disclaimer - nebraska department of roads · the information in this report is considered accurate...

12
The information in this report is considered accurate as of Friday, December 13, 2019 This report is offered as a convenience and the user should be aware that the information contained is subject to change at any time If you have any questions about the content of this report, please contact the NDOT Project Manager. and without warning. This report is updated weekly. If you do not see your request, please check back at a later date. Disclaimer MSS Requests are processed on a first come-first served basis. Requestors must be aware that the processing times within the Lincoln Construction Office (LCO), the Environmental Section's Roadside Development and Compliance (RDC) Unit, or oversight agencies are different depending on: (1) the type and complexity of environmental commitments defined in each contract and (2) the complexity of the material site being reviewed. Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Upload: others

Post on 20-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

The information in this report is considered accurate as of Friday, December 13, 2019

This report is offered as a convenience and the user should be aware that the information contained is subject to change at any time

If you have any questions about the content of this report, please contact the NDOT Project Manager.

and without warning. This report is updated weekly. If you do not see your request, please check back at a later date.

Disclaimer

MSS Requests are processed on a first come-first served basis. Requestors must be aware that the processing times within the Lincoln Construction

Office (LCO), the Environmental Section's Roadside Development and Compliance (RDC) Unit, or oversight agencies are different depending on: (1) the

type and complexity of environmental commitments defined in each contract and (2) the complexity of the material site being reviewed.

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 2: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)13341 NH-77-1 (134) Princeton South BS2 7/3/2018 Decision sent to Contractor - Review Complete 1712347 BRO-7066 (29) Nebraska City Northwest BS1 8/15/2018 Decision sent to Contractor - Review Complete 4212986 STP-8-7 (115) Salem - Falls City BS2 9/24/2018 Decision sent to Contractor - Review Complete 21

13098A STP-62-7(108) Stella West Bridges BS2 10/16/2018 Decision sent to Contractor - Review Complete 013100 STP-66-7 (116) South Bend - Jct N-50 SS1 CD1 11/6/2018 Decision sent to Contractor - Review Complete 113296 MNH-136-6(125) Beatrice East PS1 SS1 CD1 12/3/2018 Decision sent to Contractor - Review Complete 711450 STP-63-2(108) Alvo North WS2 12/10/2018 Decision sent to Contractor - Review Complete 2313340 NH-77-1(133) Pickrell South BS2 1/4/2019 Decision sent to Contractor - Review Complete 4613237 NH-77-2(162) Princeton-South of Warlick Blvd PS1 SS1 CD1 1/4/2019 Decision sent to Contractor - Review Complete 613175 BRO-7078(31) Prague South BS1 1/10/2019 Decision sent to Contractor - Review Complete 713175 BRO-7078(31) Prague South WS1 1/10/2019 Decision sent to Contractor - Review Complete 713143 BRO-7078(30) Wahoo Northwest WS1 1/11/2019 Decision sent to Contractor - Review Complete 613143 BRO7078 (30) Wahoo Northwest BS1 1/11/2019 Decision sent to Contractor - Review Complete 613100 STP-66-7(116) South Bend - Jct N-50 BS1 1/23/2019 Decision sent to Contractor - Review Complete 21813279 NH-80-9 (84) Platte River Bridges East of Mahoney BS1 1/23/2019 Decision sent to Contractor - Review Complete 513100 STP-66-7(116) South Bend - Jct N-50 PS1 1/28/2019 Decision sent to Contractor - Review Complete 213251 NH-92-6(122) Rising City East PS1 SS1 CD1 1/30/2019 Decision sent to Contractor - Review Complete 2013237 NH-77-2(162) Princeton - South of Warlick Blvd PS2 SS2 2/1/2019 Decision sent to Contractor - Review Complete 713237 NH-77-2(162) Princeton - South of Warlick Blvd BS1 3/13/2019 Decision sent to Contractor - Review Complete 213296 NH-136-6 (125) Beatrice East WS1 3/26/2019 Decision sent to Contractor - Review Complete 2113296 NH-136-6 (125) Beatrice East BS1 3/26/2019 Decision sent to Contractor - Review Complete 2213175 BRO-7078 (31) Prague South SS1 3/27/2019 Decision sent to Contractor - Review Complete 2113296 NH-136-6 (125) Beatrice East WS2 4/2/2019 Decision sent to Contractor - Review Complete 3013251 NH-92-6 (122) Rising City East WS1 4/9/2019 Decision sent to Contractor - Review Complete 2413159 URB-6217 (4) 4th Corso Viaduct, Nebraska City BS2 4/10/2019 Decision sent to Contractor - Review Complete 713251 NH-92-6(122) Rising City East BS1 4/29/2019 Decision sent to Contractor - Review Complete 213213 ENH-55 (177) Lincoln Stone Bridge Trail BS1 5/20/2019 Decision sent to Contractor - Review Complete 1713100 STP-66-7(116) South Bend - Jct N-50 BS1 6/10/2019 Decision sent to Contractor - Review Complete 113100 STP-66-7 (116) South Bend - Jct N-50 BS2 6/12/2019 Decision sent to Contractor - Review Complete 1513286 NH-77-2 (164) Ceresco South SS1 7/12/2019 Decision sent to Contractor - Review Complete 1413198 STP-S34D (103) Pickrell Spur Bridge BS1 WS1 8/2/2019 Decision sent to Contractor - Review Complete 713100 STP-66-7 (116) South Bend - Jct N-50 PS1 SS1 8/7/2019 Decision sent to Contractor - Review Complete 2211716 STP-15-1 (110) Fairbury North BS-1 8/13/2019 Decision sent to Contractor - Review Complete 7813100 STP-66-7 (116) South Bend - Jct N-50 BS3 9/16/2019 Decision sent to Contractor - Review Complete 15

