TRANSCRIPT

Page 2: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Distribution List – 1

1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045

2. Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045

3. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafir Marg, New Delhi – 110 001 Fax No. 011-2371 6674.

4. Chief Executive Officer POSOCO B-9, Qutab Institutional Area Katwaria Sarai, New Delhi – 110 0016

5. The Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore – 560 009. Fax No. 080-22259343

6. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E), Mumbai – 400 093.

7. Director (Grid Transmission and Management) Transmission Corp. of Telangana Ltd. Vidyut Soudha, Khairatabad Hyderabad – 500 082. FAX : 040-2332 1751

8. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. Vidyut Soudha Hyderabad – 500 082. FAX : 040-6666 5137

9. Director (TANTRANSCO) Tamil Nadu electricity Board (TNEB) 6th Floor, Eastern Wing, 800 Anna Salai, Chennai – 600 002. Fax No. 044-2851 6362

10. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. Fax No. 080-2222 8367

11. Member (Transmission) Kerala State Electricity Board Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram – 695 004. Fax No. 0471-2444 738

12. Superintending Engineer –I First Floor, Electricity Department Gingy Salai Puducherry – 605 001. Fax No. 0413-2334 277/2331 556

13. Director (Operation), MSETCL 4th Floor, "Prakashganga'' Plot No. C- 19, E-Block Bandra - Kurla Complex, Bandra (East), Mumbai – 400 051

14. The Executive Engineer (Projects) Chief Engineer (Transmission) Nuclear Power Corpn. of India Ltd, 12th Floor, North Wing, VS Bhawan Anushaktinagar, Mumbai-400 094

15. Managing Director Chhattisgarh State Transmission Co. Ltd. Dangania, Raipur – 492 013

16. Chairman & Managing Director MPPTCL, Block No.3 Shakti Bhawan, Rampur, Jabalpur – 482 008

17. Managing Director Gujarat Energy Transmission Corp. Ltd. Sardar Patel Vidyut Bhawan, Race Course, Vadodra -390 007

18. The Executive Engineer UT of Daman & Diu Administration. OIDC Corporate Office, Plot No. 35 Somnath, Daman, Pin 396 210

19. The Executive Engineer (Projects) Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa

20. The Chief Engineer Electricity Department The Government of Goa, Panaji

21. Director (Engineering) OPTCL Jan path, Bhubaneshwar-751022

22. Member Secretary ERPC 14, Golf Club Road, Tollygunge Kolkata-700033

Page 3: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

23. Director (System Operation) WBSETCL Vidyut Bhavan, 5th Floor Block-D, Bidhannagar Sector-II, Kolkata-700091

24. Director (System) Damodar Valley Corporation DVC Towers, VIP Road, Kolkata-700054

25. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi -834004

Page 4: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Distribution List – 2

1. Sh. Atanu Ghosh Chowdhury Vice President Bharat Aluminium Company Ltd. Balco Nagar, Korba - 495 450 Chhattisgarh Email: [email protected]; [email protected]; [email protected]

Tel: 98931 22359

2. Vikas Saksena President-Engineering

Jindal Power Limited 4th Floor, Jindal Centre Plot No.2 , Tower – B, Sector-32, Gurgaon, Haryana- 122001 Tel : +91 124 6612337 Mob : + 91 9971200857 Email : [email protected]

3. Shri Amit Jain, Director, Jindal India Thermal Power Ltd. Plot-12, Sector B-1, Local Shopping Complex Vasant Kunj, New Delhi – 110 070 Mobile : 09810062441 Email : [email protected]

4. Shri Anand Mohan Misra Associate Vice President Head – Business Development Jhabua Power Limited Avantha Power & Infrastructure Ltd., 6th & 7th Floor, Vatika City Point M.G.Road, Gurgaon – 122002 M : 09810553164 Ph : 0124-4392011 Email : [email protected]

Page 5: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 1 of 8

Agenda for processing of Long Term Access applications received during December’2014 as per CERC orders dated 16.02.2015 & 03.07.2015 and MTOA applications received during June, 2015

1.0 In pursuance with the CERC orders dated 16.02.2015 and 03.07.2015 a

meeting was convened on 06.08.2015 for processing of LTA/MTOA application

received during the period from Jan’14 to Dec’14. The LTA applications

received up to Nov’14 and MTOA applications received up to Dec’14 were

discussed and agreed during the meeting. For processing the Dec’14 LTA

applications import capability of Kerala was required to be assessed, as entire

Dec’14 LTA applicants were seeking transfer of power to Kerala. As this

processing of Dec’14 LTA applications may have impact on Jun’15 MTOA

applications, it was agreed in the meeting that same may be processed through

separate meeting after carrying out joint study with Kerala. Under present

agenda the LTA applications received in Dec’14 and MTOA applications

received in Jun ’15 are being processed.

2.0 Applications for Dec’14: Five (5) nos. LTA applications for transfer of

726.75MW of power from NEW grid to Kerala in SR were received in Dec’14.

Details of the applications are tabulated below

Sl. No. Applicant

App. date

LTA/ MTOA

Quantum Injection

Point Drawl Start Date End Date

1. Bharat Aluminium Company Limited

Dec-14 LTA 95 BALCO, Chhattisgarh

KSEB 01.10.2017 30.09.2040

2. Jindal Power Ltd.

Dec-14 LTA 190 Tamnar, Chhattisgarh

KSEB 01.12.2016 30.11.2040

3. Jindal Power Ltd.

Dec-14 LTA 142.5 Tamnar, Chhattisgarh

KSEB 01.10.2017 30.09.2040

4. Jindal India Thermal Power

Dec-14 LTA 95 Angul, Odisha

KSEB 01.10.2017 30.09.2040

5. Jhabua Power Limited

Dec-14 LTA 204.25 Jabalpur Pool, Madhya Pradesh

KSEB 01.12.2016 30.12.2040

For transfer of power to Kerala it should be seen that capacity is available for (i)

Power transfer from NEW GRID to SR and (ii) Power transfer to Kerala within

SR.

