LAMPIRAN 2 PENAWARAN ANALISA HARGA SATUAN MATA PEMBAYARAN Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Contract Package : No. 3 (Three) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Location : KABUPATEN ACEH TENGAH Pay Item Number :7.3.1 Pay Item Number :7.3.1 Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24 Payment unit :Kg Payment unit :Kg PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA (Rp.) (Rp.) A. TENAGA A. TENAGA 1. Pekerja Biasa (L01) jam 0.0700 7,150.00 500.50 1. Pekerja Biasa (L01) jam 0.0700 7,150.00 500.50 2. Tukang (L02) jam 0.0070 11,500.00 80.50 3. Mandor (L03) jam 0.0070 9,500.00 66.50 3. Mandor (L03) jam 0.0070 9,500.00 66.50 647.50 JUMLAH HARGA TENAGA B. BAHAN 1. Baja Tulangan (polos) (M39a) Kg 1.1000 10,000.00 11,000.00 2. Kawat Beton (M14) Kg 0.0200 12,500.00 250.00 2. Kawat Beton (M14) Kg 0.0200 12,500.00 250.00 11,250.00 JUMLAH HARGA BAHAN C. PERALATAN 1. Alat Bantu Ls 1.0000 500.00 500.00 500.00 JUMLAH HARGA PERALATAN 500.00 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,397.50 E. KEUNTUNGAN 5.0 % x D 619.88 JUMLAH HARGA PERALATAN F. HARGA SATUAN PEKERJAAN ( D + E ) 13,017.38 Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. 2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya. dibayar dari kontrak) dan biaya-biaya lainnya. Banda Aceh, 20 Juni 2012 PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri Ir. Mawardi Ir. Mawardi Direktur Utama

Upload: na-ja-ma

Post on 09-Sep-2015

15 views

Category:

Documents


1 download

TRANSCRIPT

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number :7.3.1Pay Item Number :7.3.1

    Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24

    Payment unit :KgPayment unit :Kg

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)

    A. TENAGAA. TENAGA

    1. Pekerja Biasa (L01) jam 0.0700 7,150.00 500.501. Pekerja Biasa (L01) jam 0.0700 7,150.00 500.50

    2. Tukang (L02) jam 0.0070 11,500.00 80.50

    3. Mandor (L03) jam 0.0070 9,500.00 66.503. Mandor (L03) jam 0.0070 9,500.00 66.50

    647.50JUMLAH HARGA TENAGA 647.50

    B. BAHAN

    JUMLAH HARGA TENAGA

    1. Baja Tulangan (polos) (M39a) Kg 1.1000 10,000.00 11,000.00

    2. Kawat Beton (M14) Kg 0.0200 12,500.00 250.002. Kawat Beton (M14) Kg 0.0200 12,500.00 250.00

    11,250.00JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Alat Bantu Ls 1.0000 500.00 500.00

    500.00JUMLAH HARGA PERALATAN 500.00

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 12,397.50

    E. KEUNTUNGAN 5.0 % x D 619.88

    JUMLAH HARGA PERALATAN

    E. KEUNTUNGAN 5.0 % x D 619.88

    F. HARGA SATUAN PEKERJAAN ( D + E ) 13,017.38

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama

  • Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24 Analisa EI-731

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24 Analisa EI-731

    Payment unit :Kg

    Pay Item Number :7.3.1 URAIAN ANALISA HARGA SATUANPay Item Number :7.3.1 URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSII. ASUMSI

    1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sepanjang jalan2 Lokasi pekerjaan : sepanjang jalan

    3 Bahan dasar (besi dan kawat) diterima seluruhnya

    di lokasi pekerjaan

    4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM

    5 Jam kerja efektif per-hari Tk 7.00 jam

    6 Faktor Kehilangan Besi Tulangan Fh 1.10 -6 Faktor Kehilangan Besi Tulangan Fh 1.10 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Besi tulangan dipotong dan dibengkokkan sesuai

    dengan yang diperlukandengan yang diperlukan

    2 Batang tulangan dipasang / disusun sesuai dengan

    Gambar Pelaksanaan dan persilangannya diikat kawatGambar Pelaksanaan dan persilangannya diikat kawat

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Baja Tulangan (polos) (M39a) 1.1000 Kg

    1.b. Kawat beton (M14) 0.0200 Kg

    2. ALAT

    2.a. ALAT BANTU2.a. ALAT BANTU

    Diperlukan Alat Bantu : 1.0000 Ls Lump Sum

    - Gunting Potong Baja = 2 buah- Gunting Potong Baja = 2 buah

    - Kunci Pembengkok Tulangan = 2 buah

    - Alat Pertukangan lainnya- Alat Pertukangan lainnya

    3. TENAGA

    Produksi kerja satu hari Qt 1,000.00 Kg

    dibutuhkan tenaga : - Mandor M 1.00 orang

    - Tukang Tb 1.00 orang- Tukang Tb 1.00 orang

    - Pekerja Biasa P 10.00 orang

    Koefisien Tenaga / Kg :

    - Mandor = ( M x Tk ) : Qt (L03) 0.0070 jam- Mandor = ( M x Tk ) : Qt (L03) 0.0070 jam

    - Tukang = ( Tb x Tk ) : Qt (L02) 0.0070 jam

    - Pekerja Biasa = ( P x Tk ) : Qt (L01) 0.0700 jam- Pekerja Biasa = ( P x Tk ) : Qt (L01) 0.0700 jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 13,017.38 / KgRp. 13,017.38 / Kg

    Berlanjut ke hal. berikut.Berlanjut ke hal. berikut.

  • Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24 Analisa EI-731

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Reinforcing Steel Pain Round Bars BJ TP 24 Analisa EI-731

    Payment unit :Kg

    Pay Item Number :7.3.1 URAIAN ANALISA HARGA SATUANPay Item Number :7.3.1

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    6. MASA PELAKSANAAN YANG DIPERLUKAN6. MASA PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 1,333.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 1,332,389.00 Kg.

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number :7.3.4Pay Item Number :7.3.4

    Type Of Work :Reinforcing Steel Deformed Bars BJ TD 40

    Payment unit :KgPayment unit :Kg

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)

    A. TENAGAA. TENAGA

    1. Pekerja Biasa (L01) jam 0.0646 7,150.00 462.001. Pekerja Biasa (L01) jam 0.0646 7,150.00 462.00

    2. Tukang (L02) jam 0.0054 11,500.00 61.92

    3. Mandor (L03) jam 0.0054 9,500.00 51.153. Mandor (L03) jam 0.0054 9,500.00 51.15

    575.08JUMLAH HARGA TENAGA 575.08

    B. BAHAN

    JUMLAH HARGA TENAGA

    1. Baja Tulangan (Ulir) (M39b) Kg 1.1000 10,700.00 11,770.00

    2. Kawat Beton (M14) Kg 0.0200 12,500.00 250.002. Kawat Beton (M14) Kg 0.0200 12,500.00 250.00

    12,020.00JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Alat Bantu Ls 1.0000 500.00 500.00

    500.00JUMLAH HARGA PERALATAN 500.00

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,095.08

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,095.08

    E. KEUNTUNGAN 5.0 % x D 654.75

    F. HARGA SATUAN PEKERJAAN ( D + E ) 13,749.83

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama

  • Type Of Work :Reinforcing Steel Deformed Bars BJ TD 40 Analisa EI-733

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Reinforcing Steel Deformed Bars BJ TD 40 Analisa EI-733

    Payment unit :Kg

    Pay Item Number :7.3.4 URAIAN ANALISA HARGA SATUANPay Item Number :7.3.4 URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSII. ASUMSI

    1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sepanjang jalan2 Lokasi pekerjaan : sepanjang jalan

    3 Bahan dasar (besi dan kawat) diterima seluruhnya

    di lokasi pekerjaan

    4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM4 Jarak rata-rata Base camp ke lokasi pekerjaan L 25.00 KM

    5 Jam kerja efektif per-hari Tk 7.00 jam

    6 Faktor Kehilangan Besi Tulangan Fh 1.10 -6 Faktor Kehilangan Besi Tulangan Fh 1.10 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Besi tulangan dipotong dan dibengkokkan sesuai

    dengan yang diperlukandengan yang diperlukan

    2 Batang tulangan dipasang / disusun sesuai dengan

    Gambar Pelaksanaan dan persilangannya diikat kawatGambar Pelaksanaan dan persilangannya diikat kawat

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Baja Tulangan (Ulir) (M39b) 1.1000 Kg1.a. Baja Tulangan (Ulir) (M39b) 1.1000 Kg

    1.b. Kawat beton (M14) 0.0200 Kg

    2. ALAT

    2.a. ALAT BANTU2.a. ALAT BANTU

    Diperlukan Alat Bantu : 1.0000 Ls Lump sum

    - Gunting Potong Baja = 2 buah- Gunting Potong Baja = 2 buah

    - Kunci Pembengkok Tulangan = 2 buah

    - Alat Pertukangan lainnya- Alat Pertukangan lainnya

    3. TENAGA

    Produksi kerja satu hari Qt 1,300.00 Kg

    dibutuhkan tenaga : - Mandor M 1.00 orang

    - Tukang Tb 1.00 orang- Tukang Tb 1.00 orang

    - Pekerja Biasa P 12.00 orang

    Koefisien Tenaga / Kg :

    - Mandor = ( M x Tk ) : Qt (L03) 0.0054 jam- Mandor = ( M x Tk ) : Qt (L03) 0.0054 jam

    - Tukang = ( Tb x Tk ) : Qt (L02) 0.0054 jam

    - Pekerja Biasa = ( P x Tk ) : Qt (L01) 0.0646 jam- Pekerja Biasa = ( P x Tk ) : Qt (L01) 0.0646 jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKEMAN ANALISA MASING-MASING HARGAPEREKEMAN ANALISA MASING-MASING HARGA

    SATUAN.

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 13,749.83 / KgRp. 13,749.83 / Kg

    Berlanjut ke hal. berikut.Berlanjut ke hal. berikut.

  • Type Of Work :Reinforcing Steel Deformed Bars BJ TD 40 Analisa EI-733

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Reinforcing Steel Deformed Bars BJ TD 40 Analisa EI-733

    Payment unit :Kg

    Pay Item Number :7.3.4 URAIAN ANALISA HARGA SATUANPay Item Number :7.3.4 URAIAN ANALISA HARGA SATUAN

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    6. MASA PELAKSANAAN YANG DIPERLUKAN6. MASA PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 69.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 88,916.00 Kg.