10584A STP-79-2 (108) Agnew North & South BS3 9/20/2019 Under Partner Agency Review

District 1

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 3: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)21558 S-30-6 (1045) Rogers to North Bend BS2 7/5/2018 Decision sent to Contractor - Review Complete 11721558 S-30-6 (1045) Rogers to North Bend BS3 7/5/2018 Decision sent to Contractor - Review Complete 11721558 S-30-6 (1045) Rogers to North Bend BS1 WS1 7/6/2018 Decision sent to Contractor - Review Complete 2621558 S-30-6 (1045) Rogers to North Bend PS1 SS1 7/11/2018 Decision sent to Contractor - Review Complete 111M2003 M2003 Oreapolis Mitigation Site Tree Planting WS1 8/8/2018 Decision sent to Contractor - Review Complete 722617 MISC-75-2 (1070) Big Papillion CR Stabilization BS1 8/16/2018 Under Partner Agency Review

22590A MISC-91-7 (1010) Blair West Culvert WS1 9/9/2018 Decision sent to Contractor - Review Complete 322617 MISC-75-2 (1070) Big Papillion CR Stabilization BS2 9/11/2018 Decision sent to Contractor - Review Complete 14

22590A MISC-91-7 (1010) Blair West Culvert PS1 9/12/2018 Decision sent to Contractor - Review Complete 822325 BRO-5026(11) Q Street Bridge, 26th to 27 Sts, Omaha WS1 12/6/2018 Decision sent to Contractor - Review Complete 422325 BRO-5026(11) Q Street Bridge, 26th to 27 Sts, Omaha WS2 12/6/2018 Decision sent to Contractor - Review Complete 422325 BRO-5026(11) Q Street Bridge, 26th to 27 Sts, Omaha WS4 12/18/2018 Decision sent to Contractor - Review Complete 1721558 S-30-6 (1045) Rogers - North Bend BS4 12/20/2018 Decision sent to Contractor - Review Complete 23522325 BRO-5026(11) Q Street Bridge, 26th to 27 Sts, Omaha WS3 1/2/2019 Decision sent to Contractor - Review Complete 222237 STPC-5011(9) 108th Street, Madison to Q Streets BS1 1/23/2019 Decision sent to Contractor - Review Complete 522629 HSIP-5003 (12) 132nd and Center St Omaha WS1 2/12/2019 Decision sent to Contractor - Review Complete 722690 NH-64-7(126) West Maple RD, Ramblewood - 156th BS1 2/22/2019 Decision sent to Contractor - Review Complete 522689 NH-64-7(125) West Maple RD, 156th-108th, Omaha BS1 3/13/2019 Decision sent to Contractor - Review Complete 222689 NH-64-7(125) West Maple RD, 156th-108th, Omaha SS1 3/13/2019 Decision sent to Contractor - Review Complete 922690 NH-64-7(126) West Maple RD, Ramblewood - 156th CD1 3/18/2019 Decision sent to Contractor - Review Complete 122689 NH-64-7(125) West Maple RD, 156th-108th, Omaha CD1 3/18/2019 Decision sent to Contractor - Review Complete 122638 NH-680-9 (37) I-680/West Center Bridge, Omaha BS1 WS1 3/22/2019 Decision sent to Contractor - Review Complete 1722654 ITS-NH-D2 (111) District 2 DMS BS1 3/25/2019 Decision sent to Contractor - Review Complete 3622690 NH-64-7 (126) West Maple RD, Ramblewood - 156th SS1 CD2 3/26/2019 Decision sent to Contractor - Review Complete 1422690 NH-64-7(126) West Maple RD, Ramblewood - 156th SS2 CD3 4/3/2019 Decision sent to Contractor - Review Complete 622575 NH-80-9 (79) EB-I-80 at I-680 Bridges, Omaha BS1 WS1 4/8/2019 Decision sent to Contractor - Review Complete 922566 NH-30-6 (137) Repair work Fremont BS1 4/11/2019 Decision sent to Contractor - Review Complete 722566 NH-30-6 (137) Repair work Fremont BS2 4/11/2019 Decision sent to Contractor - Review Complete 722325 BRO-7026 (11) Q Street Bridge, 26th to 27 Sts, Omaha WS5 4/15/2019 Decision sent to Contractor - Review Complete 1522530 HSIP-31-2 (111) Jct N-31/ N-36 BS1 4/17/2019 Decision sent to Contractor - Review Complete 1622530 HSIP-31-2 (111) Jct N-31/ N-36 BS2 4/17/2019 Decision sent to Contractor - Review Complete 2621558 S-30-6 (1045) Rogers - North Bend BS5 4/19/2019 Under Partner Agency Review22325 BR-5026(11) Q Street Bridge, 26th to 27 Sts, Omaha WS6 6/7/2019 Decision sent to Contractor - Review Complete 1122325 BR-5026 (11) Q Street Bridge, 26th to 27 Sts, Omaha WS7 6/12/2019 Decision sent to Contractor - Review Complete 922639 NH-77-3(136) US-77/Cloverly Rd, Inglewood SS2 CD1 6/17/2019 Decision sent to Contractor - Review Complete 28

