Disputes and Claims in EngineeringContracts - Causes and Remedial
Measures
Dr. S Nagabhushana Rao
Director, ESCI
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 2/56
DISPUTE
“An assertion of a right by one party and a
repudiation thereof by another”
Reasons for Dispute –
•
Gap in Interpretation and understanding theContrat
• !reah of Contrat
•
“"ore #a$eure” % Causes beyond the Contro&of '(ner ) Contrator
• *uantu+ #erit – Co+pensation for the (or,
done
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 3/56
As per Setion -. of Indian Contrat At/
- A&& agree+ents are ontrats if they are
+ade by the free onsent of parties
o+petent to ontrat0 for a &a(fu&
onsideration and (ith a &a(fu& ob$et and
are not hereby e1press&y de&ared to be
2oid3
4A5ID C'6TRACT
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 4/56
Is +ethod by (hih the sense or +eaning of (ord is
understood3
Authenti Interpretation
“Custo+ary” or “Usua&” interpretation
“C&ose”0 “Strit” or 5itera& interpretation
“E1tensi2e” or “5ibera&” interpretation
I6TERPRETATI'6 7IT8'UT PR'PER #EA6I6G 5EADS
T' DISPUTES
I6TERPRETATI'6
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 5/56
Is fai&ure to perfor+ an ob&igationarising out of the ontrat3
• Tota& !reah
• Partia& !reah
• Antiipatory !reah
!REAC8 '" C'6TRACT
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 6/56
• Abandon+ent or tota& fai&ure to
o+p&ete either to start (ith or+id(ay in e1eution3
• De&ay in o+p&etion of the (or,s
• Defeti2e (or,
C'##'6EST !REAC8ES '"
C'6TRACT
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 7/56
• "ai&ure to hando2er possession of the site to the
Contrator
• De&ay in supp&y of (or,ing dra(ings0 detai&s0
designs and deisions
• De&ay in supp&y of +ateria&s
• 'rdering suspension or stoppage of (or, or
entering (ith the progress of (or, in any +anner3
• "ai&ure ) De&ay in +a,ing pay+ents of R3A3 !i&&s0
e1tra ite+s0 e1ess 9uantities0 in&uding
sett&e+ent of fina& bi&&3
Contd:
!REAC8 !; T8E '76ER
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 8/56
• "ai&ure)De&ay in no+inating speia&ist
subontrators and supp&iers3
• De&ay aused by other agenies e+p&oyed at the
site of (or, by the o(ner in addition to the
ontrator3
• 7rongfu& dedution of &i9uidated da+ages )
pena&ty3
• Ter+ination of ontrat (rongfu&&y and i&&ega&&y3
• "ai&ure ) De&ay in appointing arhitet or anEngineer or in fi&&ing the 2aany3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 9/56
• Abandon+ent or tota& fai&ure to o+p&ete
• De&ay in o+p&etion
• Defeti2e design0 +ateria&s and ) or
(or,+anship
• "ai&ure to sub+it p&anned progra++e
!REAC8ES !; C'6TRACT'R
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 10/56
• "ai&ure to insure as re9uired
• "ai&ure to e+p&oy 9ua&ified engineers
• "ai&ure to +aintain and sub+it &abour reports
• Pay+ent of unauthorised (ages
• "ai&ure to ta,e safety preautions
• Causing da+age to property of (or, of otheragenies3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 11/56
Contrator to do (or, and supp&y +ateria&s
i+p&iit&y underta,es/
• To do (or, in (or,+an &i,e +anner that is (ith
are < s,i&&
•
To use the +ateria& of good 9ua&ity and (herespeifiations of 9ua&ity are agreed this (i&& +ean
good of their e1pressed ,ind3
• !oth the (or, and +ateria& (i&& be reasonab&y fit
for the purpose for (hih they are re9uired3
CONTRCTOR!S IM"#IED
CONDITIONS
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 12/56
• Genera& Da+age – pro1i+ity <
Re+ote
• Speia& Da+age
• 6o+ina& Da+age
• E1e+p&ary or 2inditi2e Da+age
DA#AGES ARE C5ASSI"IED AS
U6DER
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 13/56
• E2ery !reah of Contrat entit&es the in$ured party
to da+ages for the &oss he)her suffered3
• The in$ured party +ust be entit&ed to &ai+ the
2a&ue of the (or, done in (hih ase he is said to
sue upon a “*uantu+ #erit”3
• The in$ured party +ay obtain an order for speifi
perfor+ane of the ontrat or an in$untion to
restrain its breah3
• Standard "or+ Contrats in&ude pro2isions of
forfeiture (hih ta,e effet upon a breah of
ontrat3
RE#EDIES '" !REAC8 '"
C'6TRACT
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 14/56
PR'4ISI'6S '" 5A7 – C'6SE*UE6CES
'" !REAC8 '" C'6TRACT
Indian Contrat At – Chapter 4I
Sec.$% - &nli'uidated Damages
Sec. $( - #i'uidated Damages
Sec. $) - Compensation *or an+damage hich a person
ho right*ull+ rescinds the
Contract.
