direttiva eu 2015/757 mrv co2 - genoa shipping...

31
S Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017

Upload: others

Post on 16-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

S

Direttiva EU 2015/757 MRV CO2

Origini e Struttura

Genova, 29 Giugno 2017

Page 2: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Page 3: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Page 4: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

International maritime shipping remains the only means of

transportation not included in the Union's commitment to reduce

greenhouse gas emissions.

According to the impact assessment accompanying the proposal for

this Regulation, Union-related CO2 emissions from international

shipping increased by 48 % between 1990 and 2007.

Regolamento UE 2015/757 - Premesse

Page 5: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

In order to reduce CO2 emissions from shipping at Union level, the

best possible option remains setting up a system for monitoring,

reporting and verification (MRV system) of CO2 emissions based on

the fuel consumption of ships as a first step of a staged approach for

the inclusion of maritime transport emissions in the Union's

greenhouse gas reduction commitment, alongside emissions from

other sectors that are already contributing to that commitment.

Regolamento UE 2015/757 - Obiettivo

Page 6: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

1 July 2015 – Entry into Force

31 December 2016 – Adoption of Executive Acts

31 August 2017 – Monitoring Plans to be Submitted to

Verifiers

1 January/31 December 2018 – First Monitoring Period

30 April 2019 – Emission Reports to be Issued

30 June 2019 – Data Publishing by EU

Regolamento UE 2015/757 – Scadenze

Page 7: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Monitoring obligations on each ship, on per voyage or annual basis

Aim is to determine CO2 emissions (other GHG not considered)

Additional information are to be provided, such as the transport work

Energy efficiency is to be calculated

Reg. UE 2015/757 – Elementi Essenziali

Page 8: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Applicable to vessels above 5,000 GRT

Both ballast and laden voyages are to be monitored

Applicable to all vessels calling European ports, both arriving and

departing, regardless form Flag

Does not apply to warships, naval auxiliaries, fish-catching or fish-

processing ships, wooden ships of a primitive build, ships not propelled

by mechanical means, or government ships used for non-commercial

purposes.

Reg. UE 2015/757 – Applicazione

Page 9: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

«Company» means the shipowner or any other organisation or person, such as

the manager or the bareboat charterer, which has assumed the responsibility for

the operation of the ship from the shipowner.

«Verifier» means a legal entity carrying out verification activities which is

accredited by a «National Accreditation Body»

European Commission, to whom within 30 April of each year, starting from

2019, reports on CO2 emissions by ships are to be provided.

Reg. UE 2015/757 – Attori

Page 10: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 - Article 6 - Monitoring Plan

1. By 31 August 2017, companies shall submit to the verifiers a

monitoring plan for each of their ships indicating the method chosen

to monitor and report CO2 emissions and other relevant information.

[…omissis…]

Reg. UE 2015/757 – Monitoraggio

Page 11: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

3. The monitoring plan shall consist of a complete and transparent

documentation of the monitoring method for the ship concerned and shall

contain at least the following elements:

a) the identification and type of the ship, including its name, its IMO

identification number, its port of registry or home port, and the name of

the shipowner;

b) the name of the company and the address, and details of a contact person;

Reg. UE 2015/757 – Monitoraggio

Page 12: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

c) a description of the procedures used to monitor the completeness

of the list of voyages;

d) a description of the procedures, systems and responsibilities used

to update the list of CO2 emission sources over the reporting

period;

e) a description of the procedures used to monitor the completeness

of the list of voyages;

Reg. UE 2015/757 – Monitoraggio

Page 13: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

f) a description of the procedures for monitoring the fuel

consumption of the ship, including:

i. the method chosen from among those set out in Annex I for

calculating the fuel consumption of each CO2 emission source,

including, where applicable, a description of the measuring

equipment used,

Reg. UE 2015/757 – Monitoraggio

Page 14: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

ii. the procedures for the measurement of fuel uplifts and fuel in

tanks, a description of the measuring equipment used and the

procedures for recording, retrieving, transmitting and storing

information regarding measurements, as applicable,

Reg. UE 2015/757 – Monitoraggio

Page 15: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

iii. the method chosen for the determination of density, where

applicable,

iv. a procedure to ensure that the total uncertainty of fuel

measurements is consistent with the requirements of this

Regulation, where possible referring to national laws, clauses

in customer contracts or fuel supplier accuracy standards;

Reg. UE 2015/757 – Monitoraggio

Page 16: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

g) single emission factors used for each fuel type, or in the case of

alternative fuels, the methodologies for determining the emission

factors, including the methodology for sampling, methods of

analysis and a description of the laboratories used, with the ISO

17025 accreditation of those laboratories, if any;

Reg. UE 2015/757 – Monitoraggio

Page 17: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 2 – Article 6 – Monitoring Plan

h) a description of the procedures used for determining activity data per

voyage, including […] determining and recording the distance, […]

determining and recording the cargo carried and the number of

passengers, as applicable, […] determining and recording the time spent at

sea between the port of departure and the port of arrival;

i) a description of the method to be used to determine surrogate data for

closing data gaps;

j) a revision record sheet to record all the details of the revision history.

