Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 1
DIRECTORS REPORT
2014-2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 2
Table of Contents Page
Acronyms
President/Founder’s Message
Chief Executive’s Message
COMMUNITY UPLIFT PROGRAM – AN OVERVIEW
Data Sheet
1. Profile Overview
2. Governnace Structure of CUP Pakistan
3. Orgaizational Structure and Geographical Outreach & Coverage
4. Regional/Field Offices of CUP Pakistan
5. Donors/Partners of CUP Pakistan
6. Financial Stability and Corporate Systems
7. Human Resource Management & Administration
8. Donor Organization References
9. Programs of CUP Pakistan
COMMUNITY UPLIFT PROGRAM – PROJECTS 2013-2014
10. Sector-Wise Projects of CUP Pakistan (2014-2015)
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 3
11. Program Highlights 2014-2015)
A. Integrated Rehabilition Project funded by KNH in District Shangla
B. Livelihood Enhancement & Protection (LEP-III) Project Funded by PPAF
in District Shangla
C. Livelihood Support & Promotion of Small Community Infrasrtucture
Prjoect (LACIP) funded by PPAF/KFW in District D.I. Khan
D. Integrated Water Effecient Irrigation Projects (IWEIPs) funded by PPAF in
District D.I. Khan
E. HANIF Project
12. Challenges, Mitigation Measures and Lessons Learnt
Annual Audit Report 2014-2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 4
Acronyms
ADB: Asian Development Bank
APW: Activist Planning Workshop
BHU: Basic Health Unit
CBA: Child Bearing Age
CCCD: Child Centered Community Development
CIG: Common Interest Group
CMST: Community Management Skills Trainings
CO: Community Organization
CMS: Community Model School
CPI: Community Physical Infrastructure
CUP: Community Uplift Program
DI Khan: Dera Ismail Khan
ECCD: Early Child Care & Development
ECE: Early Child Education
EVI: Extremely Vulnerable Individual
HH: Household
IAUP: Integrated Area Upgrading
ICMC: International Catholic Migration Commission
ICT: Islamabad Capital Territory
KNH: Kinder Nothilfe (Germany)
KP: Khyber Pakhtunkwa
LEP: Livelihood Enhancement & Protection
LHW: Lady Health Worker
LIP: Livelihood Investment Plans
MCO: Male Community Organization
M&E: Monitoring and Evaluation
PKR: Pakistan Rupees
PPAF: Poverty Score Card
PSC: Poverty Scrore Card
TNA: Training Needs Assessment
VO: Village Organization
LSO: Local Support Organization
UC: Union Council
UNICEF: United Nations Children Fund
WB: World Bank
WCO: Women Community Organization
WFP: World Food Program
WVI: World Vision International
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 5
President/Founder’s Message
It has now indeed been over fouteen momentous years for CUP
as a National Level Development Organization.
I am pleased to observe that this growth has been well handled,
through sustained and unabated diligence, professionalism, and
a focus on integration, participation, impact and transparency of
our program.The continued relationship with all partner
organizations such as the Poverty Alleviation Fund/World Bank
(WB), Care International, World Vision International, KNH
Germany, KFW Germany, ICMC and DFID/Futures Group on a
transparent and equitable basis is the key to a long term
sustainable relationship.
I am pleased to see the progress that has been made in this regard, and would like to see a further
strengthening of these bonds in the coming years.A significant achievement of the institution has
been the success in building the capacities of community organizations in remotest parts of the
country. This has enabled CUP to provide an outreach for several funding agencies in the
delivery of programs in integrated area upgrading program through community infrastructure,
primary and reproductive healthcare, primary education, early child education/survival/
development and sustainable livelihoods for poverty reduction. As a result of the excellent track
record of CUP, there is now substantial support for CUP from all stakeholders. This is a good
indicator of the credibility that the institution has been able to achieve within a relatively short
span of time. It is now important for CUP to consolidate and strengthen its outreach in the years
ahead. The management team needs to be congratulated for their professional approach and
dedication in meeting targets set for the year 2014-2015.
I would like to thank the Board of Directors for their valuable inputs and time. We must remain
focused and understand that we are a national-level implementing agency based on an
indigenous model of participatory development that is meant to serve as a model for other
agencies. We can only achieve our goals if we are proactive and innovative in our thought
processes. That is the way ahead, and although the challenge is formidable I believe that through
teamwork, dedication and keeping the vision and goals of CUP in our sights, we would be able
to demonstrate why we consider ourselves as a development organization with a difference.
Dr. Rafiq Ur Rahman
President/Founder of CUP
October 9, 2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 6
Chief Executive’s Message
Over past 14 years of our demonstrated performance is a testimony
to the evolution of the CUP as a national level implementing
organization, for poverty reduction programs, whose interventions
are models for replication in the country. The promising start of the
early years has been fully realized, and the progress made in
subsequent years has been most gratifying and remarkable. The
steadfast belief in the inherent strength and potential of rural
communities to act as agents of change remains the central
philosophical underpinning of our program.
CUP’s image is a true reflection of the impact that has been created in the areas of our work. The
CUP management team has been a pleasure to work with, and their contribution to the
development of CUP as a sustainable and credible institution cannot be understated. Their
resolve, professional competency, and dedication have been a major factor in placing CUP as a
renowned institution for poverty alleviation at the grassroots levels in the country.
I would also like to thank our project staff working in some of the remotest and difficult areas
with the marginalized communities in empowering them to reduce their poverty. They have
indeed shown exemplary courage, devotion and alignment with a very noble cause.
We shall continue to look forward to team building and greater cohesion among the staff of CUP
in the years ahead with the aim of making CUP a model in grassroots level development.
Iftikhar Ur Rahman
Chief Executive, CUP
October 9, 2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 7
Community Uplift Program – An Overview
Data Sheet
Name of the Organization: Community Uplift Program (CUP) Pakistan
Country Office Address: 12-A, Street 28, F-8/1, Islamabad
Telephone (s): (92-51) 2256043, 2856292
Fax No: (92-51) 2856293
E-mail: [email protected]
Website: www.cup.org.pk
Contact Persons
Head of the Organization/Contact Person:
Designation:
Iftikhar Ur Rahman (Cell Phone: 0300-
5033802)
Chief Executive
Alternate Contact Person:
Designation:
Kazim Bukhari (Cell Phone: 0321-9610455)
National Program Manager
Legal Structure of the Organization
Registration: Section 42 of the Companies Ordinance 1984
Incorporation No: I-02753
Registration No: 13(1) PCR/2001
Place of Registration: Islamabad / Pakistan
Registering Authority: SECP/Joint Registrar of Companies Islamabad
Date of Registration: 29th
day of January 2001
1. Profile-Overview
Community Uplift Program (CUP) Pakistan is a national level non-profit development
organization registered under Section 42 of the Pakistan Companies Ordinance on 29 Jan 2001.
CUP has developed over the past fourteen (14) years as a national indigenous solution for
implementing poverty reduction projects; an innovation that can be replicated by the government
and development agencies with unprecedented accruals to the poorest of the poor at an
amazingly low per capita cost. It is a paradigm shift from run of the mill high-cost development
projects having minimal impact to a result-oriented and synergic participatory development,
which we call the four dimensional development approach; “integration, participation, impact
and transparency”.
CUP has also developed an intrinsic capacity to offer one-window management services, which
include monitoring, assessments & evaluation services for development organizations,
government agencies, donors, International NGOs/UN Agencies, mid-term/end project
evaluations, baseline studies and research studies. Some of our reputed clients for whom we have
conducted such services are; Monitoring & Evaluation Services for all USAID USAID/OFDA
and USAID/FFP Projects in Baluchistan (Oct 2010-Oct 2011) and Monitoring & Evaluation
Services for UN/WFP projects in 21 Districts of Baluchistan (Sep 2010- Oct 2011). Besides
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 8
impact assessment and end project evaluations for United Nations Children Fund (UNICEF),
Plan International, Technical & Management Agency (TAMA) of DFID, Ministry of Population
Welfare, Care International, National Commission for Human Development, CAFOD-UK,
Concern Worldwide, World Vision International (WVI), American Red Cross (ARC), ICMC and
MEDA/USAID Entrepreneurs Project.
Thus, we are positioned as a community development resource centre with both upstream policy
level formulation and downstream grass root level integrated participatory action planning and
implementation systems and monitoring, evaluation/assessment systems for development
interventions.
Mission/Purpose:
CUP Pakistan will strive to help the marginalized and ultra-poor
communities of Pakistan in reducing their poverty levels through
mobilization and capacity building to empower them for
acquiring their basic social needs and rights.
2. Governance Structure of CUP Pakistan
The governance structure of CUP comprises a two-tier system; Board of Directors (BoDs) and
the Management Team. CUP has undertaken to follow a democratic, non-political and a
transparent system, with the overarching principle of promoting equal opportunities for women
& children.
Governing Body: Our governing body constitutes 5 Directors and the gender ratio is 50% are
females and 50% are males:
Sr.
#
Name Gender Position Occupation Years
Served
1 Dr. Rafiq Rahman Male President Doctor (Oncologist in USA).
Also, Director of Pakistan
Human Development Fund.
14
2 Dr. Shamim Ara Female Director Doctor in USA 14
3 Ms Rehana
Ghayur
Female Director Social Worker 14
4 Lt. Col (retd)
Mamur Gul
Khattak
Male Director Civil Engineer 14
Management Team / Staffing Table: Our total full time paid staff strength is 120 including
professional, technical and support staff. The gender-wise ratio is 45% female and 55%
males. The roles and major expertise of the senior management professionals are as under:
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 9
S.# Name Gender Position Major Expertise Experien
ce
Reporting
Line
1 Iftikhar
Ur
Rahman
Male Chief
Executive
CUP Pakistan
Strategic Development
Planning, Program
Management,
Monitoring, Research
& Evaluation,
Sustainable
Livelihoods, Child
Care and Development,
Healthcare, Disaster
Risk Reduction &
International
Facilitator/Trainer.
30 BoDs
2 Kazim
Bukhari
Male National
Program
Manager
CUP Pakistan
Program/Projects
Formulation, Project
Implementation,
Surveys, Needs
Assessments
18 Chief
Executive
3 Kamran
Raza
Male M & E
Program
Officer
Education related
Research &
Evaluations.
7 National
Program
Manager
12 Abdul
Waheed
Male Finance
Manager
Finance & Accounts
Management
7 Chief
Executive
13 Zahida
Jabeen
Female Admin & HR
Manager
Administration & HR
Management
7 Chief
Executive
15 Sadia
Farid
Female M&E Officer Monitoring &
Evaluation of Family
Planning, Reproductive
Health & Maternal
Health
3 Chief
Executive
16 Sumaira
Kanwal
Female Executive
Support
Manager
Management,Executive
Support and Team
Coordination
5 Chief
Executive
17
Zahoor
Khan
Male District
Program
Manager
Project Management &
Livelihood
development and Event
management
12 National
Program
Manager
18 Shafqat
Munir
Malik
Male District
Program
manager
Project Managemen,
Education Sector
management and CPI
Sector Management
18 National
Program
Manager
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 10
19 Gulbaz
Ali Khan
Male Project
Manager/Dep
uty Team
Leader
Voice and
Accountability
Practitioner, Poverty
Monitoring &
Evaluation Specialist
10 Chief
Executive
3. Organizational Structure & Geographical Outreach of CUP
Pakistan
It is based on a participatory model, with an advisory committee made up of representatives of
donors, partners, associates and other stakeholders to guide CUP on its program and projects. A
professionally competent core management and support staff based in the Head Office at
Islamabad, manages the program of CUP, while we also have a think tank comprising
specialists/experts for each of our program thematic areas.