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 15/56
• It +ust be pro2ed that a ontrat e1ists
•
It +ust be pro2ed that defau&ting party (as under anob&igation to perfor+ that part (hih is a&&eged to
ha2e been breahed3
• The party +a,ing the a&&egation shou&d pro2e there
is a breah of ontrat or on grounds of anyaudition of ontrat3
• It +ust be pro2ed that the breah of ontrat
aused “&oss or da+age” to the in$ured party3
Contd:
ESSENTI#S CONDITIONS TO E &#I##ED/ IN0&RED "RT/ OR ENTIT#EMENT TO
DM1ES
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 16/56
• It +ust be further pro2ed that &oss or da+age
aused by the breah of ontrat natura&&y arosein the usua& ourse of things fro+ suh breah3
• The fat that the parties to the ontrat ,ne(0
(hen they +ade the ontrat0 suh &oss or
da+age to be &i,e&y to resu&t fro+ the breah of it+ust be estab&ished3
• It has further to be pro2ed that the &oss or
da+age sustained by reason of breah is neither
re+ote nor indiret3• The in$ured party has to estab&ish that he did
ta,e preautions to +itigate the &osses to the
+a1i+u+ e1tent possib&e
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 17/56
• Depri2ing the Contrator of the right to hisprofits upon (or, (hih (as ne2er arried
out3
• Redution in Contrators profit or inrease in
ost of (or, done due to !reah of Contrat3
DA#AGE ASSESS#E6T
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 18/56
DE5A; I6 C'#P5ETI'6 'R TER#I6ATI'6
'" C'6TRACT #A='RIT; '" CASES5EADI6G T' DISPUTES ARE/
• Co+p&etion of (or, getting de&ayed due to breahof ontrat by o(ner3
• Contrator treats hi+se&f disharged fro+ furtherperfor+ane due to breah of serious nature3
• '(ner ter+inates ontrat by granting – non%granting e1tension of ti+e i&&ega&&y3
• The Contrator o+p&etes or pending o+p&etionof the (or, o++enes &ega& proeedings forreo2ery of da+ages aused for de&ay ino+p&etion3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 19/56
•
5oss of o2erheads and profit
• Diret &osses on aount of id&e &abour0
+ahinery and e9uip+ent reduingproduti2ity3
• Inreased ost of +ateria&s and &abour3
C'6TRACT'R E6TIT5E#E6T T'
DA#AGES DUE T' !REAC8 '"
C'6TRACT
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 20/56
83' profit perentage 1 >>>Contrat Su+>>>>>>> 1 Period of De&ay in (ee,s
-.. Contrat period in (ee,s
8UDS'6 "'R#U5A "'R
5'SSES DUE T' DE5A;
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 21/56
"ore #a$eure
• The contract ma+ e2cuse non-per*ormanceo* the Contract 3part or 4hole5 hereper*ormance is rendered impossible b+
speci*ied una6oidable causes7• 8ct o* 1od9
• 8The :ueen!s enemies9
• 8;is Ma<or9• 8orce Ma<eure9
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 22/56
:uantum Meruit = Compensation *or
• 84or> done or ser6ices rendered hen pricethereo* is not *i2ed b+ contract9.
• 4hen the organisation orders modi*ications inscope o* or> in6ol6ing additional cost, i* thecontract is silent or is not suitabl+ modi*ied, thecontractor is still eligible *or claimingcompensation.
Subraman+an ;s Tha+appa 3?@A?5 B SCR AA%
1angapath+ ;s Truda+a Sam+ 3?@AB5 IR Mad %()
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 23/56
Arbitration is the sett&e+ent of dispute by the deision
not of a regu&ar and ordinary ourt of 5a( but of one or
+ore persons a&&ed arbitrators3
Advantages – Effiient0 E1peditious0 Eono+ia&
substitute to ourt ations3
Disadvantages – 5ega& prinip&es +ay be 2io&ated0
ru&es of e2idene +ay be (ai2ed0 in$ustie3
RITRTION = RITRTION CT?@(
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 24/56
CSE ST&D/ - I
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 25/56
• Foundation Co. Vs. State of New York
(233 N.4 177) (196)
• Contra!tors were as!end to resort to 7
sta"e #u$#in" o#erations Vs Sin"%eo#eration #ro&ided in Contra!t.
