distribution list - powergrid meeting... · 2016-07-28 · minutes special jcc-wr, sr & er page...
TRANSCRIPT
Distribution List :
Western Region
1. Sh. G. Venkatachalam Director Dheeru Powergen Pvt. ltd. 110, Amrutha Ville, Rajbhavan Road, Hyderabad -500 082, Ph. +91-40-23395167, Mob: +91 9849032180/ 9346239288/ 9350582001 E-mail:[email protected]/ [email protected]
2. Sh. P S Dutta Gupta Head - Corporate Affairs Sarda Energy & Minerals Ltd. 1st Floor, Vanijya Bhawan, Jail Road, Devendra Nagar Square, Raipur - 492 001 E-mail: [email protected] Mobile No.: +91 9752090024 Phone : +91 771 2214208/2214210
3. Sh. Deepak Tehlan General Manager (Fin.) Pipavav Energy Ltd. 12th Floor, Videocon Towers Jhandewalan Extn. New Delhi - 110 055 Mob: +91 9811750209 Email: [email protected]
4. Sh. Satish Dukare General Manager Dhariwal Infrastructure Ltd. C-6, Tadali Growth Centre, M.I.D.C, Chandrapur,-442406 Email: [email protected] Mob: +91 9561112003
5. Sh. B K Jain Chief Engineer (Electrical) Dept. of Atomic Energy, Govt. of India Heavy Water Board Vikram Sarabhai Bhawan 5th Floor, Anushaktinagar Mumbai – 400 094 Mob: +91 93 24783334
6. Sh. Makarand Chincholkar Chief General Manager (Comml), MP Power Management Company Ltd., Shakti bhawan, Vidyut Nagar, Rampur, Jabalpur, Madhya Pradesh – 482 008 Mob: +91 9425150665 Email: [email protected]/ [email protected]
7. Sh. R. V. Mathe, VP (Comml.) Vandana Vidhyut Ltd Vandana Bhawan, M.G. Road, Raipur, Chhattisgarh E-mail:[email protected]/ [email protected]/ [email protected] Mob: +91 8329992001
8. Sh. A. K. Garg, Director, Chhattisgarh State Power Trading Co. Ltd. 2nd Floor, "Vidyut Seva Bhavan", Dangania, Raipur – 492 013 Email: [email protected] Ph: 0771-2574300/ 0771-2574117 Mob: +91 9425584512
9. Sh. N. K. Jain, Associate Director, Nuclear Power Corporation of India Ltd. 9-S-30, V.S. Bhavan, Anushaktinagar, Mumbai - 400 094 Email: [email protected] Ph: 022-25992248 Mob: +91 9969482792
10. Sh.S.S.Mishra Addl. General Manager NTPC Limited (Vindhyachal –V / Lara-I) NTPC Bhavan. Core-7, Scope Complex, 7. Institutional Area, Lodhi Road, New Delhi - 110 003 Email: [email protected] Mob: +91 9650991556
Eastern Region
11. Sh Neeraj Kumar Jain General Manager ( Projects) Monnet Ispat & Energy Limited Monnet House, 11, Masjid Moth, Grater Kailash, Part-2, New Delhi – 110 048 Ph: 011-2617 6705 Email : [email protected] Mobile : +91 9560509283
12. Sh. M. S. Pal Addl. Chief Engineer & In-charge of PTR WBSEDCL Bidyut Bhawan, 7th Floor, B Block, DJ Block, Sector II, Salt Lake City, Kolkata – 700 091 Email : [email protected] Mob: +91 830955601
13. Sh. Piyush Banthia VP Commercial Corporate Power Ltd. Maple Plaza, Opposite Road No. 2 Ashok Nagar, Ranchi, Jharkhand – 834002 Email : [email protected] Ph : +91 9371672024/ 9325990005
14. Shri Ritwik Mishra DGM(Commercial) Orissa Power Generation Company Ltd. Zone-A, 7th Floor, Fortune Towers Chandrasekharpur, Bhubaneswar-751023,Odisha Ph: 0674-2303765, 9937022477 Fax: 0674-2303755 Mail: [email protected]
15. Sh. S. R. Ganguly Executive Director, Lanco Energy Pvt. Ltd. Plot No:397,Udyog Vihar Phase-III,Gurgaon-122016 Phone : 01244741305 Email : [email protected] Mobile : +91 9717052255
16. Sh. Vijay Kumar Atluri CEO, Sneha Kinetic Power Projects Pvt. Ltd. #31-A, National Highway, Behind SNOD building, Deorali, Gangtok, Sikkim- 737102 Email : [email protected] Mobile : +91 8527291712 / 9911512223/ 9959552195
17. Sh. S.S.Mishra Addl. General Manager NTPC Limited (Darlipalli) NTPC Bhavan. Core-7, Scope Complex, 7. Institutional Area, Lodhi Road, New Delhi - 110 003 Email: [email protected] Mob: +91 9650991556
18. Sh. M. K. Sharma Managing Director, Jal Power Corporation Limited A-102, Sector-65 Noida – 201 307 Email : [email protected] Phone : 0120-4397444 Mob: +91 9811216292
19. Dr. B. M. Goswami Chief Executive Officer, Madhya Bharat Power Corporation Ltd. Daragaon, Tadong, Near Sikkim Computers Gangtok – 737 102 Phone : 03592-231771, 320519 Email : [email protected] Mobile : +91 9250924624
Southern Region
20. Sh. Jagmohan Rao CFO PEL Power Limited #8-2-293/82/A/76, Road No. 9A, Jubilee Hills, Hyderabad – 500 033. Email:[email protected]/ [email protected] Mob: +91 9000123138
21. Sh Ravi.A.S DGM – Power Evacuation ReGen Powertech Pvt. Ltd Samson Tower 3rd Floor, 403L Pantheon Road, Egmore, Chennai – 600008. Email: [email protected] Mob: +91 9840940609
22. Sh. K L Narayana General Manager RVK Energy (Rajahmundry) Pvt. Ltd. 6-3-1109/A/1, 3rd Floor Navabharath Chambers, Rajbhavan Road Somajiguda, Hyderabad - 500 082. Ph: +91 9866073381
23. Sh. Sanjay Divakar Joshi Chief Operating Officer Vainateya Power Private Limited Plot No. 397, Phase-III, Udyog Vihar Gurgaon – 122 016. Email: [email protected]
24. Sh. A. K. Juneja AGM (Commercial) NTPC Limited (Kudgi TPS) NTPC Bhavan, Core-7, Scope Complex 7, Institutional Area, Lodhi Road New Delhi-110 003 Email: [email protected] Mob: +91 9650990288
Copy to: For kind information and necessary action at your end.
