digital transformation & industry 4.0: key trends to …...2018/04/19 · • increased output •...
TRANSCRIPT
-
© Copyright 2019 OSIsoft, LLC© Copyright 2019 OSIsoft, LLC
Digital Transformation & Industry 4.0: Key Trends to Look for in 2019
Neil Strother and Michael Kanellos
April 18, 2019
-
© Copyright 2019 OSIsoft, LLC 5Contact info: Neil Strother – Principal Research Analyst – [email protected]
mailto:[email protected]
-
© Copyright 2019 OSIsoft, LLC 6
IIoT: A $144.6 Billion Opportunity
-
© Copyright 2019 OSIsoft, LLC 7
So How Come Some Succeed While Others Stall?
-
© Copyright 2019 OSIsoft, LLC 8
We Decided to Find Out
-
© Copyright 2019 OSIsoft, LLC 9
But Then We Kept Getting the Same Question?
-
© Copyright 2019 OSIsoft, LLC 10
How Do I Get the Green Light?
-
© Copyright 2019 OSIsoft, LLC
The Seven Steps to IIoT Proposal Success
11
-
© Copyright 2019 OSIsoft, LLC 12
Step One: Develop a Plan that Reminds Everyone That Software Costs Less than Capital
-
© Copyright 2019 OSIsoft, LLC
• $20-$25 Million Invested• Integrated Collaboration
Center• Digitizes assets across a
continental network– 61 Gas plats– 57,000 miles of pipelines– 1400+ compressors
13
DCP Midstream Maps Out a Comprehensive Transformation
-
© Copyright 2019 OSIsoft, LLC
• Goal: ROI in 1 Year • Results: – $20-$25 Million in First
Year from increased production, lower repairs
– $20M Returned Yr. 2
• The Same Results With Capital? $350 Million
14
The Results
-
© Copyright 2019 OSIsoft, LLC 15
Step Two: The Technology Is Here
-
© Copyright 2019 OSIsoft, LLC
A Plethora of IIoT Vendors
16
Source: Navigant Research
-
© Copyright 2019 OSIsoft, LLC 17
Step Three: A Single Platform Can Deliver Multiple Applications
-
© Copyright 2019 OSIsoft, LLC 18
AGL Started with Visibility and Daily Optimization
-
© Copyright 2019 OSIsoft, LLC 19
Predictive Maintenance Followed
-
© Copyright 2019 OSIsoft, LLC 20
Next up: Optimizing Wind and Thermal Plants
-
© Copyright 2019 OSIsoft, LLC 21
Step Four: You Can Achieve Quick Wins and Long Term Success At the Same Time
-
© Copyright 2019 OSIsoft, LLC
Calculating ROI: The Easy Part
Outcomes
Investments
-
© Copyright 2019 OSIsoft, LLC
The Hard Part: Tabulating Long, Short Term Outcomes
Revenue Reduced Apex/Capex Added Benefits• Increased Output
• More product, same footprint
• Less downtime• New Products &
Services• Faster Time to
Market/Value
• Energy• Maintenance• Avoided Capital
Expenditures• Avoided Upgrades
• Safety• Quality/Brand• Reduced Risk• Avoided
Recalls/Fines• Customer Loyalty• Streamlined
Supply Chains
-
© Copyright 2019 OSIsoft, LLC
And Long, Short-Term Investments
Up Front Over Time• Hardware• Software• Implementation • Strategy
• Bandwidth• Cloud Services• Training• Employee Time• Coding and Developer Time• Support & Servicing
-
© Copyright 2019 OSIsoft, LLC
Bondtech: ROI at the Airport
Made in Kentucky, Found Anywhere
Repair calls took three days
Remote diagnostics cut travel by 50%
ROI in three months
$250K+ saved in first year
Better yet: improved customer, employee satisfaction
25
-
© Copyright 2019 OSIsoft, LLC 26
Step Five: You Don’t Need An Armada of Consultants
-
© Copyright 2019 OSIsoft, LLC 27
A Small Utility with a Major Problem
100,000 customers
600 square miles of service territory
Losing approx. 32% of water through leaks
Old technology (acoustic sensors) not easily scalable
Facing major plant upgrade
-
© Copyright 2019 OSIsoft, LLC
The Plan: Work While The District Sleeps
• Meters subdivide district into 33 DMAs
• Water use monitored from 1 a.m. to 4 a.m.
