diverter

Upload: nigin-parambath

Post on 04-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Diverter

    1/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    30. DIVERTER

    30.1 FUNCTION

    - Description

    The Diverter is installed on the conductor pipe before drilling of first phase of the well and isdesigned to keep

    personnel and Rig safe.It consist of an annular type blow out preventer and is designed to divert shallow gas away

    fromthe well area while drilling surface hole.In doing so, the well remains open but diverting the pressure avoids

    fracturing a formation.

    - Manufacture specifications

    Diverter system are manufactured according to API 16A and RP 64.The relevant ISO standard is the 13533 Spec.EN

    requirements are defined by "Well control policy" and an internal specification.

    30.2 TYPICAL CONFIGURATION

    - Off-shore application (APIRP 64) Schematic arrangement foran off-shore application, asper API RP 64

    recommendations.

    - Hydril's suggested configurations

  • 8/13/2019 Diverter

    2/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    - Hydril example with SXVspool arrangement

    This integral type spoolwith diverter has theadvantage of remotecontrols, eliminating theuse of lateral valves.

  • 8/13/2019 Diverter

    3/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    - SXV MSP Engineering Data

  • 8/13/2019 Diverter

    4/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    -Typical configurationon Saipem's Rigs

    Typical configurationon Saipem's mediumand high power Rigs

  • 8/13/2019 Diverter

    5/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    - Diverter Installations

    - Diverter valve

  • 8/13/2019 Diverter

    6/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    30.3 TYPES AND CHARACTERISTICS

    - Hydril MSP

    The 29 " Diverter is the most commonlyused.It allows the running of 27" bit.For fast moving type Rigs, uses the

    20"annular BOPThe MSP 29-1/2"-500 requires onlyclosing pressure. Seal off is effected by hydraulicpressureapplied to the closing chamber whichraises the piston, moving the packing unit radially inward into a sealing

    engagement. Any normal closing unit having aseparate regulator valve for the annular BOP and sufficient accumulator

    volumecan be used to operate the MSP.

  • 8/13/2019 Diverter

    7/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    - Table Data

  • 8/13/2019 Diverter

    8/9

    11/25/13 DIVERTER

    apirigroup.com/diverter.html

    - Table Initial Closing Pressure (psi)

    Required for MSP 29-1/2-500 BOP / DIVERTER

    Closing Pressure 500 PSI Wellbore

    12" ipe 5" Pipe CSO

    959 psi 1350 psi 1500 psi

    30.4 INSPECTIONS

    The Diverter System shall be inspected (modally and frequency) according to the manufacturer'srecommendations

    and as per API RP 53.ENI requirements are defined by an internal specification.

  • 8/13/2019 Diverter

    9/9

    11/25/13 DIVERTER

    apirigroup com/diverter html