N/A ER-GR-2815 South of Nebraska Hwy 22 on 370 Ave BS1 6/18/2019 Decision sent to Contractor - Review Complete 30N/A ER-GR-2815 South of Nebraska Hwy 22 on 370 Ave SS1 6/19/2019 Decision sent to Contractor - Review Complete 27N/A ER-GR-2815 South of Nebraska Hwy 22 on 370 Ave SS2 6/19/2019 Decision sent to Contractor - Review Complete 27

District 2

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 4: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)N/A ER-GR-2815 South of Nebraska Hwy 22 on 370 Ave BS2 6/19/2019 Decision sent to Contractor - Review Complete 27

22690 NH-64-7 (126) West Maple RD, Ramblewood - 156th PS1 SS3 6/20/2019 Decision sent to Contractor - Review Complete 722704 HSIP-5017 (5) 96th Street & Hwy 370 Intersection WS1 6/24/2019 Decision sent to Contractor - Review Complete 1722569 NH-77-3(132) Inglewood - Fremont PS1 SS1 6/27/2019 Decision sent to Contractor - Review Complete 1822530 HSIP-31-2 (111) Jct N-31/N-36 PS1 SS1 6/27/2019 Decision sent to Contractor - Review Complete 1822639 NH-77-3(136) US-77/Cloverly Rd, Inglewood PS1 SS1 6/27/2019 Decision sent to Contractor - Review Complete 1822690 NH-64-7 (126) West Maple RD, Ramblewood - 156th WS-1 7/11/2019 Decision sent to Contractor - Review Complete 5022566 NH-30-6 (137) Fremont - Arlington SS2 7/16/2019 Decision sent to Contractor - Review Complete 222789 S-30-6 (1051) West of Ames to Fremont SS1 9/4/2019 Decision sent to Contractor - Review Complete 522789 S-30-6 (1051) West of Ames to Fremont SS2 PS1 9/4/2019 Decision sent to Contractor - Review Complete 222789 S-30-6 (1051) West of Ames to Fremont SS2 PS1 9/4/2019 Decision sent to Contractor - Review Complete 222569 NH-77-3 (132) Inglewood - Fremont PS2 SS2 11/12/2019 Decision sent to Contractor - Review Complete 1522639 NH-77-3 (136) US-77, Colverly Rd. Inglewood PS2 SS2 11/12/2019 Decision sent to Contractor - Review Complete 2022690 NH-64-7(126) West Maple RD, Ramblewood - 156th BS2 12/2/2019 Decision sent to Contractor - Review Complete 121558 S-30-6 (1045) Rogers - North Bend BS6 12/9/2019 Under Partner Agency Review

District 2

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 5: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)32125 STP-98-5 (107) Pierce East CD2 5/24/2018 Decision sent to Contractor - Review Complete 2032226 NH-20-6 (111) Laurel Northeast CD1 5/25/2018 Decision sent to Contractor - Review Complete 2732226 NH-20-6 (111) Laurel Northeast SS1 5/30/2018 Decision sent to Contractor - Review Complete 4131951 NH-77-3 (127) In Oakland South PS5 SS5 CD5 6/11/2018 Under Lincoln Construction Office Review

32059A STP-16-3 (111) Pender West PS5 SS5 CD5 6/11/2018 Under Lincoln Construction Office Review32059 STP-16-3 (109) Wakefield South BS2 6/14/2018 Decision sent to Contractor - Review Complete 2631951 NH-77-3 (127) In Oakland South BS3 7/12/2018 Decision sent to Contractor - Review Complete 7531915 STP-56-5 (107) Cedar Rapids to St. Edward PS1 SS1 CD1 7/20/2018 Decision sent to Contractor - Review Complete 19532125 STP-98-5 (107) Pierce East BS1 8/8/2018 Decision sent to Contractor - Review Complete 4832251 SRTS-22(34) South Sioux City Atokad Trail BS1 8/14/2018 Decision sent to Contractor - Review Complete 832048 STP-51-6 (104) US-275 - N-9 PS1 SS1 CD1 9/17/2018 Decision sent to Contractor - Review Complete 2

00998B ER-STWD (165) 2018 ER Event Package 2 BS1 10/11/2018 Decision sent to Contractor - Review Complete 2000998A ER-STWD (164) 2018 ER Event Package 1 BS1 10/11/2018 Decision sent to Contractor - Review Complete 800998A ER-STWD (164) 2018 ER Event Package 1 BS3 10/26/2018 Decision sent to Contractor - Review Complete 2600998A ER-STWD (164) 2018 ER Event Package 1 BS2 10/29/2018 Decision sent to Contractor - Review Complete 2300998B ER-STWD(165) 2018 ER Event Package 2 BS2 11/5/2018 Decision sent to Contractor - Review Complete 932274 HSIP-D3 (106) District 3 - Districtwide Shlds PS1 SS1 CD1 11/26/2018 Decision sent to Contractor - Review Complete 131951 NH-77-3(127) Oakland South PS6 SS6 CD6 12/19/2018 Decision sent to Contractor - Review Complete 2332150 NH-35-4 (125) Hubbard SW WS1 1/2/2019 Decision sent to Contractor - Review Complete 232062 STP-15-4(120) Wayne North PS1 SS1 CD1 1/24/2019 Decision sent to Contractor - Review Complete 632064 STP-84-6(107) Hartington East PS1 SS1 CD1 1/24/2019 Decision sent to Contractor - Review Complete 2132126 STP-59-6(101) Jct N-57 - Jct N-15 PS1 SS1 CD1 1/24/2019 Decision sent to Contractor - Review Complete 2132229 STP-14-4(114) Brunswick West Viaduct BS1 1/30/2019 Decision sent to Contractor - Review Complete 2132150 NH-35-4(125) Hubbard SW BS1 1/31/2019 Decision sent to Contractor - Review Complete 1932229 STP-14-4(114) Brunswick West Viaduct CD1 2/1/2019 Decision sent to Contractor - Review Complete 1131915 STP-56-5 (107) Cedar Rapids to St. Edward BS1 2/13/2019 Decision sent to Contractor - Review Complete 1932150 NH-35-4(105) Hubbard SW PS1 SS1 CD1 3/7/2019 Decision sent to Contractor - Review Complete 1332150 NH-35-4(105) Hubbard SW WS2 3/18/2019 Decision sent to Contractor - Review Complete 232239 STP-91-5 (125) US-81 West BS1 3/27/2019 Decision sent to Contractor - Review Complete 13