Page 6: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 2 of 8

3.0 Power transfer from NEW Grid to SR. From 1st Jun’16 ATC of 542 MW

would be available for transfer of power from NEW GRID to SR due to expiry of

MTOA (KSK, NETL & Shree Cements), details at Annexure-I.

4.0 LTA applications for total quantum of 727 MW cannot be granted from 1st

Jun’16 onwards as the ATC is less than the full LTA quantum.

Further MTOA of the order of 300 MW are expiring in Feb/May’17. However, as

mentioned earlier LTA from NEW grid to SR grid on target region basis has

been granted which can only be released against MTOA, so that these LTA

applicants as and when firm up their beneficiaries, can be granted LTA.

Therefore, LTA to Dec’14 applicants can only be granted with the enhancement

of ATC through system augmentation.

5.0 During the meeting held on 06.08.2015, constituents enquired about the

enhancement of ATC with the commissioning of Angul-Srikakulam-Vemagiri

765 kV D/C line. Accordingly, studies have been carried out which indicates

that with commissioning of Angul-Srikakulam-Vemagiri 765 kV D/C line and

commissioning of Kudgi Generation, ATC would remain almost same due to

capacity constraints beyond Vemagiri and reduction in ATC on Narendra-

Kolhapur line due to Kudgi generation injection. ATC will enhance with the

commissioning of system strengthening schemes viz “Constraints in 400kV bay

extensions at Vemagiri” and/or “Wardha-Nizamabad-Maheshwaram 765kV D/c

link” which are expected by Jun’18. Therefore, notional LTA to Dec’14

applicants can be granted from Jul’18 with the commissioning of system as

indicated above.

Power transfer to Kerala within SR: Presently the import capability of Kerala

is of the order of 1800MW. With the commissioning of Mysore-Kozhikode

400kV D/c line, maximum import capability of Kerala is expected to be about

2500MW (without considering transformer contingency (N-1) at Kozhikode

substation). However, the transformers at Kozhikode substation are getting

heavily loaded. Hence augmentation of transformation capacity at Kozhikode by

2x500MVA is proposed for the grant of notional LTA. It is recommended Kerala

should also expedite completion of Edamon – Cochin 400 kV (Quad) D/C line to

meet its growing power demand.

Page 7: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 3 of 8

In view of above, notional LTA to Dec’14 applications can be granted with effect

from Jul’18 subject to following

Commissioning of System strengthening schemes viz “Constraints in

400kV bay extensions at Vemagiri” and/or “Wardha-Nizamabad-

Maheshwaram 765kV D/c link”.

Augmentation of transformation capacity at Kozhikode by 2x500MVA

subject to the approval in the Standing Committee Meeting of SR.

MTOA Applications received in the month of June, 2015

6.0 Total 9 Nos. of MTOA applications have been received in the month of June,

2015 for transfer of Power from NEW Grid to SR Grid and 1 No. application for

transfer of power within SR Grid from Karnataka to Telangana. The details of

the same are given below.

Sl. No.

Applicant (Injection and drawl) Quantum (MW)

Date of Application

Start date of MTOA

End date of MTOA

1. Adhunik Power and Natural Resources (Adhunik Power and Natural Resources Ltd, Jharkhand to TANGEDCO, Tamil Nadu)

100 30.06.2015 01.12.2015 30.11.2018

2. BESCOM (DVC Kolkata , Jharkhand to BESCOM, Karnatka)

139 30.06.2015 01.06.2016 31.05.2017

3. BESCOM (DVC Kolkata , West Bengal to BESCOM, Karnatka)

111 30.06.2015 01.06.2016 31.05.2017

4. KSEB Ltd (Mejia TPS (U# 7&8), Eastern Region to KSEB Ltd, Kerala)

93.5 23.06.2015 01.12.2015 30.11.2018

5. Jindal Power Ltd (Jindal Power Ltd, Western Region to KSEB Ltd, Kerala)

190 29.06.2015 01.06.2016 31.05.2019

6. KSEB Ltd (Maithon Power Ltd, Eastern Region to KSEB Ltd, Kerala)

140.5 30.06.2015 01.06.2016 31.05.2019

7. KSK Mahanadi Power Company Ltd (KSK Mahandi Power Company Ltd, Chhattisgarh to APEPDCL & APSPDCL, AP)

400 30.06.2015 16.06.2016 15.06.2019

8. Jindal Power Ltd (Jindal Power Ltd, Western Region to TANGEDCO, Tamil Nadu)

140.5 29.06.2015 01.12.2015 31.08.2017

9. Shree Cement Ltd (IPP, Rajasthan to TSSPDCL, Telangana)

50 30.06.2015 01.12.2015 26.05.2016

10. JSW Power Trading Company Ltd (JSW Energy Ltd, karnataka to TSSPDCL, Telangana)

150 30.06.2015 01.12.2015 26.05.2016

Page 8: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 4 of 8

7.0 Sl. No. 1 to 4 of the above applications have the same PPA as their earlier

LTA/MTOA applications.

Sl.No.

