dinulal ss cv

Upload: praveen-vs

Post on 03-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Dinulal Ss Cv

    1/4

    CURRICULUM VITAE

    Dinulal SSMECHANICAL ENGINEER

    Name : DINULAL S S

    Date of Birth : 02/08/1990

    Sex : Male

    Nationality : Indian

    Marital Status : Unmarried

    Languages known : English, Hindi, Malayalam

    E mail : [email protected]

    Phone no : 05592694054

    Career Objective:

    Aspiring to be associated with a reputed organization and working in a challenging

    environment where my qualification, potential and diverse experiences can be utilized to the

    maximum extent. To work with great sincerity towards my commitment, dedication and hard

    work for the benefits of the company in line with its mission, clients requirements and for

    personal growth where quality, professionalism and priorities are well defined.

    Career Summary:Over 1 year and 9 months of indigenous experience as a mechanical supervisor and 6

    months of overseas experience as Mechanical Technician, involved in a various challenges

    encompassing Oil and Gas Project, Piping & Structures for Petrochemical Plants, Refineries &

    Power Plants in India and Saudi Arabia.

    Professional Qualification:

    Diploma in Mechanical Engineering

    Non Destructive test(NDT Level II)

  • 8/12/2019 Dinulal Ss Cv

    2/4

    Technical Qualification:

    Ultrasonic Testing level II

    Radiographic Testing level II

    Magnetic Practicle Testing level II

    Penetrant Testing level II

    Well knowledge in Codes & Standards:

    ASME B31.3 Process Piping.

    ASME Section V - Nondestructive Examination.

    ASME Section VIII - Boiler and Pressure Vessel Code.

    ASME Section IX - Welding and brazing qualifications.

    Total Experience: 2.3 years

    INDIA- 1 Year 9 Months

    SAUDI ARABIA -6 Months

    Project Expertise:

    COMPANY : HYUNDAI HEAVY INDUSTRIES (HHI)

    CLIENT : DHURMA ELECTRICITY COMPANY

    PROJECT : POWER PROJECT NO:11

    POSITION : MECHANICAL TECHNICIAN

    LOCATION : RIYADH , SAUDI ARABIA

    DURATION : 2013 TO TILL NOW

    Responsibilities:

    In Dhurma Electricity Company(DEC) , our group took part in the liquid fuel

    commissioning. In the competitive world our group achieved the target in time. Now doing

    shut down work in DEC.

  • 8/12/2019 Dinulal Ss Cv

    3/4

    Worked with GE GTG Frame 7 Repair of Combustion Cans. Inspection of Micro filters, strainers etc. Installation of check valves, 3 way valves, Pressure safety valves etc. Repair of MOV motor operating valves. Checking of Pressure Indicators, Flow Meters and Analyzers. Repair works of various pumps. Inspection of GTG exhaust Arresting of Pressure Leaks. Maintenance of Water treatment plant & pumping station Maintenance of Boiler, pipelines and pressure lines.

    COMPANY123 : STEEL WORLD ENGG.WORKS

    CLIENT : MANGALORE REFINERY AND PETROCHEMICALS LIMITED.

    PROJECT 1: PHASE III

    POSITION 12: MECHANICAL SUPERVISOR

    LOCATION 11 : MANGALORE ,INDIA

    DURATION : NOV 2011 TO AUG 2013

    Responsibilities:

    REVIEW AND INSPECTION OF LINE CHECKING UNDER THE RFI.During this process,the line orientation, line rolling, type of Flange , Valves , Tie in line, Equipmentsinstallation, Supports and line deviation are inspected and made sure that they as perisometric drawing. After that comments to be noted on punch list A or B.

    REVIEW AND INSPECTION OF BOLT TORQUE RFI.To inspect the bolts for proper size,dimension, physical damage to threads (ASME B16.5 & ASME B16.47).Verification ofthe gasket type, rating, and dimension as per project specification and service

    condition.

    REVIEW AND INSPECTION OF PUNCH VERIFICATION. To re-inspect the A punch reworkand to give approval for hydro test. During the inspection, to verify weld summary list,

    and bolt torque report, PMI and NDT reports and all previous reports of pre- hydro testactivities.

    REVIEW AND INSPECTION OF HYDRO TEST RFI.To verify the test medium and workingpressure as per isometric and P&ID drawing. Co-ordination with client Inspectors.

    REVIEW AND INSPECTION OF REINSTATEMENT RFI.Re-inspect the B punch rework andcomplete modulation in line. To verify all supports installation with base concrete. Finalinspection of all complete line with Tie-in point.

  • 8/12/2019 Dinulal Ss Cv

    4/4

    QUALITY & SAFETY RESPONSIBILITIES

    Follow and maintain Company standards of Quality in accordance with CompanyQuality System requirements.

    Maintain standards of safety and comply with Companys Health, Safety and

    Environment Management System requirements.

    Take reasonable care of own health and safety and that of others in the workplace.

    DECLARATION:

    I hereby declare that all the above statements are true to the best of myknowledge and belief.

    Date: 16/03/2014Dinulal SS