digital transformation & industry 4.0: key trends to …...2018/04/19  · • increased output •...

Click here to load reader

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • © Copyright 2019 OSIsoft, LLC© Copyright 2019 OSIsoft, LLC

    Digital Transformation & Industry 4.0: Key Trends to Look for in 2019

    Neil Strother and Michael Kanellos

    April 18, 2019

  • © Copyright 2019 OSIsoft, LLC 5Contact info: Neil Strother – Principal Research Analyst – [email protected]

    mailto:[email protected]

  • © Copyright 2019 OSIsoft, LLC 6

    IIoT: A $144.6 Billion Opportunity

  • © Copyright 2019 OSIsoft, LLC 7

    So How Come Some Succeed While Others Stall?

  • © Copyright 2019 OSIsoft, LLC 8

    We Decided to Find Out

  • © Copyright 2019 OSIsoft, LLC 9

    But Then We Kept Getting the Same Question?

  • © Copyright 2019 OSIsoft, LLC 10

    How Do I Get the Green Light?

  • © Copyright 2019 OSIsoft, LLC

    The Seven Steps to IIoT Proposal Success

    11

  • © Copyright 2019 OSIsoft, LLC 12

    Step One: Develop a Plan that Reminds Everyone That Software Costs Less than Capital

  • © Copyright 2019 OSIsoft, LLC

    • $20-$25 Million Invested• Integrated Collaboration

    Center• Digitizes assets across a

    continental network– 61 Gas plats– 57,000 miles of pipelines– 1400+ compressors

    13

    DCP Midstream Maps Out a Comprehensive Transformation

  • © Copyright 2019 OSIsoft, LLC

    • Goal: ROI in 1 Year • Results: – $20-$25 Million in First

    Year from increased production, lower repairs

    – $20M Returned Yr. 2

    • The Same Results With Capital? $350 Million

    14

    The Results

  • © Copyright 2019 OSIsoft, LLC 15

    Step Two: The Technology Is Here

  • © Copyright 2019 OSIsoft, LLC

    A Plethora of IIoT Vendors

    16

    Source: Navigant Research

  • © Copyright 2019 OSIsoft, LLC 17

    Step Three: A Single Platform Can Deliver Multiple Applications

  • © Copyright 2019 OSIsoft, LLC 18

    AGL Started with Visibility and Daily Optimization

  • © Copyright 2019 OSIsoft, LLC 19

    Predictive Maintenance Followed

  • © Copyright 2019 OSIsoft, LLC 20

    Next up: Optimizing Wind and Thermal Plants

  • © Copyright 2019 OSIsoft, LLC 21

    Step Four: You Can Achieve Quick Wins and Long Term Success At the Same Time

  • © Copyright 2019 OSIsoft, LLC

    Calculating ROI: The Easy Part

    Outcomes

    Investments

  • © Copyright 2019 OSIsoft, LLC

    The Hard Part: Tabulating Long, Short Term Outcomes

    Revenue Reduced Apex/Capex Added Benefits• Increased Output

    • More product, same footprint

    • Less downtime• New Products &

    Services• Faster Time to

    Market/Value

    • Energy• Maintenance• Avoided Capital

    Expenditures• Avoided Upgrades

    • Safety• Quality/Brand• Reduced Risk• Avoided

    Recalls/Fines• Customer Loyalty• Streamlined

    Supply Chains

  • © Copyright 2019 OSIsoft, LLC

    And Long, Short-Term Investments

    Up Front Over Time• Hardware• Software• Implementation • Strategy

    • Bandwidth• Cloud Services• Training• Employee Time• Coding and Developer Time• Support & Servicing

  • © Copyright 2019 OSIsoft, LLC

    Bondtech: ROI at the Airport

    Made in Kentucky, Found Anywhere

    Repair calls took three days

    Remote diagnostics cut travel by 50%

    ROI in three months

    $250K+ saved in first year

    Better yet: improved customer, employee satisfaction

    25

  • © Copyright 2019 OSIsoft, LLC 26

    Step Five: You Don’t Need An Armada of Consultants

  • © Copyright 2019 OSIsoft, LLC 27

    A Small Utility with a Major Problem

    100,000 customers

    600 square miles of service territory

    Losing approx. 32% of water through leaks

    Old technology (acoustic sensors) not easily scalable

    Facing major plant upgrade

  • © Copyright 2019 OSIsoft, LLC

    The Plan: Work While The District Sleeps

    • Meters subdivide district into 33 DMAs

    • Water use monitored from 1 a.m. to 4 a.m.

