DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and Maintenance Standards; Levels 1 & 2, For Training in Maintenance Standards and Crew Scheduling. INSTITUTION Federal Highway Administration (DOT), Washington, D.C. Offices of Research and Development. PUB DATE Jan 73 NOTE 39p.; For related documents see ED 091 567-74 EDRS PRICE MF-$0.76 HC-$1.95 PLUS POSTAGE DESCRIPTORS Autoinstructional Aids; Civil Engineering; *Maintenance; *Management Development; Manuals; Performance Specifications; Programed Instruction; Programed Units; *Road Construction; *Standards; *Supervisory Training ABSTRACT Part of the series "Managing Highway Maintenance," the unit is designed for use with unit eight, level one, and unit 13, level two, and the certification tests for those units in the series. It contains typical management data and selected highway maintenance standards for the areas of: surface and shoulder; roadside and drainage; traffic services; maintenance improvement; snow and ice control; and administrative and overhead. The format is a programed, self-instructional approach in which information is presented in progressive segments or frames. (NH)

Upload: others

Post on 31-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

DOCUMENT RESUME

ED 103 639 CB 003 237

TITLE Managing Highway Maintenance: Management Data andMaintenance Standards; Levels 1 & 2, For Training inMaintenance Standards and Crew Scheduling.

INSTITUTION Federal Highway Administration (DOT), Washington,D.C. Offices of Research and Development.

PUB DATE Jan 73NOTE 39p.; For related documents see ED 091 567-74

EDRS PRICE MF-$0.76 HC-$1.95 PLUS POSTAGEDESCRIPTORS Autoinstructional Aids; Civil Engineering;

*Maintenance; *Management Development; Manuals;Performance Specifications; Programed Instruction;Programed Units; *Road Construction; *Standards;*Supervisory Training

ABSTRACTPart of the series "Managing Highway Maintenance,"

the unit is designed for use with unit eight, level one, and unit 13,

level two, and the certification tests for those units in the series.It contains typical management data and selected highway maintenancestandards for the areas of: surface and shoulder; roadside anddrainage; traffic services; maintenance improvement; snow and icecontrol; and administrative and overhead. The format is a programed,self-instructional approach in which information is presented inprogressive segments or frames. (NH)

Page 2: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MNISO

_kV Ellilitin

MANAGEM _4T DATAAND MAINTENANCESTANDARDS

For Training in MaintenanceStandards and Crew Scheduling

U.S. UEPARTMENT OF HEALTH,EDUCATION & WELFARENATIONAL INSTITUTE OF

EDUCATIONTHIS DOCUMENT HAS BEEN REPRODUCED EXACTLY AS RECEIVE() FROMTHE PERSON OR ORGANIZATION ORIGINATING IT POINTS OF VIEW OR OPINIONSSTATED DO NOT NECESSARILY REPRESENT OFFICIAL NATIONAL INSTITUTE OFEDUCATION POSITION Ok POLICY

LEVELS con

FEDERAL HIGHWAY ADMINISTRATION

Offices of Research and Development

January 1973 A4,1

Page 3: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

This book is part of the series "Managing Highway Maintenance,"prepared for the Implementation Division, Office of.Development,Federal Highway Administration, under contract FH-11-7600. The

series as a whole is described in the Training Guide and Catalogvolume.

The contents of this book reflect the views of the contractor,Roy Jorgensen Associates, Inc. The contents do not necessarilyreflect the rtffiPial views or policy of the Department ofTransportation.

These materials do not constitute a standard, specification, orregulation.

Washington, D.C.January 1973

Implementation DivisionOffices of Research andDevelopment

I.

Page 4: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

PREFACE

This booklet is used with Unit 8, Level 1; Unit 13, Level 2;

and the Certification Tests for those units. It contains typical

management data and selected highway maintenance standards.

The map, resource listing and standards are modifications of

actual data from several maintenance agencies.

Page 5: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

TABLE OF CONTENTS

Preface

REGION 7 ORGANIZATION CHART

RYAN COUNTY ROAD MAP

RYAN COUNTY RESOURCE LISTING

MAINTENANCE WORK PROGRAM AND MAN-HOURREQUIREMENTS FOR RYAN COUNTY 1973

CUMULATIVE WORK PROGRAM AND MAN-HOURSUMMARY -- FOR RYAN COUNTY

WORK SCHEDULING CALENDAR

SUMMARY TABLE OF MAINTENANCE ACTIVITIES

MAINTENANCE STANDARDS:

Surface and Shoulder

Page

1

2

3

5

7

101 Joint and Crack Filling 8

102 Remove/Replace Concrete Pavement 9

103 Premix Patching 10

104 Spot Sealing 11

105 Bituminous Surface Replacement 12

111 Patching Base 13

112 Spot Patching Shoulders 14

113 Reshaping Shoulders 15

119 Other Surface and Shoulder Maintenance 16

ii

Page 6: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

TABLE OF CONTENTS Continued.

