doc.: ieee 802.11-10/0989r0 report september 2010 adrian stephens, intel corporationslide 1 802.11...
TRANSCRIPT
doc.: IEEE 802.11-10/0989r0
Report
September 2010
Adrian Stephens, Intel CorporationSlide 1
802.11 Sept 2010 Closing Plenary Reports
Date: 2010-09-17
Name Company Address Phone email Adrian Stephens Intel
Corporation +44 792 008
4900 (mobile)
Authors:
doc.: IEEE 802.11-10/0989r0
Report
September 2010
Adrian Stephens, Intel CorporationSlide 2
Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the September 2010 closing plenary meeting.
doc.: IEEE 802.11-10/0989r0
Report Slide 3
802.11 WG Editor’s Meeting (Sept ‘10)
Date: 2010-08-11
Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,
MS SJ-14-4, San Jose, CA 95134-1706
+1-408-527-0815 [email protected]
Authors:
Adrian Stephens, Intel Corporationfrom slide 1/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Slide 4
Volunteer Editor Contacts• TGs – Kazuyuki Sakoda - [email protected]
• TGu – Necati Canpolat – [email protected]
• TGv – Emily Qi – [email protected]
• TGz – Menzo Wentink– [email protected]
• TGmb – Adrian Stephens – [email protected]
• TGaa – Hang Liu – [email protected]
• TGad – Carlos Cordeiro – [email protected]
• TGae – Henry Ptasinski – [email protected]
• Tgaf – Peter Ecclesine – [email protected]
• Editor Emeritus:
– TGk – Joe Kwak– [email protected]
– TGn – Adrian Stephens – [email protected]
– TGp – Wayne Fisher – [email protected]
– TGr – Bill Marshall – [email protected]
– TGw – Nancy Cam-Winget – [email protected]
– TGy – Peter Ecclesine – [email protected]
Adrian Stephens, Intel Corporationfrom slide 2/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Numbering Alignment Process
• Update from all published standards. Posted as 11-08/644r17 By Bill Marshall
• TGz started a new update cycle. 11v, 11u, numbering needs to be completed. 11s is the next.
• Create a working group MEC that includes numbering and ANA before going to Sponsor Ballot
• We use more columns for the two baselines.
Slide 5Slide 5 Adrian Stephens, Intel Corporationfrom slide 3/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Slide 6
Editor Amendment Ordering
Amendment Number Task Group REVCOM Date
802.11 Amendment 7 TGz Sept 2010
802.11 Amendment 8 TGv Sept 2010
802.11 Amendment 9 TGu Dec 2010
802.11 Revision 802.11mb June 2011?
802.11-2011 Amendment 1 TGs June 2011?
802.11-2011 Amendment 2 TGae Sept 2012
802.11-2011 Amendment 3 TGaf Dec 2011
802.11-2011 Amendment 4 TGaa Mar 2012
802.11-2011 Amendment 5 TGad Dec 2012
802.11-2011 Amendment 6 TGac Dec 2012?
• Data as of September 2010• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!
Adrian Stephens, Intel Corporationfrom slide 4/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Most current
doc shaded green.
TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Published
p z v u mb s ae af aa ad ac
z Y 11.0
11.0
Frame 7.2 Yes 2009 Menzo Wentink 17-July
v Y 11.0
7.0 10.0 Frame 7.2 Yes 2007 Emily Qi 18-May
u Y 11.0
7.0 11.0 10.0 Frame 7.2 Yes 2007 Necati Canpolat 14-July
mb Y 6.0 Frame 7.2 Yes 2009 Adrian Stephens 14-Sept
s Y 2010
11.0
13.0 10.0 4.0 7.0 Frame 8.0 No 2009 Kazuyuki Sakoda 14-Sept
ae Henry Ptasinski 15-July
af Y 5.0 6.0 0.05 Frame 7.1 No 2009 Peter Ecclesine 14-Sept
aa Y 11.0
9.0 11.0 9.0 5.0 1.0 1.0 Word No 2009 Hang Liu 14-July
ad Y 11.0
11.0
10.0 9.0 4.0 5.0 0.1 1.0 0.1 Word No 2009 Carlos Cordeiro 14-July
ac
Changes from last report shown in red.
Slide 7
Sept 2010 Draft Development Snapshot
Slide 7 Adrian Stephens, Intel Corporationfrom slide 5/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
802.11 Style Guide
• See 11-09-1034-00-0000-wg11-style-guide.doc
Slide 8 Adrian Stephens, Intel Corporationfrom slide 6/6 of 11-10/0970r2 by Peter Ecclesine (Cisco Systems)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 9
Closing ReportDate: 2010-09-17
Name Company Address Phone email
Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134
+1 408 544 5815 [email protected]
Authors:
from slide 1/3 of 11-10/1169r0 by Clint Chaplin, Chair (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 10
Abstract
Closing report for WNG SC for September 2010, Waikoloa, Hawaii,
Hawai’i, USA
from slide 2/3 of 11-10/1169r0 by Clint Chaplin, Chair (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 11
• Presentations at September 2010 meeting– Smart Grid and Key Lengths (11-10-0964-00-0wng-smart-grid-key-
lengths.pptx) – Dave Halasz
– 'L-Cubed': LONGER Range, LOWER Data rate, LOW Energy Wi-Fi Opportunity (11-10-1120-00-0wng-l-cubed-longer-range-lower-data-rate-low-energy.pptx) – Bill Carney
• Minutes
– 11-10-1138r0
• Plans for November 2010
– 1 2 hour session
from slide 3/3 of 11-10/1169r0 by Clint Chaplin, Chair (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 12
September 2010 Closing Report -TGmbDate: 2010-09-16
Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave
Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 13
Abstract
This document contains the TGmb closing report for September 2010.