32059A STP-16-3 (111) Pender West BS4 3/29/2019 Decision sent to Contractor - Review Complete 1832059A STP-16-3 (111) Pender West BS5 3/29/2019 Decision sent to Contractor - Review Complete 3332062 STP-15-4 (120) Wayne North BS1 4/2/2019 Decision sent to Contractor - Review Complete 3832062 STP-15-4 (120) Wayne North BS2 4/2/2019 Decision sent to Contractor - Review Complete 10532237 STP-14-4 (116) N-59 - Verdigre PS1 SS1 CD1 4/8/2019 Decision sent to Contractor - Review Complete 3032067 BRO-7090 (20) Wayne West WS1 4/12/2019 Decision sent to Contractor - Review Complete 1932239 STP-91-5 (125) US-81 West PS1 SS1 CD1 4/15/2019 Decision sent to Contractor - Review Complete 18

32059A STP-16-3 (111) Pender West WS2 4/23/2019 Decision sent to Contractor - Review Complete 831817A NH-20-4 (116) In Jackson BS1 5/2/2019 Decision sent to Contractor - Review Complete 7

District 3

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 6: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)31845A STP-91-6 (114) Clarkson East PS1 SS1 5/8/2019 Decision sent to Contractor - Review Complete 232126 STP-59-6 (101) Jct N-57 - Jct N-15 BS1 5/9/2019 Decision sent to Contractor - Review Complete 2132237 STP-14-4 (116) N-59 - Verdigre BS1 5/9/2019 Decision sent to Contractor - Review Complete 48

31845A URB-6065 (6) Clarkson East BS1 5/10/2019 Decision sent to Contractor - Review Complete 2031990 URB-6056 (6) 3rd Ave, 8th to S 5th St, Columbus WS1 5/22/2019 Decision sent to Contractor - Review Complete 831990 URB-6056 (6) 3rd Ave, 8th to S 5th St, Columbus WS2 5/22/2019 Decision sent to Contractor - Review Complete 131925 RRZ-TMT-6061 (8) UPRR/12 Ave, Columbus BS1 5/22/2019 Under Partner Agency Review32226 NH-20-6 (111) Laurel Northeast SS2 5/30/2019 Decision sent to Contractor - Review Complete 4732320 ER-12-5 (122) Niobrara West Bridges BS1 6/6/2019 Under Partner Agency Review32320 ER-12-5 (122) Niobrara West Bridges SS1 6/6/2019 Decision sent to Contractor - Review Complete 032320 ER-12-5 (122) Niobrara West Bridges SS2 6/10/2019 Decision sent to Contractor - Review Complete 232320 ER-12-5 (122) Niobrara West Bridges BS3 6/10/2019 Decision sent to Contractor - Review Complete 1032321 ER-13-4 (113) N. Fk Elkhorn River Bridge SS1 CD1 6/13/2019 Decision sent to Contractor - Review Complete 7

31845A STP-91-6 (114) Clarkson East SS3 6/14/2019 Decision sent to Contractor - Review Complete 1232064 STP-84-6 (107) Hartington East BS1 7/8/2019 Decision sent to Contractor - Review Complete 3832064 STP-84-5 (107) Hartington East BS2 7/8/2019 Decision sent to Contractor - Review Complete 3832048 STP-51-6 (104) US-275 - N-9 BS3 7/8/2019 Decision sent to Contractor - Review Complete 1032323 ER-94-7 (109) Pender East Bridge WS1 7/30/2019 Decision sent to Contractor - Review Complete 632064 STP-84-6 (107) Hartington East BS3 7/30/2019 Decision sent to Contractor - Review Complete 1032323 ER-94-7 (109) Pender East Bridge BS1 7/30/2019 Decision sent to Contractor - Review Complete 2

31845A STP-91-6 (114) Clarkson East SS2 8/2/2019 Decision sent to Contractor - Review Complete 4332320 ER-12-5 (122) Niobrara West Bridges BS6 8/2/2019 Decision sent to Contractor - Review Complete 1032320 ER-12-5 (122) Niobrara West Bridges WS1 8/6/2019 Decision sent to Contractor - Review Complete 0

31845A STP-91-6 (114) Clarkson East BS2 8/7/2019 Decision sent to Contractor - Review Complete 232322 ER-57-3 (110) Elkhorn River Bridge SE of Stanton BS1 8/14/2019 Decision sent to Contractor - Review Complete 632322 ER-57-3 (110) Elkhorn River Bridge SE of Stanton WS1 8/14/2019 Decision sent to Contractor - Review Complete 632241 STP-121-4 (112) Gavins Point Dam East BS1 8/16/2019 Decision sent to Contractor - Review Complete 1332257 STP-75-3 (122) Tekamah North PS1 SS1 CD1 8/26/2019 Decision sent to Contractor - Review Complete 1432274 HSIP-D3 (106) District 3 Sholders BS1 9/9/2019 Decision sent to Contractor - Review Complete 832257 STP-75-3 (122) Tekamah North BS1 10/4/2019 Decision sent to Contractor - Review Complete 39