Reg. UE 2015/757 – Monitoraggio

Page 18: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S SECTION 3 – Article 9 - Monitoring on a per-voyage basis

for each ship arriving in or departing from, and for each voyage to or from, a port

under a Member State's jurisdiction, companies shall monitor the following

parameters: […omissis…]

S SEZIONE 3 Article 10 – Monitoring on annual basis

Based on the monitoring plan assessed in accordance with Article 13(1), for each

ship and for each calendar year, companies shall monitor the following parameters:

[…omissis…]

Reg. UE 2015/757 – Monitoraggio

Page 19: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Reg. UE 2015/757 – Monitoraggio

Dati Per Tratta Annualmente

Porto, arrivo e partenza SI

Quantità e fattore emissione

combustibile

SI SI

Quantità CO2 emessa SI SI

Distanza percorsa SI SI

Tempo trascorso in mare SI SI

Merci trasportate SI

Attività di trasporto SI SI

Efficienza energetica media SI

Page 20: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S The company shall define in the monitoring plan which monitoring

method is to be used to calculate fuel consumption between the

following (or any combination between them):

a) Bunker Delivery Note and periodic stocktakes of fuel tanks;

b) Bunker fuel tank monitoring on board;

c) Flow meters for applicable combustion processes;

d) Direct CO2 emissions measurements.

Reg. UE 2015/757 – Monitoring Methods

Page 21: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S Art.6 - […omissis…] The monitoring plan shall contain […omissis…]

a description of the procedures used for determining activity data per

voyage […omissis…].

S Art. 9 - […omissis…] companies shall monitor […omissis…] transport

work.

Reg. UE 2015/757 – Carico e Lavoro

Page 22: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S The emissions report shall contain […omissis…] total transport work, expressed

in

• passenger-nautical miles (for passenger ships)

• tonne-nautical miles (for ro-ro ships, container ships, oil tankers, chemical

tankers, gas carriers, bulk carriers, refrigerated cargo carriers, vehicle carriers,

combination carriers)

• cubic meter-nautical miles, (for LNG carriers, container/ro-ro cargo ships)

• deadweight-tonne carried-nautical miles (for general cargo ships)

• passenger-nautical miles AND tonne-nautical miles (for ro-pax ships)

• tonne-nautical miles OR deadweight-tonne carried-nautical miles (for other

ship types)

Reg. UE 2015/757 – Rapporto

Page 23: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S The emissions report shall contain […omissis…] average energy

efficiency indicators

a) Fuel consumption per distance

b) Fuel consumption per transport work

c) CO2 emissions per distance

d) CO2 emissions per transport work

Etc…etc……

Reg. UE 2015/757 – Rapporto

Page 24: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S Article 18 - DOC

By 30 June of the year following the end of a reporting period, ships

arriving at, within or departing from a port under the jurisdiction of a

Member State, and which have carried out voyages during that reporting

period, shall carry on board a valid document of compliance.

S Article 20.1 – Penalties

Member States shall set up a system of penalties for failure to comply with

the monitoring and reporting obligations set out in Articles 8 to 12 and

shall take all the measures necessary to ensure that those penalties are

imposed.

Reg. UE 2015/757 – Obblighi e Sanzioni

Page 25: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S Article 18.3 – Expulsion order

In the case of ships that have failed to comply with the monitoring and

reporting requirements for two or more consecutive reporting periods and

where other enforcement measures have failed to ensure compliance, the

competent authority of the Member State of the port of entry may issue an

expulsion order which shall be notified to the Commission, EMSA, the other

Member States and the flag State concerned. As a result of the issuing of such

an expulsion order, every Member State shall refuse entry of the ship

concerned into any of its ports until the company fulfils its monitoring and

reporting obligations in accordance with Articles 11 and 18.

Reg. UE 2015/757 – Obblighi e Sanzioni

Page 26: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Verificatore (Lista NON esaustiva) Ente di Accreditamento

Bureau Veritas Certification Holding SAS UKAS

Centre Testing International (Shenzhen) Co. UKAS

DNV-GL DAKKS

Dromon Bureau of Shipping UKAS

Emincert ESYD

Korean Register DAKKS

LRQA Ltd. UKAS

Lucideon UKAS

Nippon Kaiji Kyokai UKAS

RINA Services ACCREDIA

Verifavia COFRAC, UKAS

………………… …………………

Page 27: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Page 28: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

S Avv. di Majo (Presidente dell’Autorità di Sistema Portuale del

Mar Tirreno Centro Settentrionale): possibilità di tariffe portuali

differenziate per utenti più virtuosi

S Necessità di trasferire e gestire grandi quantità di dati,

commercialmente ed economicamente rilevanti

Possibili scenari futuri

Page 29: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Page 30: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

I crediti EUA (European Union Allowance) rappresentano quote di emissione di gas ad effetto serra nell’ambito del sistema EU ETS. Una singola unità di EUA rappresenta una tonnellata di gas ad effetto serra emessa nell’atmosfera.

Valore del mercato mondiale CO2: 48 miliardi di Euro (2015) 70% EU-ETS

Page 31: Direttiva EU 2015/757 MRV CO2 - Genoa Shipping Week2017.gsweek.it/wp-content/uploads/01_GNECCO.pdf · Direttiva EU 2015/757 MRV CO 2 Origini e Struttura Genova, 29 Giugno 2017 1 July

Direttiva EU 2015/757 MRV CO2

Origini e Struttura Genova, 29 Giugno 2017

Grazie per l’attenzione

Alessio Gnecco

STIGE Maritime

[email protected]