Applicant (Injection and drawl) Quantum (MW)

Earlier Application

Notional LTA granted from

1. Adhunik Power and Natural Resources (Adhunik Power and Natural Resources Ltd, Jharkhand to TANGEDCO, Tamil Nadu)

100 LTA – Jan’14 1st April’15

2. BESCOM (DVC Kolkata , Jharkhand to BESCOM, Karnatka)

139 LTA – Mar’14 1st Dec’15

3. BESCOM (DVC Kolkata , West Bengal to BESCOM, Karnatka)

111 LTA – Mar’14 1st Dec’15

4. KSEB Ltd (Mejia TPS (U# 7&8), Eastern Region to KSEB Ltd, Kerala)

93.5 LTA – Apr’14 1st April’15

These applications have already been considered for notional grant of

LTA/MTOA as indicated above and their priority for operationalization shall be

higher than the MTOA applications in June, 2015. Therefore, these are not

considered in the present Agenda.

8.0 Out of the balance, 3 applications (Sl. No 5 to 7), have equal priorities (duration

36 months) and higher than that of the applications at Sl. No. 8 & 9. Sl. No. 5 &

6 sought power transfer to Kerala while Sl. No. 7 sought power transfer to

Andhra Pradesh. As proposed earlier, LTA of Dec’14 applications can be

granted only with the enhancement of Capacity between NEW grid and SR

expected by Jun’18, the balance ATC of 542 MW (available from Jun’16) as

well as 92.25 MW (getting available after reduction of LTA quantum by Kerala

in Apr’14 LTA application) can be considered for grant of MTOA for these

applications on pro rata basis as given below. The available transfer capability

to Kerala is given at Annexure-II. From the Annexure-II it is seen that the

proposed MTOA of 287 MW to Kerala can be accommodated from Jun’16.

Sl. No.

Applicant (Injection and drawl)

Req. Quantum

(MW)

Start date of MTOA

End date of MTOA

Grant (MW)

1. Jindal Power Ltd (Jindal Power Ltd, Western Region to KSEB Ltd, Kerala)

190 01.06.2016 31.05.2019 165*

Page 9: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 5 of 8

2. KSEB Ltd (Maithon Power Ltd, Eastern Region to KSEB Ltd, Kerala)

140.5 01.06.2016 31.05.2019 122

3. KSK Mahanadi Power Company Ltd (KSK Mahandi Power Company Ltd, Chhattisgarh to APEPDCL & APSPDCL, AP)

400 16.06.2016 15.06.2019 347

Total 730.5 634

*Jindal Power Ltd. has applied for LTA of 190 MW in Dec’14 and also applied for

MTOA of 190 MW in Jun’15 and enclosed same PPA in both the applications.

Jindal Power Ltd. need to relinquish MTOA rights & pay the applicable

relinquishment charges in line with the CERC regulations as and when the LTA for

the application made in Dec’14 is operationalised.

9.0 Presently the import capability of Kerala is of the order of 1800MW. With the

commissioning of Mysore-Kozhikode 400kV D/c line, maximum import capability

of Kerala is expected to be about 2500MW (without considering transformer

contingency (N-1) at Kozhikode substation). However, as per the discussions with

Kerala on 06.08.2015, Kerala has informed that they would rearrange their loads

& 220 kV network to meet their import requirement. Accordingly studies were

carried out considering modifications proposed by Kerala and import capability

has been re-assessed as 2750 MW without considering transformer contingency

(N-1) at Kozhikode substation. The expected LTA/MTOA and CGS allocations for

Kerala by Jun’16 is about 2508MW (including Jun’15 MTOA of 287MW) against

the capability of 2615 MW (2750WM-135MW TRM) (details given at Annexure-II).

10.0 Further, here it may be mentioned that Kozhikode would be a radially

connected load and transformer outage at Kozhikode shall not have any major

impact on the grid, however there may be load curtailment in Kerala, for which

KSEB has agreed. Kerala should ensure to limit their drawl through load

shedding & to ensure healthy operation of transformers in case of any

contingency.

11.0 Application at Sl.No.8, have higher priority (duration 21 months) than that of the

application at Sl. 9, is seeking transfer of 140.5 MW power from Jindal Power

Ltd, Western Region to TANGEDCO, Tamil Nadu from 01.12.2015 to

31.08.2017. As ATC of 92.25 MW (which was created by reduction of LTA

Page 10: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 6 of 8

quantum of KSEB) is available from Jan’16 to May’16, it is proposed to grant

MTOA to Jindal Power Ltd for 92.25 MW from Jan’16 to May’16 as given below.

Sl. No.

Applicant (Injection and drawl)

Req. Quantum

(MW)

Start date of MTOA

End date of MTOA

Grant (MW)

1. Jindal Power Ltd (Jindal Power Ltd, Western Region to TANGEDCO, Tamil Nadu)

140.5 01.01.2016 31.05.2016 92.25

12.0 Application at Sl.No 9 is seeking transfer of 50 MW power from Shree Cement

Ltd, Rajasthan to TSSPDCL, Telangana from 01.12.2015 to 26.05.2016. As

ATC is not available during this period, application is proposed to be closed.

13.0 Applications at Sl.No.10 is seeking transfer of 150 MW power from JSW Energy

Ltd, Karnataka to TSSPDCL, Telangana from 01.12.2015 to 26.05.2016. This

power transfer is within S1 area of Southern Region. The MTOA to JSW Energy

Ltd, Karnataka for transfer of 150 MW of power to TSSPDCL, Telangana from

01.12.2015 to 26.05.2016 may be granted.

14.0 Simulation Studies has been carried out for Jun’16 time frame with considering

the generations & transmission lines expected to be commissioned by June’16.

The details of the load flow studies along with results for the above MTOA

applications are enclosed at Exhibit-I.