32125A STP-98-5 (108) Pierce East Levee Bridge BS1 10/8/2019 Decision sent to Contractor - Review Complete 732241 STP-121-4 (112) Gavins Point Dam East PS1 SS1 CD1 10/23/2019 Decision sent to Contractor - Review Complete 2632320 ER-12-5(122) Niobrara West Bridges WS2 11/20/2019 Under Lincoln Construction Office Review

District 3

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 7: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)42616 S-136-4 (1016) N-78 - South Jct N-14 WS1 8/10/2018 Decision sent to Contractor - Review Complete 4742616 S-136-4 (1016) N-78 - South Jct N-14 SS1 8/13/2018 Decision sent to Contractor - Review Complete 442762 STP-30-4 (160) Shelton - Wood River Resurface PS1 SS1 CD1 8/29/2018 Decision sent to Contractor - Review Complete 142089 STP-11-3 (116) North Loup - Ord PS1 SS1 10/10/2018 Request Withdrawn by the Contractor Withdrawn by Contractor42693 STP-70-4 (111) Arcadia E & W PS1 SS1 10/10/2018 Request Withdrawn by the Contractor Withdrawn by Contractor42089 STP-11-3(116) North Loup - Ord PS1 10/25/2018 Decision sent to Contractor - Review Complete 642693 STP-70-4 (111) Arcadia E & W PS1 10/25/2018 Decision sent to Contractor - Review Complete 642745 NH-30-5(133) Silver Creek West Bridge SS1 10/29/2018 Decision sent to Contractor - Review Complete 342616 S-136-4(1016) N-78 South Jct. N-14 BS1 11/9/2018 Decision sent to Contractor - Review Complete 1142474 STP-53-1 (103) Alexandria South Bridges BS1 12/11/2018 Decision sent to Contractor - Review Complete 2842474 STP-53-1 (103) Alexandria South Bridges BS2 12/11/2018 Decision sent to Contractor - Review Complete 2842710 STP-L10C (103) Gibbon Link WS1 1/2/2019 Decision sent to Contractor - Review Complete 2642673 NH-80-6(107) Wood River - Platte River SS1 CD1 1/3/2019 Decision sent to Contractor - Review Complete 1442673 NH-80-6(107) Wood River - Platte River SS2 CD2 1/3/2019 Decision sent to Contractor - Review Complete 1442673 NH-80-6(107) Wood River - Platte River PS1 1/4/2019 Decision sent to Contractor - Review Complete 1842710 STP-L10C(103) Gibbon Link PS1 SS1 CD1 1/4/2019 Decision sent to Contractor - Review Complete 1342710 STP-L10C(103) PS2 CD2 SS2 1/4/2019 Decision sent to Contractor - Review Complete 1342834 STP-281-1(120) Cowles Spur North PS1 SS1 CD1 1/7/2019 Decision sent to Contractor - Review Complete 1542764 NH-281-2(128) US 281 St. Paul & South PS3 SS3 CD3 1/22/2019 Decision sent to Contractor - Review Complete 742764 NH-281-2(128) US 281 St. Paul & South PS4 SS4 CD4 1/22/2019 Decision sent to Contractor - Review Complete 842764 NH-281-2(128) US 281 St. Paul & South PS1 SS1 CD1 1/23/2019 Decision sent to Contractor - Review Complete 542763 STP-183-2(110) I-80 - Elm Creek PS1 SS1 1/23/2019 Decision sent to Contractor - Review Complete 542764 NH-281-2(128) US 281 St. Paul & South PS2 SS2 CD2 1/23/2019 Decision sent to Contractor - Review Complete 642474 STP-53-1(103) Alexandria South Bridges PS1 SS1 CD1 2/6/2019 Decision sent to Contractor - Review Complete 642474 STP-53-1(103) Alexandria South Bridges PS2 SS2 CD2 2/7/2019 Decision sent to Contractor - Review Complete 542474 STP-53-1(103) Alexandria South Bridges PS3 SS3 CD3 2/7/2019 Decision sent to Contractor - Review Complete 542572 STP-70-4(108) Ord Northeast PS1 SS1 2/22/2019 Decision sent to Contractor - Review Complete 542673 NH-80-6(107) Wood River - Platte River BS1 2/27/2019 Decision sent to Contractor - Review Complete 042474 STP-53-1(103) Alexandria South Bridges CD4 3/1/2019 Decision sent to Contractor - Review Complete 542599 STP-34-5 (116) Aurora East PS2 3/7/2019 Decision sent to Contractor - Review Complete 1342728 HSIP-30-4(159) 12th to 7th Ave, Kearney CD1 3/13/2019 Decision sent to Contractor - Review Complete 542613 STP-58-2 (110) US-281 - Dannebrog PS1 SS1 CD1 3/19/2019 Decision sent to Contractor - Review Complete 2042599 STP-34-5 (116) Aurora East BS1 4/3/2019 Decision sent to Contractor - Review Complete 842710 STP-L10C (103) Gibbon Link CD3 4/8/2019 Decision sent to Contractor - Review Complete 3042834 STP-281-1 (120) Cowles Spur North PS2 SS2 CD2 4/30/2019 Decision sent to Contractor - Review Complete 942474 STP-53-1 (103) Alexandria South Bridges PS4 SS4 CD5 4/30/2019 Decision sent to Contractor - Review Complete 1042745 NH-30-5 (133) Silver Creek West Bridge CD1 5/7/2019 Decision sent to Contractor - Review Complete 17842866 NH-81-2 (147) Columbus South NB BS1 WS1 5/21/2019 Decision sent to Contractor - Review Complete 49