from slide 2/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 14Slide 14
Accomplishments
• One interpretation request received, see https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01-000m-august-2010-interpretation-request.doc
• Completed LB167 Comment Resolution– 7 Editorial, 9 Technical
• Met conditions for conditional approval to go to Sponsor Ballot– See https://mentor.ieee.org/802.11/dcn/10/11-10-0801-05-000m-tgmb-ec-
approval-to-sb.ppt
• Scheduled Teleconference calls on Oct 15, 22, 29 2010 – 10am Eastern (7am Pacific)
• Timeline Analysis
from slide 3/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 15
Mandatory Editorial Coordination
• IEEE SA staff performed MEC on P802.11REVmb D5.0, and indicated one mandatory change to be made prior to Sponsor Ballot (see https://mentor.ieee.org/802.11/dcn/10/11-10-1070-00-000m-revmb-mec-comments.doc ).
• This change was deemed editorial by the WG chair, and IEEE staff liaison, and P802.11REVmb D6.0, which includes this change, will be submitted to Sponsor Ballot.
September 2010
from slide 4/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 16Slide 16
Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14• September 2010 – Sponsor Ballot start – D6.0, Nov finish• December 2010 – Sponsor Recirc. Start – (January-Feb)• November 2011 – WG/EC Final Approval• December 2011 – RevCom/SASB Approval
from slide 5/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 17Slide 17
Goals for September - November
• Initial Sponsor Ballot
from slide 6/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 18
Motion
• Motion:• Accept the interpretation response contained in
https://mentor.ieee.org/802.11/dcn/10/11-10-0992-01-000m-august-2010-interpretation-request.doc on the subject of AES-CCM test vectors and forward the response to the IEEE-SA for publication.
• Moved: D. Stanley on behalf of the TG
• TG: Moved: Jon Rosdahl, Seconded: Harry Worstell• Result: 11-0-0 Passes
from slide 7/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 19
References
from slide 8/8 of 11-10/1157r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 20
TGs Waikoloa Closing ReportDate: 2010-09-17
Author:
Name Address Affiliation Phone Email
Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands
Philips +31 40 2749743
from slide 1/5 of 11-10/1150r1 by Dee Denteneer (Philips)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 21
Abstract
TGs closing report for the September 2010 meeting.
Resolved outstanding comments, compiled a report to show that the conditions to go to Sponsor Ballot have
been met.
from slide 2/5 of 11-10/1150r1 by Dee Denteneer (Philips)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 22
Status• Before meeting
• TGs passed LB 166 on Draft 7.0 with 94.9% approval rate (August 2010).
• We received 3* technical comments
• IEEE staff provided us with an annotated copy edit of the Draft with editorial suggestions and questions
• During meeting
• Resolutions to all comments (see 1036r2)
• Prepared response to IEEE staff to answer the questions raised in the editorial review of the Draft.
• Approved a report to show that the conditions required to go to Sponsor Ballot have been met; the report is in 895r5.
• Sponsor pool closed September 12, with 184 participants
* Initially 11 comments were received, but 8 of these were subsequently withdrawn
from slide 3/5 of 11-10/1150r1 by Dee Denteneer (Philips)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 23
• Motion*:• Approve document report 895r5, “P802.11s Report to EC on Conditional
Approval to go to Sponsor Ballot” as the report to the 802 Executive Committee (EC) showing that P802.11s has met the Clause 13 conditional requirements to proceed to sponsor ballot.
• Moved by Dee Denteneer on behalf of TGs
• TGs vote: • Moved: Stephen McCann, Seconded: Guido Hiertz
• Y: 4, N: 0, A: 0
*In the TG vote, a slightly different wording was used
from slide 4/5 of 11-10/1150r1 by Dee Denteneer (Philips)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 24
• Motion*, – Authorize TG s to hold an ad-hoc meeting in the time frame
November 29-December 10 in Munich (Germany)
• Moved by Dee Denteneer on behalf of TGs
• TGs vote: • Unanimous consent
*In the TG vote, a slightly different wording was used
from slide 5/5 of 11-10/1150r1 by Dee Denteneer (Philips)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 25
Closing ReportDate: 2010-09-17
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1/3 of 11-10/1165r0 by Stephen McCann, RIM
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 26
Abstract
Closing report for TGu Interworking with External Networks for September 2010,
Waikoloa, Big Island, HI, USA
from slide 2/3 of 11-10/1165r0 by Stephen McCann, RIM
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 27
• 4th Re-circ Sponsor Ballot progress– No comments received
– Forward Draft D12.0 to RevCom
• Teleconferences– Wednesday 13th October 2010 11:00am ET, 1 hour
– Wednesday 27th October 2010 11:00am ET, 1 hour
• Plans for November 2010– Complete any outstanding RevCom issues
from slide 3/3 of 11-10/1165r0 by Stephen McCann, RIM
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 28
September 2010 Closing ReportDate: 2010-09-16
Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave
Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 29
Abstract
This document contains the TGv closing report for September 2010.