15.0 Conclusion:

1. In view of above, notional LTA to Dec’14 applications can be granted with effect

from Jul’18 subject to following

Commissioning of System strengthening schemes viz “Constraints in 400kV

bay extensions at Vemagiri” and/or “Wardha-Nizamabad-Maheshwaram

765kV D/c link”.

Augmentation of transformation capacity at Kozhikode by 2x500MVA subject

to the approval in the Standing Committee Meeting of SR

2. MTOA may be granted with the existing/under construction transmission system

to the applications received in the Jun’15 for transfer of power from NEW to SR

and within SR as indicated above.

Page 11: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 7 of 8

Kerala should ensure to limit their drawl through load shedding & to ensure

healthy operation of transformers in case of any contingency.

Further the applicants are liable to pay relinquishment charges as per the

directions of Hon’ble CERC, wherever applicable and are also subject to the

establishment of necessary payment security mechanism.

Page 12: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Agenda for Dec’14 LTA & Jun’15 MTOA applications

Page 8 of 8

Annexure-I

Total ATC envisaged between NEW grid and SR grid

Post Grant of LTA &

MTOA to Nov’14 applications

Total LTA (including GoI allocation to SR beneficiaries) 4781

Talcher Firm Share to SR beneficiaries 1773

DVC Allocation 33

Solar Allocation 85

BALCO (1200 MW) 100

Jindal Power Ltd. (2400 MW) 400

KSK Mahanadi Power Co. Ltd (3600 MW) 500

DB Power Ltd. (500 MW) 208

Ind-Bharat (Utkal) Power Ltd. 500

GMR EMCO Energy Ltd. ** 150

BALCO 100

Dhariwal Power 100

KSEB (from Maithon Power) 140.5

Adhinik Power & natural Resources 100

BESCOM 450

KSEB(from West Bengal) 141.5

Total MTOA Granted 484.7

PTC India Ltd (01.03.2015 to 28.02.2017) 100

SAIL - VISP (01.08.2014 to 31.07.2017) 4.55

SAIL - VISP (01.08.2014 to 31.07.2017) 13.65

NTPC Vidyut Vyapar Nigam Ltd (01.08.2014 to 28.02.2017) 297

Facor Power Ltd (01.08.2014 to 30.09.2016) 10

Jindal Power Ltd 59.5

Grand Total LTA/MTOA Granted 5265.7

Total ATC between NEW grid and SR 5900

Transmission Margin available 634.3

Page 13: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Power Transfer Capability to Kerala - considering Dec'14 LTA applications

Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17

TTC2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750

ATC2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615

Allocation2221 2508 2508 2546 2546 2546 2546 2546 2546 2186 2186 2186 2186 2186 2186 2224

LTA 1824 1824 1824 1862 1862 1862 1862 1862 1862 1899 1899 1899 1899 1899 1899 1937

MTOA397 397 397 397 397 397 397 397 397 0 0 0 0 0 0 0

Jun'15 MTOA0 287 287 287 287 287 287 287 287 287 287 287 287 287 287 287

Margin 394 107 107 69 69 69 69 69 69 429 429 429 429 429 429 391

Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19

TTC 2750 2750 2750 2750 2750 2750 2750 2750 2750 3000 3000 3000 3000 3000 3000 3000

ATC 2615 2615 2615 2615 2615 2615 2615 2615 2615 2865 2865 2865 2865 2865 2865 2865

Allocation 2224 2224 2224 2224 2224 2224 2224 2224 2224 2786 2786 2786 2786 2786 2786 2786

LTA 1937 1937 1937 1937 1937 1937 1937 1937 1937 2664 2664 2664 2664 2664 2664 2664

MTOA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Jun'15 MTOA 287 287 287 287 287 287 287 287 287 122 122 122 122 122 122 122