District 4

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 8: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)42866 NH-81-2 (147) Columbus South NB WS2 5/22/2019 Decision sent to Contractor - Review Complete 1242613 STP-58--2 (110) US-281 - Dannebrog WS1 5/28/2019 Decision sent to Contractor - Review Complete 342895 ER-39-3 (106) Loup River Overflow South BS2 5/30/2019 Decision sent to Contractor - Review Complete 1342895 ER-39-3 (106) Loup River Overflow South BS1 5/31/2019 Request Withdrawn by the Contractor Withdrawn by Contractor42763 STP-183-2 (110) I-80 - Elm Creek BS1 5/31/2019 Decision sent to Contractor - Review Complete 1842613 STP-58-2 (110) US-281 - Dannebrog BS1 7/9/2019 Decision sent to Contractor - Review Complete 742896 ER-58-2 (113) Boelus East BS1 7/11/2019 Decision sent to Contractor - Review Complete 542896 ER-58-2 (113) Boelus East BS2 7/12/2019 Decision sent to Contractor - Review Complete 542613 STP-58-2 ((110) US-281 Dannebrog PS2 SS3 CD3 7/23/2019 Decision sent to Contractor - Review Complete 2842572 STP-70-4 (108) Ord Northeast BS1 7/29/2019 Decision sent to Contractor - Review Complete 3142745 NH-30-5 (113) Silver Creek West Bridge PS1 SS1 8/2/2019 Decision sent to Contractor - Review Complete 2842895 ER-39-3 (106) Loup River Overflow South WS1 8/2/2019 Decision sent to Contractor - Review Complete 6842576 STP-68-2(103) Ravenna North BS1 9/25/2019 Decision sent to Contractor - Review Complete 1442763 STP-183-2 (110) I-80 - Elm Creek BS2 10/22/2019 Decision sent to Contractor - Review Complete 9

District 4

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 9: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)51277 STP-27-2 (104) I-80 North PS2 SS2 CD2 8/1/2018 Decision sent to Contractor - Review Complete 751229 NH-26-1 (171) Morrill/Garden Co. Line East PS1 SS1 CD1 8/28/2018 Decision sent to Contractor - Review Complete 251375 NH-STP-20-1 (149) Crawford - Whitney PS1 SS1 CD1 9/6/2018 Decision sent to Contractor - Review Complete 651444 NH-80-2 (95) N-27 - South Platte River SS3 10/3/2018 Decision sent to Contractor - Review Complete 051557 NH-26-1 (169) In Broadwater and East PS1 SS1 CD1 10/17/2018 Decision sent to Contractor - Review Complete 651519 NH-80-2(103) Chappell - N-27 BS1 12/17/2018 Decision sent to Contractor - Review Complete 2251519 NH-80-2 (103) Chappell - N-27 SS1 CD1 1/15/2019 Decision sent to Contractor - Review Complete 851519 NH-80-2(103) Chappell - N-27 PS1 2/4/2019 Decision sent to Contractor - Review Complete 1151519 NH-80-2(103) Chappell - N-27 BS3 BS4 WS2 2/21/2019 Decision sent to Contractor - Review Complete 2251242 STPB-71-2(110) Kimball Underpass Restoration BS1 WS1 3/18/2019 Decision sent to Contractor - Review Complete 451507 NH-HSIP-26-1 (167) Scottsbluff - Minatare BS1 4/5/2019 Decision sent to Contractor - Review Complete 1451557 NH-26-1 (169) In Broadwater and East BS1 4/10/2019 Decision sent to Contractor - Review Complete 6351557 NH-26-1 (169) In Broadwater and East BS2 4/10/2019 Decision sent to Contractor - Review Complete 6351518 NH-STP-80-1 (186) Wyoming Line - Bushnell BS2 6/3/2019 Decision sent to Contractor - Review Complete 1551519 NH-80-2 (103) Chappell - N-47 SS4 CD4 6/7/2019 Decision sent to Contractor - Review Complete 1951519 NH-80-2 (103) Chappell - N-47 BS5 7/26/2019 Decision sent to Contractor - Review Complete 5

District 5

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 10: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)61658 NH-80-2 (113) Colorado Line - Big Springs BS1 WS1 7/27/2018 Decision sent to Contractor - Review Complete 1261658 NH-80-2 (113) Colorado Line - Big Springs PS1 SS1 CD1 7/27/2018 Decision sent to Contractor - Review Complete 1161658 NH-80-2 (113) Colorado Line - Big Springs SS2 CD2 8/9/2018 Decision sent to Contractor - Review Complete 6

61566A NH-80-2 (104) Big Springs West Crossovers BS1 WS1 8/17/2018 Decision sent to Contractor - Review Complete 1361658 NH-80-2 (113) Colorado Line - Big Springs PS2 SS3 CD3 8/20/2018 Decision sent to Contractor - Review Complete 061380 STP-61-2 (112) Lake McConaughy North SS5 CD5 8/27/2018 Decision sent to Contractor - Review Complete 4

