LOAD BAY SEGMENT STORAGE ADDITIONAL SEGMENT STORE. GROUT EQUIPMENT GOXHILL AGI SILOS GANTRY CRANE (OR TWO CRAWLER CRANES) RUNNING TRACK FOR PIPE INSTALLATION AND COFFERDAM 5.500m3 TOP SOIL STORAGE 14,600m3 TOP SOIL STORAGE 8m WIDE RUNNING TRACK FOR PIPE STRINGING 34,000m3 SUBSOIL BUND FOR COFFERDAM EXCAVATION 42,000m3 TOP SOIL STORAGE 8m WIDE RUNNING TRACK FOR PIPE STRINGING STORAGE AREA FOR PIPE STRINGING OPERATIONS 8m WIDE HAUL ROAD 8m WIDE HAUL ROAD PROJECT OFFICES AND WELFARE (LOCATED ON A RAISED PLATFORM A MINIMUM OF 3.4 AOD FOR FLOOD PROTECTION) ARISINGS STORAGE AND LOADING AREA CAR PARKING WASTE AREA (SKIPS AND BINS) 15,900m3 TOP SOIL STORAGE 15,800m3 TOP SOIL STORAGE 7,700m3 TOP SOIL STORAGE 2,200m3 TOP SOIL STORAGE STOPPLE AND BYPASS PIT 28,000m3 TOP SOIL STORAGE 23,900m3 TUNNEL ARISINGS STORAGE 24,500m3 TOP SOIL STORAGE 25,900m3 TUNNEL ARISINGS STORAGE 20,800m3 TUNNEL ARISINGS STORAGE 14,600m3 TUNNEL ARISINGS STORAGE 16,400m3 TUNNEL ARISINGS STORAGE SURFACE AND DE-WATERING MANAGEMENT AREA SITE ENTRANCE SITE EXIT DRIVE PIT GENERATOR COMPOUND (LOCATED ON A RAISED PLATFORM A MINIMUM OF 3.4m AOD FOR FLOOD PROTECTION) DITCH CROSSING DITCH CROSSING 1 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 17 18 19 20 21 22 23 WORKSHOPS, ELECTRICAL ETC (LOCATED ON A RAISED PLATFORM A MINIMUM OF 3.4m AOD FOR FLOOD PROTECTION) SPARES RAIL STORE QUARANTINE AREA DITCH CROSSING . . GENERATOR COMPOUND AND SEPTIC TANK (LOCATED ON A RAISED PLATFORM A MINIMUM OF 3.4 AOD FOR FLOOD PROTECTION) PIPE DUMP HYDROTEST EXCLUSION ZONE. 100m RADIUS FROM END OF OUTER PIPE STRINGS. 23000 22000 750m3 PILLOW TANK SUB SOIL BUND EQUIPMENT AND PUMP AREA HYDROTEST EXCLUSION ZONE. 100m RADIUS FROM END OF OUTER PIPE STRINGS. SURFACE AND DE-WATERING MANAGEMENT AREA SURFACE AND DE-WATERING MANAGEMENT AREA HYDROTEST WATER AREA SETTLEMENT / SLURRY TANKS FILTER PRESS 3,600m3 TOP SOIL STORAGE BUND 3,600m3 SUB SOIL STORAGE BUND 19,800m3 TOPSOIL BUND . TOPSOIL BUND DITCH CROSSING TRAFFIC WARDEN . TRAFFIC WARDEN GOXHILL AGI Spoil Storage HELICOPTER PAD 6,600m3 TOP SOIL STORAGE H 750m3 PILLOW TANK 750m3 PILLOW TANK 750m3 PILLOW TANK 750m3 PILLOW TANK 750m3 PILLOW TANK 750m3 PILLOW TANK PIPE STORAGE AREA . VEHICLE CHECK/HOLDING POINT TUNNEL ALIGNMENT EAST MARSH ROAD 2 3 5 6 7 8 9 10 11 12 13 14 15 OPERATIONS CABINS DE-SANDING AND DE-SILTING CHAPEL FIELD ROAD INDICATIVE LOCATION OF FLOOD PROTECTION (A MINIMUM OF 3.4m AOD FOR FLOOD PROTECTION) TRAFFIC WARDEN ADDITIONAL LAYDOWN AREA AND LORRY PARK Paull Holme Strays 1 2 3 4 5 6 7 8 10 11 13 3 DRAWING NO. DRAWN SCALE ISSUE TITLE CHECKED ORIG SIZE PROJECT REVISION APPROVED DATE CLIENT WARRINGTON OFFICE 6 Bowood Court, Calver Rd, Warrington, WA2 8QZ T 01925 418333 F 01925 418800 www.capita.co.uk/property Capita Property and Infrastructure Ltd BIRMINGHAM OFFICE Eleven Brindleyplace, 2 Brunswick Square, Birmingham, B1 2LP T 0121 423 6060 F 0121 423 6065 EDINBURGH OFFICE 2nd Floor, Elder House, Multrees Walk, Edinburgh, EH1 3DX T 0131 460 1200 F 0131 460 1201 Utilities and Industrial DO NOT SCALE. IF IN DOUBT ASK. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED. 1 2 3 4 5 6 7 8 9 10 A B C D E G H J K L M A1 SHEET RIVER HUMBER GAS PIPELINE REPLACEMENT PROJECT INDICATIVE GOXHILL SITE LAYOUT FIGURE 2.4 B 03 1 : 2000 1 of 1 JN KB NH 12 OCT 15 REFERENCE KEY PLAN HUMBER ESTUARY GOXHILL PAULL GOXHILL COMPOUND A DCO ISSUE JN KB NH 07 APR 15 Close Board Fencing Legend. Water management area Tunnel arisings storage 3m Topsoil Bund Lighting position Direction of Lighting Gantry crane. Note: Gantry crane can travel. Lights 15 and 16 pointing down. Ditch crossing 4m Subsoil Bund Hardstanding Tunnel Alignment & New Feeder 9 Security Heras Fencing FIR TREE FARM SPRING FARM MARSHLANDS COTTAGE Pipeline crossing Pipe Storage Area Sub Soil Car Parking Spaces Helicopter Pad Proposed Pipeline from Paull AGI H B POST SUBMISSION CHANGES JN KB NH 23 SEP 15 Bird Survey Field Numbers Refer to DCO Ref No. 2.2A for field boundaries Cathodic Protection Kiosk Area B UPDATE AS REQUESTED BY THE EXA JN KB NH 12 OCT 15