ED (Commercial) / ED (CMG) / ED (BDD) / ED (ER-I) / ED (ER-II)/ ED (WR-I)/ ED (WR-II)/ ED (SR-I)/ ED (SR-II)
Minutes Special JCC-WR, SR & ER
Page 1 of 29
Minutes of Special Joint Co-ordination Meeting of IPPs granted LTA in WR, SR & ER held on 07.07.2015 at CC, POWERGRID
1. The Special meeting of the Joint Co-ordination Committee of IPPs in WR, SR & ER was held at POWERGRID Office, Gurgaon
on 7th July, 2015. The list of participants of the meeting is enclosed at Annexure-I.
2. COO (CTU-Planning & CE) informed that as per the BPTAs applicable for IPPs/ LTA Customers, CTU shall monitor/ review the progress of generating units through Joint Co-ordination meetings with the representative of each of the developer at regular intervals. Accordingly, the latest JCC meetings were held on 25.05.2015 for WR and 26.05.2015 for SR & ER. However, in view of the consistent absence of representatives of some of the IPPs in JCCs, this Special Joint Co-ordination Committee meeting has been convened. Further, for the development of generation projects vis-à-vis associated transmission systems in a coordinated manner, CTU urged all the IPPs and LTA customers to ensure participation in the JCC meetings and share the status of their generation projects at regular intervals.
3. COO (CTU Planning & CE) mentioned that LTOA/LTA to most of the applicants was granted on the basis of target regions. It is therefore high time that the firm beneficiaries should be finalized at the earliest as the common transmission system required is completed / very close to completion. However till firm beneficiaries are finalized the end links cannot be planned which may lead to constraints in transmission of power.
4. It was also stressed that generation developers should ensure completion of their dedicated lines to match with the
commissioning of transmission network in order to prevent bottling up of power. POWERGRID stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the IPPs need to focus on implementing the final dedicated transmission system. Constraints shall be faced in evacuation of power from the generation projects connected through LILO arrangement, provided as an interim arrangement. Therefore, all the IPPs should expedite the construction of their dedicated line as well as the terminating bays at the Pooling Station.
5. Representative of Business Development Department (BDD), POWERGRID informed that wherever POWERGRID is
implementing terminal line bays on consultancy basis, timely payment to POWERGRID contractor for the same should be made. In case of non-payment, the work of bays awarded to the contractor shall be cancelled and fresh tender of the same shall delay the work by 6 months to 1 year.
Minutes Special JCC-WR, SR & ER
Page 2 of 29
Towards this, representative of CTU Planning stated that the responsibility of such delay shall lies with the generation developer. Delay in completion of terminating bays shall also delay connection to the pooling station and interim arrangement is liable for removal for efficient grid operation and reliability and security of grid.
6. It was further stated that though the construction of transmission line constitutes a very small portion compared to the total
investment made by the developers, it is still put on a lesser priority by the generation developers and POWERGRID emphasized the need to change this scenario as it could lead to a bottleneck for transfer of power.