Chief Executive Iftikhar Ur Rahman
Program Unit
Kazim Bukhari, National Program Manager
KPK
Major Program
Shangla
36 Staff
DI Khan
35 Staff
Balochistan
Associates
Punjab
Associates
Rural Islamabad & Rawalpindi CUP Projects
Finance Unit
Waheed (Finance Manager
Admin & HR Unit
Jabeen (Manager)
Resource Mobilization Unit
Aasia Waqar
Executive Support Manager
Sumaira Kanwal
Board of Directors
Dr. Rafiq Ur Rahman, President/Founder
Dr. Shamim Ara, Director
Rehana Ghayur, Director
Lt Col (Retired) Mamur Gul Khattak
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 11
Geographical Outreach of CUP Pakistan
Partner/Associate Local NGOs
CUP Offices
Quetta
Noshki
Jaffarabad
Killa Saifullah
Kharan
Zhob
Sibi
Shangla
Mansehra
Kohat
Bannu
Karak
Lakki Marwat
DI Khan
4. Regional/Field Offices of CUP Pakistan:
CUP-Islamabad Field Office
Contact Person: Vacant
CUP Field Office: 12-A, Street 28, F-8/1, Islamabad
Tel: 92-51-2256043, Fax: 92-51-2856293
CUP-Shangla and Swat Field Office
Contact Person: Zahoor Khan, District Program Manager, Cell: 0300-5747283
CUP Field Office, Shangla, Tel: 0996-850764
CUP-Karak Field Office
Contact Person: Vacant
CUP Field Office, Community Hospital, Main Indus Highway, Karak
Tel/Fax: 92-927-260635
CUP-DI Khan Field Office
Contact Person: Vacant
CUP Field Office, House No 1, Near Banana Guest House, Diyal Road, and District D.I.Khan
Tel/Fax: 92-966-741214-15
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 12
CUP Peshawar Office
Contact Person: Gulbaz Ali Khan, Project Manager/Deputy Team Leader, Cell: 0300-4625004
CUP Field Office, Street # 1, Defense Town, Warsak Road, Peshawar Pakistan
Tel/Fax: 091 - 5200396
5. Donors/Clients of CUP Pakistan
Donors/Partners/Client Agencies Acronym Thematic Areas
Pakistan Poverty Alleviation Fund PPAF CPI, Health, Education, Livelihoods &
IWEIP
Australian High Commission AHC Infrastructure
Asian Development Bank ADB Multi-Sectoral
Care International CARE Healthcare
International Fund for Agricultural
Development
IFAD Multi-Sectoral
Committee Encouraging Corporate
Philanthropy – USA
CECP-USA Health & Education
Catholic Relief Services CRS Livelihoods
Plan International - ECCD, Water & Hygiene Sanitation,
Child Rights, Health
International Catholic Migration
Commission
ICMC Evaluation of Projects
United Nations Children Fund
UNICEF Child Protection, Water & Sanitation
& Integrated ECCD
UNDP- Global Environment
Facility/Small Grants
UNDP-SGP Livelihoods
Trust for Voluntary
Organizations/European
Commission
TVO/EC Health
National Commission for Human
Development
NCHD Capacity Building/Local Government
National Education Foundation NEF Education/Out of School Child
Education for All Wing, Ministry of
Education
EFA Education
Concern Worldwide RAPID Fund - IDP Response
Catholic Agency for Overseas
Development (UK)
CAFOD-UK Exit Strategy (Health, Education)
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 13
John Snow International/PAIMAN JSI/PAIMAN Health
Department for International
Development
DFID/TAMA Reproductive Health
United States Agency for
International Development.
USAID M&E Services for all USAID Funded
Projects in Baluchistan
World Food Program WFP M&E Services for all WFP funded
Projects in Baluchistan
DFID/Futures Group
Citizen Led Monitoring of Public
Family Planning Services
6. Financial Stability & Corporate Systems:
We are a financially sound National Level NGO. We have a Resource Mobilization Strategy, which also
includes the provision of Consulting Services to International Development Agencies in “Project
Management, Monitoring and Evaluation Services” and Research and Assessment Studies. Our annual
turnover for the past 6 years is as under:
# Years Amount in Million (PKR)
1 Turn Over 2008-2009 169.432
2 Turn Over 2009-2010 133.607
3 Turn Over 2010-2011 81.526
4 Turn Over 2011-2012 79.071
5 Turn Over 2012-2013 110.323
6 Turn Over 2013-2014 63.85
7 Turn Over 2014-2015 107.44
Other aspects related to our financial profile are as under:
Admissible Organization for Tax Credits: We are “admissible organization for tax credits”
under Section 2 (136) of the Income Tax Ordinance 2001” by an order of the Central Board
of Revenue (CBR);
Exemption from Levy of Taxes: We are “exempt from Levy of Taxes under Section 151 of
the Income Tax Ordinance 2001 by an order of the Central Board of Revenue (CBR).
Securities and Exchange Commission, Pakistan: CUP has an outstanding record of
fulfilling all requirements of the Securities and Exchange Commission of Pakistan, under the
Companies Ordinance 1984.
External Financial Audit: We subject ourselves to a very exhaustive external audit each
year and we take pride in the fact that there have been no negative observations either from
neither the SECP nor the Income Tax Departments.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 14
Corporate Responsibility
As a custodian of public funds, CUP is conscious of the need for prudence and appropriate
control in the management of finances. In pursuance of this objective, the Operations Division
has been assigned responsibility for executing and recording all financial transactions in a
systematic and transparent manner. The unit ensures compliance with regulations of Securities
and Exchange Commission of Pakistan and the covenants stipulated in the Agreements with the
Government of Pakistan (GoP) and donors.
The Operations Division works closely with other operational and support units of CUP in order
to ensure adherence to due process and facilitate release of funds for program activities. The
activities of the unit are carried out in an automated computerized environment through
customized software dedicated to CUP requirements. A comprehensive manual for financial
management has been developed which governs work processes of the unit. Books of accounts
are being kept in accordance with the statutory requirements and agreements with donors. The
records are subject to both internal and external audit as well as review of donor missions. The
unit generates internal and external reports for management, donors and Stakeholders. The
relevant internal reports are submitted to Chief Executive on a monthly basis to facilitate timely
decisions on the important aspects of CUP operations. External reports to sponsors and donors
are sent in accordance with stipulated requirements.
The external auditors furnished unqualified opinions that financial affairs of the company were
being conducted in accordance with approved accounting standards and requirements of
Companies Ordinance 1984. Maintenance of books and recording of entries was found to be in
order. These opinions were based on the inspection and review of records of the company and
the funds released to community organizations. Field visits form an integral part of the audit
exercise. Information and data submitted were also in compliance with disclosure requirements
and formats as well as International Accounting Standards.
Community Uplift Program is “admissible organization for tax credits” under Section 2 (136) of
the Income Tax Ordinance 2001” by an order of the Central Board of Revenue (CBR). We are
“exempt from Levy of Taxes under Section 151 of the Income Tax Ordinance 2001 by an order
of the Central Board of Revenue (CBR). CUP has an outstanding record of fulfilling all
requirements of the Securities and Exchange Commission of Pakistan, under the Companies
Ordinance 1984. The print media has regularly covered the activities and achievements of CUP.
This is a vindication of our sincere efforts to make a paradigm change in result-based
development of the poorest of the poor.
Our Procurement Process
CUP Procurement Policy & Procedures with regard to types of procurement related to contract
value is in synchronization with the World Bank Guidelines on Procurement. These are as under:
1) National Competative Biding:National Competative Bidding (NCB) is the competative
bidding procedure normally used for public procurement for contract values as follows:
a) Works: Value less than US$ 2,000,000 or PKR Equivalent
b) Goods: Value Less Than US$ 300,000 or PKR Equivalent.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 15
2) National Shopping: In most of procurement of goods (capital Items) and services,
National Shopping would the competitive bidding procedure used for public procurement
for contarct values as follows:
a) Works: Value less than US$ 25,000 or PKR Equivalent
b) Goods: Value less than US$ 50,000 or PKR Equivalent
Our Procurement Process is in line with International Procurement Processes as under:
Major Procurements for CUP Program (2014-2015)
# Project Major Items/Services Procurred Amount
(PKR)
Dates
1 KNH-IRP Toolkits for 57 Female
Beneficiaries Tailoring and
Embroidery
893,000
12/02/2014
2 KNH-IRP Toolkits to 57 Female
Beneficiaries Tailoring &
Embroidery
894,550 12/29/2014
3 KNH-IRP Payment for Procurement Assets
Transfer, 08 Different Trades 2,498,950 09/25/2014
4 KNH-IRP Assets Transfer to 40 female
Ben. UC Pirabad. Embroidery &
Tailoring
1,200,000 06/16/2015
5 KNH-IRP Payment for Office Setup &
Systems for 04 LSOs 799,300 12/25/2014
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 16
6 LEP-III PPAF-III
Assets Transfer to 60
Beneficiaries LSO Ranyal 3,000,000 12/29/2014
7 LEP-III PPAF-III
Assets Transfer(Karyana Shops)
to 14 Beneficiaries -UC Damorai 650,000 01/20/2015
8 LEP-III PPAF-III
Assets Transfer (Karyana Shops)
to 27 Beneficiaries –- UC Opal 886,006 01/20/2015
9 LEP-III PPAF-III
Assets purchased by LSO –
Electric Store UC Damorai 50,000 01/20/2015
10 LEP-III PPAF-III
Assets purchased(Hairdresser
Kits) by LSO- UC Opal 50,000 01/20/2015
11 LEP-III PPAF-III
Assets purchased(Medical
Stores) by LSO UC Opal 100,000 01/20/2015
12 LEP-III PPAF-III
Assets purchased(Clothes Shops)
by LSO –UC Opal. 100,000 01/20/2015
13 LEP-III PPAF-III
Assets purchased( Cosmetics) by
LSO –UC Opal 50,000 01/20/2015
14 LEP-III PPAF-III
Assets purchased(Stationeries)
by LSO –UC Opal 50,000 01/20/2015
15 LEP-III PPAF-III
Assets purchased(Electrician
Kit) by LSO- UC Opal 50,000 01/20/2015
16 LEP-III PPAF-III
Assets purchased ( Sewing
Machine) by LSO –UC Opal 13,994 01/20/2015
17 LEP-III PPAF-III
Assets purchased(Deep Freezer)
by LSO- UC Opal 50,000 01/20/2015
18
LEP-III PPAF-III
Procurement of 60 Enterprise