61380B STP-61-3 (111) Arthur South WS4 9/15/2018 Decision sent to Contractor - Review Complete 12661380B STP-61-3 (111) Arthur South WS5 9/15/2018 Decision sent to Contractor - Review Complete 12661380B STP-61-3 (111) Arthur South WS1 9/21/2018 Decision sent to Contractor - Review Complete 2661380B STP-61-3 (111) Arthur South WS2 9/21/2018 Decision sent to Contractor - Review Complete 2661380B STP-61-3 (111) Arthur South WS3 9/21/2018 Decision sent to Contractor - Review Complete 2661596 NH-23-2(122) Mason City Southeast PS1 SS1 CD1 12/17/2018 Decision sent to Contractor - Review Complete 2361596 NH-2-3(122) Mason City Southeast SS2 CD2 1/23/2019 Decision sent to Contractor - Review Complete 661614 STP-61-3(112) Hyannis South PS1 SS1 CD1 1/28/2019 Decision sent to Contractor - Review Complete 1161603 STP-9201(127) Lewellen - Lemoyne PS1 SS1 CD1 1/28/2019 Decision sent to Contractor - Review Complete 1161602 STP-61-3(113) Arthur/Grant County Line North PS1 SS1 CD1 1/28/2019 Decision sent to Contractor - Review Complete 11

61380B STP-61-3(111) Arthur South PS1 SS1 CD1 1/28/2019 Decision sent to Contractor - Review Complete 1161596 NH-2-3 (122) Mason City Southeast PS2 SS3 CD3 2/12/2019 Decision sent to Contractor - Review Complete 9

61565A NH-80-3 (153) Brule to Ogallala Crossovers BS1 2/27/2019 Decision sent to Contractor - Review Complete 661565A NH-80-3 (153) Brule to Ogallala Crossovers BS2 4/11/2019 Decision sent to Contractor - Review Complete 2861634 NH-80-4 (146) North Platte I-80 Scales BS1 5/22/2019 Under Partner Agency Review61566 NH-80-2 (100) Big Springs West BS1 6/7/2019 Decision sent to Contractor - Review Complete 4961636 STP-21-2 (117) Eddyville Road N&S PS1 SS1 CD1 6/12/2019 Decision sent to Contractor - Review Complete 2761583 STP-21-2 (112) Lexington North Bridges BS1 WS1 6/20/2019 Decision sent to Contractor - Review Complete 2861566 NH-80-2 (100) Big Springs West BS2 WS2 7/10/2019 Decision sent to Contractor - Review Complete 761596 NH-2-3 (122) Mason City Southeast BS1 7/29/2019 Decision sent to Contractor - Review Complete 2361636 STP-21-2 (117) Eddyville Road N&S SS2 CD2 8/6/2019 Decision sent to Contractor - Review Complete 361636 STP-21-2 (117) Eddyville Road N&S SS3 CD3 8/16/2019 Decision sent to Contractor - Review Complete 21

61565A NH-80-3 (153) Brule to Ogallala Crossovers BS3 SS1 WS1 CD1 8/23/2019 Decision sent to Contractor - Review Complete 4260942 STP-183-3 (112) Ansley Viaduct BS1 9/5/2019 Decision sent to Contractor - Review Complete 1561566 NH-80-2 (100) Big Springs West SS1 9/25/2019 Decision sent to Contractor - Review Complete 1461566 NH-80-2 (100) Big Springs West PS1 10/3/2019 Decision sent to Contractor - Review Complete 2861566 NH-80-2 (100) Big Springs West PS2 SS2 10/17/2019 Decision sent to Contractor - Review Complete 2961594 STP-30-2(147) Maxwell - Brady PS1 SS1 CD1 12/5/2019 Under Partner Agency Review

District 6

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 11: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)70885 NH-6-2(125) Indianola to Cambridge BS2 12/20/2017 Decision sent to Contractor - Review Complete 1571123 STP-23-3(109) Smithfield - Bertrand BS1 7/3/2018 Decision sent to Contractor - Review Complete 2871185 STP-NH-283-1(118) Platte River South BS1 11/19/2018 Decision sent to Contractor - Review Complete 1470872 STP-46-1(103) Oxford South BS1 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS2 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS3 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS4 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS6 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS7 11/28/2018 Decision sent to Contractor - Review Complete 570872 STP-46-1(103) Oxford South BS5 11/28/2018 Decision sent to Contractor - Review Complete 571161 STP-23-2(128) Colorado State Line-Brandson PS1 SS1 CD1 12/13/2018 Decision sent to Contractor - Review Complete 2671185 STP-NH-283-1(118) Platte River South PS1 SS1 CD1 12/17/2018 Decision sent to Contractor - Review Complete 2371184 STP-283-1(119) Elwood North PS1 SS1 CD1 12/18/2018 Decision sent to Contractor - Review Complete 2271184 STP-283-1(119) Elwood North SS2 CD2 1/23/2019 Decision sent to Contractor - Review Complete 10771185 STP-283-1(118) Platte River South SS2 CD2 1/23/2019 Decision sent to Contractor - Review Complete 11071184 STP-283-1(119) Elwood North WS1 2/6/2019 Decision sent to Contractor - Review Complete 1371184 STP-283-1(119) Elwood North BS1 2/6/2019 Decision sent to Contractor - Review Complete 1571184 STP-283-1(119) Elwood North SS3 CD3 2/14/2019 Decision sent to Contractor - Review Complete 1871184 STP-283-1 (119) Elwood North SS4 CD4 5/22/2019 Decision sent to Contractor - Review Complete 3771184 STP-283-1 (119) Elwood North SS5 CD5 5/22/2019 Decision sent to Contractor - Review Complete 3571185 STP-283-1 (118) Platte River South SS4 CD4 5/23/2019 Decision sent to Contractor - Review Complete 5471184 STP-283-1 (119) Elwood North SS6 CD6 5/24/2019 Decision sent to Contractor - Review Complete 3471221 NH-83-1 (119) In McCook Pavement Repair WS1 6/12/2019 Decision sent to Contractor - Review Complete 971163 STP-10-1 (111) Franklin North PS1 SS1 CD1 12/10/2019 Under Lincoln Construction Office Review71164 STP-10-1 (112) Macon - N-4 PS1 SS1 CD1 12/10/2019 Under Lincoln Construction Office Review71196 STP-10-1 (114) N-4 - Minden PS1 SS1 CD1 12/10/2019 Under Lincoln Construction Office Review