7. Agenda for the Special JCC meeting was taken-up and the outcome of the same is placed below:
Minutes Special JCC-WR, SR & ER
Page 3 of 29
Status of the Generation Projects in Eastern Region
HIGH CAPACITY TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum (MW)
Target Beneficiaries Firm beneficiary
Comm. schedule
(as per 5th
JCC)
Comm. schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
NR WR ER SR
1 Monnet Power Company Ltd
900 300 225 225 150 400MW-West
Bengal
Not Attended U1: May’16 U2: Aug’16
Monet TPS-Angul Pool 400kV D/c line-Mar’16
CTU requested the developer to forward copy of PPA as per CERC Regulations
Subtotal (Odisha) 900 300 225 225 150
HIGH CAPACITY TRANSMISSION CORRIDOR – II
(Phase-I IPPs in Jharkhand & associated Transmission System)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule
(as per 5th
JCC)
Comm. schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
NR WR ER
1 Corporate Power Limited Ph-I (2x270 MW)
480 240 240 0 Uncertain Uncertain
Corporate TPS-Jharkhand Pooling Station 400kV D/c line: Not taken up
Developer informed that project is uncertain due to de-allocation of Coal Blocks. Requested for relinquishment of LTA. 2
Corporate Power Limited Ph-II (2x270 MW)
480 240 240 0 Uncertain Uncertain Corporate TPS - Ranchi 400kV D/c line: Not taken up
3 WBSEDCL (1000 MW State surplus)
1000 600 400 0 Not attended Not attended
Representative not attended Special JCC, status of progress not submitted since 5
th JCC.
Total 1960 1080 880 0
Minutes Special JCC-WR, SR & ER
Page 4 of 29
HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary Comm. schedule (as per 5
th
JCC)
Comm. schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
NR WR ER
1 Lanco Energy Pvt. Ltd. (Teesta-VI) (4x125 MW)
500 0 500 0 MSEDCL-500 MW Apr’16 Apr’18
Teesta VI- Rangpo 220 kV D/c Twin Moose Conductor line : Dec’17
CTU requested the developer to forward copy of PPA as per CERC Regulations
2 JAL Power Corporation (Rangit-IV) (3x40 MW)
120 16 16 88 WBSEDCL-
72MW;
U-1/2/3: COD by May-June’16.
U-1: Nov’17 U-2/3: Dec’17
Rangit IV - New Melli 220kV D/c line: expected by Jun’16
Progress stuck on accounts of fund constraints (>55% work completed) CTU requested the developer to forward copy of PPA as per CERC Regulations
3 Madhya Bharat Power Corpn Ltd. (Rongnichu) (2x48 MW)
96 56 40 0 Nil (till date) U-1: Jun’18; U-2: July’18
U-1: Jun’18; U-2: July’18
Rongnichu-Rangpo 220kV D/c Zebra conductor line: expected by Mar’17
Total 716 72 556 88
Minutes Special JCC-WR, SR & ER
Page 5 of 29
Other Generation Projects – Granted Connectivity & LTA
Generation Projects granted LTOA/LTA
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Comm. schedule
(as per 5th
JCC)
Comm. schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
NR WR ER SR
1 NTPC Ltd. (Darlipalli) 793.5 0 0 793.5 0 ------ U-1:Jun’18 U-2: Dec’18
Darlipalli-Jharsuguda 765 kV D/c line
Requested for availability of dedicated line by Dec’16 for Start-Up power requirement. CTU stated that despite regular follow up by POWERGRID there was considerable delay in signing of LTA Agreement without which the implementation of system could not be approved.
2 Orissa Power Generation Company Ltd. (2X660 MW)
600 200 200 0 200 Nil (Till date) ------ U1: Nov’17 U2: Mar’18
OPGC-Jharsuguda 400 kV D/c line with Triple snowbird conductor : Under TBCB, Jul’17
3 Sneha Kinetic Power Projects Ltd (Dikchu)
96 48 48 0 0 Nil (Till date) U1 & 2: Oct’15
Dikchu- Dikchu Pool 132 kV D/c Moose conductor/ HTLS line – Matching with generation project
Tripartite LTA Agreement to be signed
Total 1489.5 248 248 793.5 200
Minutes Special JCC-WR, SR & ER
Page 6 of 29
Status of the Generation Projects in Western Region
HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries
Firm beneficiary
Commissioning schedule
(as per 8th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR
CHATTISGARH IPP
1 Dheeru Power Gen 450 367.5 82.5 NIL Not Attended Uncertain Dheeru Power gen - WR Pooling Station (Bilaspur) 400kV D/c (High Capacity)
Physical construction of project not yet started. Project on hold due to coal de-allocation & pending Environmental Clearance.
Representative informed that in view of the above factors, they are not in a position to indicate commissioning schedule.
2 Chhattisgarh State Power Trading Co. Ltd
432 260 172 NIL Not Attended
Plant & Corridor wise PPA details to be informed along with time schedule by CSPTCL
Total 882 627.5 254.5
Minutes Special JCC-WR, SR & ER
Page 7 of 29
HIGH CAPACITY TRANSMISSION CORRIDOR – V (Transmission System Associated with Chhattisgarh IPPs)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 8th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR SR
JANJGIR-CHAMPA COMPLEX
1 Vandana Vidyut Ltd. (2X135 + 1X270)
265 165 100 25MW-
CSPTCL
U-1: Commissioned;
U-2/3: Mar'15/Apr'18
U-1: Commissioned;
U-2:Sep’15 U-3:Apr’18
Vandana Vidhyut – Dharamjaygarh PS 400kV D/c line : Dec’17
Representative not attended Special JCC, however, submitted progress. CTU requested to forward copy of PPA as per CERC Regulations
RAIGARH/JANJGIR- CHAMPA/RAIPUR COMPLEX
2 Chhattisgarh State Power Trading Co. Ltd
5809 3487 2322 NIL Not Attended
Plant & Corridor wise PPA details to be informed along with time schedule by CSPTCL
Total 6074 3652 2422
Other Generation Projects in Chattisgarh & Madhya Pradesh
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 8th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
1 Heavy Water Board 18 18 0 0 0 NIL Not Attended Operational
(14 MW) -
Wheeling power from Kakrapar APS and revised LTA quantum of
Minutes Special JCC-WR, SR & ER
Page 8 of 29
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 8th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
14 MW is already operational
2 Pipavav Energy Private Ltd
1200 550 290 360 0 NIL Not Attended Not Attended Pipavav TPS – Pirana 400kV D/c (triple) line
Over the telephonic discussion, it was informed that there is no progress in last 2 years and no one was there to attend the JCC meeting. The same may be put-up to Conn/LTA committee of WR constituents for discussion & decision