from slide 2/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 30
Goals and Accomplishments
• Completed comment resolution from sixth Recirculation Sponsor Ballot– 1099 comments, 1099 resolutions completed, 0 remain
• Next recirculation SB 15Sept to 30Sept on D15.0
• Teleconferences• Sept 30, Oct 12, 14, 19, 21, 26, 28, Nov 2, 4, 2pm Eastern (11am
Pacific), 2 hours
• Adding Oct 5, 7 11am Pacific, 2pm Eastern (5am HongKong), 2 hours
from slide 3/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 31
TGv Timeline – Updated September, 2010
• Initial Working Group Letter Ballot: July 07 – completed– Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0
• Re-circulation Working Group Letter Ballot: November 08 (D4.0)– Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged)
• Form Sponsor Ballot Pool: August 09
• Initial Sponsor Ballot: Oct 09– Oct 09 – D7.0 Approved Sponsor Ballot: Nov 09
– Jan 10 – D8.0, D9.0, March D10.0, May D11.0, June D12.0, July D13.0 August D13, D14, Sept D15.0, Oct D15.0[unchanged]
– 18 Oct submit for Dec Revcom approval
• WG/EC Approval: July 2010 (Conditional)
• RevCom/Standards Board Approval: December 2010 – was Sept
from slide 4/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 32
Goals for September-November 2010
• Recirculation Sponsor Ballot
• Resolve comments from Recirculation Sponsor Ballot
• Subsequent Recirculation Sponsor Ballot
• Revcom submission
from slide 5/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 33
References
from slide 6/6 of 11-10/1156r0 by Dorothy Stanley (Aruba Networks)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
802.11aa – Robust Audio Video Transport Streaming Waikoloa, Hawaii Closing Report
Date: 2010-09-17
Authors:
Name Affiliation Address Phone email Ganesh Venkatesan Intel Corporation JF3-336 2111NE 25th Ave +1 503 334 6720 Ganesh.Venkatesan@intel
.com Alex Ashley NDS Ltd One London Road, Staines,
Middlesex, TW18 4EX, England
+44 1784 848770 [email protected]
Adrian Stephens, Intel CorporationSlide 34from slide 1/5 of 11-10/1163r2 by Ganesh Venkatesan, Intel Corporation et al
September 2010
doc.: IEEE 802.11-10/0989r0
Report Slide 35
Summary
– Started the meeting with a great demo of some 11aa features from Alex Ashley
– Focused on LB164 comment resolution– Resolved and adopted resolutions for 190
comments in this meeting– A modification to MRG that has the TG
consensus has the potential to resolve a significant chunk of MRG comments.
Adrian Stephens, Intel CorporationSlide 35from slide 2/5 of 11-10/1163r2 by Ganesh Venkatesan, Intel Corporation et al
September 2010
doc.: IEEE 802.11-10/0989r0
Report
LB164 Comment Resolution Status (9/16/2010)
Category Total Resolved Resolved and adopted
Editorial 78 (145) 78 78
General 36 (41) 04 0
Interworking 33 (40) 33 33
MRG 303 (361) 14 14
OBSS 188 (283) 87 87
SCS 56 (111) 56 56
694 (981) 272 (39%) 268(37% done)
Adrian Stephens, Intel CorporationSlide 36* 287 comments are duplicates due to a processing error
from slide 3/5 of 11-10/1163r2 by Ganesh Venkatesan, Intel Corporation et al
September 2010
doc.: IEEE 802.11-10/0989r0
Report Slide 37
Teleconferences
Weekly on Mondays 1100-1230 Hrs EDT
Sep 27, Oct 11, Oct 18, Oct 25, Nov 1 and Nov 15
Adrian Stephens, Intel CorporationSlide 37from slide 4/5 of 11-10/1163r2 by Ganesh Venkatesan, Intel Corporation et al
September 2010
doc.: IEEE 802.11-10/0989r0
Report Slide 38
Plans for Nov 2010 meeting
• Resolve Letter Ballot Comments• Joint meeting with 802.1AVB• Complete Draft 2.0 and start recirculation
Adrian Stephens, Intel CorporationSlide 38from slide 5/5 of 11-10/1163r2 by Ganesh Venkatesan, Intel Corporation et al
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 39
TGac September 2010 Closing ReportDate: 2010-09-16
Name Affiliations Address Phone email Osama Aboul-Magd Samsung Electronics 613-599-5078 [email protected]
Authors:
from slide 1/5 of 11-10/1171r0 by Osama Aboul-Magd (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 40
Abstract
This document is the closing report for the TGac for the September 2010 session.
