distribution water main extension and replacement multiple ... · distribution water main extension...
TRANSCRIPT
04/07/15 Slide 1
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Distribution Water Main Extension and Replacement – Multiple locations
Project ID: MED625
Entire Project duration: 2015-2017
Engineering Firm: KS Engineers, PC
Contractor: Judlau Contracting, Inc.
04/07/15 Slide 2
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Project Intent & Purpose:
Intent:
• Upgrade existing water mains (newer & bigger)
Purpose:
Increased population (demand)
Aging infrastructure (increase the useful life)
04/07/15 Slide 3
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Scope of Work Water Main Extension & Replacement
Extension & Replacement of Existing 12” & 20”
Distribution Water Mains.
Roadway Restoration.
Installation of Catch Basins and Basin Connections
04/07/15 Slide 4
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Project Duration May 2015 – August 2015
• Delancey Street (between Columbia Street and Pitt Street)
• Pitt Street (between Delancey Street and East Houston Street)
• Rivington Street (between Pitt Street and Clinton Street)
August 2015 – April 2016
• Bowery (between Canal Street and East 4th Street)
• First and Second Streets (between Bowery and Second Avenue)
• Second Avenue (between East 2nd Street and East Houston Street )
04/07/15 Slide 5
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
04/07/15 Slide 6
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Allowable Work Days/Hours: (as per NYC DOT Stipulations)
7:00AM-6:00PM: Monday-Friday (Weekend Work as Needed)
• Bowery and auxiliary blocks between Spring Street and East 4th Street
10:00PM-6:00AM: Monday- Friday
(Weekend Work as Needed) • Bowery between Canal Street and Spring Street
TBD • Delancey Street between Columbia Street and Pitt Street
• Pitt Street between Delancey Street and East Houston Street
• Rivington Street between Pitt Street and Clinton Street
04/07/15 Slide 7
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
New York City DOT Traffic Stipulations During Construction on Bowery between Canal Street & Spring Street
• Night Work 10PM-6AM
• 5ft pedestrian walkways
• Two 12ft wide Northbound lanes
• One 12ft wide Southbound lane
• No construction materials on Bowery
• 50ft X 8ft of curb lane on one-way streets for enclosed storage of materials
• On Delancey Street– Two 11ft wide Eastbound Lanes & Two 11ft wide Westbound
Lanes
• At other cross streets- One 10ft wide lane on one-way streets, Two 10ft wide lanes
on two way streets
04/07/15 Slide 8
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
New York City DOT Traffic Stipulations During Construction on Bowery between Spring Street & East 4th Street • Day Work 7AM-6PM
• 5ft pedestrian walkways
• Will not impact Northbound and Southbound traffic at the same time.
• One 12ft wide Southbound lane
• One 12ft wide Northbound lane
• No construction materials on Bowery
• 50ft X 8ft of curb lane on one-way streets for enclosed storage of
materials
• At Cross Streets– 11ft wide lanes for one-way traffic & Two 10ft wide lanes
for two-way traffic
04/07/15 Slide 9
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
COMMUNITY IMPACTS &
WHAT TO EXPECT
04/07/15 Slide 10
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
COMMUNITY IMPACTS • Pedestrian access will be maintained at all times
• Intermittent street closures and/or limited access may be necessary
• Bus routes affected by the project:
• Bowery (Canal St. – E. 4th St.) – M103
• DDC will monitor operation and work within DEP Noise Code regulations
• Sidewalk and/or loading dock access from the curb may be temporarily
restricted while work is conducted (coordination will be arranged on a
case by case basis)
• Parking may be temporarily restricted during construction
04/07/15 Slide 11
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Water Service Interruptions:
Water service disruption planned
• Typically 8hrs (not consecutive)
• 72 hour advance notice will be provided
• Specific instruction will be provided prior to water shutoff
• If your water service is not restored within 3 hours of the indicated on the
Shutoff notice, please contact the community construction Liaison (CCL) or
311 if after hours.
Special Needs:
• Individuals with special needs should contact the CCL
• DDC field staff will work specially with those individuals to minimize certain
inconveniences
Rodent Control:
• A rodent survey will be performed prior to construction
• Rodent Control Stations will be installed by a professional rodent control
contractor
04/07/15 Slide 12
Project Name: Distribution of Water Main Extension and Replacement
Project ID: MED 625
Keeping You Informed Office of Community Outreach & Notification, DDC
• DDC has assigned Amanda Girgis of KS Engineers, PC as the Community
Construction Liaison (CCL). She will keep the community informed by:
• Being the first point of contact between the project and the community
• Identifying, addressing and/or resolving field inquiries & issues as well as any coordination between the project and needs of the affected stakeholders
• Providing regular updates/advisories for the community to better plan around construction activities
• CCL contact information:
• Name: Amanda Girgis
• Email: [email protected]
• Field Office: 84 Bowery, 6th Floor, New York NY 10013
• Telephone : (646)-723-9925
• DDC Website: www.nyc.gov/ddc
• DDC Video: www.nyc.gov/webuild
• During Non-Working hours, please call 311 and give the Project ID: MED625