Margin 391 391 391 391 391 391 391 391 391 79 79 79 79 79 79 79

Annexure-II

Page 14: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

Exhibit-I-Base case

FROM ------AT ZONE BUSES------- TO -NET INTERCHANGE-

GENE- FROM IND TO IND TO TO BUS GNE BUS TO LINE FROM TO TO TIE TO TIES

X-- ZONE --X RATION GENERATN MOTORS LOAD SHUNT DEVICES SHUNT CHARGING LOSSES LINES + LOADS

50 7144.6 0.0 0.0 6059.4 0.0 0.0 0.0 0.0 119.3 965.9 965.9

ANDHRA -694.9 0.0 0.0 1991.6 585.4 0.0 3366.7 9473.2 1167.4 1667.1 1667.1

51 5385.6 0.0 0.0 6270.5 0.0 0.0 0.0 0.0 125.4 -1010.3 -1010.3

TELANGANA -452.7 0.0 0.0 2061.0 -838.4 0.0 736.4 3607.2 1724.8 -529.2 -529.2

52 6736.4 0.0 0.0 8837.6 0.0 0.0 0.0 0.0 354.9 -2456.1 -2456.1

KARNATKA -1068.4 0.0 0.0 2904.8 -737.7 0.0 1579.2 6823.8 4114.4 -2105.3 -2105.3

53 1687.4 0.0 0.0 3753.5 0.0 0.0 0.0 0.0 154.9 -2221.0 -2221.0

KERALA 514.1 0.0 0.0 1237.3 -548.6 0.0 0.0 1205.8 969.3 61.9 61.9

54 12429.4 0.0 0.0 13107.8 0.0 0.0 0.0 0.0 275.7 -954.1 -967.1

TAMILNAD 1509.0 0.0 0.0 4330.2 177.1 0.0 1139.7 7240.2 3143.9 -41.7 -45.9

57 29.1 0.0 0.0 356.2 0.0 0.0 0.0 0.0 1.5 -328.5 -315.6

PONDY 19.0 0.0 0.0 117.1 -23.8 0.0 0.0 11.6 61.5 -124.2 -119.9

COLUMN 33412.5 0.0 0.0 38385.0 0.0 0.0 0.0 0.0 1031.6 -6004.0 -6004.0

TOTALS -173.8 0.0 0.0 12642.0 -1385.9 0.0 6822.0 28361.7 11181.3 -1071.4 -1071.4

FROM AREA 5 SOUTH

TO AREA 3 WEST

X---- FROM AREA BUS ----X X----- TO AREA BUS -----X

BUS# X-- NAME --X BASKV BUS# X-- NAME --X BASKV CKT MW MVAR

514009 CHAND-SR 400.00 374007 BHADRAWATI 400.00* 2DC -502.4 -204.8 TWO TRM DC "11"

514009 CHAND-SR 400.00* 374007 BHADRAWATI 400.00 2DC -497.0 246.0 TWO TRM DC "12"

522031 AMBD 220.00 342002 PONDA2 220.00* 2 15.5 -27.9

522031 AMBD 220.00* 342006 XELDEM 220.00 2 21.9 -39.2

524015 NARENDR-NEW 400.00* 374050 KOLHAPURPG 400.00 1 -92.7 -81.7

524015 NARENDR-NEW 400.00* 374050 KOLHAPURPG 400.00 2 -92.7 -81.7

528003 RAIC800 765.00 378040 SHOLAPUR 765.00* 1 -1099.3 -191.4

528003 RAIC800 765.00 378040 SHOLAPUR 765.00* 2 -1099.3 -191.4

TOTAL FROM AREA 5 TO AREA 3 -3346.1 -572.0

TO AREA 4 EAST

X---- FROM AREA BUS ----X X----- TO AREA BUS -----X

BUS# X-- NAME --X BASKV BUS# X-- NAME --X BASKV CKT MW MVAR

524011 KOLAR 400.00 424019 TALCHER 400.00* 2DC -1004.8 -421.8 TWO TRM DC "10"

514010 GAZU-SR 400.00* 424099 GAZ-ER 400.00 2DC -320.3 172.1 TWO TRM DC "13"

514010 GAZU-SR 400.00* 424099 GAZ-ER 400.00 2DC -320.3 172.1 TWO TRM DC "14"

524011 KOLAR 400.00 424019 TALCHER 400.00* 2DC -1004.8 -421.8 TWO TRM DC "9"

TOTAL FROM AREA 5 TO AREA 4 -2650.1 -499.4

-------- --------

TOTAL FROM AREA 5 SOUTH -5996.3 -1071.4

Page 15: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

400

MDRA

398

54

5

-54

2

12

49

7

-28

93

-12

4

0

18

9

-27

-24

1

-92

18

00

-21

1

TIRUNEL4

ARSUR4 398

SALEM 398

-15

2

12

15

2

-45 1

93

-59

-19

1

-12

METTUR4

38

8

-28

-38

4

-35

10

HOSUR4 396

SMNH 393

NYVL 400

16

5

-58

14

1

-40

KOLAR

BIDADI

26

9

41

11

3

-29

-11

3

19

-44

0

44

3

18

NELMANG4 394

10

-31

3

402

MYSORE4 399

HIRY4

TALAGUP4 404

84

-24

10

8

-97

-10

7

22

-41

0

29

41

5

-26

12

7

-24

-32

9

-14

33

1

-17

-94

-79

UDUPI400 400

-42

1

31

42

8

-65

10

39

-11

8

405

-453

26

-74

404

RAIC-NEW 401

406

403

31

0

-47

-50

3

56

50

6

-99

-37

6

-50

38

3

-45

-24

2

30

15

8

-11

1

-15

7

-15

15

7

-12

6

-16

2

400

DAVAN4 401

45

2

-36

-44

6

17

-16

7

-42

16

8

30

KAIGA 400

NAREND-4

TORNGL4 400

MNRB

-13

8

-7

13

8

-53

3

-21

-3 -63

-32

9

14

-46

-9

-14

8

29

14

8

-83

-11

4 8

79

3

-63

84

4

-11

1

400

-54

-36

24

-11

2

-24

10

5

-21

1

31

72

4

-28

3

402

-32

7

36

0

-21

0

HOODI4

-38

3

-17

9

38

4

16

2

405

10

5

17

76

-29

HYDR 396

-21

6

23

-274

21

27

8

-91

22

5

-57

-22

2

27

-33

-10

6

33

8

-36

-33

4

21

58

-10

8

-58

-13

22

96

13

CHAND-SR 400

GAJWEL4 399

MALKARM4 396

399

-48

9

67

49

7

-78

-40

4

10

40

8

-25

34

7

-31

-40

-55

-27

-12

0 -50

0

62

22

34

4

-20

11

8

48

2

83

409

-34

4

-67

NELLORE4 404

CHITOR 410

MADR 407

ALMATI4 401

407

-32

6

22

32

8

-12

3

-14

5

-22

14

5 7

20

-1713

2

-13

-13

1

-55

-23

3

-0

-37

5

15

0

37

5

-15

3

60 6

32

-78

400

402

-34

8

65

34

8

-76

-15

9

2

15

9

-54

-31

8

66

32

0

-12

0

-75

33

5

13

37

-39

1

397

11

77

-75

69

9

-53

3

400

-29

411

12

1

-83

11

2

-83

-11

1

69

-6 -6

6 -65

NEYEXTN4

400

205

-21

377

-131

TRIC

29

9

-77

-23

6

-58

KARAIK 415

-37

-17

5

19

8

-11

7

