disclaimer · electrical components shall meet nec code requirements. if ul or nfpa requirements...

11
DISCLAIMER REV: 888-628-8682 www.autovacinc.com [email protected] CLIENT APPROVAL PROJECT NO.: PROJECT TITLE: NAME AND DATE: SIGNATURE: DRAWN BY: VACUUM SYSTEM PIPING DESIGN NOTES: INDOOR/OUTDOOR ABOVE GROUND PIPING: PIPING SYSTEM SHALL BE EITHER (1) SCHEDULE 40 SOLID CORE PVC OR ABS PLASTIC PIPE D.W.V. (DRAIN, WASTE, AND VENT) FITTINGS. (2) ZINC GALVANIZED OR ALUMINUM TUBING\PIPING AND SHALL HAVE DIRECTIONAL FLOW FITTINGS OF NO LESS THAN 16 GAUGE. NON PLASTIC PIPE\TUBE AND FITTINGS SHALL BE DESIGNED SPECIFICALLY FOR CENTRAL VACUUM SYSTEMS. NON PLASTIC PIPE\TUBE AND FITTING CONNECTIONS SHALL BE SHRINK SLEEVE OR COMPRESSION COUPLINGS. (3) ALUMINUM PIPE\TUBING USED WITH PLASTIC FITTINGS SHALL BE PROPERLY SEALED. IN-GROUND PIPING: IN-GROUND PIPING SYSTEM SHALL BE EITHER (1) SCHEDULE 40 SOLID CORE PVC OR ABS PLASTIC PIPE, WITH PLASTIC D.W.V. (DRAIN, WASTE, AND VENT) FITTINGS. (2) ZINC GALVANIZED TUBING\PIPING AND SHALL HAVE DIRECTIONAL FLOW FITTINGS OF NO LESS THAN 16 GAUGE. NON PLASTIC PIPE\TUBE AND FITTINGS SHALL BE DESIGNED SPECIFICALLY FOR CENTRAL VACUUM SYSTEMS. NON PLASTIC PIPE\TUBE AND FITTING CONNECTIONS SHALL BE SHRINK SLEEVE OR COMPRESSION COUPLINGS. PLASTIC PIPE INSTALLED IN-GROUND HAVE A POTENTIAL POSSIBILITY OF CRACKING AND WEAR. AUTOVAC DOES NOT RECOMMEND PLASTIC PIPE FOR IN-GROUND APPLICATIONS. ALL PIPE SYSTEMS IN-GROUND MUST BE BELOW FREEZE LINE. PIPING PREPARATION: ALL INTERIOR SURFACES OF PIPE AND FITTINGS SHALL BE FREE OF BURRS AND OBSTRUCTIONS FOR NON- RESTRICTIVE AIR FLOW. ABS AND PVC PIPING SHALL BE CUT STRAIGHT AND BURRS REMOVED. PIPING SHALL BE ATTACHED TOGETHER USING A PRIMER AND CEMENT (CLEAR PVC CEMENT FOR PVC AND BLACK ABS CEMENT FOR ABS) FOR 100% SEAL. PIPING SUPPORT: OVERHEAD PIPING SYSTEMS SHALL BE SUPPORTED WITH APPROVED PIPE HANGERS AND SHALL BE INSTALLED AT A MAXIMUM OF SIX FEET O.C. WHEN USING ABS OR PVC PIPE AND TEN FEET WHEN USING ZINC OR ALUMINUM TUBING. ALL FITTINGS SUPPORTING VACUUM DROPS/HOSE ASSEMBLIES SHALL BE SUPPORTED WITHIN ONE FOOT ON EACH SIDE OF THE FITTING CONNECTION. WHEN UTILIZING AUTOVACS VACUUM STANCHIONS AND STRUCTURES ALUMINUM PIPE SHOULD BE USED TO PREVENT PIPE SAG BETWEEN STRUCTURES. PLASTIC PIPE WARNINGS: PVC PIPE WILL BECOME BRITTLE AT 40° F AND CAN CRACK/SPLIT WHEN MOVING DEBRIS COLLIDES WITH IT. IT IS RECOMMENDED TO USE ZINC OR ALUMINUM TUBING FOR COLDER CONDITIONS. PVC AND ABS PLASTIC PIPE ARE NOT U.V. RATED AND WILL DISCOLOR AND SOFTEN CAUSING PIPE SAG WHEN EXPOSED TO DIRECT SUNLIGHT. IT IS RECOMMENDED THAT ALL EXPOSED PLASTIC PIPE AND FITTINGS BE PRIMERED AND PAINTED TO HELP PREVENT THIS. IT IS RECOMMENDED TO USE ZINC OR ALUMINUM TUBING WITH ZINC FITTINGS WHEN EXPOSED TO DIRECT SUNLIGHT. PIPING FOR COMBUSTABLE DUST CONVEYING SYSTEMS: WHEN CONVEYING COMBUSTABLE DUST MATERIAL, THE FOLLOWING STANDARDS MY BE REQUIRED. NFPA 654 - PROCESSING AND HANDLING OF COMBUSTABLE PARTICULATE. NFPA 68 STANDARD ON EXPLOSION PREVENTION THROUGH DEFLAGRATION. NFPA 69 - STANDARD ON EXPLOSION PREVENTION SYSTEMS. NFPA 77 - RECOMMENDED PRACTICE ON STATIC ELECTRICITY. NFPA 70 - NATIONAL ELECTRIC CODE. PLEASE CONSULT WITH AUTOVAC’S ENGINEERING DEPARTMENT IF REQUIREMENTS ARE APPLICABLE. ADDITIONAL FEES APPLY FOR EACH COMPLIANCE REQUEST. VACUUM SYSTEM EQUIPMENT DESIGN NOTES: (IF APPLICABLE) VACUUM PRODUCER: VACUUM PRODUCER EQUIPMENT PAD MUST BE FLAT AND LEVEL. VACUUM PRODUCER SHALL NOT BE “HARD” MOUNTED TO THE FLOOR. ISOLATOR PADS ARE TO BE USED UNDER FRAME FEET. VACUUM PRODUCER SHALL BE PROPERLY VENTELATED. IF LOCATED IN ANY EQUIPMENT ROOM THAT IS ENCLOSED, PROPER FRESH AIR VENTS SHALL BE INSTALLED. ENCLOSURE DOOR MUST BE LOUVERED AND A