• Court 'e%d t'e !ontra!tors !an !%ai$
uantu$ erit
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 26/56
Case Stud+ II
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 27/56
• Citi*ens Nationa% +ank of eridian Vs
, , -%oss Co!k /n!.
(243 S0 2d.67) (1967)
• n eistin" +ank +ui%din" was to e
dis$ant%ed and a new ui%din" to e
!onstru!ted at t'e sa$e site in (ississi##i)
• fter de$o%ition t'e !ontra!tor found a
!onf%i!t etween eistin" ui%din" foundation
and t'e new foundations (o&er%a##in").5e$o&in" o%d foundations resu%ted in etra
!ost and !%ai$ed etra under :uantum
Meruit
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 28/56
:uantum Meruit9
• +ut t'e !ontra!t !ontained a !%ause
t'at o%d foundations s'ou%d e
re$o&ed ored if found ne!essar8
• :'e Court 'e%d t'at re$o&a% of o%d
foundations was !onte$#%ated 8 t'e!ontra!t and 'en!e no !ase for
uantu$ eruit.
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 29/56
Case Stud+ III
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 30/56
-3 !ai&ing out (ater for CC -/?/-.@ RCC -//B infoundations
3 "ooting "or+u&a 8) A-A A-A F not
aepted
3 Change in roof height fro+ -. to -
B3 8eight of S&ab -H abo2e Ground 5e2e& 6ot
fro+ base+entF
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 31/56
?3 Re%ereting the "or+ (or, dis+ant&ed by
neighbours
H3 C&ai+ for CC -//B for urbing instead of
-//HF – differene in ost3
3 Cost of doub&e entering – done at the
instane of dept3
J3 Cost of Stee& e1tra onsu+ed – differene in
theoretia& o%effiient atua&s3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 32/56
K3 Interest for de&ays in pay+ents < refund of
"SD et3
-.3 Id&e &abour0 +ahinery0 '8 Charges
--3 E1tra for (or, e1euted beyond the period of
agree+ent
-3 Reo2ery (rongfu&&y +ade / retifiations0
e1tra ost
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 33/56
CSE ST&D/ - I;
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 34/56
LM 7or, is a(arded to LA for a onsideration
of 3 Crores
• Period of Co+p&etion / -J +onths
• Date of Co++ene+ent / -3B3K
• Date of Co+p&etion / .3?3KH
• De&ay / - +onths
• C&ai+s preferred but re$eted by Depart+ent3
• 7ent in for Arbitration
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 35/56
•
6ot handing o2er Clear site
• 6ot furnishing dra(ings in ti+e
• 6ot pro2iding strutura& designs
• Changes +ade in "oundation designs
1RO&NDSreach o* Contract b+ Department b+
causing dela+s and otherimpediments.
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 36/56
• 6o P&ae to du+p E1a2ated soi&
• De&ay in supp&y of stee& by depart+ent
• De&ay in +a,ing part pay+ents
• 6on% pay+ent of "ina& !i&&
• Change of Speifiations in doors ) (indo(s
•
Interferene by other Contrators0 et3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 37/56
?. Claim toards compensation *or the
loss sustained due to rise in prices *or
the or> done be+ond agreement
period
?,$@,(,A%.
B. Claim toards pa+ment o* Sales Ta2 on
4or> Contract
?%,A@,A?%.
%. Claim toards pa+ment o* e2tra
o6erhead and establishment charges
be+ond the agreement period
)%,$),%.
(. Claim toards pa+ment o* interest on
dela+ed pa+ment
?@,%%,()?.
Contd:
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 38/56
). Claim toards re*und o* di**erence in
cost o* cement beteen design mi2
and nominal mi2),B,BB?.
A. Claim toards re*und o* di**erence in
cost o* empt+ cement bags collected
b+ the corpn. 3di**erence beteen
1unn+ "ol+thene ag5
?,(),A@.
Claim toards re*und o* e2cess
amount collected b+ the Corpn. On
electricit+ consumption
?$,$?.
$. Claim toards pa+ment o* loss o*
pro*it due to illegal entrustment o*
part o* the contractual or> to the
third part+.
?,@%,%($.
Contd:
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 39/56
. Claim toards pa+ment o* loss
o* pro*it on due to illegaldeletion o* greement items
$,($,A(.
@. Claim toards pa+ment o*
'uantities o* or> done in
e2cess o* greement 'uantities
A(,B$,BA?.
?. Claim toards di**erence in
rates *or supplemental items
%(,%A,@.
Contd:
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 40/56
??. Claim toards di**erence o* cost
e2ecuted other than the
agreement speci*ications butpaid *or treating it as agreement
item and also some o* the items
not recorded and paid *or
BA,)?,?$(.
?B. Claim toards pa+ment o*pro6isional *inal bill along ith
interest
?,,.