TUTI-OA 402

-44

3

98

400

400

-40

9

20

1

38

1

-20

9

11

6

-11

26

5

-12

85

25

-22

1

VIJW 400

12

8

-69

-8

-32

GAZW 400

405

VIJTP-IV

400

-22

8

9

98

-35

42

5

-19

9

0 0

400

SIMHD-II 400

VIZPOOL 400

-64

1

-27

-21

0

8

21

0

-14

-218

35

21

8

-41

0 -37

1

24

4

-36

-24

2

9 -24

6

65

24

8

-91

18

1

-66

-34

85

7

-95

SIMHADRI 400

-19

9

17

20

0

-31

20

0

-31

-19

9

17

52 -5

85

0

-13

0

GAZU-SR

400

-11

23

11

-50

-40

-27

41

5

-34

R

HYDR-AP4 395

KOTH-VI

17

8

-34

-17

6

-62

20

7

-36

-20

7

5

-28

23

41

5

-73

R

400

-18

5

-65

18

6

-12

38

8

-97

72

0

-16

7

VIJ-AP

20

16

-20

-67

4

93

-11

1

-90

11

2

-12

16

5

-62

-16

3

-10

CHENN-EX 400

-11

3

50

11

3

-65

38

4

-96

-38

2

86

99

3

-32

3

MENAK-OA

LANCO-OA

44

4

-55

-18

7

UDMP

31

4

-22

RSTP

KURL-NEW

54

HASSAN4

397

VEMAGIR4

WARN4

21

8

KAKTIA-G

400

CUDP

-58

27

393

400

-74

43

-4

394

398

393

24

6

20

-24

5

-56

-39 3

39

-24

41

16

-41-3

2

SSLBPH4

PUGALUR4

89

2

-74

-74

-33

4

7

NEY_IIEX

32

3

-14

0

MALEKTT

-543

BELLARY

399

MAHABUB4

21

0

-3

-93

-72

403

-16

4

400

-24

7L

PONDY4

KURNOOL4

400

SVCHTRM

33

9

-48

2

KRISH-AP 400

NELLORE-AP 404

-17

8

-36

1

17

1

-28

2

55

28

5

-12

5

1

64

7

-30

2L

11

5

48

-11

5

-48

11

5

48

-11

5

-48

36

2

TIRUVLM

SIMHP-OA

MADHUGI4

-28

406

404

RAIC

-26

-63

-21

7

12

6

NSAG

CEPL

400

-130

1558

-147R

545

-93

-13

-16

34

6

-95

44

5

399

400

400

YELAHNKA

21

4

-13

0

KHAM

-17

8

NEL-POOL

KUDAN4

40

3

25

-40

3

-12

GOOT

-21

0

-11

3

TUTICORN

-12

7

-24

12

8

-68

-13

8

-16

400

ILFS

406172

-110-172

59

407

-172

27

172

-59

-11

-27

172

NAGAPTNM4

TPCIL 400

13

5

-14

2

-13

5

12

71

35

-14

2

-13

5

12

7

27

0

-28

3

-171

VTPS

-36

0

-10

6

36

3

-43

-36

0

-10

6

36

3

-43

-7

-35

6

KOZIKODE4 401

16

9

-77

-16

8

-23

16

9

-77

-16

8

-23

NARENDR-NEW 417

-92

-17

89

2

47

KOLHAPURPG 414

-92

-47

92

-98

ELAPULY4 398

-36

7

14

36

9

-38

COCHIN4 398

TRICHUR4A 397

18

9

-31

-18

8

-11

61

-43

-61

-14

TRIVNDRM4 389

-30

3

-75

30

6

22

MADKTHRA4A 397

25

4

10

8

403

41

8

20

7

-10

6-2

06

4

DHARMPR 397

11

8

-83

-11

7

38

11

8

-83

-11

7

38

-11

7

0

11

7

-38

-11

7

0

11

7

-38

24

9

53

18

8

41

23

2

48

14

9

35

59

1

25

8

20

1

50

14

8

51

70

95

38

92 6

-11

0

27

11

7

52

19

9

23

16

0

31

94 2

-10

6

2

23

7

90

82

13

28

8

10

9

14

4 1

36

-31

34

4

93

18

2

20

11

0

62

32

24

9

36

37

0

68

27

6

61

-25

1

54

59 3

19

7

64

12

5

37

10

7

39

72

35

23

1

68

12

5

19

21

8

66

-22

8

-50

86

45

12

9

64

13

9

-11

5

16

3

59

30

6

-18

8

-49

7

-49

7

-32

0

-32

0

31

3

12

4-9

32

-93

2

-20

8

-24

12

4

19

2

69

24

6

84

13

0

30

34

6

12

233

-21

6

-38

22

8

74

-22

8

-50

-36

32

36

-31

-59

-1

-19

7

-47

-86

-41

-23

1

-44

-53

12

4

19

-21

8

-45

-10

7

-34

-12

5

-18

-16

0

-20

11

0

-22

-92

-3

-95

-34

-26

7

-39

-31

3

-96

10

6 2

-19

9

-7

-23

7

-74

-20

1

-39

-24

9

-27

-14

8

-17

-14

8

-17

24

-14

8

-41

23

5

81

-19

2

TALCHER

18

5

32

-18

5

-18

21

8

66-1

24

-13

-11

7

-46

-72

-33

-14

4

7

-28

8

-85

28

8

10

9

12

5

37

-12

5

-30

68

19

6

Bus - Voltage(kV)Branch - MW/MvarEquipment - MW/Mvar

kV: <=110.000 <=132.000 <=220.000 <=230.000 <=400.000 <=765.000 >765.000

-17

7

-11

17

8

17

-11

17

8

17

-17

7

-61

-12

61

-61

-12

61

14

-85

-33

85

36

-85

-33

85

-85

85

36

-33

14

-20

1

-32

20

2

50

-20

1

-32

36

-16

8

-12

16

8

23

-16

8

-12

16

8

23

26

7

SYSTEM STUDIES FOR GRANT OF MTOA TO JUNE15 APPLICATIONS

-24

6

-66

24

6

84

-13

0

-25

13

0

30

87

34

79

31

-79

-26

13

5

25

-13

5

-13

12

39

-42

7

KURL800

771RAIC800

783

TIRUVLM 784

-40

3

-15

1

40

4

-20

2

SHOLAPUR 778

11

06

10

3

-11

01

9

NELL-POL 782

-4 -18

0

4

-15

8

-30

6

25

0

-37

0

-1

20

8

43

-24

9

-7

18

8

41

-23

2

-26

-27

6

-26

-18

2 -7

-233

-10-1

10

-56

-16

3

-48

25

1

-24

-14

9

-26

-20

8

-24

-18

8

-26

-22

7

10

22

7

10

-22

7

10

22

7

10

1

Exhibit-I a- Base case

Page 16: Distribution List - POWERGRID · 2016-07-28 · Engineering Building, HEC, Dhurwa, Ranchi - 834004 . Distribution List ... For transfer of power to Kerala it should be seen that capacity