PROPERLY SIZED EXHAUST FAN MUST BE INSTALLED TO TURN OVER AIR EVERY 3 MINUTES. AMBIENT ROOM TEMPERATURE CANNOT EXCEED 105° F. VACUUM PRODUCER EXHAUST MUST BE EXHAUSTED OUTSIDE WITH A METALLIC PIPE NO SMALLER THAN 6". EXHAUST PIPING SHALL NOT EXCEED 25 FEET. EXHAUST PIPE OPENING SJHALL BE PROTECTED FROM ELEMENTS. ELECTRICAL REQUIREMENTS: ELECTRICAL COMPONENTS SHALL MEET NEC CODE REQUIREMENTS. IF UL OR NFPA REQUIREMENTS ARE TO BE MET THEN IT SHOULD BE REQUESTED IN ADVANCE. ALL CODE VERIFICATION AND CONFORMATION ARE RESPONSIBILITY OF OWNER. AUTOVAC CAN SUPPLY NEEDED ITEMS TO MEET CODE REQUIREMENTS FOR A FEE. IF CODE REQUIREMENTS ARE NOT LISTED IN THIS DRAWING THEY ARE NOT A PART OF THE SCOPE. VACUUM IQ MOTOR CONTROL CENTER (VARIABLE FREQUENCY DRIVE (VFD): EACH VFD MUST BE WIRED FROM MAIN DISTRIBUTION PANEL WITH APPROPRIATE SIZED WIRE AND CONDUIT (SIZED PER CODE: BASED ON TURBINE H.P. AND VOLTAGE) TO EACH VFD AND FROM EACH VFD TO MOTOR. A SEPARATE CONDUIT (SIZED PER CODE) MUST ALSO BE INSTALLED FROM MOTOR CONTROL PANEL TO VACUUM PRESSURE TRANSDUCER INSTALLED ON FILTER SEPARATOR. VACUUM SYSTEM INSTALLATION NOTES INSTALLATION BY OTHERS: AUTOVAC PROVIDES INSTALLATION AND REFRENCE DRAWINGS FOR ALL PROJECTS IN WHICH AUTOVAC SUPPLIES THE VACUUM AND PIPING SYSTEM. ALL REFRENCE TO INFORMATION CONTAINED HERIN IS FOR REFRENCE ONLY AND SHOULD BE VERIFIED TO MEET LOCAL AND APPLICABLE CODES AND RULES. WHEN REQUESTED, AUTOVAC CAN ESTIMATE THE NUMBER OF DAYS REQUIRES FOR INSTALLATION. PIPING SIZES, LENGTHS AND ROUTING CONTAINED HERIN ARE ENGINEERED FOR THE SPECIFIC SITE AND USER REQUIREMENTS DESIGNATED BY THE PURCHASER. ANY CHANGE TO PIPE SIZING, LENGTH OR ROUTING WILL VOID ALL WARRANTIES EXPRESSED BY AUTOVAC EITHER WRITTIN IN THIS DOCUMENT OR IN ANY OTHER DOCUMENT OR CONTRACT. INSTALLATION BY AUTOVAC: AUTOVAC OFFERS INSTALLATION OF ITS EQUIPMENT AS A SEPARATE CHARGE PER CONTRACT. AUTOVAC OFFERS ITS INSTALLATION AND IS LIMITED TO LISTED ITEMS NOTED IN THE INSTALLATION DOCUMENTS. ALL COMPONENTS REQUIRING A LICENSED INDIVIDUAL TO INSTALL WILL BE INSTALLED BY OTHER ENTITIES. VACUUM SYSTEM START UP AND COMMISSIONING: AUTOVAC OFFERS VACUUM COMISSIONING AS AN OPTION FOR ITS CLIENTS. AUTOVAC CAN EITHER BE PRESENT ONSITE OR COMPLETE THE STARTUP PROCEEDURES REMOTELY VIA VIDEO CONFRENCE. CERTAIN REQUIREMENTS APPLY SO PLEASE CONTACT YOUR AUTOVAC REPRESENATIVE FOR INFORMATION VACUUM SYSTEM ENGINEERING, LICENSING, PERMITS AND FEES VACUUM SYSTEM \ STRUCTURAL ENGINEERING: AUTOVAC ENGINEERS ALL OF ITS VACUUM SYSTEMS IN HOUSE. THIS CONSISTS OF VACUUM USAGE ANALYSIS, PIPE SIZING AND PIPE ROUTING. STRUCTURAL ENGINEERING ON ANY OF AUTOVAC PRODUCTS IS AVAILABLE AT AN ADDITIONAL FEE AND IS NOT INCLUDED IN THE QUOTED PRICE OR DOCUMENT SET UNLESS SPECIFICALLY NOTED AS STRUCTURAL ENGENEERING INCLUDED”. STRUCTURAL ENGINEERING IS COMPLETED BY A LICENSED STRUCTURAL ENGINEER IN THE MUNICIPALITY OF THE JOB SITE. VACUUM SYSTEM INSTALLATION BY LICENSEE: AUTOVAC HOLDS A CLASS B GENERAL CONTRACTING LICENSE AND CAN INSTALL ON A CONTRACT BASIS IN 50 STATES EITHER DIRECTLY OR THROUGH AFFILIATE LICENSEE SUBCONTRACTORS. LICENSED INSTALLATION IS AN OPTION THROUGH THE INSTALLATION PROCESS. UNLESS OTHERWISE NOTED, ALL INSTALLATION IS CONSIDERED THROUGH THE MANUFACTURER WHEN A LICENSEE IS NOT REQUIRED. IT IS THE RESPONSIBILITY OF THE PURCHASER TO DETERMINE THE CORRECT REUIREMENTS FOR THE INSTALLATION. VACUUM SYSTEM INSTALLATION PERMITS AND FEES: AUTOVAC DOES NOT INCLUDE ANY PERMITS, TAXES OR FEES IN ANY OF ITS INVOICEING OR DRAWINGS. ALL SUCH ITEMS WILL BE AN ADDITIONAL CHARGE IF REQUIRED. THIS DRAWING IS THE PROPERTY OF AUTOVAC. THIS PRELIMINARY DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT THE WRITTEN CONSENT OF AUTOVAC.