Upload: others

Post on 29-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DO NOT SCALE. IF IN DOUBT ASK. ALL DIMENSIONS IN METRES ...... · DE-SANDING AND DE-SILTING CHAPEL FIELD ROAD INDICATIVE LOCATION OF FLOOD PROTECTION (A MINIMUM OF 3.4m AOD FOR FLOOD

LO

AD

BA

Y

SE

GM

EN

T S

TO

RA

GE

ADDITIONAL SEGMENT STORE.

GROUT

EQUIPMENT

GOXHILL

AGI

SILOS

GANTRY CRANE

(OR TWO CRAWLER CRANES)

RUNNING TRACK FOR

PIPE INSTALLATION

AND COFFERDAM

5.5

00m

3 T

OP

SO

IL S

TO

RA

GE

14,6

00m

3 T

OP

SO

IL S

TO

RA

GE

8m

W

IDE

RU

NN

ING

TR

AC

K F

OR

PIP

E S

TR

ING

ING

34,000m3 SUBSOIL BUND

FOR COFFERDAM

EXCAVATION

42,000m3 TOP SOIL STORAGE

8m

W

IDE

RU

NN

ING

TR

AC

K F

OR

PIP

E S

TR

ING

ING

STORAGE AREA FOR

PIPE STRINGIN

G

OPERATIONS

8m

W

IDE

HA

UL R

OA

D

8m

W

IDE

HA

UL R

OA

D

PROJECT OFFIC

ES

AND WELFARE (L

OCATED ON A

RAISED PLATFORM A MIN

IMUM O

F

3.4 AOD FOR FLOOD PROTECTION)

ARISINGS STORAGE

AND LOADING AREA

CAR PARKING

WASTE AREA (SKIPS

AND BIN

S)