400

MDRA

397

54

9

-54

7 -2

50

1

-14

73

-12

6

-4

17

9

-25

-24

5

-99

18

00

-16

4

TIRUNEL4

ARSUR4 397

SALEM 397

-17

5

8

17

5

-39 2

27

-56

-22

6

-10

METTUR4

41

0

-20

-40

6

-65

10

HOSUR4 396

SMNH 392

NYVL 400

19

0

-57

13

3

-34

KOLAR

BIDADI

26

5

53

14

0

-36

-14

0

27

-46

2

46

4

26

NELMANG4 393

5

-34

0

400

MYSORE4 398

HIRY4

TALAGUP4 403

82

-24

12

2

-92

-12

1

18

-45

9

41

46

5

-24

13

3

-22

-34

3

-19

34

5

-11

-10

2

-80

UDUPI400 400

-42

5

25

43

2

-57

10

39

-10

2

404

-462

22

-73

403

RAIC-NEW 400

405

403

28

9

-47

-57

3

61

57

7

-88

-38

1

-48

38

8

-44

-23

1

30

13

9

-10

6

-13

9

-22

14

5

-17

8

-15

0

400

DAVAN4 401

48

9

-25

-48

2

17

-19

4

-45

19

5

36

KAIGA 400

NAREND-4

TORNGL4 400

MNRB

-15

1

-11

15

1

-48

21

-22

-21

-62

-35

1

14

-39

-12

-13

6

22

13

6

-77

-22

1

18

94

3

-66

84

4

-80

400

-87

-33

1 -40

-1 34

-20

1

28

72

4

-12

6

402

-40

5

36

0

-18

9

HOODI4

-35

9

-19

8

36

0

18

0

405

59

22

48

-22

HYDR 396

-19

4

19

-270

19

27

3

-90

21

4

-57

-21

2

24

-47

-10

7

33

4

-33

-33

0

17

23

-10

3

-23

-20

22

96

43

CHAND-SR 400

GAJWEL4 398

MALKARM4 396

399

-48

9

67

49

7

-78

-40

6

6

40

8

-21

35

3

-30

-27

-57

-39

-12

0 -50

0

64

21

32

7

-22

10

4

57

6

30

409

-33

6

-64

NELLORE4 403

CHITOR 409

MADR 407

ALMATI4 401

406

-33

1

19

33

3

-11

9

-12

9

-26

12

9

11

29

-2214

7

-16

-14

6

-51

-24

1

1

-44

6

15

3

44

7

-15

5

69 -0

22

-75

400

402

-34

5

63

34

6

-74

-16

0

0

16

0

-53

-32

0

62

32

3

-11

5

-57

32

6

13

37

-37

8

397

16

94

-79

69

9

-51

4

400

-28

410

12

8

-80

12

0

-80

-11

9

68

11 -8

-11

-63

NEYEXTN4

400

198

-21

377

-129

TRIC

31

2

-75

-22

3

-59

KARAIK 414

-30

-17

4

19

0

-11

6

TUTI-OA 402

-43

9

93

400

400

-40

9

18

9

38

1

-19

7

11

6

-11

26

5

-11

65

25

-20

9

VIJW 400

10

9

-68

-6

-33

GAZW 400

405

VIJTP-IV

400

-21

8

7

11

7

-36

42

5

-19

6

0 0

400

SIMHD-II 400

VIZPOOL 400

-64

1

-27

-21

4

3

21

4 -9

-216

34

21

6

-41

0 -37

1

24

0

-35

-23

8

7 -24

1

64

24

3

-91

17

2

-66

-36

85

7

-83

SIMHADRI 400

-20

0

15

20

0

-29

20

0

-29

-20

0

15

51 -5

85

0

-12

0

GAZU-SR

400

-9 26

9 -53

-35

-32

41

5

-19

R

HYDR-AP4 394

KOTH-VI

17

2

-31

-17

1

-65

20

7

-35

-20

7

3

-29

21

41

5

-69

R

400

-19

7

-67

19

8

-8

32

8

-84

72

0

-14

6

VIJ-AP

2

17

-2 -68

2

93

-11

0

-92

11

1

-10

15

2

-61

-15

1

-12

CHENN-EX 400

-11

2

48

11

2

-63

38

5

-93

-38

3

82

99

3

-31

2

MENAK-OA

LANCO-OA

44

4

-51

-17

7

UDMP

34

1

-15

RSTP

KURL-NEW

55

HASSAN4

396

VEMAGIR4

WARN4

21

6

KAKTIA-G

400

CUDP

-79

43

392

400

-10

0

53

-2

393

397

392

25

6

18

-25

5

-53

-61

17

61

-38

45

9

-45-2

5

SSLBPH4

PUGALUR4

89

2

-70

-71

-35

3

12

NEY_IIEX

31

5

-13

2

MALEKTT

-563

BELLARY

399

MAHABUB4

27

0

-10

-93

-70

402

-18

9

400

-21

4L

PONDY4

KURNOOL4