Development Packages for UC
Ranyal
2,849,995 03/30/2015
19
LEP-III PPAF-III
Assets Transfer, 03 Enterprise
Development Packages UC
Ranyal
150,000 04/01/2015
20
LEP-III PPAF-III
Procurement of 46 Enterprise
Development Packages - Tuck
Shop - UC Opal
2,300,000 04/16/2015
21
LEP-III PPAF-III
Procurement of 03 Enterprise
Development Packages -
Karyana Shops - UC Opal
150,000 04/16/2015
22
LEP-III PPAF-III
Procurement of 03 Enterprise
Development Packages - Sugar
& Rice - UC Damorai
150,000 04/16/2015
23
LEP-III PPAF-III
Procurement of 02 Enterprise
Development Packages - Sugar -
UC Opal
100,000 04/16/2015
24 LEP-III PPAF-III
Assets Transfer to 03 Enterprise
Development Packages - 150,000 04/16/2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 17
Deepfreezer for UC Opal
25
LEP-III PPAF-III
Assets Transfer to 02 Enterprise
Development Packages -
Carpenter for UC Opal
100,000 04/16/2015
26
LEP-III PPAF-III
Assets Transfer to 01 Enterprise
Development Packages -
Medical Store, for UC Opal
50,000 04/16/2015
27
LEP-III PPAF-III
Assets Transfer to 03 Enterprise
Development Packages - Cloth
& Sewing Machines for UC
Opal
99,000 04/16/2015
28
LEP-III PPAF-III
Assets Transfer to 03 Enterprise
Development Packages - Sewing
Machines & Cloth, UC Opal
51,000 04/16/2015
29
LEP-III PPAF-III
Assets Transfer to 03 Enterprise
Development Packages - Cloth
Shop, for UC Opal
100,000 04/16/2015
30 LEP-III PPAF-III
Procurement of 01 EDT Package
(Hosery) UC Damorai 50,000 04/16/2015
31
LEP-III PPAF-III
Procurement of 20 Enterprise
Development Packages -
Carpenter - UC Damorai
1,000,000 04/22/2015
32
LEP-III PPAF-III
Procurement of 09 Enterprise
Development Packages - Cold
Drink - UC Opal
450,000 04/22/2015
33 LEP-III PPAF-III
Procurement of 69 EDT Package
(Livestock/Goats) UC Damorai 2,763,450 05/13/2015
34
LEP-III PPAF-III
Procurement of 04 EDT Package
(Granding Machines) UC
Damorai
200,000 05/22/2015
35 LEP-III PPAF-III
Procurement of 02 EDT Package
(Carperner) UC Damorai 100,000 05/22/2015
36
LEP-III PPAF-III
Procurement of 1/2 EDT
Package (Sewing Machine) UC
Opal
22,300 05/22/2015
37
LEP-III PPAF-III
Procurement of 1/2 EDT
Package (Tailoring Equipments)
UC Opal
27,700 05/22/2015
38 LEP-III PPAF-III
Procurement of 01 EDT Package
(Cloth Shop) UC Damorai 50,000 05/22/2015
39 LEP-III PPAF-III
Procurement of 01 EDT Package
(Karyana Shop) UC Opal 50,000 05/25/2015
40 LEP-III PPAF-III
Procurement of 12 EDT
Packages (Livestock/Goats & 480,600 05/25/2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 18
Seving Machine) for UC Opal
41
LEP-III PPAF-III
Procurement of 20 Enterprise
Development Packages for UC
Ranyal
950,000 05/26/2015
42 LEP-III PPAF-III
Procurement of 02 EDT
Packages (Donkey) for UC Opal 100,000 05/26/2015
43 LEP-III PPAF-III
Procurement of 01 EDT Package
(Madical Store) UC Damorai 50,000 05/26/2015
44
LEP-III PPAF-III
Procurement of 18 EDT
Packages (Karyana Stores) UC
Damorai
900,000 05/26/2015
45
LEP-III PPAF-III
Procurement of 12 EDT Package
(Seving Machines & Goats) UC
Opal
119,400 05/26/2015
46 LEP-III PPAF-III
Procurement of 02 EDT Package
(Deep Freezers) UC Damorai 100,000 05/26/2015
47
LEP-III PPAF-III
Procurement of 69 EDT
Packages (Seving Machines &
Goats) UC Damorai
686,550 05/26/2015
48
LEP-III PPAF-III
Procurement of 20 Stands for
EDTs of Knitting Machines for
UC Damorai
140,000 05/26/2015
49
LEP-III PPAF-III
Procurement of Wool for 20
EDT Packages of Knitting
Machines for UC Damorai
140,000 05/26/2015
50
LEP-III PPAF-III
Procurement of 02 EDT
Packages (Grainding Machines)
UC Damorai
100,000 05/26/2015
51
LEP-III PPAF-III
Procurement of 20 EDT
Packages (Knitting Machines)
UC Damorai
720,000 05/26/2015
7. Human Resource Management and Administration
a) HR Functions in Support of CUP Program
Empoloyment with Community Uplift Program is regardless of gender, cast, creed,age,
religion or colour. We follow a transparent recuritment process to select the best possible
candidate in accordance with laid down job description, qualifications, experience and other
criteria that is announced through leading newspapers.
b) Admin Functions in Support of CUP Program
The administration provides support to the program. It provides support services such as
travel, staff training, staff orientation, staff displinary matters, transport, maintenance, central
supplies and printing coordination.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 19
c) The HR and Admin Team
Sr.# Names Designation Location
1 Ms Zahida Jabeen Manager HR & Admin Head Office
3 Mr Shamsher Gul Admin Assistant Head Office
4 Mr Mohammad Ayaz Finance & Admin Officer CUP Shangla
5 Mr Majeed Khan Admin Assistant CUP Peshawar
6 Mr. Shakeel Ahmad Finance & Admin Officer CUP D.I.Khan
7 Mr David Javid Driver Head Office
8 Mr Sahil Cook/ Guard Head Office
d) Staff Inductions(July2013 – June 2014)
S.# Name Designation Project Date of Joining
1 Yasmeen Bibi Livelihood Officer KNH-IRP 3rd
Jul, 2014
2 Nazish Begum Social Organizer KNH-IRP 23r Sep, 2014
3 Rashid Minhas Social Organizer KNH-IRP 26th
Aug, 2014
4 Tariq Ahmed Junior Social
Organizer
KNH-IRP 29th
Dec, 2014
5 Muhammad Zubair Design Engineer KNH-IRP 1st Feb, 2015
6 Ali Bash Social Organizer KNH-IRP 11th
Mar, 2015
7 Ahmed Faraz CBDRM Officer KNH-IRP 19th
May, 2015
8 Ishfaq Yousaf Livelihood Officer KNH-IRP 13th
May, 2015
9 Elizbath Social Organizer KNH-IRP 15th
May, 2015
10 Rozi Afsar Peon/Guard KNH-IRP 1st May, 2015
11 Ihsan Ullah Peon/Guard KNH-IRP 16th
Oct, 2014
12 Painda Mand Peon/Guard KNH-IRP 30th
Nov, 2014
13 Rozi Afsar Peon/Guard KNH-IRP 1st May, 2015
14 Sher Ali Cook/Guard KNH-IRP 1st Nov, 2014
15 Muhammad Fahim
Ghani
Project Manager DFID/HANIF 20th
April, 2015
16 Raheel Tahir Social Organizer DFID/HANIF 20th
April, 2015
17 Maimoona Khalid Social Organizer DFID/HANIF 20th
April, 2015
18 Saira Hussain Social Organizer DFID/HANIF 23rd
April, 2015
19 Majeed Khan Admin Assistant DFID/HANIF 20th
April, 2015
20 Marya Anwar Finance Assistant DFID/HANIF 26th
May, 2015
21 Raheem Ullah Watchman DFID/HANIF 24th
April, 2015
22 Jan Muhammad Watchman DFID/HANIF 24th
April, 2015
23 Shafqat Munir Malik District Program
Manager
KFW-LACIP 30th
Jan, 2015
24 Shakeel Ahmad Financee &Admin
Officer
KFW-LACIP 16th
March, 2015
25 S. Muhammad Ali
Jafar
Social Organizer KFW-LACIP 16th
March, 2015
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 20
26 Abdul Rasheed Social Organizer KFW-LACIP 16th
March, 2015
27 Asma Noor Social Organizer KFW-LACIP 16th
March, 2016
28 Waheed Ullah Junior Social
Organizer
KFW-LACIP 17th
March, 2015
29 Shafqat Ali Office Boy/Guard KFW-LACIP 9th
April, 2015
30 Fakhar Zaman Livelihood Officer KFW-LACIP 16th
March, 2015
31 Nighat Azam Livelihood Officer KFW-LACIP 16th
March, 2015
32 Nayyar Abbas Office
Boy/Guard/Cook
KFW-LACIP 8th
April, 2015
33 Muhammad Sajid Design Engineer KFW-LACIP 1st July, 2015
34 Muhammad Nawaz Field Supervisor KFW-LACIP 10th
September,
2014
35 Sultan Mehmood Project
Coordinator
LEP-III/PPAF 6th
May, 2015
36 Jawad Ali Shah Admin & Logistics
Officer
Head Office 3rd
March, 2015
e) Staff Leavers (July2013 – June 2014)
S.
#
Name Designation Project Date of
Leaving
Reasons
1 Naseer Ullah Admin and Logistics
Assistant
Head Office 11th
Feb, 2015
Resigned
2 Rambel Gul Watchman Head Office 15th
June, 2015 Resigned
3 Imran Sani Cook Head Office 18th
November,
2015
Resigned
4 Jawad Ali Shah Admin & Logistics
Officer
Head Office Resigned
5 Rizwan Baig Project Assistant KNH-IRP 11th
January,
2015
Contract
Ended
6 Liaqat Ali Design Engineer KNH-IRP 7th
February,
2015
Resigned
7 Inam Ul Haq Education
Coordinator
KNH-IRP 15th
August,
2014
Resigned
8 Farooq Shah Livelihood
Coordinator
KNH-IRP 4th
July, 2014 Resigned
9 Fayaz Ali Livelihood Officer KNH-IRP 10th
August,
2014
Resigned
10 Yasmin Bibi Livelihood Officer KNH-IRP 31st January,
2015
Project
Ended
11 Seemab
Khanum
Social Organizer KNH-IRP 31st August,
2014
Resigned
12 Sher Alam Social Organizer KNH-IRP 10th
March,
2015
Project
Ended
13 Ahmed Ali Junior Social KNH-IRP 31st December, Project
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 21
Organizer 2014 Ended
14 Zahid Khan Hr Assistant KNH-IRP 31st December,
2014
Project
Ended
15 Muhammad
Hanif Khattak
Office Assistant KNH-IRP 10th
Sep, 2014 Resigned
16 Khurshid Ali Peon/ Guard KNH-IRP 15th
Oct, 2014 Resigned
17 Ihsan Ullah Peon/ Guard KNH-IRP 30th
Sep, 2014 Resigned
18 PaindaMand Peon/ Guard KNH-IRP 30th
Nov, 2014 Resigned
19 Rabil Iqbal Finance & Admin
Officer
KFW-LACIP 15th
Dec, 2014 Resigned
20 Imran Khan Office Boy/Guard KFW-LACIP 31st Mar, 2015 Terminated
21 Asma Noor Social Organizer KFW-LACIP 31th May, 2015 Terminated
22 Kamran Haneef Livelihood Officer KFW-LACIP 10thOct, 2014 Project
Ended
23 Jan Muhammad Office Boy KFW-LACIP 31st Mar, 2015 Terminated
24 Muhammad
Nawaz
Field Supervisor KFW-LACIP 8th
June, 2015 Contract
Ended
25 Rozi Afsar Peon/Guard KNH-IRP 15th
Oct, 2014 Resigned
26 Sultan
Mehmood
Project Coordinator LEED/PPAF 30th
June, 2015 Resigned
27 Rahman Ghani Junior Social
Organizer
LEP/PPAF 31st Dec, 2014 Contract
Ended
28 Rahmat Ali Cook KNH-IRP 30th
Jun, 2015 Contract
Ended
30 Sohail Anwar CPI Coordinator KNH-IRP 30-Jun-15
Project End
31 Umer Badshah Office Attendent
KNH-IRP 30-Jun-15
Project End
32 Rashid Minhas Social Organizer
KNH-IRP 30-Jun-15
Project End
33 Ms. Maria Bibi
Cleaner - Female
Hostel
KNH-IRP 30-Jun-15
Project End
8. Donor Organizations References
Donor
Agency
Name & Designation of
Focal Point
Contact
Number
Email ID
PPAF
(Existing)
Muhammad Riaz, LEED
Manager
92-300-
5740796
KNH
(Existing)
Anwaar Ahmed, Country
Program Coordinator
92-312-
5906612
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 22
Futures
Group
Dr. Wajiha Ghias, HANIF
Fund Manager
92-302-
8555487
9. Programs of CUP
CUP in 14 Years of Development Programming & Implementation: Our Development
Programs are summarized as under:
Management Services Consultancy Program: Ever since its inception the Community Uplift
Program (CUP) Pakistan has rapidly developed an intrinsic capacity to offer one-window
project management and implementation services, 3rd
party monitoring and evaluation
services for programs/impact assessment, baseline studies, research, strategy development for
development organizations, government agencies, donors, NGOs and the private sector.