Upload: others

Post on 22-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

DISCLAIMER

REV

:

888-

628-

8682

ww

w.a

utov

acin

c.co

m

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:

DR

AWN

BY:

VACUUM SYSTEM PIPING DESIGN NOTES:INDOOR/OUTDOOR ABOVE GROUND PIPING:PIPING SYSTEM SHALL BE EITHER (1) SCHEDULE 40 SOLID CORE PVC OR ABS PLASTIC PIPE D.W.V. (DRAIN, WASTE,AND VENT) FITTINGS. (2) ZINC GALVANIZED OR ALUMINUM TUBING\PIPING AND SHALL HAVE DIRECTIONAL FLOWFITTINGS OF NO LESS THAN 16 GAUGE. NON PLASTIC PIPE\TUBE AND FITTINGS SHALL BE DESIGNED SPECIFICALLYFOR CENTRAL VACUUM SYSTEMS. NON PLASTIC PIPE\TUBE AND FITTING CONNECTIONS SHALL BE SHRINK SLEEVE ORCOMPRESSION COUPLINGS. (3) ALUMINUM PIPE\TUBING USED WITH PLASTIC FITTINGS SHALL BE PROPERLY SEALED.

IN-GROUND PIPING:IN-GROUND PIPING SYSTEM SHALL BE EITHER (1) SCHEDULE 40 SOLID CORE PVC OR ABS PLASTIC PIPE, WITH PLASTICD.W.V. (DRAIN, WASTE, AND VENT) FITTINGS. (2) ZINC GALVANIZED TUBING\PIPING AND SHALL HAVE DIRECTIONALFLOW FITTINGS OF NO LESS THAN 16 GAUGE. NON PLASTIC PIPE\TUBE AND FITTINGS SHALL BE DESIGNEDSPECIFICALLY FOR CENTRAL VACUUM SYSTEMS. NON PLASTIC PIPE\TUBE AND FITTING CONNECTIONS SHALL BESHRINK SLEEVE OR COMPRESSION COUPLINGS. PLASTIC PIPE INSTALLED IN-GROUND HAVE A POTENTIALPOSSIBILITY OF CRACKING AND WEAR. AUTOVAC DOES NOT RECOMMEND PLASTIC PIPE FOR IN-GROUNDAPPLICATIONS. ALL PIPE SYSTEMS IN-GROUND MUST BE BELOW FREEZE LINE.