3 Dhariwal Infrastructure Ltd.
300 150 150 0 0 Tamil Nadu:
100 MW ----
Commissioned in Aug’14
LILO point Bhadravati - Parli one circuit at Dhariwal TPS- Commissioned
Reduction of quantum from 300 to 270 MW (120-WR; 150-NR); LTA applied for SR for 100MW and the same quantum need to be relinquished from WR
4 NPCIL (Kakrapar) 1400 1400 0 0 0 NIL Not Attended Not Attended Kakrapar NPP - Navsari 400kV D/c
Representative not attended Special JCC, status of progress not submitted since 8
th JCC.
5 NTPC (Vindhyachal -V)
495.78 495.7
8 0 0 0 NIL ------ Oct’15
Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard
6 NTPC (Lara-I) 1586.51 1586.
51 0 0 0 NIL -------
U1: Apr’17; U2: Oct’17
Lara STPP – Raigarh (Kotra) Pooling Station 400 kV D/c
Minutes Special JCC-WR, SR & ER
Page 9 of 29
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 8th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
WR NR ER SR
7 Heavy Water Board 17 17 0 0 0 NIL Not Attended Uncertain
Representative informed that they are not in a position to sign LTA Agreement due to Levy of cross subsidy by MSEDCL, which has been taken up with MoP for resolution.
8 MP Power Management Company Ltd.
246 246 0 0 0 NIL Dec’15
Jhabua TPS - Jabalpur Pool 400kV D/c (Triple): Commissioned
9 Sarda Energy & Minerals Ltd (2X150+1X50)
156 106 50 0 0 NIL Not Attended Uncertain
SEML TPS - Raigarh PS (near Tamnar) 400kV D/c line
Project cannot be taken up due to de-allocation of coal block.
Total 5419.29 4569.
29 490
360 0
Minutes Special JCC-WR, SR & ER
Page 10 of 29
Status of the Generation Projects in Southern Region
HIGH CAPACITY TRANSMISSION CORRIDOR – XI (Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, TN)
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1 PEL Power Limited (3x350 MW)
987 700 0 287 NIL
Not Attended
(Status submitted - TN Govt. approval in respect of Consent For Establishment (CFE) awaited.)
Uncertain PEL-Nagapattinam PS 400kV quad D/c line
Project can be taken up only after Environmental & Pollution Board clearances. Matter pending in CERC for return of construction Bank Guarantee
Total 987 700 0 287
Other Generation Projects – Granted Connectivity & LTA
Generation Projects granted LTOA/LTA
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
1 NTPC Limited (Kudgi TPS-3x800)
2392.49 2033.62 0 287 50%-
Karnataka;
Not Attended U1: Sep’16 U2: Mar’17 U3: Sep’17
Kudgi TPS – Narendra (New) 400 kV 2xD/C quad lines
CTU requested NTPC to forward copy of final PPA allocation as per CERC Regulations
Minutes Special JCC-WR, SR & ER
Page 11 of 29
Sl. No.
LTOA / LTA Applicant
LTOA Quantum
(MW)
Target Beneficiaries Firm beneficiary
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
SR WR NR
Total 2392.49 2033.62 0 287
Generation Projects granted only Connectivity
Sl. No.