?%. Claim toards re*und o* EarnestMone+ Deposit
?,$%,B.
Contd:
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 41/56
?(. Claim toards re*und o**urther Securit+ Deposit
,?,(%$.
?). Claim toards re*und o*illegal reco6eries proposed
in the C.C. )th inal ill
(,)A$.
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 42/56
;is#ute 5eso%ution
• State$ent of fa!ts
• -rounds for !%ai$s
• ,aw a##%i!a%e to t'e !ase
• uantu$ of ;a$a"e Co$#ensation
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 43/56
THAN Q
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 44/56
MODES O IN;ITIN1 TENDERS
NE1OTITED TENDERS
#IMITED COM"ETITION
O"EN COM"ETITION
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 45/56
TENDER DOC&MENTS TO E RED/ EOREIN;ITIN1 TENDERS
NOTICE IN;ITIN1 TENDERS
STNDRD ORM O TENDER SCFED&#E O :&NTITIES O 4ORG
COM"#ETE SET O DR4IN1S
COM"#ETE SET O S"ECIICTIONS
ESSENTI# RCFITECT&R# DR4IN1S
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 46/56
INORMTION TO E "RO;IDED IN NOTICE
:&#IICTIONS
NME
EMD
SEC&RIT/ DE"OSIT
TIME #IMIT
COST
MODE O S&MISSION
DTE, TIME ND "#CE O O"ENIN1 TENDERS
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 47/56
"RE"RTION ND S&MISSION O TENDER
"&RCFSE O #NG TENDER ORM
ST&D/ O TENDER DR4IN1S
;ISIT TO TFE SITE O 4ORG RO&1F ;ERIICTION
N#/SIS O RTES
DECIDIN1 TFE "ERCENT1E
4ORGIN1 O&T TFE #&M"S&M
CFECGIN1 O&T TFE RTES
CO"IES O DOC&MENTS
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 48/56
IRRE1&#RIT/ IN S&MISSION O TENDER
&NSI1NED TENDER M/ E INDIN1
ESTIMTES S OERS RE INDIN1
"/MENT O ERNEST MONE/
4ITFDR4# O TENDER "RIOR TO ITS CCE"TNCE
"RE :&#IICTION O TENDERS
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 49/56
C'6TRACT
As per Indian Contrat At -J is “An agree+ent
enforeab&e by &a(” Setion LhF3
AGREE#E6T
“A pro+ise or a set of reiproa& pro+ises
neessari&y in2o&2es a +ini+u+ of persons3 A
person (ho +a,es the proposa& is a pro+isor0 a
person (ho aepts the proposa& is a pro+isee”3
Contrat an be 'ra& or 7ritten
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 50/56
C&assifiation of Contrats –
• "or+a& and Infor+a& Contrats
• E1press and I+p&ied Contrats
• Uni&atera& and !i&atera& Contrats
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 51/56
ESSE6TIA5S '" 4A5ID C'6TRACT AS PER
SEC3 -. '" I6DIA6 C'6TRACT ACT
• There +ust be agree+ent or +eeting of+inds
• The agree+ent +ust be bet(een partieso+petent to enter into a ontrat
• The parties +ust gi2e their free onsent
• The Agree+ent +ust be supported byonsideration (hih +ust be &a(fu&
• Sub$et +atter of the agree+ent +ust be
definite and &a(fu&3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 52/56
7ho are not o+petent to enter
Contrat
•#inor
• 5unati
• #e+bers of Par&ia+ent &egis&ature0 et3
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 53/56
A&& Agree+ents are Contrats if they are
+ade by
•
"ree Consent
• PartyNs Co+petent to Contrat
• 5a(fu& Consideration
• 5a(fu& 'b$eti2e
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 54/56
• Sope of 7or,
• Shedu&e of &ist of (or, or ite+s of (or,
• Genera& Conditions
• Speia& Conditions
• Speifiations
• 6otie of Tender0 Correspondene to
aeptane and &etter of aeptane
Contents of Contrat Agree+ent
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 55/56
• Co&&et aurate basi data
• #ore ti+e to a&&otted for proper p&anning
• A9uisition of 5and prior to o++ene+ent
• Rea&isti period of o+p&etion
• '+it nothing +ateria& and a2oid repetition
• C&arity in e1pression beyond the reah of
per2ersion
I+portant Points for Drafting Agree+ents
7/23/2019 Disputes and Claims in Engineering Contracts - Causes and Remedial Measures (56 Slaytlık Sunum)
http://slidepdf.com/reader/full/disputes-and-claims-in-engineering-contracts-causes-and-remedial-measures 56/56
• 5u+psu+
• Ite+ rate
• Perentage rate
• !'T fa+i&y Contrat
• Design < !ui&d
• Turn,ey < EPC
Types of Contrats