from slide 2/5 of 11-10/1171r0 by Osama Aboul-Magd (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 41
Work Completed• Continued with the Ad Hoc group meetings. Ad Hoc group reports are
available at:– PHY Ad Hoc report 11-10-1097r3– MU-MIMO Ad Hoc report 11-10-1102r5– Coexistence Ad Hoc report 11-10-1122r3– MAC Ad Hoc Ad Hoc report . 11-10-1100r3
• Motions passed to update the TG Specification Framework in areas related to:
– MAC: AID Selection, DL MU-MIMO TXOP Sharing, A-MPDU Delimiter, Max MPDU/A-MPDU Sizes
– PHY: Explicit Sounding, Phase rotation, Spectral mask, BCC coding rates, NDP sounding, 160 MHz transmission flow, support for channelization in China
– Coexistence: Medium access for wider BW, 160 MHz channelization.– MU-MIMO: Sounding frame exchange protocol and formats, backoff procedure for
MU-MIMO• For a complete set of motions, please refer to 10/1016r5
– Minutes are available in 10/1170r0• The current approved revision of the specification Framework is
09/0992r15
from slide 3/5 of 11-10/1171r0 by Osama Aboul-Magd (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 42
November 2010 Goals
• Continue the work on the Specification Framework document and its related functional blocks.
from slide 4/5 of 11-10/1171r0 by Osama Aboul-Magd (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 43
Conference Call Times
• TGac Conference call– October 21, 2010, 10:00-12:00 ET
from slide 5/5 of 11-10/1171r0 by Osama Aboul-Magd (Samsung)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 44
TGad September 2010 Closing ReportDate: 2009-09-16
Name Company Address Phone email Eldad Perahia Intel
Corporation
2111 NE 25th Ave Hillsboro, OR 97124
503-712-8081 [email protected]
Authors:
from slide 1/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 45
Abstract
This document is the closing report for TGad for the September 2010 session.
from slide 2/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 46
Work Completed
• Comment resolution completed on D0.1, 10/717r15
• TG approved Coexistence Assurance document, 10/1025r3
• TG approved motion for Letter Ballot on D1.0
• Update to ITU-R 60GHz liaison report approved in joint meeting with 802.15, 10/824r4
from slide 3/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 47
Motion for Working Group Letter Ballot
• Having approved changes to TGad Draft 0.4, as defined in 11-10/717r15,
• Instruct the editor to prepare TGad Draft 1.0, and• Approve a 30 day Working Group Technical Letter
Ballot asking the question “Should TGad Draft 1.0 be forwarded to Sponsor Ballot?”
• Moved by Eldad Perahia on behalf of TGad• TGad vote:• Moved: Assaf Kasher, Seconded: Shu Kato, Result:
38-0-0
from slide 4/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 48
Goals for November 2010
• Comment resolution on D1.0• CA Doc review• CWPAN liaison
from slide 5/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 49
Conference call times
• Previously approved conference calls– Not overlap with TGac
– Aug 19, Sept 2, Sept 30• 10:00-12:00 ET
– Aug 12, 26, Sept 23, Oct 7• 20:00-22:00 ET
• New conference calls– Not overlap with TGac
– Oct 14, Oct 28, Nov 18, Dec 9• 10:00 – 12:00 ET
– Oct 21, Nov 4, Dec 2• 20:00-22:00 ET
from slide 6/6 of 11-10/1074r0 by Eldad Perahia, Intel Corporation
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 50
TGae Closing Report – September 2010Date: 2010-09-16
Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.
Mississauga, ON. Canada. L4W 0B4
+1-905-629-4746 [email protected]
Authors:
from slide 1/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 51
Abstract
This document is the closing report for the TGae Task Group for the September 2010 session.
from slide 2/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 52
Work Completed• Thanks to Stephen McCann, Santosh Pandey, Harry Worstell,
and Matthew Fischer for acting as Secretary.• Input:
– https://mentor.ieee.org/802.11/dcn/10/11-10-1144-00-00ae-cid-17-changes.doc– https://mentor.ieee.org/802.11/dcn/10/11-10-0997-04-00ae-default-mfq-policy-
normative-text-proposal.doc– https://mentor.ieee.org/802.11/dcn/10/11-10-1142-01-00ae-mfq-ccmp-pn.doc– https://mentor.ieee.org/802.11/dcn/10/11-10-1140-01-00ae-mlme-primitive-
text.doc
• Output:– https://mentor.ieee.org/802.11/dcn/10/11-10-1051-05-00ae-tgae-internal-
review-comments.xls– Voted to produce TGae Draft 1.0 and approved a motion to go to Working
Group Letter Ballot
• Teleconferences:– Wednesday Nov 3 at 11am ET for 1 hour.