PIPING PREPARATION:ALL INTERIOR SURFACES OF PIPE AND FITTINGS SHALL BE FREE OF BURRS AND OBSTRUCTIONS FOR NON-RESTRICTIVE AIR FLOW. ABS AND PVC PIPING SHALL BE CUT STRAIGHT AND BURRS REMOVED. PIPING SHALL BEATTACHED TOGETHER USING A PRIMER AND CEMENT (CLEAR PVC CEMENT FOR PVC AND BLACK ABS CEMENT FORABS) FOR 100% SEAL.

PIPING SUPPORT:OVERHEAD PIPING SYSTEMS SHALL BE SUPPORTED WITH APPROVED PIPE HANGERS AND SHALL BE INSTALLED AT AMAXIMUM OF SIX FEET O.C. WHEN USING ABS OR PVC PIPE AND TEN FEET WHENUSING ZINC OR ALUMINUM TUBING. ALL FITTINGS SUPPORTING VACUUM DROPS/HOSE ASSEMBLIES SHALL BESUPPORTED WITHIN ONE FOOT ON EACH SIDE OF THE FITTING CONNECTION. WHEN UTILIZING AUTOVACS VACUUMSTANCHIONS AND STRUCTURES ALUMINUM PIPE SHOULD BE USED TO PREVENT PIPE SAG BETWEEN STRUCTURES.

PLASTIC PIPE WARNINGS:PVC PIPE WILL BECOME BRITTLE AT 40° F AND CAN CRACK/SPLIT WHEN MOVING DEBRIS COLLIDES WITH IT. IT ISRECOMMENDED TO USE ZINC OR ALUMINUM TUBING FOR COLDER CONDITIONS. PVC AND ABS PLASTIC PIPE ARE NOTU.V. RATED AND WILL DISCOLOR AND SOFTEN CAUSING PIPE SAG WHEN EXPOSED TO DIRECT SUNLIGHT. IT ISRECOMMENDED THAT ALL EXPOSED PLASTIC PIPE ANDFITTINGS BE PRIMERED AND PAINTED TO HELP PREVENT THIS. IT IS RECOMMENDED TO USE ZINC OR ALUMINUMTUBING WITH ZINC FITTINGS WHEN EXPOSED TO DIRECT SUNLIGHT.

PIPING FOR COMBUSTABLE DUST CONVEYING SYSTEMS:WHEN CONVEYING COMBUSTABLE DUST MATERIAL, THE FOLLOWING STANDARDS MY BE REQUIRED. NFPA 654 -PROCESSING AND HANDLING OF COMBUSTABLE PARTICULATE. NFPA 68 STANDARD ON EXPLOSION PREVENTIONTHROUGH DEFLAGRATION. NFPA 69 - STANDARD ON EXPLOSION PREVENTION SYSTEMS. NFPA 77 - RECOMMENDEDPRACTICE ON STATIC ELECTRICITY. NFPA 70 - NATIONAL ELECTRIC CODE. PLEASE CONSULT WITH AUTOVAC’SENGINEERING DEPARTMENT IF REQUIREMENTS ARE APPLICABLE. ADDITIONAL FEES APPLY FOR EACH COMPLIANCEREQUEST.

VACUUM SYSTEM EQUIPMENT DESIGN NOTES: (IF APPLICABLE)VACUUM PRODUCER:VACUUM PRODUCER EQUIPMENT PAD MUST BE FLAT AND LEVEL. VACUUM PRODUCER SHALL NOT BE “HARD”MOUNTED TO THE FLOOR. ISOLATOR PADS ARE TO BE USED UNDER FRAME FEET. VACUUM PRODUCER SHALL BEPROPERLY VENTELATED. IF LOCATED IN ANY EQUIPMENT ROOM THAT IS ENCLOSED, PROPER FRESH AIR VENTSSHALL BE INSTALLED. ENCLOSURE DOOR MUST BE LOUVERED AND A PROPERLY SIZED EXHAUST FAN MUST BEINSTALLED TO TURN OVER AIR EVERY 3 MINUTES. AMBIENT ROOM TEMPERATURE CANNOT EXCEED 105° F. VACUUMPRODUCER EXHAUST MUST BE EXHAUSTED OUTSIDE WITH A METALLIC PIPE NO SMALLER THAN 6". EXHAUST PIPINGSHALL NOT EXCEED 25 FEET. EXHAUST PIPE OPENING SJHALL BE PROTECTED FROM ELEMENTS.