15,9

00m

3 T

OP

SO

IL S

TO

RA

GE

15,8

00m

3 T

OP

SO

IL S

TO

RA

GE

7,7

00m

3 T

OP

SO

IL S

TO

RA

GE

2,2

00m

3 T

OP

SO

IL

ST

OR

AG

E

STOPPLE AND

BYPASS PIT

28,0

00m

3 T

O

P S

O

IL S

TO

RA

G

E

23,9

00m

3

TU

NN

EL A

RIS

ING

S

ST

OR

AG

E

24,5

00m

3 T

OP

SO

IL S

TO

RA

GE

25,9

00m

3

TU

NN

EL A

RIS

ING

S

ST

OR

AG

E

20,8

00m

3

TU

NN

EL A

RIS

ING

S

ST

OR

AG

E

14,6

00m

3

TU

NN

EL A

RIS

ING

S

ST

OR

AG

E

16,4

00m

3

TU

NN

EL A

RIS

ING

S

ST

OR

AG

E

SURFACE AND

DE-WATERIN

G

MANAGEMENT

AREA

SITE

ENTRANCE

SITE EXIT

DR

IVE

PIT

GENERATOR COMPOUND (L

OCATED ON A R

AISED PLATFORM A

MINIM

UM OF 3.4m AOD FOR FLOOD PROTECTIO

N)

DITCH

CROSSING

DITCH

CROSSING

1

2

3

4

5

6

7

8

9

11

10

12

13

14

15

16

17

18

19

20

21

22

23

WORKSHOPS, ELECTRIC

AL ETC (LOCATED O

N A RAISED

PLATFORM A MIN

IMUM O

F 3.4m AOD FOR FLOOD PROTECTION)

SPARES

RAIL STORE

QUARANTINE AREA

DITCH

CROSSING

.

.

GENERATOR COMPOUND A

ND

SEPTIC TANK (L

OCATED ON A

RAISED PLATFORM A MINIM

UM

OF 3.4 AOD FOR FLOOD

PROTECTION)

PIP

E D

UM

P

HYDROTEST EXCLUSION ZONE.

100m RADIUS FROM END OF OUTER

PIPE STRINGS.

23000

22000

750m

3 P

ILLO

W

TA

NK

SU

B S

OIL

BU

ND

EQ

UIP

ME

NT

AN

D

PU

MP

AR

EA

HYDROTEST

EXCLUSION ZONE.

100m RADIUS FROM

END OF OUTER PIPE

STRINGS.

SURFACE AND

DE-WATERIN

G

MANAGEMENT AREA

SU

RF

AC

E A

ND

DE

-W

AT

ER

IN

G

MA

NA

GE

ME

NT

A

RE

A

HYDROTEST

WATER A

REA

SETTLEMENT /

SLURRY TANKS

FILTER PRESS

3,600m3 TOP SOIL

STORAGE BUND

3,600m3 SUB SOIL

STORAGE BUND

19,8

00m

3 T

OP

SO

IL B

UN

D

.

T

OP

SO

IL B

UN

D

DITCH

CROSSING

TRAFFIC

WARDEN

.

TRAFFIC

WARDEN

Running Track

Running Track

Access . Egress

Running Track

R

u

n

n

i

n

g

T

r

a

c

k

Running T

rack

A

c

c

e

s

s

.