Connectivity Applicant
Connectivity Quantum
(MW)
Comm. Schedule (TA/Intimation)
Commissioning schedule
(as per 11th
JCC)
Commissioning schedule
(as per Special JCC)
Dedicated / Connectivity line & Status
Remarks
1 Regen Powertech Private Limited (6x100) [Wind]
600 100 MW in every 3 month time from Sept’ 13 onward
Not Attended U1: Mar’17; Other units
progressively
Regen PS - Pugalur 230 kV D/c (twin moose) line: Mar’17
2 Vainateya Power Private Limited (2x660 MW)
1320 Mar’ 15 (Subject to notification of BPC
by Sept’ 11) Not Attended Not Attended
Generation switchyard - Tuticorin PS 400kV D/c (Quad/Twin HTLS) line
Representative from these generation projects have consistently not attended JCCs and no substantial progress is reported. Accordingly, it may be referred to Connectivity/ LTA committee of SR constituents for discussion & decision
3 RVK Energy (Rajahmundry) Pvt. Ltd. (3x120 MW)
360 After establishment
of Vemagiri PS, likely Sept’ 14
Not Attended Not Attended Generation switchyard - Vemagiri-II PS 400kV D/c line
Total 2280
Minutes Special JCC-WR, SR & ER
Page 12 of 29
Status of the Associated Transmission System
HIGH CAPACITY TRANSMISSION CORRIDOR – I
(Phase-I IPPs in Odisha & associated Transmission System)
Transmission System under the Scope of POWERGRID:
Transmission System for Phase-1 generation projects in Odisha - Part-A
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Angul Pooling Station – Jharsuguda Pooling Station 765kV 2xS/c line Mar’15
(commissioned)/ Jun’15
Mar’15 (commissioned)/ Sep’15
2 LILO of Rourkela – Raigarh 400kV D/c at Jharsuguda Pooling station Commissioned Commissioned
3 LILO of Meramundali – Jeypore 400kV S/c line at Angul pooling station
Commissioned Commissioned
4 LILO of one ckt of Talcher - Meramundali 400kV D/c line at Angul pooling station
Commissioned Commissioned
5 Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda
Commissioned Commissioned
6 Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul Commissioned Commissioned
Transmission System for Phase-1 generation projects in Odisha - Part-B
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Establishment of 765kV switching station at Dharamjaygarh / near Korba
Commissioned Commissioned
2 LILO of Ranchi – WR Pooling near Sipat 765kV S/c line at Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 13 of 29
Dharamjaygarh / near Korba
3 Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) 765kV D/c
Commissioned Commissioned
4 Establishment of 765/400kV Pooling Station at Jabalpur Commissioned Commissioned
5 Dharamjaygarh / near Korba – Jabalpur Pooling Station 765kV D/c line
July’15 Sep’15
6 Jabalpur Pooling Station – Jabalpur 400 kV D/c (high capacity) line Commissioned Commissioned
Transmission System for Phase-1 generation projects in Odisha - Part-C
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Jabalpur Pooling Station – Bina 765kV D/c line Commissioned Commissioned
2 Bina – Gwalior 765kV S/c (3rd circuit) Commissioned Commissioned
3 Gwalior - Jaipur 765kV S/c line (2nd circuit) Aug’15 Sep’15
4 Jaipur - Bhiwani 765kV S/c line June’15 Aug’15
Transmission System under the Scope of Private Sector:
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station Commissioned Commissioned
2 Jabalpur Pool – Bhopal – Indore 765kV S/c Commissioned Commissioned
3 Bhopal New substation – Bhopal (M.P.) 400kV D/c (high capacity) Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 14 of 29
HIGH CAPACITY TRANSMISSION CORRIDOR – II
(Phase-I IPPs in Jharkhand & associated Transmission System)
Transmission System under the Scope of POWERGRID:
Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-1
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Establishment of 400kV GIS Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects.
Dec’15 Dec’15
2 Ranchi - Gaya 400 kV D/c (Quad) line via pooling station proposed near Essar / Corporate generation projects
Dec’15 Dec’15
Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-2
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Ranchi New (765/400kV S/s) - Dharamjaygarh / near Korba 765kV S/c
Sep15 Sep’15
2 2x1500 MVA, 765/400 kV New GIS substation at Varanasi Sep’15 Sep’15
3 Gaya - Varanasi 765kV S/c Dec’15 Sep’15
4 Varanasi - Balia 765 kV S/c line Sep’15 Sep’15
Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-B
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 New 2x1500 MVA, 765/400 kV substation at Kanpur Sep’15 Oct’15
Minutes Special JCC-WR, SR & ER
Page 15 of 29
2 Varanasi – Kanpur 765 kV D/c Sep’15 Oct’15
3 Kanpur – Jhatikra 765 kV S/c Dec’15 Dec’15
4 Kanpur (765/400kV) - Kanpur (Existing) 400kV D/C (Quad) Sep’15 Oct’15
5
400kV connectivity for new 765/400kV S/s at Varanasi
Varanasi - Sarnath (UPPCL) 400kV D/c (quad)
LILO of Sasaram - Allahabad 400kV line at Varanasi
Opening of LILO of one ckt of Sasaram - Allahabad 400kV D/c line at Sarnath
Sep’15 Targeted by Dec’15
Transmission System under the Scope of TBCB:
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Dharamjaygarh – Jabalpur 765kV D/C line (2nd line) Sep’15 Sep’15 As per CEA Report of
May’15
HIGH CAPACITY TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)
Transmission System under the Scope of POWERGRID:
Transfer of power from generation projects in Sikkim to NR/WR (Part-A)
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Establishment of New 2x315 MVA, 400kV sub-station at
Kishanganj June’15 Sep’15
2 LILO of Siliguri (Existing) – Purnea 400kV D/c line(quad) at new
pooling station Kishanganj June’15 Dec’15
3 LILO of Siliguri (Existing) – Purnea 400kV D/c line (on which reconductoring is being carried out) at Kishanganj with higher
June’15 Dec’15
Minutes Special JCC-WR, SR & ER
Page 16 of 29
capacity (quad) conductor
4 LILO of Siliguri – Dalkhola 220kV D/c line at new pooling station
Kishanganj June’15 Sep’15
5 LILO of Gangtok-Melli 132kV S/c line upto Rangpo, where
Chuzachen-Rangpo 132kV D/c would be connected so as to form Chuzachen-Gangtok and Chuzachen-Melli 132kV S/c lines.