Primary, Reproductive & MNCH & Nutrition care Program: To establish community based
and managed health care systems comprising health and hygiene promotion committees,
community health workers and Mother and Child healthcare centers with the aim of meeting
the integrated rural needs of primary and reproductive healthcare, MNCH care, referral
systems and, emergency treatment and health education.
Primary Education Development Program: To work in collaboration with partners and
establish community-based and managed primary education and adult literacy centers in
order to contribute to the national effort of literacy.
Livelihoods Enhancement and Enterprise Program: We work with the communities through
a holistic livelihood enhancement & protection framework that facilitates the graduation of
the ultra-poor to non-poor through a process starting with poverty score card analysis,
development of livelihood investment plans, capacity building of common interest groups,
assets transfer (tools and micro-finance), marketable skills & enterprise development and
linking to various safety nets. These interventions are needs based and cover agriculture,
livestock, small individual & group businesses etc.
Community Physical Infrastructure/WASH Development Program: To mobilize communities
and other stakeholders in establishing environment friendly integrated area upgrading
projects which comprise inter-connected community physical infrastructure, WASH systems,
water efficient irrigation systems, street surfacing, safe sanitation, link roads etc.
Child Care & Development Program: To create awareness and capacities within
communities, government, law enforcers and the civil society in child rights to survival
growth, protection from abuse and exploitation, and development, within the parameters
defined by the Convention on the Rights of the Child 1989. Also under the CCCD approach,
the integration of ECCD, ECE, Health & Education and Child Rights;
Humanitarian Assistance Programs: We support the disaster affected communities through
the emergency response & early recovery phases leading to facilitating the transformational
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 23
development to pre-disaster situation. This effort comprises all sectoral interventions (rescue,
food security, livelihoods, education, health, WASH, education and child friendly spaces).
Cross Cutting Programs:
Good Governance Integration in Service Delivery; Social accountability, local
empowerment, social audit and citizen report cards.
Community Mobilization and Capacity Building: To facilitate the formation of women and
men community organizations (COs) and to strengthen the capacity of these partner
community organizations in acquiring their basic human needs through participatory
planning, organizational management and project cycle management. We also aim to develop
the institutional capacity of COs to enable them to form village level organizations (VOs)
and later Union Council Level apex representative local support organizations (LSOs).
Rights Based Mainstreaming: We envision CUP Pakistan playing its part without any
discrimination with regard to gender, caste colour or religion. Our programs factor in gender
related equity and rights as well as sensitize on citizen rights (as rights holders) &
government as duty bearers.
10. Sector-Wise Projects of CUP Pakistan (2014-2015)
MAJOR EDUCATION SECTOR PROJECTS OF CUP PAKISTAN (2014-2015)
# Project Title & Area Period Donor Amount (PKR)
From To
1 Integrated Rehabilitation Project
(Education Component) in District
Shangla
Jul 2012 Jun 2015 KNH
Germany
18,778,523
MAJOR LIVELIHOOD SECTOR PROJECTS OF CUP PAKISTAN (2013-2014)
# Project Title & Area Period Donor Amount (PKR)
From To
1 Integrated Rehabilitation Project
(Livelihood Component) in District
Shangla
Jul 2012 Jun 2015 KNH
Germany
20,326,155
2 Livelihood Enhancement and Enterprise
Development Project-III in District
Shangla
June 2013 Jul 2016 PPAF/WB 76,680,000
3 “Livelihood Support & Promotion of
Small Community Infrastructure
Project” (LACIP)
June 2013 Dec 2016 KFW/PPAF 125,194,500
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 24
MAJOR COMMUNITY PHYSICAL INFRASTRUCTURE/WASH SECTOR PROJECTS
OF CUP PAKISTAN (2014-2015)
# Project Title & Area Period Donor Amount (PKR)
From To
1 Integrated Rehabilitation Project (CPI
Component) in District Shangla
Jul 2012 Jun 2015 KNH
Germany
21,151,477
2 12 Integrated Water Efficient Irrigation
Projects
Jun 2012 Sep 2015 PPAF 29,855,620
MAJOR GOVERNANCE PROJETS OF CUP PAKISTAN (2014-2015) (CEO) # Project Title & Area Period Donor Amount (PKR)
From To
1 Improvement in Quality of Family
Planning, Reproductive & Maternal
Health Services through Citizen-Led
(Women-Led) Performance Monitoring
of Public Health and Population Service
Facilities in District Peshawar.
15 Apr
2015
15 Feb
2016
DFID/Future
s Group
7,451,263
11. Program Highlights (2014-2015)
A. Integrated Rehabilitation Project (IRP) in District Shangla
The Context/Background
Exceptionally heavy monsoon rains in July-August 2010 ravaged the North West range of
Khyber PakhtunKhwa (KPK). This includes district Shangla, from where the play full waters
started the destruction. Residents of this wrenched district were badly affected by the flood.
Bridges, link roads, schools, hospitals, agricultural land and houses were washed away.
According to the district revenue office 45% infrastructure in district Shangla was damaged.
While, District Shangla was going through a slow early recovery process through the collective
efforts of CUP and several stakeholders, the most vital aspects such as rehabilitation of
livelihoods of the most vulnerable sections of the community; the very poor women, men and
children required money & resources to restore livelihoods to pre-flood levels. Also, the access
to basic services (health, education, agriculture, livestock and markets) was hindered by the
damage caused to infrastructure mainly; small suspension bridges, micro-hydel structures, water
courses, health & education facilities and drinking water sources.
The floods exposed agricultural land, access roads and soil erosion to possible future such like
disasters, which were needed to be addressed through a community managed disaster
preparedness system and strengthening of spurs, retaining walls, gabion structures etc as part of
community based disaster risk management plans. Lastly, the education system collapsed due to
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 25
the damage to government schools and the lack of accessibility, protection and motivation
towards early child education and development. Learning was further stymied as schools have
no toilets, running water or electricity. As a result there had been a sharp reduction in school
attendance, particularly of the girl child, which is mainly because of cost of books, stationery,
transportation and the compulsion of families to engage children, particularly the girl child in
domestic chores boys, instead of encouraging them to enroll or start attending school.
In short, an integrated development approach was much needed for the complete
rehabilitation of the most affected and most vulnerable sections of the communities within the
flood affected Union Councils of District Shangla. Based on the submission of a proposal by
CUP, KNH awarded a grant on 20 June, 2012 for this project.
The Project Area
The area of the District is 1,586 sq-Km (339,614 Acres) in which 104,672 Acres (31%) is
cultivated and 109,685 Acres (32%) is forest. It consists of 2 Tehsils; Tehsil Alpuri and Tehsil
Puran and 28 Union Councils. Pirabad, Damorai, Opal & Ranyal are the Union Councils (UCs)
of Tehsil Alpuri in District Shangla which bore the massive destruction by floods and the earlier
affected by the terrorism and flash floods. Therefore, these above mentioned four UCs were
selected for the integrated rehabilitation project.
The Target Population
The project is focusing on the 4 Union Councils covering 15 Revenue Villages with a total
population of 70,593 (40,465 children, 14889 women & 15,239 men) comprising 12,625
households. The Project area map with targeted UCs highlighted in Pink Colour:
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 26
Project Goal:
The goal of this 3 year integrated development project is to fully rehabilitate the lives of the most
affected and extremely vulnerable communities in District Shangla through a community-
led process managed by representative community organizations at various levels.
Project Objectives:
Progress Update Component-Wise
(1) Strengthening of Local Community Organizations:
Under the component, CUP focused on building institutions of communities through its social
mobilization strategy, a process that is instrumental in the institutional development of the target
communities. This is based on decentralized approach to rural development and poverty
reduction. It believes that communities have immense capacity for self-help, however, they need
a catalyst organization to enable them to realize their potential. The CUP provided for this, role
of a stimulus and pursued community participation in development by placing them at the centre
of the process.
Program Component Objectives
Strengthening of Local
Community Organizations
Objective-1: To support local community organizations in
planning and implementing community-based strategies to
build and sustain initiatives for local development which are
sensitive to the needs of EVIs and EVFs;
Livelihoods Restoration Objective-2: To support an integrated livelihood restoration
framework which builds the capacities of EVIs in enterprise
development, develops their marketable skills, provides them
with assets (cash& materials) and facilitates them to access
social safety nets, services & jobs leading to their socio-
economic empowerment;
Restoration of Community
Physical Infrastructure
Objective-3: To construct, repair, restore, rehabilitate or
maintain vital community physical infrastructure damaged by
floods in order to enable mobility & access to basic social
services;
Disaster Risk Reduction &
Mitigation
Objective-4: To build the capacity of the communities in
disaster preparedness and risk mitigation planning, while
strengthening and/or constructing the protection infrastructure
for mitigating future identified risks;
Education-CFS, ECCD, Child
Rights & Protection
Objective-5: To facilitate the transformation of flood affected
government schools into child friendly learning centers
through rehabilitation/renovation, capacity development of
the school management in innovative learning and
improvement of the larger community awareness on child
rights & child protection;
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 27
The three tiers structure organizations of the target communities are organized into broad-based
democratic bodies that are representative of people and provide for the role of local self-
government.
During the year (July 2014-June 2015) a total of 37 MCOs, 47 WCOs and 11 VOs have been
formed. These community institutions and the existing had been further strengthened through
Community Management Skill Training, Activists Planning Workshops and Exposure Visits.
The local communities showed great interest and actively participated in formation of
community institutions and are eager to strengthen these organizations. A total of 90 number of
male and female community organizations (Tier–I) had been trained in community management
and development skills, documentation, and other procedures related to an organization. 90
members of the community institutions (Tier– I) had also actively participated in Activists
Planning Workshops while 100 members participated in Exposure Visits. The Exposure Visits
were of greater importance for improving the capacities of community institutions. They were
exposed to model community institutions, other than the home district. The main focus of these
visits was to expose them to outside good practices, adopted by model community institutions.
Moreover, their advocacy skills are developed to articulate and negotiate with relevant
authorities and other development actors to influence pro-poor policies and resource allocation.
This approach gives poor a voice and vision to address issues that hinder their integration into
mainstream development.
Formation of Local Support Organizations is certainly an encouraging achievement of the
current year. The COs and VOs of four union councils; UC Ranayl, Opal, Pirabad and Damorai
had been further federated in Local Support Organization. The 3rd Tier organizations are
showing keen interest in the developmental activities at union council level. The capacities of the
same group of people will be enhanced through imparting various trainings on community
development and Annual Planning Workshops. The community institutions supported in all the
interventions under the umbrella of Integrated Rehabilitation Project (IRP) and striving hard to
lead the program to a successful completion.
Sharing Experiences during exposure visit to LSO
Batagrarm Briefing session by LSO Batagaram office bearers
to WCO members
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 28
Component-1: Strengthening of Local Organizations
Targets Vs Achievements 2014-2015
Sr
# Major Interventions
Project
Targets the
Year 2014-
15
Project Progress as of June 2015
Women Men Mix Total Status in
%age
1
Strengthening and Formation of
Community Institutions (Male)
MCOs
39 0 39 0 39 100%
2
Strengthening and Formation of
Community Institutions (Female)
WCOs
47 47 0 0 47 100%
3
Strengthening and Formation of
Community Institutions Village
Organizations (Vos)
11 0 11 0 11 100%
Group Work Exercise during APW session CMST Workshop with MCO Members of
UC Ranyal
Community gathering during WCO formation WCO members in LSO Batagaram office during
Exposure Visit
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 29
4 Strengthening and Formation of
Community Institutions (LSOs)
4 0 4 0 4 100%
5 Community Management Skill
Trainings
126 0 90 0 90 71%
6 Activists Planning Workshops 126 0 90 0 90 71%
7 Exposure Visits 126 0 100 0 100 80%
(2) Livelihoods Restoration, Enhancement & Protection
The objective of Livelihood restoration component of the project is to develop the capacity,
opportunities, assets and productivity of community members to reduce their vulnerability to
shocks, improve their livelihoods initiatives and strengthen their business operations.