400

SVCHTRM

35

7

-57

6

KRISH-AP 400

NELLORE-AP 403

-16

9

-35

7

16

2

-28

6

52

28

9

-12

1

1

64

7

-29

0L

13

7

49

-13

7

-49

13

7

49

-13

7

-49

35

8

TIRUVLM

SIMHP-OA

MADHUGI4

-33

405

403

RAIC

-11

-2

-21

5

17

8

NSAG

CEPL

400

-125

1558

-143R

542

-88

-16

-16

34

2

-92

44

1

399

400

400

YELAHNKA

20

1

-12

8

KHAM

-17

0

NEL-POOL

KUDAN4

45

8

11

-45

8 6

GOOT

-27

0

-97

TUTICORN

-10

8

-28

11

0

-68

-12

0

-20

400

ILFS

406179

-108-178

59

407

-178

26

178

-59

-11

-26

178

NAGAPTNM4

TPCIL 400

13

5

-13

4

-13

5

11

91

35

-13

4

-13

5

11

9

27

0

-26

7

-177

VTPS

-38

3

-97

38

6

-44

-38

3

-97

38

6

-44

-11

4

-31

8

KOZIKODE4 399

19

7

-71

-19

5

-24

19

7

-71

-19

5

-24

NARENDR-NEW 416

-13

2

-16

91

32

41

KOLHAPURPG 413

-13

2

-41

13

2

-10

1

ELAPULY4 395

-41

2

4

41

5

-21

COCHIN4 396

TRICHUR4A 395

21

8

-30

-21

8

-10

79

-50

-79

-5

TRIVNDRM4 386

-32

3

-85

32

6

37

MADKTHRA4A 395

27

7

12

0

402

43

2

21

6

-10

7-2

15

6

DHARMPR 396

14

1

-84

-14

0

42

14

1

-84

-14

0

42

-14

0

5

14

0

-42

-14

0

5

14

0

-42

25

5

56

19

0

36

23

1

46

15

4

33

58

3

26

0

20

0

51

14

9

51

72

90

38

88 6

-11

8

25

13

7

53

21

1

23

17

3

30

99 2

-10

8

2

24

6

88

81

13

28

6

11

2

15

5 3

28

-29

35

1

97

18

3

20

10

9

60

32

25

0

35

37

0

68

27

7

61

-25

6

55

71 3

20

8

70

13

3

41

11

0

41

78

37

23

6

71

13

1

21

22

1

69

-23

4

-52

95

46

14

1

68

14

1

-11

6

16

4

59

30

5

-18

8

-49

7

-49

7

-32

0

-32

0

30

6

12

9-9

32

-93

2

-21

4

-23

12

6

20

8

72

24

7

84

12

5

30

36

6

13

235

-22

1

-40

23

4

77

-23

4

-52

-28

30

28

-29

-71

-1

-20

8

-51

-95

-42

-23

6

-46

-53

12

6

21

-22

1

-47

-11

0

-35

-13

1

-19

-17

3

-18

11

8

-19

-88

-3

-90

-34

-26

8

-41

-30

6

-10

2

10

8 2

-21

1

-5

-24

6

-71

-20

0

-40

-25

5

-29

-16

5

-19

-16

5

-19

26

-14

9

-40

23

6

80

-20

8

TALCHER

20

1

33

-20

1

-17

22

1

69-1

26

-14

-13

7

-44

-78

-34

-15

5

6

-28

6

-88

28

6

11

2

13

3

41

-13

3

-33

66

20

0

Bus - Voltage(kV)Branch - MW/MvarEquipment - MW/Mvar

kV: <=110.000 <=132.000 <=220.000 <=230.000 <=400.000 <=765.000 >765.000

-19

3

-18

19

4

26

-18

19

4

26

-19

3

-79

-3

79

-79

-3

79 5

-92

-36

92

40

-92

-36

92

-92

92

40

-36

5

-21

4

-35

21

5

57

-21

4

-35

40

-19

4

-8

19

5

24

-19

4

-8

19

5

24

26

8

SYSTEM STUDIES FOR GRANT OF MTOA TO JUNE15 APPLICATIONS

-24

7

-66

24

7

84

-12

5

-26

12

5

30

87

34

79

31

-79

-26

13

8

26

-13

8

-14

15

79

-44

1

KURL800

766RAIC800

780

TIRUVLM 782

-45

8

-13

7

45

9

-20

7

SHOLAPUR 772

13

73

11

0

-13

66

70

NELL-POL 780

-57

-16

1

57

-17

5

-30

5

24

9

-37

0

-1

21

4

43

-25

0

-6

19

0

36

-23

1

-23

-27

7

-25

-18

3 -6

-235

-9-1

09

-54

-16

4

-47

25

6

-24

-15

4

-23

-21

4

-23

-19

0

-21

-22

8

10

22

8

11

-22

8

10

22

8

11

1

Exhibit-Ib- with Jun'15 MTOA