    • Usage plotted on map

    28

  • © Copyright 2019 OSIsoft, LLC

    Reduced Leakage: $1.6 million a year • $400K in yr 1• $900,000 in yr two• $350,000 in yr three

    Reduced Data Prep• 6 hours data prep reduced to 10 mins• $30,000 est. savings

    Avoided SCADA Upgrade • $200,000 avoided costs

    A Boost to the Public Profile• Flat Rock Springs is not a streamAnd...

    29

    $1.3 Million Invested. The Outcomes:

  • © Copyright 2019 OSIsoft, LLC 30

    A $15-$20 Million Facility Delayed for 11 Years

  • © Copyright 2019 OSIsoft, LLC 31

    Step Six: Your Employees Will Embrace It (Seriously)

  • © Copyright 2019 OSIsoft, LLC

    A Nasty Buttery Smell• Solved with a sensor and

    Monitoring• Payback in 3 months• $450,000 increase in output

    Next• Let’s remove a cooler• And reduce manual checks• A data driven culture

    32

    The Earn While You Learn School of Engineering

  • © Copyright 2019 OSIsoft, LLC 33

  • © Copyright 2019 OSIsoft, LLC

    Industrial Attention Deficit Disorder

    Before• Fixed metals recovery goals• Employees ability to act constrained

    After• Simulator enables employees to

    change processes with ore grades• 4.5 more “days” per month• A data-driven culture

    34

  • © Copyright 2019 OSIsoft, LLC 35

    Step Seven: You Can Move Ahead of the Competition

  • © Copyright 2019 OSIsoft, LLC 36

    It Starts As A Tale of Woe

    Hera Processing Plant

  • © Copyright 2019 OSIsoft, LLC

    • Gold Recovery Low (74.6%)

    • Debt High (A$125 million)• 700 Jobs on the Line• Two Vendors Flopped• So They Turned to This Guy

    37

    Six Months to Live

  • © Copyright 2019 OSIsoft, LLC

    • Crushing to Grinding to Flotation

    • Recovery Climbs to 88.6%• PI System Return in 12

    Days• Facility Above Nameplate • Vendor Hugs Integrator

    38

    A Step-by-Step Transformation

  • © Copyright 2019 OSIsoft, LLC 39

    Summary/Conclusion?

    Step 1: Develop a Plan that Reminds Everyone That Software Costs Less than Capital

    Step 2: The Technology Is Here

    Step 3: A Single Platform Can Deliver Multiple Applications

    Step 4: You Can Achieve Quick Wins and Long Term Success At the Same Time

    Step 5: You Don’t Need An Armada of Consultants

    Step 6: Your Employees Will Embrace It (Seriously)

    Step 7: You Can Move Ahead of the Competition

  • © Copyright 2019 OSIsoft, LLC

    Questionsand

    Answers

    30

  • © Copyright 2019 OSIsoft, LLC

    Slide Number 1Digital Transformation & Industry 4.0: Key Trends to Look for in 2019�Slide Number 3Slide Number 4Slide Number 5IIoT: A $144.6 Billion OpportunitySo How Come Some Succeed While Others Stall?We Decided to Find OutBut Then We Kept Getting �the Same Question?How Do I Get the Green Light?The Seven Steps �to IIoT Proposal SuccessStep One: Develop a Plan that Reminds Everyone That Software Costs Less than CapitalDCP Midstream Maps Out a Comprehensive TransformationThe ResultsStep Two: The Technology Is HereA Plethora of IIoT Vendors Step Three: A Single Platform Can Deliver �Multiple ApplicationsAGL Started with Visibility and Daily OptimizationPredictive Maintenance Followed Next up: Optimizing Wind and Thermal PlantsStep Four: You Can Achieve Quick Wins and Long Term Success At the Same TimeCalculating ROI: The Easy PartSlide Number 23Slide Number 24Bondtech: ROI at the AirportStep Five: You Don’t Need An Armada of ConsultantsA Small Utility with a Major ProblemThe Plan: Work While The District Sleeps$1.3 Million Invested. The Outcomes:A $15-$20 Million Facility Delayed for 11 YearsStep Six: Your Employees Will Embrace It (Seriously)The Earn While You Learn School of EngineeringSlide Number 33Industrial Attention Deficit DisorderStep Seven: You Can Move Ahead of the CompetitionIt Starts As A Tale of WoeSix Months to LiveA Step-by-Step Transformation Summary/Conclusion?Slide Number 40Slide Number 41