During the first year of the project (2012-13) CUP project team carried out a comprehensive
carpet coverage survey PSC in targeted UC of Pir Abad to identify the most deserving and needy
beneficiaries having poverty ranking of 0-11, 12-18 and 19-23. They were further assisted in
developing Livelihood Investment Plans (LIPs). As a result of LIPs hence 563 beneficiaries
were targeted for assistance during the entire life of the project.
Under this component, during the year 2014-15, the CUP project team made enormous efforts
and achieved 80% of the target. The targeted beneficiaries were grouped into Common Interest
Groups (CIGs) on the basis of interest and experience and trained in business/enterprise set up
and training in employable trades and finally provided with tools and assets that were relevant to
their skills/trade such as; Agriculture, Poultry, Tailoring and Embroidery etc. During the year
2014-15, 204 beneficiaries received demand driven skills and enterprise development training in
employable trades, while 252 trained extremely vulnerable individuals (EVIs) received
productive assets. The community institutions are supporting all the interventions under the
umbrella of Integrated Rehabilitation Project (IRP) and striving hard to lead the program to a
successful completion.
View of the package for general merchant Female trainees were provided tailoring &
Embroidery tool kits for their business
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 30
Targets Vs Achievements 2014-2015
Sr
# Major Interventions
Project Progress Details
Remarks Project
Targets for
the Year
2014- 2015
Progress
During
2014-
2015
Achiev:
in
%age
1 Demand Driven Skills &
Enterprise Development Training
for EVIs in Employable Trades
281 204 72%
2 Assets (Trade Tools/Productive
Assets) Transfer to Trained EVIs
378 252 67%
3 Formation of Common Interest
Groups (CIGs)
18 19 105%
A display of dresses by the skilled trainees in embroidery and tailoring
after the two month comprehensive training in embroidery and tailoring
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 31
Community members engaged in construction of
Pathway Damorai UC Damorai
Work under progress at Pathway Damorai UC
Damorai
Water Tank Opal village UC Opal before
Construction
(3) Restoration of Community Physical Infrastructure
At the outset of the reporting year, especially in the first quarter of the year, the component,
“Restoration of Community Physical Infrastructure” went through soft activities and preliminary
preparation for executing schemes. Community Institutions established by CUP came up with
number of damaged and new schemes such as Pathways, Retaining Wall, Breast Walls, Water
Channels, Drinking Water Supply Schemes and Suspension bridges for restoration. The
proposed schemes were identified in all four targeted UCs, Ranyal, Damorai, Opal and Pir Abad,
which were got approved by KNH. Rapid progress was made to achieve the set target for the
year. The allied physical civil activities around all schemes i.e. RCC Culvert Village Pirabad at
UC Pirabad and MHP Lodhar at UC Damorai are in progress, while three schemes DWSS
Donai, Pathway Chichlo at UC Ranyal, Pathway Damorai at UC Damorai, and DWSS of village
Opal UC Opal have been completed. Furthermore, the identified new schemes will be initiated in
the next year 2015.
4 Establishment of Community
Based Business Centers (2 Ucs)
2 2 100%
5 Linking EVIs to Social Safety
Nets
60 40 67%
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 32
Component-3: Restoration of Community Physical Infrastructure
Targets Vs Achievements 2014-2015
Sr.
# Major Interventions UC
MCO/VO
Village
Hamlet
Total No.
of Direct
Benef:
Physical Status of Work
2 Micro Hydel
Structures
Damorai MCO Lodhar Soray 215 Completed
3 Pathways Damorai Damorai 353
Completed Ranyal Ranyal 367
4 Drinking Water
Supply
Opal Opal 289 Completed
Ranyal Ranyal 331
6 Culvert/Small
Bridge
Pir Abad Pira Abad 189 Completed
View of the completed Water Tank DWSS Opal Construction of Pathway village Chichlo UC
Ranyal
Completed structure of DWSS Dhonai UC Ranyal Construction of the water tank DWSS Dhonai
Diversion channel MHP Lodhar is 500 feet long
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 33
(4) Disaster Risk Reduction & Mitigation
During the reporting year the major focus of the CUP DRR team was on Awareness Training for
Community Activists on Disaster Preparedness. A total of six trainings were conducted in which
Children, PWDs and LSO, VOs members participated. The trainings were intended to strengthen
the capacities of Community, LSO & VO members to mainstream community managed disaster
risk reduction concepts, principles and practices in planning and implementation of community
development efforts. Specifically, it was aimed at helping them to understand the concepts and
principle of DRR. They were also expected to share own experiences and appreciate limitations
of their current approach and have clear ideas on how to improve them. The facilitators used
experiential learning approach, which starts with what participants already know together with
time tested learning by doing, where concepts, principles and process were explained and
assignments were given. Key achievements of the workshop were; enhanced knowledge and
skills of participants in facilitating disaster risk reduction planning process and helping the
participants appreciate limitation of their current development approaches and planning
concrete action plans to improve practices in their respective communities institutions etc.
Besides Awareness Trainings, during the reporting year DRR team worked closely with the
LSOs for the formation of UC level Union Council Disaster Preparedness & Mitigation Plans
(DPMPs) and Disaster Management Committees. The team has been able to deftly carry out the
ground work to formally establish these committees. Both the DRR and the social mobilization
teams are working in coordination to establish these committees as well as organizing Training
on Awareness of Communities on Disaster Preparedness.
Component-4: Disaster Preparedness Training
Targets Vs Achievements 2014-2015
Sr
# Major Interventions
Project Progress Details
Remarks Project
Targets
for the
Year 2014-
2015
Progress as
af of 30 Jun
2015
Achievement in
%age
1 Awareness Training for
Community Activists on Disaster
Preparedness
10 10 100%
2 Formation of Disaster Management
Committees & Linkages with
DDMAs
4 4 100%
3 UC Level Disaster Management
Plans & Capacity Building
Trainings of Disaster Management
Committees
4 4 100%
4 Plantation on the identified risky
areas to reduce the land sliding etc
20,000 20,000 100%
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 34
Community member reciting during the sessions
Resource Person delivering session
Group activity during the session
View of Group activity during sessions
The session underway at community level
Communities attended the session with full
concentration
(5) Education-CFS, ECCD, Child Rights & Protection
During the year 2014-15, the project team focused on remaining set of targeted activities like
Educational Events, Developing Teacher Evaluation Check List, Formation of Child Rights
Protection Committees (CRPCs) etc. To ensure the sustained and active position of these PTCs,
project team maintained their continuous mentoring. No proper school management system was
in place in the targeted schools prior to the PTC trainings but as for now the trained PTCs are
well aware of their roles and responsibilities and this is their first step towards attaining
sustainable position. During the PTC mentoring meetings topics such as active involvement of
Child Protection Committee (CRPC) in promoting rights of the children were discussed.
The PTC members were informed that CPRC is aimed at the realization of the Rights of the
Child such as their Education Right, Health Right, or also the right to be raised in a healthy
environment. This is the prime responsibility of the committee to ensure that all children go to
school, especially girls. In this perspective, the members work actively in collaboration with the
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 35
Teachers and Parents Association and Village Educational Committee in order to achieve a
constant schooling for every child. The Committee members organize meetings in order to raise
awareness of the negative effects of child labour and encourage the community to improve the
capacity to realize the rights of all the children.
During the reporting year a total of four educational the educational events with children were
organized. These events were aimed to develop a child friendly atmosphere where student have
better chance to flourish and demonstrate their hidden talents. Besides it was also envisaged to
help PTCs in better management of co-curricular activities and to encourage them for active
participation in the school affairs. These co-curricular activities included school level quiz
competition and speeches/debates on various topics such as peace, literacy and environment.
These events played significant role in creating non-threatening and enabling environment at
school level. Other activities that include dissemination of ECE learning materials were
distributed among newly identified 22 government primary schools. These schools were
identified through district education department in the targeted four UCs.
Component-5: CFS, ECCD, Child Rights/Protection
Targets Vs Achievements 2014-15
Sr# Major Interventions
Project Progress Details
Remarks Project
Targets for
the Year
2014-2015
Progress
During
2014-2015
Achiev:
in %age
1 Develop teacher evaluation check
list and test (pax);
22 22 100%
2 Mentoring meetings with PTCs;
(With 22 PTCs)
13 13 100%
3 Meetings with Education
Department for fund allocation to
PTCs;
12 12 100%
4 Formation of Child Rights
Protection Committees (CRPCs)
4 4 100
5 Organization of different events with
School Children
23 15 65%
6 Training of rehabilitated school on
child friendly methods & Role &
Responsibilities of SMCs
0 0 -
B. Livelihood Enhancement & Protection (LEP-III) Project Funded by
PPAF:
Project Background:
District Shangla is one of the 25 districts of Khyber Pakhtunkhwa (KPK), which is marked by a
high rate of poverty, illiteracy, unemployment, and infant and maternal mortality due which has
been further multiplied by the current militancy & flash floods that has hit the region. The
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 36
Human Development Index (HDI) is the best-known measure of development and has three
basic dimensions: (i) a long healthy life, as measured by life expectancy at birth; (ii) knowledge,
as measured by the adult literacy rate; and (iii) a decent standard of living, as measured by GDP
per capita. According to the Pakistan National Human Development Report 2003, wide
variations in HDI measures exist across the provinces and districts. According to the report
“there is considerable variation across provinces with respect to literacy rates which vary from
51 per cent in Sindh to 43 per cent in Khyber Pakhtunkhwa.
The picturesque area of the District is 1,586 sq-Km (339,614 Acres) in which 104,672 Acres
(31%) is cultivated and 109,685 Acres (32%) is forest. It consists of 2 Tehsils; Tehsil Alpuri and
Tehsil Puran and 28 Union Councils. Damorai, Opal & Ranyal are the Union Councils (UCs) of
Tehsil Alpuri in District Shangla which bore the brunt of destruction by floods and the earlier
military conflict. CUP with PPAF funding covered 30% of the identified poor in the UCs of
Damorai, Ranyal & Opal of Tehsil ALPURI through the early recovery Livelihood Enhancement
Protection Project, Health & Education & Disability (Nov 2010 to Aug 2011). Later on CUP
Pakistan focused on “deepening” of the interventions in these 3 existing UCs as under:
Project Goal:
The goal of this 3 year integrated development program was to fully rehabilitate the lives of the
most affected and extremely vulnerable communities in District Shangla through a community-
led process managed by representative community organizations at various levels.
Outcomes & Output:
Outcome-1:
Ultra Poor Graduated to Poor and Poor Graduated to Non-Poor by Jun 2014
Outcome-2: Target Communities develop set of Skills & Assets for Improved Livelihoods through
establishment of Community Livelihood Funds (CLF)
Outputs:
Poverty Levels Identified
CLF Established;
CLFs Strengthened through one-time contribution of Rs 5,000 per member of the CO.
A. DEEPENING OF INTERVENTIONS IN EXISTING 3 UCS OF TEHSIL ALPURI,
DISTRICT SHANGLA
Code Name
of UC
Tehsil District No. of
Revenue
Villages
Total
HH
Total
Population
Male Female
UC-
A001
Damori Alpuri Shangla 3 3,553 17,952 9,156 8,796
UC-
A002
Opal Alpuri Shangla 6 3,447 19,063 9,722 9,341
UC-
A003
Ranyal Alpuri Shangla 3 2,452 15,183 7,743 7,440
Total: 3 UCs 1 1 12 9,452 52,198 26,621 25,577
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 37
Vocational & Entrepreneurial Skills Developed;
CLF establishes a revolving fund for Internal Livelihood Lending;
Reduced Unemployment
Project Progress during the Year:
During the reporting year the project progress remained slow as field activities were hindered
due to non-availability of “No Objection Certificate” from the PDMA-KPK and DDMA
suspended project activities in the district till the issuance of NOC. The overview of the
problems and challenges is given in the following lines.
