Discussion: Scheduling. Haibo Zeng Amit Mahajan. Outline. Problem: multi-program scheduling on a single processor Optimum fixed priority scheduler – rate monotonic scheduling Optimum dynamic scheduling algorithm – deadline driven scheduling Mixed scheduling algorithm. Introduction. - PowerPoint PPT PresentationTRANSCRIPT
EE 249, Fall 2002 1
Discussion: Scheduling
Haibo ZengAmit Mahajan
EE 249, Fall 2002 2
Outline Problem: multi-program scheduling
on a single processor Optimum fixed priority scheduler –
rate monotonic scheduling Optimum dynamic scheduling
algorithm – deadline driven scheduling
Mixed scheduling algorithm
EE 249, Fall 2002 3
Introduction Environment:
hard-real-time vs. soft-real-time Scheduling:
Preemptive and priority driven Fixed priority vs. dynamic
EE 249, Fall 2002 4
Assumption of environment A1: The requests for all tasks with
hard deadlines are periodic A2: Task deadline is its next request A3: The tasks are independent A4: Run-time for each task is
constant A5: Nonperiodic tasks have no
deadlines
EE 249, Fall 2002 5
Outline Problem: multi-program scheduling
on a single processor Optimum fixed priority scheduler –
rate monotonic scheduling Optimum dynamic scheduling
algorithm – deadline driven scheduling
Mixed scheduling algorithm
EE 249, Fall 2002 6
Rate Monotonic Scheduling According to their request rates only
Higher request rates, higher priorities Optimum fixed priority scheduling:
feasible if any feasible fixed priority assignment exists
Proof: Use the concept critical instant to
analyze the case of scheduling two tasks
EE 249, Fall 2002 7
RMS (cont’d) Proof:
Use the concept critical instant to analyze the case of scheduling two tasks
Result: assign higher priorities to task with shorter request period; independent of their run-times.
Generalize this result to m tasks
EE 249, Fall 2002 8
RMS (cont’d) Available Processor Utilization can
be as low as:
Analysis: Right hand side of the inequality is
monotonic decreasing with m
)12(/ /1
1
mm
iii mTCU
%3.692ln)12( /1lim
m
m
m
EE 249, Fall 2002 9
RMS (cont’d) Question:
Why utilization factor can’t reach 100%? Answer:
Processor idle time: example Question:
How to relax the utilization bound? Answer:
For i=1,2,…,m-1, Better choice: dynamic priority assignment
iim TkT
EE 249, Fall 2002 10
Outline Problem: multi-program scheduling
on a single processor Optimum fixed priority scheduler –
rate monotonic scheduling Optimum dynamic scheduling
algorithm deadline driven scheduling
Mixed scheduling algorithm
EE 249, Fall 2002 11
Deadline Driven Scheduling According to their request rates:
earliest deadline first (EDF) No processor idle time before overflow Schedulable iff processor use is less
than 1 Optimum scheduling algorithm:
feasible if any feasible assignment exists
EE 249, Fall 2002 12
Outline Problem: multi-program scheduling
on a single processor Optimum fixed priority scheduler –
rate monotonic scheduling Optimum dynamic scheduling
algorithm – deadline driven scheduling
Mixed scheduling algorithm
EE 249, Fall 2002 13
Mixed scheduling algorithm Nice for many applications
Interrupt hardware: fixed priority scheduler
Other software tasks: dynamic priority scheduler
Scheduling algorithm K tasks of shortest periods: RMS Remaining slower paced tasks: EDF
EE 249, Fall 2002 14
Mixed scheduling algorithm (cont’d) Comparison with RMS and EDF:
Still can’t reach 100% utilization But much better than RMS
Example with 3 tasks T1=3, T2=4, T3=5 C1=1, C2=1, C3=1(rate-monotonic), 2(mixed) RMS: U = 1/3 + 1/4 + 1/5 = 78.3% Mixed scheduling algorithm:
U = 1/3 + 1/4 + 2/5 = 98.3%
EE 249, Fall 2002 15
Questions Overhead we ignored?
Dynamic scheduling Preemption
If programs are nonterminating, how about the resources?
Are the assumptions about environment always fine? If A1 or A4 don’t hold, what do we do? Is A3 suitable for embedded systems?