Commissioned Commissioned
Transfer of power from generation projects in Sikkim to NR/WR (Part-B)
Sl. No.
Scope of Transmission System Status (as per 6th JCC)
Status (as per Special JCC)
Remarks
1 Establishment of 400/220/132kV (400/220kV, 16x105 MVA, Single Phase transformers and 220/132kV, 3x100MVA) Gas
Insulated Substation at Rangpo
Commissioned Commissioned
2 Establishment of 220kV Gas Insulated switching station at New
Melli Expected by May’15 Commissioned
3 LILO of Teesta III – Kishanganj 400kV D/c line (quad, Teesta III – Kishanganj 400kV D/c line to be constructed through JV route) at
Rangpo
Commissioned Commissioned
4 Rangpo – New Melli 220kV D/c line (with twin Moose conductor) Expected by May’15 Commissioned
5
LILO of Gangtok-Rangit 132kV S/c line at Rangpo and termination of Gangtok-Rangpo/Chujachen and Melli – Rangpo/Chujachen
132kV lines (constructed under part-A through LILO of Gangtok-Melli 132kV S/c line upto Rangpo) at Rangpo sub-station
Commissioned
Commissioned
6 LILO of Teesta V – Siliguri 400kV D/c line at Rangpo Commissioned Commissioned
7 Kishanganj – Patna 400kV D/c (quad) line June’15 Sep’15
Minutes Special JCC-WR, SR & ER
Page 17 of 29
HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)
Transmission System under the Scope of POWERGRID:
Transfer of power from generation projects near Bilaspur complex in Chhattisgarh & MP projects
Sl. No.
Tr. System Status (as per 9th JCC))
Status (as per Special JCC)
Remarks
1 Indore- Vadodara 765kV S/c Commissioned Commissioned
2 Vadodara – Pirana 400kV D/c (Quad) Commissioned Commissioned
3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara
May’15 Commissioned
Status of other associated transmission lines
Sl. No.
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 765 KV S/C Bina - Gwalior line (3rd
Ckt) Commissioned Commissioned
2 765KV S/C Gwalior-Jaipur line (2nd
Ckt) July/Aug’15 Aug’15
3 765 KV S/C Jaipur - Bhiwani line (2nd
Ckt) Sep’15 Mar’16 ROW issues at Bhiwani end
Minutes Special JCC-WR, SR & ER
Page 18 of 29
HIGH CAPACITY TRANSMISSION CORRIDOR – V
(Transmission System Associated with Chhattisgarh IPPs)
Transmission System under the Scope of POWERGRID
Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1
Sl. No.
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Raigarh Pooling Station (Near Kotra) – Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits
Commissioned Commissioned
2 Raigarh Pooling Station (Near Kotra) – Raigarh 400kV D/c
Commissioned Commissioned
3 Raipur Pooling Station – Raipur 400kV D/c Commissioned Commissioned
4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra) (1x240 MVAR B/R) at 765kV, 1x80 MVAR bus reactor (charged at 400kV)
400kV - Commissioned;
765kV -Commissioned
Commissioned
5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R)
Commissioned Commissioned
Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2
Sl. No.
Transmission System Status (as per 9th JCC)
Status (as per Special JCC)
Remarks
1 Champa Pooling Station – Raipur Pooling Station 765kV D/c -150 KM - 2x240 MVAR line reactors at Raipur
Commissioned Commissioned
2 Raigarh Pooling station(near Kotra) – Raigarh pooling station(near Tamnar) 765kV D/c
Commissioned Commissioned
3 Champa Pooling Station – Dharamjaygarh/Korba 765kV S/c
Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 19 of 29
4 Raigarh Pooling Station (near Kotra) – Champa Pooling Station 765kV S/c
May’ 15 Commissioned
5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station (1x240 MVAR B/R) 1x80 MVAR bus reactor when charged at 400kV)
May’ 15 Commissioned
6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R)
Commissioned Commissioned
Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special JCC)
Remarks
1 Raipur Pooling Station – Wardha 765kV D/c - 2x240MVAR line reactor at Raipur Pooling Station and 2x330MVAR line reactor at Wardha
Commissioned Commissioned
2 Wardha bus reactor – 1x330 MVAR Commissioned Commissioned
Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Wardha – Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad
Commissioned Commissioned Commissioned
2 Aurangabad(PG) – Boisar 400kV D/c (Quad)-300 km - 2x63 MVAR line reactors at each end on both circuits
Targeted by Mar’ 16
Targeted by Mar’ 16
Severe RoW issues in Nashik Dist. due to grape garden
3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R)
Commissioned Commissioned Commissioned
4 Augmentation of transformation capacity at Boisar by 1x500MVA
Commissioned Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 20 of 29
System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5
Sl. No.