from slide 3/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 53
TGae Timeline – September 2010
• Initial Working Group Letter Ballot: September ‘10
• Re-circulation Working Group Letter Ballot: January ‘11
• Form Sponsor Ballot Pool: March ’11
• Mandatory Editorial Check: March ’11
• Initial Sponsor Ballot: May ’11
• Sponsor Ballot Recirculation: Sep ‘11
• Final WG/EC Approval: Nov ‘11
• RevCom/Standards Board Approval: March ‘12
from slide 4/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
WG Motion
Instruct the editor to prepare IEEE P802.11ae/D1.0 incorporating the approved resolutions and
Approve a 30 day Initial Letter Ballot on IEEE P802.11ae/D1.0 asking the question “should P802.11ae D1.0 be forwarded to Sponsor Ballot?”
Moved:
Seconded:
Result:
Moved by Michael Montemurro on behalf of Tgae
TGae vote:
Moved: Stephen McCann, Seconded: Santosh Pandey, Result: 8-0-0
Adrian Stephens, Intel CorporationSlide 54from slide 5/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 55
November 2010 Goals• Find Secretary for TGae• Comment resolution on the results of the first Letter Ballot.• Prepare for the next Letter Ballot.
from slide 6/6 of 11-10/1162r0 by Michael Montemurro, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 56
IEEE 802.11 TGafWaikoloa Closing Report
Date: 2010-09-17
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Peter Ecclesine Cisco Systems 170 W. Tasman Dr., San Jose, CA 95134
+1-408-527-0815 [email protected]
Authors:
from slide 1/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 57
AbstractThis presentation is the closing report for the fifth face-to-
face meeting of IEEE 802.11 TGaf taking place the week of September 13, 2010 at the IEEE 802 Wireless Interim in Waikoloa, HI.
from slide 2/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Agenda
• Overview of the Internal Review and comment spreadsheet
• Review progress from the weekly teleconferences
• Discuss submission relevance and remaining comments
• Educational session Tuesday evening
• Complete comment resolution
• Direct the Editor to create new, pre-1.0 draft
• Plan for November and teleconferences
Adrian Stephens, Intel CorporationSlide 58from slide 3/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
TGaf Accomplishments • Approved the minutes from San Diego and 7
teleconferences
• Approved Draft d0.05 [d0.04 with editorial changes]
• Approved 11-10/595r9 as the comment spreadsheet
• Completed the discussion of the 150 comments
• Instructed the Editor to create speculative draft d0.06
• Reviewed 7 comment resolutions; approved 5 for the draft; 1 for the comment spreadsheet
• Planned for November and weekly teleconferences– Tuesdays at 22:00 ET
Adrian Stephens, Intel CorporationSlide 59from slide 4/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 60
TGaf Timeline – Updated July 2010
• No changes since San Diego
• Initial Working Group Letter Ballot: November 2010
• Re-circulation Working Group Letter Ballot: January 2010
• Form Sponsor Ballot Pool: March 2011
• Initial Sponsor Ballot: May 2011
• Approved Sponsor Ballot: July 2011
• Final WG/EC Approval: November 2011
• RevCom/Standards Board Approval: December 2011
from slide 5/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Plans for November
• Review the FCC TVWS rules changes• Resolve remaining and new regulatory
comments• Make additional changes to comply with the
new Part 15.700 rules• Create Draft 1.0• Request WG start first Letter Ballot
Adrian Stephens, Intel CorporationSlide 61from slide 6/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Teleconferences
• Weekly on Tuesdays:
– September 21 and 28
– October 5, 12, 19 and 26
– November 2, 16, 23, 30
• Time: 22:00 ET for 90 minutes
Adrian Stephens, Intel CorporationSlide 62from slide 7/7 of 11-10/1136r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 63
Sub 1 GHz license-exempt operation Closing Report for September 2010
Date: 2010-09-15
Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street
Austin, IX 78703 330-283-2715 dave.halasz@oaktreewirel
ess.com
Authors:
from slide 1/2 of 11-10/1147r0 by David Halasz, OakTree Wireless
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Activity in S1G
• Prepared for first Task Group Meeting in November
• Submissions were presented for;– Use cases - 10/1044
– Possible MAC changes - 10/1045
• Teleconference – October 18, 6:30 PM Eastern US
– November 1, 6:30 PM Eastern US
Adrian Stephens, Intel CorporationSlide 64from slide 2/2 of 11-10/1147r0 by David Halasz, OakTree Wireless
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 65
IEEE 802.11Fast Initial Authentication Study Group
Closing ReportDate: 2010-09-17
Authors:
Name Company Address Phone email
Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN
+81-3-5719-7630 [email protected]
Marc Emmelmann Fraunhofer FOKUS
Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany
+49-30-3463 7268
from slide 1/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 66
AbstractThis presentation is the closing report for the Waikoloa
meeting of the IEEE 802.11 FIA SG.