Extremely harsh and severely cold weather conditions also hampered the delivery of project
activities.
But, with all these challenges and problems the CUP Shangla team managed to accomplish some
targets and tasks. The CUP Shangla Team organized total 36 Common Interest Groups (CIG) in
different trades. These 36 CIGs includes 5 CIGs of women of Poultry Farming, Livestock,
Tailoring and Embroidery and the 31 men CIGs were for Enterprise development, Livestock and
Poultry, Plumbing, Mobile Repairing, Agriculture, Tile Fixing and Electrician.
The major progress can be seen under the Assets Distributed and livelihoods training provided to
ultra and vulnerable poor so that they could generate income to enhance their livelihoods. Under
these two main heads, 470 poor were provided with the assets including 87 women and 383 men.
And, total 128 poor were provided with the training during this reporting period in which 39
participants were women whereas the 89 participants were men. A detail of all the achievements
during this year is as mentioned in following table;
Livelihood Enhancement Program
Annual Progress (1st July 2014 to 30 June 2015)
Activities Previous Progress Progress During the Year Cumulative Progress
Women Men Mix Total Women Men Mix Total Women Men Mix Total
PSC Completed - - - 9452 0 0 0 0 - - - 9452
LIP Completed 220 540 0 760 0 0 0 0 220 540 0 760
CIG Formed 6 23 0 29 4 7 0 11 10 30 0 40
Assets Distributed
to Person 205 216 0 421 87 383 0 470 94 978 0 891
Training Provided
to Person 964 1226 0 2190 39 89 0 128 1003 1315 0 2318
Person Provided
with the wage
compensation
60 162 0 222 78 20 0 98 138 182 0 320
Linkages
Developed 6 23 0 29 4 7 0 11 10 30 0 40
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 38
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 39
Glimpse of the Community meetings conducting during the course of the Project
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 40
C. Livelihood Support & Promotion of Small Community Infrastructure
Project (LACIP) Funded by the KFW/PPAF:
Project Background
Livelihood Support & Promotion of Small Community Infrastructure Project (LACIP) is
implemented by PPAF in the Province of Khyber Pakhthunkhwa (KP) with financial assistance
from the Federal Republic of Germany through KfW. The project is implemented under a
trilateral agreement signed among Government of Pakistan, KfW and PPAF. The project tends to
improve life of marginalized communities in district DIKhan with provision of conventional and
innovative small community infrastructure schemes, livelihood support through asset transfer
and vocational trainings and disaster risk reduction strategies. All interventions of the project i.e.
HID, LEP & CPI will be implemented in close coordination with the government line
departments in the district. Moreover, the interventions will be carried out jointly with the
Community Organizations, Village Organizations, and Local Support Organizations at the UC
level.
Project Objectives:This project has the following objectives;
Objective of the Project HID- Component
To provide a strong platform for the mobilization & capacity building of communities to enable
them to manage & sustain the community driven Integrated Poverty Alleviation Project.
Objective of LEP Component:
To reduce poverty in the target area by 50% through holistic livelihood enhancement protection
measures for the ultra-poor by end Dec 2014.
Objective of CPI Component
To improve the quality of life through provision of environmental friendly CPI in the 2 target
UCs of District D.I Khan by Dec 2014
Project Components:
a. Human & Institutional Development (HID):
Human Institutional development is increasingly recognized as crucial to overall development.
The rationale being that HID is the foundation of any development strategy. It provides the
framework as well as the fuel for translating ideas into action.It built capacity in individuals,
institutions, and societies to build up the knowledge, skills, and resources for meeting their own
needs to respond to human crises.
The HID program implies making communities realize their capability and enable them to march
towards professionalism by acquiring certain skills and techniques. It is also a process of
capacity Development for socio-economic empowerment that enable both male and female to
have equal access to economic opportunities and controlling their income. Participative, demand-
driven and empowerment processes are the basis of HID. Disadvantaged members of a society
need a voice in any intervention to be able to take responsibility for their own development by
responding and defending themselves.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 41
Main objective of the HID-Social Mobilization component is, to provide a strong platform for
the mobilization & capacity building of the marginalized communities to enable them to manage
& sustain the community driven Integrated Poverty Alleviation Project.
During the reporting period, total 99 COs were revitlized and 6 new Community Organizations
were formed from the total project target i.e.259 in both the UCs. The organized COs were
further federated into 12 VOs at villages level. While, 12 VOs were further federated into two
LSOs at UC level. The community insttiutions were also facilitated in development their VDPs
and UCDPs to further implement those plans.
View of the Male, Female Broad Based Community Meetings
during formation of Community Organization
b. Project Component, LEP (Livelihood Enhancement & Protection)
The Livelihood Support & Promotion of Small Community Infrastructure Project (LACI-P) aims
to reduce the poverty levels by increasing economic opportunities in the project region. In
addition, to support the livelihood measures to stabilize and restore the livelihoods of vulnerable
and poor communities. The main objective of this component is to develop the capacity,
opportunities, assets and productivity of community members to reduce their vulnerability to
shocks, improve their livelihoods initiatives and strengthen their business operations.
A carpet survey of two target UCs i.e. Kurai and Yarik has been successfully completed covering
5977 H/Hs in both the UCs. Besides this, LIPs (Livelihood Investment Plan) have also been
developed of 667 Beneficiaries in both the UCs. The project team has also facilitated in linkages
development to community institutions for resources mobilization from those institutions for
their development initiatives. After resumption of project, the LOs facilitated the identified the
ultra-poor in development of their Livelihoods Investment Plans.
c. Project Component, CPI (Community Physical Infrastructure): CPI is one of the main components of the LACI-P, to restore the basic and critical community
physical infrastructure and services like DWSS, Street pavement, link roads, flood protection
bunds, IAUP irrigation, sanitation etc. The main objective of the component is to improve the
quality of life through provision of environmental friendly CPI in the 2 target UCs of District D.I
Khan by Dec 2014.
Different types of schemes have been implemented in the target area: IAUP (Integrated Area
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 42
Upgrading Project) or Model village, Sanitation, Street Pavement, DWSS, and link road are
included. All the target communities are deprived of basic human needs like drinking water,
sanitation, roads and street pavements. All these are located very far away having insufficient
communication to the settled areas. So far, 19 CPIs are 100% completed in the target
communities of both targeted UCs. After change in strategy, the CPI will be implemented IAUP
at VO level.
Picture 1 & 2: snaps shot of streets before construction of street pavement projects.
Picture 3 & 4 Views of village streets after rain
Picture 5 & 6: Construction work of a Village street pavement is going on.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 43
Summary of Progress during 2014-15:
S. # Title of
Activity
Unit of
Measurement
Planned
Target
Till Jun-
2015
Achieved
Cumulative
Till June-
2015
% age
achieved
Remarks
/Reasons for
delay, if any.
1. Human and Institutional Development (HID) Component
1.1 Community
Organizations
(COs)
formation.
(Men+
Women)
No. of COs 99 106 106%
1.2 Village
Organization
formed
No of VOs
formed
20 12 80%
1.3 Local Support
Organization
(LSO) formed
No of LSOs
formed
2 2 100%
1.2 Community
Managerial
Skill Trainings
(CMSTs)
No. of Persons
Trained
through CMST
53 10 19%
1.3 Exposure
Visits
No. of Persons
Taken for
Exposure Visits
20 9 45%
2. Livelihood Enhancement & Protection (LEP) Component.
2.1 Poverty Score
Cards. (PSCs)
No. of Poverty
Score Card to
be Prepared on
HH Basis
7392 7392 100%
2.2 Livelihood
Investment
Plan (LIP)
Development
No. of
Livelihood
Investment
Plans to be
Prepared
520 698 134%
2.3 Assets
Transfer to
ultra and
Vulnerable
Poor
No. Of
Beneficiaries
520 214 45%
2.4 Livelihood
Training
No. Of
Beneficiaries
340 97 24%
2.5 Linkages
development.
No. of
Linkages
Developed
30 10 35%
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 44
3. Community Physical Infrastructure (CPI) Dev. Component
3.1 Physical
infrastructure
Schemes
No. of CPI
Schemes to be
initiated
99 19 19%
D. Integrated Water Efficient Irrigation Projects (IWEIP) Funded by the
PPAF:
Project Background
Integrated Water Efficient Irrigation (IWEI) Program is a nationwide program of
PPAF that encompasses the implementation of projects mainly consisting of two
sets of interventions: the first set consists of water source development and an
efficient water conveyance system, while the second set encompasses efficient
application and productivity enhancement of water. Integrated Water Efficient Irrigation (IWEI)
projects are being implemented by PPAF’s Water Management Center (PWMC) for an efficient
and optimal use of water and its associated resources through construction of irrigation related
infrastructure and its better Water Source On-Farm management in an integrated manner.
Interventions at all levels from the development of water source to the end user till its application
at field level are made for minimizing water loses during water conveyance delivery. These
projects are undertaken targeting the poor communities with their active involvement.
Irrigation consumes about 70-80% of water for agricultural production. The
existing irrigation systems practiced in Pakistan, are so inefficient that most of the
water is either lost in conveyance or by mismanagement. However, the future
needs for water by all the sectors could be met by increasing the efficiency of
irrigation and transferring the saved water in irrigation to the domestic, industrial,
livestock and environmental sectors. The farmers in Pakistan have been using
traditional surface irrigation causing water losses and land degradation due to
water logging resulting from over-irrigation. Further, yields per unit of water in the
country are lowest in the world. There is a need to maximize the per unit
production of water. This challenge can only be fulfilled by better & efficient use
of these two natural resources. Adoption of advanced irrigation water saving
methods like drip and sprinkler irrigation methods can help to achieve this goal.
High Efficiency Irrigation System is an ideal way to produce high value crops as it reduces water
use, increases crop yield and gives good quality produce within less time and money as
compared to traditional ways of cultivating and irrigating commercial crops. However, majority
of the small holders in developing countries including Pakistan, are deprived of this technology
due to its high initial cost and non-adaptability to small holdings. Until recently, it has been too
expensive to be affordable for poor families and too large for tiny plots of land. But due to local
manufacturing of the pipes and other products, cost per acre has now become as low as farmers
can afford this new technology.
The High Efficiency Irrigation Systems are suitable where traditional surface irrigation methods
do not work properly. For example in desert and hillyter rains HEIS can work quite
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 45
satisfactorily. These systems can also be used with gravity flow where hydraulic head is
available, reducing the initial cost. Such locations are available in northern areas and KPK.
This integrated poverty alleviation project is based on interventions that are driven by needs
identified through an inclusive participatory process. This integrated approach was adopted for
social mobilization and capacity building of community organizations (COs) with livelihood
enhancement and protection, community physical infrastructure, irrigation water management,
healthcare and educations. COs were formed according to the planning to work in the villages of
the target UCs for the execution of the integrated interventions for desired poverty alleviation
impacts through saturation.
Objective of the Project IWEIP- Component To establish an Integrated Water Efficient Irrigation System within 4 months in order to increase
crop yield by 20%-80% through cost-effective environment friendly usage of irrigation water,
with the ultimate purpose of an economically uplift the ultra-poor.