ELECTRICAL REQUIREMENTS:ELECTRICAL COMPONENTS SHALL MEET NEC CODE REQUIREMENTS. IF UL OR NFPA REQUIREMENTS ARE TO BE METTHEN IT SHOULD BE REQUESTED IN ADVANCE. ALL CODE VERIFICATION AND CONFORMATION ARE RESPONSIBILITYOF OWNER. AUTOVAC CAN SUPPLY NEEDED ITEMS TO MEET CODE REQUIREMENTS FOR A FEE. IF CODEREQUIREMENTS ARE NOT LISTED IN THIS DRAWING THEY ARE NOT A PART OF THE SCOPE.

VACUUM IQ MOTOR CONTROL CENTER (VARIABLE FREQUENCY DRIVE (VFD):EACH VFD MUST BE WIRED FROM MAIN DISTRIBUTION PANEL WITH APPROPRIATE SIZED WIRE AND CONDUIT (SIZEDPER CODE: BASED ON TURBINE H.P. AND VOLTAGE) TO EACH VFD AND FROM EACH VFD TO MOTOR. A SEPARATECONDUIT (SIZED PER CODE) MUST ALSO BE INSTALLED FROM MOTOR CONTROL PANEL TO VACUUM PRESSURETRANSDUCER INSTALLED ON FILTER SEPARATOR.

VACUUM SYSTEM INSTALLATION NOTESINSTALLATION BY OTHERS:AUTOVAC PROVIDES INSTALLATION AND REFRENCE DRAWINGS FOR ALL PROJECTS IN WHICH AUTOVAC SUPPLIESTHE VACUUM AND PIPING SYSTEM. ALL REFRENCE TO INFORMATION CONTAINED HERIN IS FOR REFRENCE ONLY ANDSHOULD BE VERIFIED TO MEET LOCAL AND APPLICABLE CODES AND RULES. WHEN REQUESTED, AUTOVAC CANESTIMATE THE NUMBER OF DAYS REQUIRES FOR INSTALLATION. PIPING SIZES, LENGTHS AND ROUTING CONTAINEDHERIN ARE ENGINEERED FOR THE SPECIFIC SITE AND USER REQUIREMENTS DESIGNATED BY THE PURCHASER. ANYCHANGE TO PIPE SIZING, LENGTH OR ROUTING WILL VOID ALL WARRANTIES EXPRESSED BY AUTOVAC EITHERWRITTIN IN THIS DOCUMENT OR IN ANY OTHER DOCUMENT OR CONTRACT.

INSTALLATION BY AUTOVAC:AUTOVAC OFFERS INSTALLATION OF ITS EQUIPMENT AS A SEPARATE CHARGE PER CONTRACT. AUTOVAC OFFERS ITSINSTALLATION AND IS LIMITED TO LISTED ITEMS NOTED IN THE INSTALLATION DOCUMENTS. ALL COMPONENTSREQUIRING A LICENSED INDIVIDUAL TO INSTALL WILL BE INSTALLED BY OTHER ENTITIES.

VACUUM SYSTEM START UP AND COMMISSIONING:AUTOVAC OFFERS VACUUM COMISSIONING AS AN OPTION FOR ITS CLIENTS. AUTOVAC CAN EITHER BE PRESENTONSITE OR COMPLETE THE STARTUP PROCEEDURES REMOTELY VIA VIDEO CONFRENCE. CERTAIN REQUIREMENTSAPPLY SO PLEASE CONTACT YOUR AUTOVAC REPRESENATIVE FOR INFORMATION

VACUUM SYSTEM ENGINEERING, LICENSING, PERMITS AND FEESVACUUM SYSTEM \ STRUCTURAL ENGINEERING:AUTOVAC ENGINEERS ALL OF ITS VACUUM SYSTEMS IN HOUSE. THIS CONSISTS OF VACUUM USAGE ANALYSIS, PIPESIZING AND PIPE ROUTING. STRUCTURAL ENGINEERING ON ANY OF AUTOVAC PRODUCTS IS AVAILABLE AT ANADDITIONAL FEE AND IS NOT INCLUDED IN THE QUOTED PRICE OR DOCUMENT SET UNLESS SPECIFICALLY NOTED AS“STRUCTURAL ENGENEERING INCLUDED”. STRUCTURAL ENGINEERING IS COMPLETED BY A LICENSED STRUCTURALENGINEER IN THE MUNICIPALITY OF THE JOB SITE.

VACUUM SYSTEM INSTALLATION BY LICENSEE:AUTOVAC HOLDS A CLASS B GENERAL CONTRACTING LICENSE AND CAN INSTALL ON A CONTRACT BASIS IN 50 STATESEITHER DIRECTLY OR THROUGH AFFILIATE LICENSEE SUBCONTRACTORS. LICENSED INSTALLATION IS AN OPTIONTHROUGH THE INSTALLATION PROCESS. UNLESS OTHERWISE NOTED, ALL INSTALLATION IS CONSIDERED THROUGHTHE MANUFACTURER WHEN A LICENSEE IS NOT REQUIRED. IT IS THE RESPONSIBILITY OF THE PURCHASER TODETERMINE THE CORRECT REUIREMENTS FOR THE INSTALLATION.