from slide 2/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Agenda• Time slots
– Monday PM2– Tuesday PM1– Wednesday AM1/PM1– Thursday AM2/PM1
• Agenda– Modify and/or Approve Agenda– Review and Approve the San Diego and Teleconference meeting
minutes– Plan for the Week– Reporting IETF 78– Technical presentations– Review draft of PAR & 5C– Forward PAR & 5C motion to WG– TIME line of FIA – Plan for November & Teleconference
Slide 67 Adrian Stephens, Intel Corporationfrom slide 3/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Accomplishments• Approve the San Diego and Teleconference meeting minutes
– 11-10-0925-01-0fia-fia-sg-meeting-minutes-july-2010– 11-10-1103-00-0fia Combined-FIA-Telefone-Conference-Minutes-July-
September-2010• Technical presentation
– 11-10-0965-01 Potential performance improvements with fast initial link set-up
• Marc Emmelmann (Fraunhofer FOKUS)
– 11-10-1106-01 PAR & 5C Transition from FIA to Fast Initial Link Set-Up• Marc Emmelmann (Fraunhofer FOKUS & Root INC.)
– 11-10-1125-01 How does the (new) Fast Initial Link Set-Up PAR address risen concerns
• Marc Emmelmann (Fraunhofer FOKUS & Root INC.)
– 11-10-1146-00 feasible-exchange• Robert Moskowitz(ICSAlabs/Verizon Business)
Adrian Stephens, Intel CorporationSlide 68from slide 4/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Accomplishments - II
• Reviewed ,Edited and Approved the 802.11 FIA PAR and 5C – 11-10-0583-17-0fia-fia-par-and-5c.doc – 11-10-1152-00-0fia-Fast-Initial-Link-Set-Up-PAR.doc– 11-10-1153-00-0fia-Fast-Initial-Link-Set-Up-5C-.doc
• Time line – Finalize PAR and 5C by , September 16th
– Approve in 802.11 WG by September 17th
– Submission to the EC by October 8th
– Submission to the NesCom By October 18th
• Selected weekly teleconference as,– Wednesday , Start Time 01:00 EDT , Duration 1Hour– Starting 4th Aug Wednesday 01:00 EDT– Using WEB-EX that will be provided by Study Group Chair
Adrian Stephens, Intel CorporationSlide 69from slide 5/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Approve PAR
• Motion: – Believing that the PAR in the documents referenced below meet
IEEE-SA guidelines,
– Request that the PAR contained in 11-10-1152-00-0fia-Fast-Initial-Link-Set-Up-PAR.doc be posted to the IEEE 802.11WG approval
• Moved: Marc Emmelman, Seconded: Hiroshi Morioka,
• Result: [26-0-2]
September 2010
Adrian Stephens, Intel CorporationSlide 70from slide 6/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
doc.: IEEE 802.11-10/0989r0
Report
Approve 5 Criteria
• Motion: – Believing that the Five Criteria contained in the documents
referenced below meet IEEE-SA guidelines,
– Request that the Five Criteria contained in 11-10-1153-00-0fia-Fast-Initial-Link-Set-Up-5C.doc be posted to the IEEE 802.11WG approval.
• Moved: Marc Emmelman, Seconded: Hitoshi Morioka,
• Result: [27-0-2]
September 2010
Adrian Stephens, Intel CorporationSlide 71from slide 7/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
doc.: IEEE 802.11-10/0989r0
Report
Weekly Teleconference Schedule
• Motion: – Approve the following schedule of weekly teleconferences.
– Wednesday , Start Time 01:00EST , Duration 1Hour
– Using WEB-EX that will be provided by Study Group Chair
• Moved: Marc Emmelman, Seconded: Hitoshi Morioka,
• Result: 9-0-2
September 2010
Adrian Stephens, Intel CorporationSlide 72from slide 8/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
doc.: IEEE 802.11-10/0989r0
Report
Documents
• Minutes – 11-10-0925-01-0fia-fia-sg-meeting-minutes-july-2010– 11-10-1103-00-0fia Combined-FIA-Telefone-Conference-Minutes-July-
September-2010
• Technical presentation– 11-10-0965-01 Potential performance improvements with fast initial link set-up– 11-10-1106-01 PAR & 5C Transition from FIA to Fast Initial Link Set-Up– 11-10-1125-01 How does the (new) Fast Initial Link Set-Up PAR address risen
concerns– 11-10-1146-00 feasible-exchange
• PAR – 11-10-1152-00-0fia-Fast-Initial-Link-Set-Up-PAR.doc
• 5C – 11-10-1153-00-0fia-Fast-Initial-Link-Set-Up-5C-.doc
Adrian Stephens, Intel CorporationSlide 73from slide 9/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Thanks to all who participated!
Adrian Stephens, Intel CorporationSlide 74from slide 10/10 of 11-10/1151r1 by Hiroshi Mano (Root Inc.)