This Integrated Water Efficient Irrigation Project will have a number of direct and in-direct
benefits to the target community in particular farmers. Several outputs are envisaged to lead to
the following outcome indicators:
Savings of Irrigation Water by 40-70% due to the water sprinkler system;
An increase in crop yield by 20-80%;
Increase in irrigation efficiency by 60%
Reduction of input costs by 50%;
Negligible weed growth thus increasing water efficiency
No land leveling would mean no cost;
Minimized disease propagation thus reducing healthcare costs;
Reduced water logging will increase the cultivable area;
Negligible soil erosion will result in saving of agricultural land;
Reduced labor costs due to easy field operation during irrigation.
Progress of the Project IWEIP
During the reporting period, the CUP Pakistan with the collaboration of PPAF concluded the
IWEIP Projects in UC Chirah of Islamabad and in progress in UC Korai of DIKhan. CUP
Pakistan after the initial conducted surveys and feasibility studies and proposed 19 IWEIP
schemes to PPAF. After the approval from PPAF, the
View of water reservoir of IWEIP System:
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 46
CUP started execution of those 19 schemes in Islamabad & DIKhan and successfully completed
10 projects in Islamabad and remaining 9 are ongoing in DIKhan, details is given as below.
S.
No
District Scheme Total Cost PPAF
Share
CO
Share
Per
Capi
ta
H.H Pop
ulati
on
1 Islamabad MCO
DhokRakh
2,222,000 1,777,600 444,400 3,174 80 560
2 Islamabad MCO New
Balara
868,000 694,400 173,600 5,301 25 131
3 Islamabad MCO Sereh 2,015,500 1,612,400 403,100 2,710 85 595
4 Islamabad MCO
ChirahChowk
1,473,500 1,178,800 294,700 3,368 50 350
5 Islamabad MCO Suti Ni
Pari
1,607,500 1,286,000 321,500 2,624 70 490
6 Islamabad MCO Dhok
Abbas Ali Shah
1,598,000 1,278,400 319,600 3,805 48 336
7 Islamabad MCO
DarkalaKalan
1,444,000 1,100,000 288,800 1,213 136 952
8 Islamabad MCO Dalla 1,328,000 1,062,400 265,600 3,794 68 280
9 Islamabad MCO
Mangonama
1,583,000 1,266,400 316,600 4,523 68 280
10 Islamabad MCO Samlair 1,130,000 904,000 226,000 3,690 45 245
11 D.I.Khan Bazed Khel-1 1,834,508 1,467,606 366,902 4765 44 308
12 D.I.Khan Bazed Khel-2 1,993,100 1,594,480 398,620 5994 38 266
13 D.I.Khan Mehmodia
Abad
1,826,863 1,461,490 365,373 5643 37 259
14 D.I.Khan MachianWala 1,900,183 1,520,146 380,037 3016 72 504
15 D.I.Khan WelanWala 1,923,408 1,538,762 384,682 2892 76 532
16 D.I.Khan FarooqAzam 1,846,525 1,477,220 369,305 5007 42 295
17 D.I.Khan SolgianWala 1,933,924 1,547,139 386,785 5525 40 280
18 D.I.Khan VO Khushhal 2,190,887 1,752,710 438,177 3338 72 525
19 D.I.Khan Abba Shaheed 2,342,127 1,873,702 468,425 1171 200 1,400
TOTAL 33,061,025 26,393,655 6,612,205
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 47
View of Sprinkler Irrigation System installed in UC Chirah, ICT:
There were eight remaining schemes for the same UC in Islamabad but as per the PPAF
recommendation these schemes were shifted to UC Kurai District D.I. Khan. CUP initiated
feasibility and technical assessment for the further implementation of the IWEIPs in UC Kurai.
But, these eight IWEIP Schemes were shifted to UC Kurai of DIKhan for implementation and to
utilize the remaining budget of IWEIP as UC Kurai was out of the fence of target area. The CUP
team, DIKhan conducted the technical and social appraisal of the area and after the approval of
PPAF, following area has been identified feasible for implementation of remaining 8 projects
and work is in progress:
# Scheme Revenue
Village
Union
Council Tehsil District
Type of
Project
1 Solgian Wala
Kurai Kurai D.I.Khan D.I.Khan Irrigation
2 Welan Wala
Kurai Kurai D.I.Khan D.I.Khan Irrigation
3 Abba Shaheed
Kurai Kurai D.I.Khan D.I.Khan Irrigation
4 Machian Wala
Kurai Kurai D.I.Khan D.I.Khan Irrigation
5 Bazid Kkel 1
Kurai Kurai D.I.Khan D.I.Khan Irrigation
6 Bazid Kkel 2
Kurai Kurai D.I.Khan D.I.Khan Irrigation
7 Farooq Azam
Kurai Kurai D.I.Khan D.I.Khan Irrigation
8 Mehmodia
Abad
Kurai Kurai D.I.Khan D.I.Khan Irrigation
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 48
E. Livelihood Enterprise & Emplyment Development (LEED) Project Funded
by PPAF:
Project Background:
The CUP Pakistan in partnership with Pakistan Poverty Alleviation Fund (PPAF) initiated
Livelihoods Enterprise and Employment Development (LEED) batch 62 project in April, 2015.
The project was implemented in 3 Union Councils of District Shangla (Damorai, Opal and
Ranyal) one of the poorest districts of KP. These UCs were declared as priority areas keeping in
view the awful economic condition of the people due to less social and economic opportunities
and fewer attentions from the concerned authorities. Similarly, the PPAF has significant previous
investment for community institutions and livelihoods focused institutional development. The
LEED project’s activities had been continuation of previous livelihoods focused projects in the
target area since 2010 by launching social mobilization activities in the targeted UCs. The
purpose of SMP was to mobilize communities and form platform in the shape of sustainable
community structures in the targeted UCs to carry out future interventions for community uplift
through PPAF support and other development actors especially the public sector. Hence, the
CUP had successfully completed the three phases of LEP in same area. The same baselines were
followed for all the projects.
The LEED is deepening and expansion of PPAF’s previous livelihood grant investments, and
through LEED activities it has positively leverage, synergize and add value to both previous and
existing work. Thus, the project focused on interventions with the remaining ultra, vulnerable
and poor whilst also building the capacity of graduate households.
Project Goal/objectives:
The project was aimed to be in line with PPAF/CUP overall goal, i.e. to contribute to poverty
alleviation and the achievement of the Millennium Development Goals (MDGs), in particular
focusing on 18 indicators of 5 MDGs, i.e. eradicate extreme poverty and hunger, achieve
universal primary education, promote gender equality and women empowerment, reduce child
mortality and improve maternal health. It also aligns LEED’s specific objectives, i.e. to:
A. DEEPENING & EXPENSION OF INTERVENTIONS IN EXISTING 3 UCS OF TEHSIL
ALPURI, DISTRICT SHANGLA
Code Name
of UC
Tehsil District No. of
Revenue
Villages
Total
HH
Total
Population
Male Female
UC-
A001
Damori Alpuri Shangla 3 3,553 17,952 9,156 8,796
UC-
A002
Opal Alpuri Shangla 6 3,447 19,063 9,722 9,341
UC-
A003
Ranyal Alpuri Shangla 3 2,452 15,183 7,743 7,440
Total: 3 UCs 1 1 12 9,452 52,198 26,621 25,577
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 49
Identify and target the poor men and women within the communities, provide them asset
and/or vocational and microenterprise skills, and assist them to become contributing
members of their own households and the community;
Develop institutional mechanisms and platforms within the community that can increase
its access to critical resources for sustained economic activity, e.g. linkages to relevant
and certified training, resource persons and institutions, public-private partnerships, etc.
The project expanded the coverage up to 50% of poor including ultra and vulnerable identified
through the PSC. The beneficiary households, previously served by PPAF funding, had
additional opportunity to graduate and further enhance their productivity, capacities, and
community contributions through asset transfer and livelihood trainings.
Project Progress during the Year:
But, with all these challenges and problems the CUP Shangla team
managed to accomplish some targets and tasks. The CUP Shangla
Team organized total 36 Common Interest Groups (CIG) in different
trades. These 15 CIGs includes 5 CIGs of women of Poultry Farming,
Livestock, Tailoring and Embroidery and the 10 men CIGs were for
Enterprise development, Livestock and Poultry, Plumbing, Mobile
Repairing, Agriculture, Tile Fixing and Electrician.
The major progress can be seen under the Assets Distributed and
livelihoods training provided to ultra and vulnerable poor so that they
could generate income to enhance their livelihoods. Under these two main heads, 90 poor were
provided with the assets including 15 women and 75 men. And, same number of beneficiries
were provided the Enterprise Development Training and different livelihoods trainings.
F. Institutional Development (ID) Project Funded by PPAF (April-Sep, 2015)
The CUP Pakistan as partner organization came under agreement with PPAF in April, 2015 to
launch Institutional Development (ID) Batch 62 project in Union Council Damorai of District
Shangla, one of the poorest district of KP. UC Damorai amongst other UCs was declared as
priority area keeping in view the awful economic condition of the people due to lack of
opportunities and negligence of concerned development authorities.
A score of efforts have been made by national and international humanitarian organizations over
community organizations but capacity building and strengthening of these organization probably
have not been remained the prime concerns of the same efforts. The PPAF and Community
Uplift Program (CUP) Pakistan identified and analyzed the gaps inevitable to be removed in
order to place them on the right track of community development.
Under the ID Batch 62 Project, one of the most successful accomplishments is the identification
and training of institutional CRPs, who are community volunteers. The CRPs are envisaged to
evolve as functional specialists with each one having their own strengths in specific areas. Under
the project the CUP project team identified a total of 16 CRPs who received training in their
specific area.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 50
Under the component of Institutional Capacity Building, in order to improve the organizational
effectiveness of three tier structure organizations i.e. LSO, VOs and COs, the project would
facilitat number of trainings for members of second and third tier organization, this includes
Developing of SOPs, Strategic Plan, Development of Proposal and trainings on Values,
Management and Governance, MDGs, ODF, Rural Connectivity, YC vertical Horizontal Growth
etc. The community termed these ventures as highly successful and fruitful in developing
stronger and more mature organizations.
Goal of the Project:
The project goal was to organize/strengthen the poor communities into community institutions
through social mobilization process and different capacity building strategies, in district Shangla.
The project includes technical assistance to the community in behavioral change through social
mobilization and in livelihood approaches.
Specific Objectives:
The following were the specific objectives of ID (batch # 62) project:
1. Extent and severity of poverty among populations reduced
2. Human Development status of targeted populations improved
3. Inter-personal disparities between neglected regions & districts, and the rest of the
Country
4. Community and non-governmental institutions pursuing the preceding objectives
established and strengthened
5. To foster the crisis ridden tribal communities and local grass roots institutions for playing
effective role in development.
6. To minimize the existing gaps among neglected tribal communities and the rest of the
country
7. To bring marginalized communities especially women and children into the mainstream
of development through improving their social and economic condition and status.
