Page 1: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020 SAFER, SMARTER, GREENERDNV GL ©

Claudia Ohlmeier / Jens Plötz

25 March 2020

MARITIME

DNV GL’s PSC FOCUS 2020 – PSC Planner updated

1

Customer info: Detailed survey of PSC Top 18 items

Page 2: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC focus 2020: Introduction of PSC TOP 18 items

2

PSC focus 2020:

▪ The detainable items from previous PSC inspections have been analysed and as a result the list of TOP 18 items has been created

▪ The ship and port specific checklists in the PSC Planner includes an additional part related to PSC Top 18

items for every vessel with DNV GL services

➢ The key for success to reduce PSC detentions:

➢ Regular maintenance on board

➢ with a more detailed focus of PSC Top 18 items (e.g. by using the PSC Planner checklist as

unregular “quick checks”)

➢ Increase awareness of your shore staff and onboard crews with this presentation and ensure high quality

and safety in shipping

Page 3: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

Top 18 detainable deficiencies found in 8 main categories as defined by PSC regimes

The majority of PSC deficiencies where issued in

▪ 03xxx - Water/Weathertight condition

▪ 04xxx - Emergency systems

▪ 07xxx - Fire Safety

▪ 10xxx - Safety of Navigation

▪ 11xxx - Life Saving Appliances

▪ 13xxx - Propulsion main engine

▪ 14xxx - Environmental Protection

One or more deficiencies in the above categories

may be seen as evidence of a failure of the Safety

Management System on board and are likely to

trigger a detainable deficiency towards ISM:

▪ 15xxx - ISM related deficiency

3

• Verify operational preparedness and compliance with international requirements

and

• Judge if the management system needs improvement

During regular

maintenance on board

Page 4: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Water/ Weathertight condition

▪ Every Top 18 item

4

PSC Code category

PSC CodePSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Water/ Weathertight

condition03108

Ventilators, air pipes, casings

• Examine condition including watertight integrity, if applicable, of ventilators, air pipes and casings.

Multiple ballast tanks air vent closing arrangements defective

Page 5: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Emergency systems

▪ Every Top 18 item

5

PSC Code category

PSC CodePSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Emergency systems

04102Emergency fire pump and its pipes

• Examine fire water system incl. fire pumps, fire mains, hoses, hydrants, international shore connection and nozzles.

Emergency fire pump unable to pressurize the fire mains

04103Emergency lighting, batteries and switches

• Verify functioning of emergency lighting, batteries and switches.Lack of emergency light/or not marked in the locker with B.A. and over the launching instruction of liferafts/lifeboat.

04114Emergency source of power - Emergency generator

• Examine with respect to general condition, fire hazard, personnel safety and function.

• Test function of emergency generator, emergency switchboards and battery chargers.

Emergency generator not connecting automatically to the emergency switchboard

Page 6: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Fire Safety I

▪ Every Top 18 item

6

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Fire Safety

07105Fire doors/ openings in fire resisting divisions

• Examine and perform function testing of all manual and automatic fire doors. Fire doors shall not be blocked or kept permanently open.

Fire protection self-closing door from escape trunk to accommodation after deck corridor found out of order.

07106 Fire detection • Examine condition and perform function testThe maximum distance between two smoke detectors in a deck accommodation space corridor more than 11 m (about 15 m).

07109Fixed fire extinguishing installation

• Examine condition of fixed firefighting equipment in the machinery spaces.

CO2 Fixed fire extinguishing system defective.

Page 7: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Fire Safety II

▪ Every Top 18 item

7

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Fire Safety

07114Means of control (opening, pumps) Machinery spaces

• Test remote start of the main fire pumps.

Test stopping of power ventilation from outside the spaces served.

Test closing of main inlets and outlets.

Quick close valve of no. 2 generator fuel oil pipe failed to be closed by remote control.

07115 Fire-dampers • Examine all fire dampers. Verify adequateness of maintenance intervals. Fire funnel damper, unable to properly closed.

07126Oil accumulation in engine room

• Examine that space is free of fire and explosion hazards e.g. oil spill, oily rags, buckets with oil, overfilled drip trays.

Oli racks in bilge; general oily ER

Page 8: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Safety of Navigation

▪ Every Top 18 item

8

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Safety of Navigation

10111&

10112

Charts + Electronic charts (ECDIS)

• Verify that nautical charts and nautical publications necessary for the intended voyage are available and have been updated

• Verify in working order including back-up arrangements

Found charts expired or not updated. Same Deficiency as mentioned in inspection on 10.10.2016 and before.

10114Voyage Data Recorder (VDR/ S-VDR)

• Verify that the annual performance test report is available on board and not overdue.

• Verify that VDR is in good working condition

The S-VDR of the vessel found malfunctioning. There was alarm about "Data lost" and "Logging Failed".

Page 9: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist –Life Saving Appliances

▪ Every Top 18 item

9

PSC Code category

PSC Code

DNV GL - PSC TOP 18 / Deficiency category

PSC Planner: Top detainable deficiencies (TOP 18) worldwide PSC deficiency examples

Life Saving Appliances

11101 Lifeboats • Examine condition of structure and engine for each lifeboatThe free-fall L/B engine failed to be started by the battery in use.

11104 Rescue boats • Examine condition of structure and engine for each rescue boat The engine of rescue boat failed to start during testing.

Page 10: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Propulsion

▪ Every Top 18 item

10

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Propulsion 13101 Propulsion main engine

• Verify that normal operation of the propulsion machinery can be sustained or restored even though one of the essential auxiliaries becomes inoperative.

• Verify that means are provided so that the machinery can be brought into operation from the dead ship condition without external aid.

• Examine and test function.

• Test remote control system.

Propulsion main engine M.E. has failure that limit and not allows works more than half ahead / astern (50%).

Page 11: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – Environmental Protection

▪ Every Top 18 item

11

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

Environ-mental

Protection

14104 Oil filtering equipment• Examine that automatic discharge stopping device and oil filtering

equipment alarm are working15ppm OCM alarm unit for the OWS in engine room found malfunction.

14402 Sewage treatment plan

• Examine externally and verify satisfactory operation

• Verify that no change has been made nor any new equipment installed if that working which.

The dosage pump for sewage treatment plant out of control.

Page 12: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

PSC Top 18 items in PSC Planner checklist – ISM

▪ Every Top 18 item

12

PSC Code category

PSC Code

PSC Code Text/ Defective item

DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples

ISM 15150Maintenance level and crew performance

• Verify implementation on ISM with focus on findings from previous PSC inspections and internal/ external audits

• Check if procedures for essential shipboard operations and training of crew are available

• Verify that crew is trained in the task assigned and drills are successfully carried out

Several of the above deficiencies regarding ventilation of machinery are evidence of a serious lack of implementation of the ISM Code

Page 13: DNV GL’s PSC FOCUS 2020 – PSC Planner updated · DNV GL PSC Planner: TOP 18 checklist item text PSC deficiency examples Fire Safety 07105 Fire doors/ openings in fire resisting

DNV GL © 25 March 2020

SAFER, SMARTER, GREENER

www.dnvgl.com

The trademarks DNV GL®, DNV®, the Horizon Graphic and Det Norske Veritas®

are the properties of companies in the Det Norske Veritas group. All rights reserved.

13

Class Systematics, Data and Operation Centre, DNV GL Maritime

[email protected]

+49 40 36149 0