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Padghe – Padghe(PG) 400kV D/c (Quad)-25 km Unless Kudus Substation is constructed, Power cannot be evacuated from Padghe
Mar’16 Unless Kudus Substation of MSETCL is constructed, Power cannot be evacuated from Padghe
2 Vadodara – Asoj 400kV D/c(Quad)-15 km - Commissioned
3 Aurangabad (PG) – Padghe(PG) 765kV D/c - 2x240MVAR line reactors at each end on both circuits
Mar’16
4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R)
Mar’16
System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Raipur Pooling Station – Wardha 765kV 2nd D/c-380 km - 2x240 MVAR line
Mar’16 Mar’16
System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Wardha – Aurangabad (PG) 765kV 2nd D/c – 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad
Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 21 of 29
WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR)
Targeted by Jun’16
Mar’16
2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s
Sep’15
3 LILO of Abdullapur – Sonepat 400kV D/c(triple) at Kurukshetra
Sep’15
4 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively: to be upgraded to 6000MW
Mar’18
5 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra
Dec’15
Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10
[TBCB award placed to succesful bidder Sterlite in Mar ’12 with commissioning schedule of 39 months(June ’15)]
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 Aurangabad(PG) – Dhule (IPTC) 765kV S/c line TBCB
2 Dhule (IPTC) – Vadodara (PG) 765kV S/c line TBCB
3 Dhule (IPTC) – Dhule (MSETCL) 400kV D/c Quad line Commissioned Commissioned Commissioned
4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s
Commissioned Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 22 of 29
Status of otherTransmission Lines
Sl. No
Transmission System Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 +/- 800KV HVDC Bipole between Champa Pooling Station - Kurukshetra line (with provision to upgrade HVDC terminal to 6000MW at later date)
Dec’ 16 Mar’16
2 400KV D/C Kurukshetra - Jind line (Q) Mar’18 Mar’18
3 765 KV D/C Jabalpur Pooling Station - Bina line Commissioned Commissioned Line commissioned in Dec'13.
4 Jabalpur PS-Bhopal 765kV S/c Jun’15 Jun’15 As per CEA Report of May’15
5 Bhopal- Indore 765kV S/c TBCB
6 TEL(DGEN) TPS- Vadodara 400kV D/c Bidding is Process, RFQ has
been issued
Bidding is Process, RFQ has
been issued
As per CEA Report of May’15
7 220kV Navsari- Besthan TBCB
8 765KV D/C Jabalpur Poolin Stn. - Orai line
Apr’18 Apr’18 As per CEA Report of May’15
9 765kV Orai- Aligarh Apr’18 Apr’18 As per CEA Report of May’15
10 765KV D/C Narendra (New Kudgi) - Kolhapur line (initially charged at 400KV)
Aug’ 16 Efforts being made to complete the line by Sep’15
11 400KV D/C Kakrapar APP - Vapi line Oct’16 Oct’16 As per CEA Report of May’15
12 Vindhayachal PS- Jabalpur PS 765kV D/c TBCB
13 400KV D/C Lara STPS - Raigarh (Kotra) line Apr’17 Dec’15 (for start-up power)
Sl. No
Name of the Sub-Station Status (as per 9th JCC)
Status (as per Special
JCC)
Remarks
1 765/400 KV Champa Pooling Station
Dec’15** Commissioned
2 765/400KV Jabalpur Pooling station (2x1500MVA) Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 23 of 29
3 1x1500 MVA 765/400kV ICT at Vindhayachal PS Mar’15 Jul’17 Inadvertent error in earlier JCC minutes
HIGH CAPACITY TRANSMISSION CORRIDOR – VI
(Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh)
Common System Associated With ISGS Projects in Krishnapatnam Area of Andhra Pradesh
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 765/400 kV, 2x1500 MVA pooling station at Nellore by LILO of Simhapuri-Nellore 400 kV D/c quad line Commissioned Commissioned
2 Nellore Pooling station – Kurnool 765 kV D/c line Commissioned Commissioned
3 Kurnool – Raichur 2nd
765 kV S/c line Commissioned Commissioned
4 Associated 765 kV & 400 kV bays at Nellore Pooling station, Kurnool and Raichur stations Commissioned Commissioned
HIGH CAPACITY TRANSMISSION CORRIDOR – VII (Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu)
Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation
projects in Tuticorin Area – Part-A
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 765 kV pooling station in Tuticorin (Initially charged at 400 kV) including 1x80 MVAR, 400 kV bus reactor Commissioned Commissioned
2 LILO of both circuits of Tuticorin JV – Madurai 400 kV D/c (quad) line at Commissioned Commissioned
Minutes Special JCC-WR, SR & ER
Page 24 of 29
Tuticorin Pooling Station
Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation projects in Tuticorin Area – Part-B
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 765/400 kV Pooling Station at Salem (Initially charged at 400 kV). Ready Ready
2
Tuticorin Pooling station – Salem Pooling station 765 kV D/c line initially charged at 400 kV.