VACUUM SYSTEM INSTALLATION PERMITS AND FEES:AUTOVAC DOES NOT INCLUDE ANY PERMITS, TAXES OR FEES IN ANY OF ITS INVOICEING OR DRAWINGS. ALL SUCHITEMS WILL BE AN ADDITIONAL CHARGE IF REQUIRED.

THIS DRAWING IS THE PROPERTY OF AUTOVAC. THIS PRELIMINARY DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR INSTALLATION WITHOUT THE WRITTEN CONSENT OF AUTOVAC.

TUNNEL(REFERENCE)

VACUUM AREA #324 SPACES / 48 HOSES

VACUUM AREA #2(PROPOSED AREA)

VACUUM AREA #1(PROPOSED AREA)

VACUUMEQUIPMENT

AREA #3

REV

:

888-

628-

8682

ww

w.a

utov

acin

c.co

m

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:

DR

AWN

BY:

OVERVIEW

A1 ARCH

VACUUM AREA #3B

SINGLE DROPA1 ARCH

PROPOSED AREA #2

(REFERENCE)

VACUUM AREA #3A

SINGLE DROP

CL

CLEANOUT

CLCL

CLEANOUT

DOUBLE DROP

CL

A1 ARCH

CL

PROPOSED AREA #1

CLEANOUT

VACUUMEQUIPMENTAREA

TUNNEL

CL

60°

12'-6"

10'-10"

(305'-10")

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

ww

w.a

utov

acin

c.co

mSI

GN

ATU

RE:

CLI

ENT

APP

RO

VAL

REV

:

sale

s@au

tova

cinc

.com

BY:

PRO

JEC

TN

O.:

DR

AWN

VACUUM SYSTEM PLAN VIEW

888-

628-

8682

NOTES: UNLESS OTHERWISE SPECIFIED

UNDERGROUND PIPE TO BE SUPPLIED BY OTHERS (SBO).1.REFER TO INVOICE FOR ELECTRICAL REQUIREMENTS.2.

3

3

3

3

3

3

3

3

3

2

1

110

10

11

12

12

12

12

12

12

12

12

125

14

14

14

14

14

14

14

14

14

14

14

14

4

4

4

4

4

4

4

4

4 9

8

6

7

12

13

NOTES: UNLESS OTHERWISE SPECIFIED

REFER TO INVOICE FOR ELECTRICAL REQUIREMENTS

ITEM NO. PART NUMBER DESCRIPTION QTY.1 C522-0003 COMBO WYE, 90 DEG, ABS, 3 IN 22 C522-0005 COMBO WYE, 90 DEG, ABS, 4 X 3 IN 13 C524-0008 WYE, 45 DEG, ABS, 6 X 3 IN 104 C526-0102 ELBOW, STREET, 45 DEG, ABS, 3 IN 105 C526-0204 ELBOW, 90 ABS, 6 IN 16 C528-0202 CLEANOUT ADAPTER, 3 IN SLIP X 3 IN FNPT, ABS 17 C529-0102 3" ABS PLUG 18 C530-0003 BUSHING, ABS, 4 X 3 19 C530-0006 BUSHING, ABS, 6 X 4 1

10 C555-0012 TUBE, ALUM, 3.5 OD X 14 FT 211 C555-0013 TUBE, ALUM, 4.5 OD X 14 FT 112 C555-0015 TUBE, ALUM, 6.5 OD X 14 FT 1013 C706-15XX A1 VACUUM ARCH SINGLE DROP (RIGHT) ASSY 114 C706-15XX A1 VACUUM ARCH DOUBLE DROP ASSY 12

REV

:

888-

628-

8682

ww

w.a

utov

acin

c.co

m

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:

DR

AWN

BY:

VACUUM AREA #3A PARTS LIST

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

NOTES: UNLESS OTHERWISE SPECIFIED1. REFER TO INVOICE FOR ELECTRICAL REQUIREMENTS.2. DUAL MANIFOLD SUPPORT SHOULD BE INSTALLED EVERY 10 FEET.3. FOR MORE INFO SEE DUAL MANIFOLD SUPPORT ASSY PAGE.