• Usage plotted on map
28
-
© Copyright 2019 OSIsoft, LLC
Reduced Leakage: $1.6 million a year • $400K in yr 1• $900,000 in yr two• $350,000 in yr three
Reduced Data Prep• 6 hours data prep reduced to 10 mins• $30,000 est. savings
Avoided SCADA Upgrade • $200,000 avoided costs
A Boost to the Public Profile• Flat Rock Springs is not a streamAnd...
29
$1.3 Million Invested. The Outcomes:
-
© Copyright 2019 OSIsoft, LLC 30
A $15-$20 Million Facility Delayed for 11 Years
-
© Copyright 2019 OSIsoft, LLC 31
Step Six: Your Employees Will Embrace It (Seriously)
-
© Copyright 2019 OSIsoft, LLC
A Nasty Buttery Smell• Solved with a sensor and
Monitoring• Payback in 3 months• $450,000 increase in output
Next• Let’s remove a cooler• And reduce manual checks• A data driven culture
32
The Earn While You Learn School of Engineering
-
© Copyright 2019 OSIsoft, LLC 33
-
© Copyright 2019 OSIsoft, LLC
Industrial Attention Deficit Disorder
Before• Fixed metals recovery goals• Employees ability to act constrained
After• Simulator enables employees to
change processes with ore grades• 4.5 more “days” per month• A data-driven culture
34
-
© Copyright 2019 OSIsoft, LLC 35
Step Seven: You Can Move Ahead of the Competition
-
© Copyright 2019 OSIsoft, LLC 36
It Starts As A Tale of Woe
Hera Processing Plant
-
© Copyright 2019 OSIsoft, LLC
• Gold Recovery Low (74.6%)
• Debt High (A$125 million)• 700 Jobs on the Line• Two Vendors Flopped• So They Turned to This Guy
37
Six Months to Live
-
© Copyright 2019 OSIsoft, LLC
• Crushing to Grinding to Flotation
• Recovery Climbs to 88.6%• PI System Return in 12
Days• Facility Above Nameplate • Vendor Hugs Integrator
38
A Step-by-Step Transformation
-
© Copyright 2019 OSIsoft, LLC 39
Summary/Conclusion?
Step 1: Develop a Plan that Reminds Everyone That Software Costs Less than Capital
Step 2: The Technology Is Here
Step 3: A Single Platform Can Deliver Multiple Applications
Step 4: You Can Achieve Quick Wins and Long Term Success At the Same Time
Step 5: You Don’t Need An Armada of Consultants
Step 6: Your Employees Will Embrace It (Seriously)
Step 7: You Can Move Ahead of the Competition
-
© Copyright 2019 OSIsoft, LLC
Questionsand
Answers
30
-
© Copyright 2019 OSIsoft, LLC
Slide Number 1Digital Transformation & Industry 4.0: Key Trends to Look for in 2019�Slide Number 3Slide Number 4Slide Number 5IIoT: A $144.6 Billion OpportunitySo How Come Some Succeed While Others Stall?We Decided to Find OutBut Then We Kept Getting �the Same Question?How Do I Get the Green Light?The Seven Steps �to IIoT Proposal SuccessStep One: Develop a Plan that Reminds Everyone That Software Costs Less than CapitalDCP Midstream Maps Out a Comprehensive TransformationThe ResultsStep Two: The Technology Is HereA Plethora of IIoT Vendors Step Three: A Single Platform Can Deliver �Multiple ApplicationsAGL Started with Visibility and Daily OptimizationPredictive Maintenance Followed Next up: Optimizing Wind and Thermal PlantsStep Four: You Can Achieve Quick Wins and Long Term Success At the Same TimeCalculating ROI: The Easy PartSlide Number 23Slide Number 24Bondtech: ROI at the AirportStep Five: You Don’t Need An Armada of ConsultantsA Small Utility with a Major ProblemThe Plan: Work While The District Sleeps$1.3 Million Invested. The Outcomes:A $15-$20 Million Facility Delayed for 11 YearsStep Six: Your Employees Will Embrace It (Seriously)The Earn While You Learn School of EngineeringSlide Number 33Industrial Attention Deficit DisorderStep Seven: You Can Move Ahead of the CompetitionIt Starts As A Tale of WoeSix Months to LiveA Step-by-Step Transformation Summary/Conclusion?Slide Number 40Slide Number 41