District 7

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM

Page 12: Disclaimer - Nebraska Department of Roads · The information in this report is considered accurate as of Friday, December 13, 2019 ... 13340 NH-77-1(133) Pickrell South BS2 1/4/2019

Control

Number Project Number Project Name MSS Request ID

Date Submittal

Requirements

Met Site Status

Calendar Days Elapsed

(Date Submittal Requirements Met

to the Date Decision Sent to the

Contractor)80943 STP-11-4 (115) Holt Creek North and South BS3 8/16/2018 Decision sent to Contractor - Review Complete 680884 STP-11-4 (112) Amelia North BS3 8/16/2018 Decision sent to Contractor - Review Complete 1580983 STP-11-4 (117) Atkinson South PS1 SS1 CD1 9/5/2018 Decision sent to Contractor - Review Complete 14880903 STP-137-4 (107) Niobrara River North WS2 10/12/2018 Decision sent to Contractor - Review Complete 1480644 STP-70-4(105) N. Jct. US-281 East PS1 SS1 CD1 1/4/2019 Decision sent to Contractor - Review Complete 680976 STP-12-4 (111) Bristow Box Culvert BS1 1/24/2019 Decision sent to Contractor - Review Complete 2680883 STP-137-4(106) Keya Paha River - NE/SD Line PS1 SS1 CD1 2/5/2019 Decision sent to Contractor - Review Complete 581001 STP-137-4(108) Newport North PS1 SS1 CD1 2/6/2019 Decision sent to Contractor - Review Complete 2780709 RD-96-4 (1001) Burwell West BS1 2/14/2019 Decision sent to Contractor - Review Complete 14880971 STP-12-4(110) Lynch - Monowi BS1 2/19/2019 Decision sent to Contractor - Review Complete 4480883 STP-137-4(106) Keya Paha River - NE/SD Line BS1 2/21/2019 Decision sent to Contractor - Review Complete 1180886 ENH-16 (38) Valentine Cowboy Trail Conn. Phase 1 BS1 3/1/2019 Decision sent to Contractor - Review Complete 581001 STP-137 (4 (108) Newport North BS1 3/14/2019 Decision sent to Contractor - Review Complete 880983 STP-11-4 (117) Atkinson South BS1 3/15/2019 Decision sent to Contractor - Review Complete 380709 RD-96-4 (1001) Burwell West BS2 3/27/2019 Decision sent to Contractor - Review Complete 10781039 ER-281-4 (130) 281 Niobrara River BS1 3/29/2019 Under Lincoln Construction Office Review80709 RD-96-4 (1001) Burwell West BS3 4/10/2019 Decision sent to Contractor - Review Complete 9380644 STP-70-4 (105) N Jct US-281 East BS1 4/15/2019 Decision sent to Contractor - Review Complete 1580709 RD-96-4 (1001) Burwell West BS4 4/18/2019 Decision sent to Contractor - Review Complete 8580979 NH-20-3 (115) Long Pine - Atkinson SS1 5/22/2019 Decision sent to Contractor - Review Complete 180979 NH-20-3 (115) Long Pine - Atkinson SS2 5/22/2019 Decision sent to Contractor - Review Complete 1281038 ER-11-4(120) Holt/Boyd C/L Niobrara River Bridge BS1A 6/18/2019 Decision sent to Contractor - Review Complete 13581038 ER-11-4 (120) Holt/Boyd C/L Niobrara River Bridge WS1 7/22/2019 Decision sent to Contractor - Review Complete 980986 NH-20-2 (144) Eli to Nenzel SS1 7/26/2019 Decision sent to Contractor - Review Complete 581038 ER-11-4 (120) Holt/Boyd C/L Niobrara River Bridge WS2 8/16/2019 Request Withdrawn by the Contractor Withdrawn by Contractor80971 STP-12-4(110) Lynch - Monowi SS1 CD1 9/20/2019 Decision sent to Contractor - Review Complete 380817 TCSP-16(36) Niobrara Scenic River Corridor BS2 11/14/2019 Decision sent to Contractor - Review Complete 2880817 TCSP-16(36) Niobrara Scenic River Corridor BS1 11/15/2019 Under Partner Agency Review80817 TCSP-16(36) Niobrara Scenic River Corridor BS3 11/15/2019 Decision sent to Contractor - Review Complete 2781020 STP-7-4(119) Niobrara River South PS1 SS1 CD1 11/20/2019 Decision sent to Contractor - Review Complete 1580883 STP-137-4 (106) Kaya Paha River PS2 SS2 CD2 11/21/2019 Decision submitted to Construction Office81020 STP-7-4(119) Niobrara River South PS2 SS2 CD2 12/13/2019 Under Environmental Section Review81001 STP-137-4(108) Newport North PS2 SS2 CD2 12/13/2019 Under Environmental Section Review80883 STP-137-4(106) Keya Paha River - South Dakota Line PS3 SS3 CD3 12/13/2019 Under Environmental Section Review

District 8

Nebraska Department of Transportation MSS Status Report 12/13/2019 11:32 AM