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 75
JTC1 ad hoc closing report (Sept 10)Date: 2010-09-16
Name Company Address Phone email
Andrew Myles Cisco [email protected]
Authors:
from slide 1/4 of 11-10/1174r0 by Andrew Myles, Cisco
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 76
Abstract
Closing report for JTC1 ad hocfor Sept 2010, Hawaii, USA
from slide 2/4 of 11-10/1174r0 by Andrew Myles, Cisco
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 77
JTC1 ad hoc reviewed items related to SB drafts and SC6 meeting
• Progress in Hawaii (Sept 2010)– Reviewed status of SB drafts sent to ISO/IEC JTC1/SC6
• Latest 11u/v/z were sent to SC6 - no technical comments received
– Reviewed agenda for SC6 JTC1/SC6 meeting in London in Sept • Little detail but items include 8802-1, WLAN sec, 60 GHz & TVWS
• Documents suggest proposals to do work on replacements to– 802.11 security with WAPI
– 802.11 with synchnronised MAC/PHY
– 802.1AE with TLSec
– 802.1X with WePA-AC
– 802.16 security with TAAA
– IPv6 with CPK on IPv9
• Bruce Kraemer is IEEE rep for JTC1/SC6 meeting and will promote appropriate liaisons with IEEE
from slide 3/4 of 11-10/1174r0 by Andrew Myles, Cisco
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 78
JTC1 ad hoc reviewed items related to SB drafts and SC6 meeting
• Plans for Dallas (Nov 2010)– Review results of JTC1/SC6 meeting in London in Sept
from slide 4/4 of 11-10/1174r0 by Andrew Myles, Cisco
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 79
IEEE 802.11Regulatory Ad Hoc Committee
Closing ReportDate: 2010-09-17
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 80
AbstractThis presentation is the closing report for the Waikoloa
meeting of the IEEE 802.11 Regulatory Ad Hoc Committee.
from slide 2/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Agenda
• Administrative items– Required notices
– Approve minutes from San Diego
• Introduction
• The regulatory summaries
• Regulatory issues status– The impending FCC TVWS rulings
– EN 300 328 revision update
– FCC 5 GHz rules changes update
• Critical issues actions
– Discussion of Wi-Fi Direct in the 5 GHz bands
Slide 81 Adrian Stephens, Intel Corporationfrom slide 3/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Regulatory AHC Activities• Discussed regulatory summaries from North America
and the EU– The impending FCC TVWS rulings, the FCC 5 GHz rules changes
update
– ERM TG11 - EN 300 328 revision 1.8.1 update status• Essential test suites being written
• Next meeting is in October (conflicting with the Wi-Fi Alliance meeting)
– ETSI BRAN to begin revision of EN 301 893
• Issues considered critical at this time– Should IEEE 802.11 involve itself in Wi-Fi Direct issue?
– Could lead to FCC redefinition of Software Defined Radio regulations
Adrian Stephens, Intel CorporationSlide 82from slide 4/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
The SDR Issue
• The FCC sees Wi-Fi Direct as a problem mainly because systems in the field, not certified as 5 GHz master devices, can be upgraded to operate as masters.
• They have dealt with APs that could turn off DFS when upgraded with open source code. These have not been considered as Software Defined Radios...yet.
• If they start classifying all of these devices that can be upgraded with open source code as SDRs, it could be problematic
Adrian Stephens, Intel CorporationSlide 83from slide 5/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
References
• 11-10-1058-00-0reg-waikoloa-meeting-plan-and-agenda-sept-2010.ppt
Adrian Stephens, Intel CorporationSlide 84from slide 6/6 of 11-10/1137r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 85
Smart Grid Closing Report 2010
Date: 2010-September-13
Abstract: Discussion NIST PAP#2 ReportDiscussion of other industry & standards activities
Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,
Santa Clara, CA, 95054
+1-321-751-3988 [email protected]
from slide 1/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 86
Meeting Summary• Teleconference Document• https://mentor.ieee.org/802.11/dcn/10/11-10-0955-06-0000-smart-grid-ad-hoc-
summer-2010-plans.ppt
• Meeting Document for the week• https://mentor.ieee.org/802.11/dcn/10/11-10-1108-04-0000-smart-grid-ad-hoc-
september-2010.ppt
• Comment document• https://mentor.ieee.org/802.11/dcn/10/11-10-1133-01-0000-nist-pap-2-report-r5-
consolidated-change-suggestions.ppt
• R5 was posted at:• http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/PAP02Wireless/
NIST_Priority_Action_Plan_2_r05.pdf
from slide 2/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 87
Smart Grid Status SummaryFeedback from NIST
– Bruce,Thank you very much for your input.Section 6 is for the performance analysis of trends and behaviors, ie a mix of sample data and analysis to discuss the findings.Nada
• Need to confirm schedule plan (any changes?)