Progress of Project: Following were the achievement of project as of June 30, 2015:
Build Exit into Entry: The PPAF funded ID Batch 62 project is an effort to strengthen the ability of community
organizations at the three levels, i) individual, ii) organizational and iii) institutional to build their
structures, systems, people and skills so they are better able to define and achieve their objectives
and engage in consultation and planning, manage community projects and take part in
partnerships and community enterprises. This includes aspects of training, organizational and
personal development and resource building, organized and planned in a self-conscious manner,
reflecting the principles of empowerment and equality.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 51
Identification and development of Community Resource Persons (CRPs): To create a cadre of Community Resource Persons (CRPs) supervising local development
initiatives, synergizing and leveraging the existing institutional base, a total of 16 CRPs were
identified in 8 specific fields such that they will have their specific ToRs with target oriented
Action Plan as per PPAF guidelines. 4 days training were given to each cadre of CRPs in their
respective fields. As per PPAF guidelines, all training of CRPs were organized through Cluster
Approach whereas the selection criteria was properly defined for their selection in such a way
that ensure capable and potential community members as CRPs. Following are the names of
CRPs along with their define role and responsibilities of the specific fields:
Details of Institutional CRPs
S.No Name Type of CRP and Training Received
1 Sardar Muhammad Khan
Financial Management and Procurement 2 Fazal Bari
3 Wasim Shahid
Youth Champion 4 Sher Nawaz
5 Aman Ullah
Community Facilitator 6 Nadar Khan
7 Amir Zada
Financial Literacy 8 Muhammad Aftab
9 Jebran Khan
CBDRM 10 Irfanullah Khan
11 Khaliq Dad
Operation and Maintenance Facilitator 12 Himatullah
13 Najeeb Ahmad
Environmental and Social Management 14 Rahat Muhammad
15 Muhammad Anwar
Gender Main Streaming and Leadership 16 Sajid Ali
The training under component Build Exit into Entry were clubbed with PPAF other POs and
organized by SRSP Manshera office. Brief details of training are as under:
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 52
Community Facilitators: The CRPs were envisaged to evolve as functional specialists with each one having their own
strengths in specific areas. These CRPs would work as volunteers to provide support
services to the area and community institutions. As per PPAF guideline these CRPs will
be responsible to ensure regularity of meetings, record keeping, planning and linkages
development etc, whereas they will ensure participation of all segments of society for
effective utilization of PPAF funds. They will also form new community institutions if there is a
need to increase HHs coverage. LSOs formation and its registration process may also be
facilitated by CRPs in adjacent UCs where LSO has yet to be formed. They will also be
responsible to strengthen linkages of community institutions with local stakeholders and
leveraging to get resources from other than PPAF funding.
Training Objectives:
At the end of three day training, participants will be able to:
1. Know the difference between people,
community and society
2. Familiarize the process of social mobilization
and its stages
3. Understand the role of community facilitator
and his/her responsibilities in community
4. Know about formation of community
organization and its Values
5. Know the formation of organizations at village
and union council level
6. Understand the process of record keeping and
budget handling
Main Content of the Training
1. People, Community and Society
2. Social Mobilization, stages, process and strategy
3. Community Facilitator, roles and responsibilities
4. Community Organization, formation, characteristics, values
5. Organize meeting and record keeping of community organization
6. Formation of Organization at Village and Union council Level
7. Communication and resource mobilization of community organization
The participants’ feedback was recorded on this three days capacity building training. Many of
them expressed that they feel positive change in themselves after attending this four days training
and told that now they are able to build the capacity of the community in the better
way. All of them were looking much enthusiastic and motivated towards their work. All the
participants extended gratitude the resource person for giving such an informative, capacity
building training in such an easy and interesting way. All the participants were very thankful
to the CUP for very useful training workshop arrangement.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 53
CBDRM (Simulations) The objective of the training was to explain the concept of CBDRM to the participants and
prepare a Disaster Management Plan.
CRPs training was given on community based disaster risk management (CBDRM) in a very
conducive and through practical exercises. Training was provided in such a way that they will be
responsible to describe their UC level strategy and may have their action plan to mitigate the risk
if unpleasant circumstances happen. They were properly guided that CBDRM CRPs will help in
VDPs and UCDPs development to incorporate the disaster risk management aspect with concrete
actions in their local level planning and will be responsible to establish link with government
level disaster committees at UC and district level.
The major topics that were covered in CBDRM training were as,
Basic concept and approaches in Disaster Management (i.e. Disaster, Hazard, Vulnerability,
capacity, Disaster Risk and Disaster Risk Assessment, Disaster management, Disaster Risk
Management, participation, CBDRM, Retrofitting, mitigation, preparedness, Hyogo
Framework of Action, ISDR, IDNDR and Social mobilization etc.
On Aging and disaster in such a way that to consider old age people as an asset for disaster
preparedness and because they have rich source of knowledge about indigenous techniques
for disaster preparedness and mitigation.
On impacts of disaster on women as one of the vulnerable group in disaster and natural
hazard.
The Effect of disasters on Children. Vulnerabilities of children to natural and anthropogenic
hazards were explored and both direct and indirect impacts of disasters were discussed with
the participants
On concept of Risk and Participatory Risk Assessment, Hazard Assessment, vulnerability
Assessment, capacity Assessment, people perception of risk, Risk Mapping and Risk
Analysis.
On Perception and attitude assessment in such a way that sensation, perception, attitude and
were differentiated and why it is important to conduct perception and attitude assessment
regarding disasters was discussed.
On Disaster Risk Management in such a way that CRPs focus on disaster risk management at
the community level.,
On the lessons learnt from recent disasters: earthquakes and floods, top down approach
(traditional approach) and bottom up approach (CBDRM approach), CBDRM planning
process, and stakeholders in CBDRM and mobilization cycle for CBDRM etc. were
discussed in detail.
On prioritization and quantification tools (i.e. simple ranking, wealth ranking, pair wise
ranking and matrix ranking).
On concept of hazard, classification of hazard and nature/Behavior of different types of
hazards.
It was discussed that how the human use system is activating different types of hazards and
how they are responding into it. Moreover it was also discussed that how one hazard
can lead to another hazard.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 54
On difference between Disaster Management, Disaster Risk Management and Disaster Risk
Reduction.
On the need and importance of CBDRM planning at the community/UC level.
CRPs of CMDRM were trained through Mock Drill and Simulation Exercises. The basic aim
and objectives of this session was on to define the mock drill or exercise, explain the
importance of the mock drill, discuss the phases to organize mock drill, precautions need to
be taken in organizing mock drill and demonstrate the mock drill.
Glimpses of the Training:
Financial Literacy The training objective was to know about Basic
Financial concepts, Terminology, policies &
utilization of financial resources in an
organization, Personal financial management,
enforcing financial discipline in the
organization in the use of financial resources,
proper Record Keeping, Cash Book, Bank
Book, Income Statement, Balance Sheet,
Accounting Cycle, Accounting equation &
Voucher.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 55
The key objectives for this course were to implement the above mentioned financial Record in
community Institutions, their annual budgeting, project specific basic record keeping, savings,
funds and its management.The project in progress and will be completed in September, 2015.
G. HANIF PROJECT
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 56
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 57
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 58
The subsequent phases of the project will be implemented next fiscal year and the pilot project
ends 15 February 2016.
12. Challenges, Mitigation Measures & Lessons Learnt
The following challenges were encountered and mitigation measures were taken during the year:
1) As district Shangla falls in the geographical location where plain area is very limited and
most of the topography is hilly. Hence, the project team faced mobility issues, especially
female social organizers. Travelling consumed most of the energy and time. Besides, this
also utilized maximum resources. To cope with the situation, the detail implementation plan
(DIP) was revised and was shaped according to the remaining duration of the project.
2) The difficult hilly tracks also made it difficult for the women beneficiaries to attend
community meetings and any training with full participation, thus training venues were
selected in places that were easy to access for female beneficiaries.
3) Short duration of the project and hectic schedule of activities made it difficult to access
communities therefore another hindrance in timely achievements of activities. Short duration
of projects do not allow for adequate follow‐up planning, in order to achieve sustainable
impact, especially to achieve national as well as MDGs, projects should be planned to allow
time for impact and its measurement.
4) Minimum logistical support for the project team was a problem in timely performing of the
field activities.
5) Due to delay in release of resources, maximum activities were planned at the final phase of
the project utilizing maximum resources of the organization to meet the targets.
6) The political interference by the local leaders made it difficult for the LSOs as well as
project team in smooth implementation of the project. Besides, communities of the Shangla
district are highly politically motivated and members of the majority community institutions
had political associations and affiliations. Political issues were mostly solved through
community gatherings and Jirgas.
7) The market survey for different trade assets in different markets consumed more time and
use of resources. In order to effectively deal with the matter all the three targeted LSO
members were convinced for purchase of items in the nearby local markets.
8) The short duration of the project, hectic schedule of activities coupled with extended leaves
due to two major evens the “Eid festivities” and the holy month of Ramadan was a big
challenge in timely achievements of activities. To cope with the situation, the detail
implementation plan (DIP) was revised and was shaped according to the remaining duration
of the project.
9) Some areas were located in far flung and high altitude regions that were inaccessible and
required long hours of driving and trekking to reach the communities, thus this made it hard
to cover the mammoth target of CO meetings. However the project team was resolute to
reach the hard areas and revitalized the COs.
10) Minimum logistical support for the project team was a problem in timely performing of the
field activities.
11) Most of the project activities were planned towards the final phase of the project which also
posed a challenge for the team to achieve the target.
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 59
12) The farmers were more stick to old farming strategies especially with the flood irrigation
system. They had very limited knowledge and believe in judicious us of water for its
conservation and better present crop production. So, after social organization it was again a
constraint to motivate them about the Efficient Irrigation system. For this, some progressive
small farmers were used to first start a project and then organized demos for other small
farmers for their motivation and further installation of such system.
13) As we focused the small farmers, so community share that was 20% was also a hurdle in
smooth implementation of this project. The willing farmers were raised this issue of non-
availability of community share.
14) The political and influential people also tried to get these projects to install this system on
their farms on subsidized rates. But, they were countered by stick to our processes and only
focused the poor small farmers.
The following Lessons were Registered:
Lesson Learned:
The role of Community Organization is significant in the livelihood improvement of
marginalized communities, timely execution of developmental projects in the poor
communities and ensuring the participation and gaining the support of the locals in
developmental activities.
Community participation is the critical element to keep the community institutions
functional and operational especially in rural and hard to reach areas.
An effective awareness raising campaign along with supporting activities in rural areas
can improve the adverse effects of illiteracy.
Significant changes in behavior, attitude and thinking could be possible through capacity
building interventions in conservative areas, where social, cultural and religious
constraints affect female participation.
The development of communities is impossible without the active participation of the
target community members which forces the development agencies to enhance the
capacity of communities through social mobilization to participate in development
initiative under taken by development organizations; private or public.
The government, as well as developing agencies, acknowledges the performance of civil
society in terms of development endeavors as essential for promoting good governance
improving responsiveness of national policies and programs to citizens' needs and
ensuring transparency and accountability in policy making and implementation processes.
Real participation does not end in dialogues with non-governmental organizations. It
involves the entire community, for whom the project is designed, in their various
capacities, socio-economic status, affiliations and locations beyond elections to active
participation in making decisions that affect their lives.
Social mobilization is a vital tool to mobilize the community trust in its own sources and
strengths and consider itself the very basic and indispensable element in terms of
community development.
Recommendations:
Short duration of projects do not allow for adequate follow‐up planning, in order to
achieve sustainable impact, especially to achieve national as well as MDGs, projects
Directors Report of CUP Pakistan for Fiscal Year 2014-2015
Page 60
should be planned for a minimum duration of 5 years to allow time for impact and its
measurement.
Future refresher training program for community members are required to keep the
sustained position of the community institutions.
Training program for newly elected village councilors should be made part of the
program so that both the community institutions and local government body may work
together for the community uplift.
Further assistance is required to for women community organizations, to develop strong
linkages with government for resolving their issues.
The small farmers have less capacity to contribute 20% cost sharing in total cost of sub-
project. So, there is need to review the policy and either the community share may be
reduced up to 10%;
In future. the project may be focused more in arid or semi-arid areas with having more
water stress due to less rainfall;
There may be more open recommended technology options for Efficient Irrigation
system according to area i.e. Sprinkler, Bubbler etc;
The project may be implemented with more integrated approach and it may include some
livelihoods interventions and Social Sector Services, if there is no any other PPAF project
is going on;
The success stories may be promoted through communication strategies at the last stage
of project in other areas for its further replication especially by the Public sector and
other progressive famers;
There is need to add plan regarding the capacity building of benefitted farmers about best
utilization of IWEIP systems for its sustainability and more impact in judicious use of
available water and livelihoods of farmers.