ITEM NO. PART NUMBER DESCRIPTION QTY.1 C522-0003 COMBO WYE, 90 DEG, ABS, 3 IN 22 C522-0005 COMBO WYE, 90 DEG, ABS, 4 X 3 IN 23 C524-0008 WYE, 45 DEG, ABS, 6 X 3 IN 84 C524-0009 WYE, 45 DEG, ABS, 6 X 4 15 C526-0004 ELBOW, 45 DEG, ABS 6 IN 26 C526-0102 ELBOW, STREET, 45 DEG, ABS, 3 IN 87 C527-0004 COUPLING, ABS, 6IN 88 C528-0202 CLEANOUT ADAPTER, 3 IN SLIP X 3 IN FNPT, ABS 19 C528-0203 CLEANOUT ADAPTER, 4 IN M SLIP X 4 IN FNPT 110 C529-0102 3" ABS PLUG 111 C529-0103 PLUG, ABS, 4 IN 112 C530-0003 BUSHING, ABS, 4 X 3 113 C530-0006 BUSHING, ABS, 6 X 4 114 C555-0012 TUBE, ALUM, 3.5 OD X 14 FT 215 C555-0013 TUBE, ALUM, 4.5 OD X 14 FT 216 C555-0015 TUBE, ALUM, 6.5 OD X 14 FT 817 C555-0015 TUBE, ALUM, 6.5 OD X 20 FT 918 C5XX-0000 ASSEMBLY, SUPPORT, DUAL OVERHEAD MANIFOLD 1519 C706-15XX A1 VACUUM ARCH SINGLE DROP (RIGHT) ASSY 120 C706-15XX A1 VACUUM ARCH DOUBLE DROP ASSY 11

9

DETAIL B

4

5

511

REV

:

888-

628-

8682

ww

w.a

utov

acin

c.co

m

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:

DR

AWN

BY:

VACUUM AREA #3B PARTS LIST

1920

20

2020

2020

20

2020

20

20

1

14

1

14

2

15

2

15

3

16

3

16

3

16

3

16

3

16

3

16

3

16

317

7

17

7

177

17

7

17

7

17

17 7

77

17

8

1012

6

136

6

66

6

6618

18

1818

1818

1818

1818

18

18

18

18

18

3

B

A

DETAIL A

3

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

NOT R

EQUI

RED

NOT R

EQUI

RED

NOT R

EQUI

RED

NOT R

EQUI

RED

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

ww

w.a

utov

acin

c.co

mSI

GN

ATU

RE:

DR

AWN

REV

:

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

BY:

888-

628-

8682

A1 ARCH - DOUBLE DROP ASSEMBLY(XX TOTAL REQUIREMENTS)

A1 ARCH - SINGLE DROP ASSEMBLY(XX TOTAL REQUIREMENTS)

ITEM NO. PART NUMBER DESCRIPTION DOUBLE SINGLE

1 C499-0001 ARCH ELECTRICAL JUNCTION BOX 1 12 C574-0012 ADAPTER, 3IN PIPE X 2IN FNPT N/A 13 C579-0007 COMPRESSION COUPLING, 3" 2 24 C590-0010 WYE, DOUBLE, STEEL, 3 X 2 1 N/A5 C592-0002 JIM CAP, 3" 1 1

6 C700-0012 TRASH CAN HOLDER ASSY, ONE PIECE (SEECOLOR SHEET FOR COLOR) 2 2

7 C706-1102 ARCH STANCHION ASSEMBLY (SEE COLORSHEET FOR COLOR) 1 1

8 C706-1520 A1 ARCH - w AIRLINE & CONDUIT (SEE COLORSHEET FOR COLOR) 1 1

9 C706-3003A1 VACUUM ARCH PRIME SEPARATOR,

OVERHEAD VAC (SEE COLOR SHEET FORCOLOR)

1 1

10 C706-3026 LED FIXTURE, 6 FT 1 1

11 C740-1901 A1 VAC ARCH BASE PLATE COVER ASSY, ONEHALF (SEE COLOR SHEET FOR COLOR) 1 1

12 C740-1938 ARCH PRIMARY SEPARATOR BUCKET ASSY DARKBLUE 1 1

13 C790-0010 A1 ARCH CYCLONIC CONNECTOR, BLACK 1 114 C790-0909 ARCH TRASH CAN, DARK BLUE 1 115 C790-0918 TRASH CAN LID, DARK BLUE 1 1

16 C790-0920 MAT HOLDER ASSEMBLY (SEE COLOR SHEET FORCOLOR) 1 1

17 C791-9001 HARDWARE KIT, ARCH TO POST 1 118 C791-9003 HARDWARE KIT, MAT HOLDER 1 119 C791-9004 HARDWARE KIT, TRASH CAN HOLDER 1 120 C791-9005 HARDWARE KIT, BASE PLATE COVER 1 121 C791-9022 HARDWARE KIT, NEW VACUUM NOZZLE 1 122 C821-1005 CUFF, SWIVEL, GREY, 1 1-2 2 123 C821-1013 CUFF, GREY, 1 1-2 2 124 C821-1101 INLET VALVE ALUMINUM 2 125 C821-1102-1 HOSE ADAPTER ALUMINUM 2 126 C821-1518-4 VACUUM NOZZLE, NEW, BLACK 2 127 C821-1519-4 VACUUM NOZZLE HOLSTER, BLACK 2 1

28 C821-1602-2 VACUUM NOZZLE 'L' BRACKET (SEE COLORSHEET FOR COLOR) 2 1

29 C822-0151 VACUUM HOSE, 1 1/2, 15 FT, BLACK 2 1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTES: UNLESS OTHERWISE SPECIFIED

COLORS AND ACCESSORIES REFLECTED ARE FOR REPRESENTATION PURPOSESONLY. REFER TO INVOICE FOR SPECIFIC REQUIREMENTS.