• Plan of attack for Section 6
• Telecons will resume Sept 22
from slide 3/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 88
NIST Timeline
Release of draft 0.6
Release of Version 1
Draft 0.5July 28, 2010
Call for Input to Section 6August 4, 2010
End of draft 0.5 review periodSeptember 15, 2010
December 3, 2010
November 4, 2010
SGIP face-to-face, ChicagoPAP 2 meeting
OpenSG meeting, MiamiTentative PAP 2 meeting
SGIP face-to-face, St LouisTentative PAP 2 meeting
September 16, 2010
End of draft 0.6 review period
September 30, 2010
October 29, 2010
from slide 4/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 89
Call for Contributions to Section 6
• Suggested Outline
• Factors affecting performance, i.e. reliability, delay, throughput– Channel conditions such as distance, transmitted power,
interference, propagation environment
– Traffic load
– Number of users
• Seeking volunteers?
from slide 5/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 90
Section 6 – Default Suggestions• 6. Findings / Results• Does wireless technology X meet SG-Network requirements
– Performance Metrics– Reliability– Latency– Scalability– meets throughput needs– handles the number of devices needed– range– interference immunity– By actor to actor / Link by link which is the best to use– How does its work in urban, sub-urban, rural– How well does it propagate (e.g. walls, basements, vaults, clutter, hills)– scalability over a quantity of end points– Equipment required to operate– Include processing time between actor to actor
from slide 6/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 91
Smart Grid ad hoc Call Schedule
• Call schedule
• Call plan/call topics for period leading up to September interim– Wednesdays at 2pm ET has been the pattern
– Agree to schedule calls
– Convene next sequence beginning Wed Sept 22, R6 should be available• Review NIST schedule & output of SGIP meeting
• Input of simulations previously created (for 802.11)
– Primary topic will be comments on R6 & generation of input to Section 6
from slide 7/7 of 11-10/1172r0 by Bruce Kraemer, Marvell
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 92
RR-TAG (802.18) Liaison Report
Date: 2010-09-17
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1/5 of 11-10/1139r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 93
AbstractThis presentation is the closing plenary report of the
802.18 liaison for the IEEE 802 Wireless Interim in Waikoloa, HI.
from slide 2/5 of 11-10/1139r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
IEEE 802.18 Activities• Worked on an edited response to an ITU-R WP-5A document on 60 GHz
– To be approved by the 802.11 WG
• Discussed possible implications of proposed WP US-5B input to ITU WP4C on protection criteria for Aeronautical Mobile Telemetry (AMT) in the 5150 to 5250 MHz band
• Discussed IEEE 802.11/18 need to get involved with the WFA Wi-Fi Direct issues in the 5 GHz DFS bands
• Prepared ITU-R documents:– Submission to WP5A M2M (ITU-R non-IMT related)
– Submission to WP5D on Reference Formats M.RSPEC (ITU-R IMT related)
– Submission to WP5D on Vocabulary Terms Related to IEEE 802.16 (ITU-R IMT related)
• Prepared a reply comments on the FCC 7th Broadband Deployment NOI
Slide 94 Adrian Stephens, Intel Corporationfrom slide 3/5 of 11-10/1139r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
Motion
• Approve document 18-10/064r0 as the IEEE 802 response to the ITU-R WP-5A document “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
• Moved by: Rich Kennedy (Research In Motion)
• Seconded by:
• Discussion on the motion?
• Vote:
Adrian Stephens, Intel CorporationSlide 95from slide 4/5 of 11-10/1139r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report
References
• 18-10-0064-00-0000-submission-to-wp-5a-lms-mgws1-60-ghz-recommendation.doc
• 18-10-0058-01-0000-submission-to-wp-5a-m2m.docx 18-10-0059-01 – Submission to WP5D on Reference Formats M.RSPEC (ITU-R IMT related)
• 18-10-0059-01-0000-submission-to-wp-5d-on-reference-formats-m-rspec.docx
• 18-10-0060-01-0000-802-reply-comments-to-the-fcc-7th-broadband-deployment-noi.doc
• 18-10-0061-01-0000-submission-to-wp-5d-on-vocabulary-terms-related-to-ieee-802-16.docx
Adrian Stephens, Intel CorporationSlide 96from slide 5/5 of 11-10/1139r1 by Rich Kennedy, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 97
IEEE 802.23 Liaison Report for 2010-09Date: 2010-09-16
Name Affiliations Address Phone email George Bumiller Research In
Motion 39 Lakeview Terrace Ramsey, NJ 07446 USA
1 201 327 1136
Authors:
from slide 1/3 of 11-10/1166r0 by George Bumiller, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 98
Abstract
Liaison Report on IEEE 802.23 as presented to IEEE 802.11
from slide 2/3 of 11-10/1166r0 by George Bumiller, Research In Motion
September 2010
doc.: IEEE 802.11-10/0989r0
Report Adrian Stephens, Intel CorporationSlide 99
IEEE 802.23 Emergency Services
• Reviewed regulations and references• Gathering material for “Green Book”
An informal collection of technical material• November meeting – a day and a half:
collocate with IEEE 802.11 Dallas• January meeting – decide in November
from slide 3/3 of 11-10/1166r0 by George Bumiller, Research In Motion
September 2010