creek Mining Company
Kennecott Minerals Company
Passive Filter Installation
-
Greens Creek Mining Company
Kennecott Minerals Company
Active Filter InstallationGetman A64 Powder Truck
-
Greens Creek Mining Company
Kennecott Minerals Company
Active FilterMounted on Getman Powder Truck
-
Greens Creek Mining Company
Kennecott Minerals Company
LR46 - 6 Weeks -Filtered Exhaust
-
Greens Creek Mining Company
Kennecott Minerals Company
LR46 - 1 1/2 Shifts with no Filter
-
Greens Creek Mining Company
Kennecott Minerals Company
Pre & Post Filter Samples
-
Greens Creek Mining Company
Kennecott Minerals Company
Failing FilterDischarge Side - Soot Ghosting, Rotation
-
Greens Creek Mining Company
Kennecott Minerals Company
Failed Ceramic - Exhaust Bypass
-
Greens Creek Mining Company
Kennecott Minerals Company
Active Regeneration FiltersLeft – Clean Filter, Right - Soot Loaded Filter
-
Greens Creek Mining Company
Kennecott Minerals Company
Active Regeneration Station Control Panels
-
Greens Creek Mining Company
Kennecott Minerals Company
Active Regeneration Station Heater Bases
-
Greens Creek Mining Company
Kennecott Minerals Company
ThermographHeat Plume of Heating Filter
-
Greens Creek Mining Company
Kennecott Minerals Company
ThermographDischarge side of Regenerating Filter
-
Greens Creek Mining Company
Kennecott Minerals Company
MSHA Cooperative TestDPM Sampling - Jan 2003
Average Stope Sample - Total CarbonStopes tested 675 / 704 / 490 / 446 / 30
Sampler mounted on LR46, outside cab– Filtered Equipment : 205 ug/m3
– Unfiltered Equipment : 1,233 ug/m3
-
Greens Creek Mining Company
Kennecott Minerals Company
MSHA Cooperative TestDPM Sampling - Jan 2003
Average Stope Sample - Total CarbonStopes tested 675 / 704 / 490 / 446 / 30
Sampler mounted on LR46, inside cab– Filtered Equipment : 49 ug/m3
– Unfiltered Equipment : 271 ug/m3
-
Greens Creek Mining Company
Kennecott Minerals Company
Mark Good – Senior Mining Engineer
(907) 789 – 8122
DPM Workshop��June 5 - 6, 2007�Elko, NevadaKennecott Greens Creek Mining CompanyExhaust FiltrationDiesel ParticulateExhaust FiltrationExhaust Filtration4 Channel Data Logger6” K type ThermocoupleData Logger, Probe and Case Toro 40 D InstallationToro 40 D InstallationGetman A64 Scissors TruckGetman A64 InstallationGetman A64 InstallationGetman A64 InstallationKubota M5030 TractorKubota M5030 TractorKubota M5030 InstallationTemperature ProfileTemperature ProfileDiesel Particulate Filter� Selection CriteriaTemperature HistogramTemperature HistogramTemperature HistogramTemperature HistogramPassive Filter InstallationActive Filter Installation�Getman A64 Powder TruckActive Filter�Mounted on Getman Powder TruckLR46 - 6 Weeks -Filtered ExhaustLR46 - 1 1/2 Shifts with no FilterPre & Post Filter SamplesFailing Filter�Discharge Side - Soot Ghosting, RotationFailed Ceramic - Exhaust BypassActive Regeneration Filters�Left – Clean Filter, Right - Soot Loaded FilterActive Regeneration Station �Control PanelsActive Regeneration Station �Heater BasesThermograph�Heat Plume of Heating FilterThermograph�Discharge side of Regenerating FilterMSHA Cooperative Test�DPM Sampling - Jan 2003MSHA Cooperative Test�DPM Sampling - Jan 2003