1

1

11

16

15

137

13

9

272622

3

8

4

24

23

5

29

12

28

14

6

25

10

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

cjimenez
Text Box
23
cjimenez
Text Box
2
cjimenez
Text Box
2

DUAL (OVERHEAD) MANIFOLDSUPPORT ASSEMBLY

ITEM NO. PART NUMBER DESCRIPTION 3" PIPE 4" PIPE 6" PIPE

1 C549-0013 UNISTRUT PIPE MOUNT, 3 IN 1 N/A N/A

2 C549-0014 UNISTRUT PIPE MOUNT 4 IN N/A 1 N/A

3 C549-0015 UNISTRUT PIPE MOUNT 6 IN 1 1 2

4 C911-1004 THREADED ROD, 7/16-14 X 4 IN 2 2 2

5 C911-1005 NUT, FLANGE, 7/16-14 8 8 8

6 C911-7011 UNISTRUT, .875 x 10 IN 2 2 2

6" PIPE OVER 3"(XX TOTAL REQ)

6" PIPE OVER 4"(XX TOTAL REQ)

6" PIPE OVER 6"(XX TOTAL REQ)

1

2

2

1

2 SIG

NA

TUR

E:

CLI

ENT

APP

RO

VAL

DR

AWN

REV

:

sale

s@au

tova

cinc

.com

BY:

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

ww

w.a

utov

acin

c.co

m

888-

628-

8682

NOTES: UNLESS OTHERWISE SPECIFIED

1 SHOWN FOR ILLUSTRATION PURPOSES ONLY. USE APPROPRIATE SIZE REQUIRED.

2 INTERNAL NUTS (4X) TO BE PLACED EXTERNAL, OVER OUTER NUTS ON 6" PIPE OVER 6" ONLY. THIS WILL LOCK EXTERNAL NUTS IN PLACE.

6

5

3

4

5

6

1

5

5

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

cjimenez
Text Box
3
cjimenez
Text Box
2
cjimenez
Text Box
10

DR

AWN

REV

:

VACUUM AREA #2 PARTS LIST

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:w

ww

.aut

ovac

inc.

com

BY:

888-

628-

8682

ON CONCEPTUALDRAWING PACKAGES

BOM NOT SHOWN

NOTES: UNLESS OTHERWISE SPECIFIED

1. HUMAN MODELS ARE FOR REFERENCE ONLY.

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

A1 STANCHION WITH 30'-0 HOSE AND TRACK SYSTEM DETAILS

DR

AWN

SIG

NA

TUR

E:R

EV:

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

(8 TOTAL REQUIREMENTS)

ww

w.a

utov

acin

c.co

m

BY:

888-

628-

8682

NOTES: UNLESS OTHERWISE SPECIFIED

1. HUMAN MODELS ARE FOR REFERENCE ONLY.

9'-5

"8'

-0"

REV

:

888-

628-

8682

ww

w.a

utov

acin

c.co

m

sale

s@au

tova

cinc

.com

CLI

ENT

APP

RO

VAL

PRO

JEC

TN

O.:

PRO

JEC

TTI

TLE:

NA

ME

AN

DD

ATE

:

SIG

NA

TUR

E:

DR

AWN

BY:

VACUUM EQUIPMENT AREA #3 DETAILS

1

1

1

2

7

7

7

7

7

7 9 7 10

7 9 7 10

7

9

7

10

4

4

4841

3847

5 5

4 4

8 4 7

NOTES: UNLESS OTHERWISE SPECIFIEDREFER TO INVOICE FOR ELECTRICAL REQUIREMENTS.

ITEM NO. PART NUMBER DESCRIPTION QTY.

1 C216-2001 VACUUM PRODUCER, 30 HP, 7S 208.230.460V 3P 6IN IN-OUT 3

2 C316-3001 FILTER/SEPARATOR, 600 JUMBO FS 96X45 w33.5 DB (3)IN-OUT 1

3 C526-0004 ELBOW, 45 DEG, ABS 6 IN 1

4 C526-0204 ELBOW, 90 ABS, 6 IN 8

5 C529-0004 CAP, ABS, 6 IN 2

6 C555-0015 TUBE, ALUM, 6.5 OD X 14 FT 3

7 C591-0004 NO-HUB RUBBER COUPLING, 6 IN 14

8 C595-0002 SWING CHECK VALVE, 6IN 3

9 C836-0006 EXHAUST MUFFLER, 6 INCH 3

10 C836-0009 MUFFLER RAIN CAP, 6 IN 3

36 X 36DIRT BUCKETCLEARANCE

13'-3"8'

-4"

BOM NOT SHOWNON CONCEPTUAL

DRAWING PACKAGES

BASIC ELECTRICAL LAYOUTS WITH VFD