E

g

r

e

s

s

Demarcation Fencing

Demarcation Fencing

Ditch Top Of Bank

Ditch Top Of Bank

Ditch Top Of Bank

P

r

o

p

o

s

e

d

1

0

5

0

N

B

P

i

p

e

l

i

n

e

F

r

o

m

P

a

u

l

l

A

G

I

Existing 1050NB Feeder 9 From Paull AGI

Existing 1050NB Feeder 9

GOXHILL

AGI

S

p

o

i

l

S

t

o

r

a

g

e

P

ip

e

C

r

o

s

s

in

g

P

r

o

te

c

tio

n

D

itc

h

M

a

y

N

e

e

d

F

lu

m

in

g

,

C

o

n

tr

a

c

to

r

T

o

A

s

s

e

s

s

A

t

T

im

e

O

f C

o

n

s

tr

u

c

tio

n

Pipe Crossing

Protection

IP17

45° SBR

IP16

5⅝

° SBR

IP18

Connection

Working Platform

Working Platform

Working Platform

Working Platform

HELICOPTER

PAD

6,600m

3 T

OP

S

OIL S

TO

RA

GE

H

750m

3 P

ILLO

W

TA

NK

750m

3 P

ILLO

W

TA

NK

750m

3 P

ILLO

W

TA

NK

750m

3 P

ILLO

W

TA

NK

750m

3 P

ILLO

W

TA

NK

750m

3 P

ILLO

W

TA

NK

PIPE STORAGE AREA

.

VEHICLE C

HECK/HOLDIN

G POINT

TU

NN

EL A

LIG

NM

EN

T

EA

ST

M

AR

SH

R

OA

D

2

3

5

6

7

8

9

1

0

1

1

1

2

1

3

1

4

1

5

OPERATIONS CABINS

DE-SANDING AND

DE-SILTING

C

H

A

P

E

L

F

I

E

L

D

R

O

A

D

INDICATIVE LOCATION OF

FLOOD PROTECTION (A

MINIMUM OF 3.4m AOD FOR

FLOOD PROTECTION)

TRAFFIC

WARDEN

ADDITIONAL

LAYDOWN AREA

AND LORRY PARK

East Marsh

Paull Holme

Strays

1

2

3

4

5

6

7

8

10

11

13

3

DRAWING NO.

DRAWN

SCALE

ISSUE

TITLE

CHECKED

ORIG SIZE

PROJECT

REVISION

APPROVED

DATE

CLIENT

WARRINGTON OFFICE

6 Bowood Court, Calver Rd, Warrington, WA2 8QZ

T 01925 418333 F 01925 418800

www.capita.co.uk/property

Capita Property and Infrastructure Ltd

BIRMINGHAM OFFICE

Eleven Brindleyplace, 2 Brunswick Square,

Birmingham, B1 2LP

T 0121 423 6060 F 0121 423 6065

EDINBURGH OFFICE

2nd Floor, Elder House, Multrees Walk,

Edinburgh, EH1 3DX

T 0131 460 1200 F 0131 460 1201

Utilities and Industrial

DO NOT SCALE. IF IN DOUBT ASK. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

12

34

56

78

91

0

A B C D E G H J K L M

A1

SHEET

RIVER HUMBER

GAS PIPELINE REPLACEMENT PROJECT

INDICATIVE GOXHILL SITE LAYOUT

FIGURE 2.4 B

03

1 : 20001 of 1

JN KB NH

12 OCT 15

REFERENCE

KEY PLAN

HUMBER ESTUARY

GOXHILL

PAULL

GOXHILL COMPOUND

A DCO ISSUE JN KB NH 07 APR 15

Close Board Fencing

Legend.

Water management area

Tunnel arisings storage

3m Topsoil Bund

Lighting position

Direction of Lighting

Gantry crane.

Note: Gantry crane can

travel. Lights 15 and 16

pointing down.

Ditch crossing

4m Subsoil Bund

Hardstanding

Tunnel Alignment & New Feeder 9

Security

Heras Fencing

FIR TREE FARM

SPRING FARM

MARSHLANDS COTTAGE

Pipeline crossingPipe Storage Area

Sub Soil

Car Parking Spaces

Helicopter Pad

Proposed Pipeline

from Paull AGI

H

B POST SUBMISSION CHANGES JN KB NH 23 SEP 15

Bird Survey

Field Numbers

Refer to DCO Ref No. 2.2A

for field boundaries

Cathodic Protection

Kiosk Area

B UPDATE AS REQUESTED BY THE EXA JN KB NH 12 OCT 15