Dec’15 Mar’16
3 Interconnection of Salem pooling station with existing Salem 400/230 kV substation through 400 kV D/c (quad) line. Ready Ready
4 Salem pooling station – Madhugiri pooling station 765 kV S/c initially charged at 400 kV. Dec’15 Mar’16
HIGH CAPACITY TRANSMISSION CORRIDOR – VIII (Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh)
Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation
Projects In Srikakulam Area – Part-A&C
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 765/400 kV Pooling Station at Srikakulam with 2x1500 MVA transformation capacity Dec’15 Jun’16
2 Srikakulam Pooling Station – Angul 765 kV D/c line June’16 June’16
Minutes Special JCC-WR, SR & ER
Page 25 of 29
3 Associated 765 kV bays at Srikakulam & Angul June’16 June’16
Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation Projects In Srikakulam Area – Part-B
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 2nd
Angul – Jharsuguda – Dharamjaigarh 765 kV D/c line Mar’16 Mar’16
2 Associated 400 & 765 kV bays at Angul, Jharsuguda & Dharamjaigarh substations. Mar’16 Mar’16
HIGH CAPACITY TRANSMISSION CORRIDOR – XI
(Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu)
Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu – Part-A1(a)
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Establishment of 765/400kV GIS Pooling station at Nagapattinam with
4x1500 MVA transformer(initially charged at 400 kV) June’15 Commissioned
2 LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling Station for
interim arrangement which later shall be bypassed
Charged as per interim
arrangement Commissioned
Minutes Special JCC-WR, SR & ER
Page 26 of 29
Transmission System under the Scope of TBCB:
Sl. No.
Scope of Transmission System Status (as per 12th JCC)
Status (as per Special
JCC)
Remarks
1 Nagapattinam Pooling Station – Salem 765kV D/c line Dec’15 Dec’15 As per May’15 CEA
Report
2 Salem – Madhugiri 765 kV S/c line Dec’15 Dec’15 TBCB
Minutes Special JCC-WR, SR & ER
Page 27 of 29
Annexure-I
List of Participants in the Special Joint Co-ordination Committee Meeting of IPPs granted LTA in WR, SR & ER held on 07.07.2015
Sl. No.
Name Designation Organisation E-mail
1. Seema Gupta COO (CTU-Plg & CE) Power Grid Corporation of India Ltd. [email protected]
2. D N Rozekar DGM (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
3. P Saraswat DGM (Commercial) Power Grid Corporation of India Ltd. [email protected]
4. Poonam Varshney DGM- CMG Power Grid Corporation of India Ltd. [email protected]
5. B.P.Kundu DGM-BDD Power Grid Corporation of India Ltd. [email protected]
6. S.Majumdar Asst GM- BDD Power Grid Corporation of India Ltd. [email protected]
7. S K Varshney Asst. GM (Commercial) Power Grid Corporation of India Ltd. [email protected]
8. Rajesh Verma CDE (CTU-Plg) Power Grid Corporation of India Ltd [email protected]
9. Anil Kumar Meena DCDE (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
10. Jeremy Officer (BDD) Power Grid Corporation of India Ltd. [email protected]
11. Ankush Patel Engineer Power Grid Corporation of India Ltd. [email protected]
12. K Jyoth Kumar Officer (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]
13. Neeraj Jain General Manager Monnet Power Co. Ltd [email protected]
Minutes Special JCC-WR, SR & ER
Page 28 of 29
Sl. No.
Name Designation Organisation E-mail
14. Omprakash Verma RGP Dheeru Powergen Pvt Ltd [email protected]
15. S.R. Ganguly Ex- Director Lanco Teesta Hydro Power Ltd [email protected]
16. Sharad Kumar Singh AM Lanco Teesta Hydro Power Ltd [email protected]
17. Vikas Sharma DGM Regen Powertech [email protected]
18. Ravi Ghatia DM Regen Powertech [email protected]
19. Shailendra Rastogi SM Regen Powertech [email protected]
20. Satish Dukare GM Dhariwal Infrastructure Ltd [email protected]
21. Suresh Kumar S Asst. Manager Dhariwal Infrastructure Ltd [email protected]
22. K Jagan Mohan Rao CFO PEL Power Ltd [email protected]
23. S.M Malik Consultant PEL Power Ltd [email protected]
24. Sunil Kundu GM-Commercial Sneha Kinetic [email protected]
25. P.S. Dutta Gupta Head-Corporate Affairs Sarda Energy & Minerals Ltd [email protected]
26. B.M.Goswami CEO & Director Madhya Bharat Power Corporation Ltd [email protected]
27. M.K. Sharma MD Jal Power Corporation [email protected]
28. R.S.Chadha Sr. VP Jal Power Corporation jpcl@[email protected]
29. K.C.Samantray Sr. Manager OPGC [email protected]
30. P.K.Dora Engg & Commercial- Head OPGC [email protected]
Minutes Special JCC-WR, SR & ER
Page 29 of 29
Sl. No.
Name Designation Organisation E-mail
31. D.S.Bhagat ACE CSPTCL [email protected]
32. B.K Jain CE (Elect) Heavy Water Board [email protected]
33. Pramod Chowdhary Sr. GM (Commercial) MP Power Management Co Ltd- Jabalpur [email protected]
34. Vinod Kumar Jain DGM-Commercial NTPC Ltd [email protected]
35. Rohit Ladha DM-Commercial NTPC Ltd [email protected]
36. VK Garg Sr Manager-Commercial NTPC Delhi [email protected]
37. P.K.Goyal AGM NTPC [email protected]
38. Manoj Kumar Sharma Sr. Manager NTPC [email protected]