Page

MAINTENANCE STANDARDS (Continued)

Roadside and Drainage

120 Tree Removal 17

121 Stump Removal 18

122 Clean DrOinage Structures 19

123 Full-Width Litter Pickup 20

124 Clean and Reshape Ditches 21

126 Machine Mowing 22

Traffic Services

130 Replace Steel Beam Guardrail 23

131 Sweeping and Flushing 24

133 Sign Maintenance 25

134 Signal Maintenance 26

Maintenance Improvement

150 General Bridge Maintenance 27

159 Other General Maintenance 28

Snow and Ice Control

160 Spreading Salt

161 Plowing Snow

Administrative and Overhead,....01"..0.1.611.0.....170 Building Maintenance

171 Grounds Maintenance

180 Administrative Overhead

29

30

31

32

33

Page 7: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

I

CR

EW

FO

RE

MA

N

F. C

omst

ock

RE

GIO

N 7

OR

GA

NIZ

AT

ION

CH

AR

T

MA

INT

EN

AN

CE

EN

GIN

EE

R

R. E

. Joh

nsto

n

ASS

IST

AN

T M

AIN

T. E

NG

R.

B. C

. Dav

is

SIG

N &

SIG

NA

LSU

PER

VIS

OR

J. W

illia

ms

EQ

UIP

ME

NT

SUPE

R!

NT

EN

DE

NT

H. P

.. H

andy

MA

INT

EN

AN

CE

SUPE

RV

ISO

R

Rya

n C

oiin

tyA

. B. S

omm

ers

CR

EW

FO

RE

MA

N

J. B

oxC

RE

W F

OR

EM

AN

P. F

ram

m

MA

INT

EN

AN

CE

SUPE

RV

ISO

R

Kin

g C

ount

yJ.

P. S

mith

SPE

CIA

L P

RO

JEC

TSU

PER

VIS

OR

Reg

ion

7

C. B

row

n.

CR

EW

FO

RE

MA

N

R. H

arri

s

CR

EW

FO

RE

MA

N

A. R

yan

CR

EW

FO

RE

MA

N

(Pos

ition

Vac

ant)

Page 8: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

RYAN COUNTY ROAD MAP

Interstate-30 milesammo Primary System48 miles

--- Secondary System- 88 miles

8

Page 9: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

RYAN COUNTY RESOURCE LISTING

PERSONNEL ROSTER

Group

MAINTENANCE EQUIPMENT

Position Number Description Number

Maintenance Supervisor 1

Crew Foreman 3

Equipment Operator II 2

Equipment Operator I 3

Maintainer II 2

Maintainer I 5

01

02

03

04

05

06

07

08

Pickup truck -- ton

Pickup truck -- 6-passenger

Dump truck -- 25,000 GVW

Dump truck -- 32,000 GVW

Farm tractor -- with sickle bar

Farm tractor with 15' rotary

Utility backhoe -- buckets

Service truck -- ton

1

1

3

3

1

3

1

2

09 Truck tractor diesel

10 Farm tractor -- with power broom 1

11 Gradall 1

15 Steel-wheel roller -- towed

16 Rubber-tire roller 10-ton, towed

ROAD MATERIALS STOCKPILED 17 Stump chipper -- towed 1

Description Quantity18 Mechanict.1 sweeper -- gas/SP

19 Compressor towed, with attach. 1

Asphalt, MC-4 (gal.) 1500 20 Trailer -- tandem floatCrushed stone, 31C -11 (c.y.) 210 31 Water truck -- 1600-gal. cap.Pit-run gravel (c.y.) 320 32 Motor grader -- diesel 2

River sand, full screen (c.y.) 50 33 Pull grader -- 40' wheel baseCold mix (ton) 80 34 Cat -- D-8 crawler

36 Asphalt kettle -- 600-gal. cap. 1

37 Asphalt distributor 1600-gal. cap. 1

38 Front-end loader 11 c.y.bucket 1

39 FWD --with one-way and wing 1

40 Chip spreader (fits Group 04) 1

55 Snowplow (fits Group 03/04) 3

57 Tailgate auger and spreader 5(fits Group 03/04)

-.3-

9

Page 10: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE WORK PROGRAM

AND MAN-HOUR REQUIREMENTS.

FOR RYAN COUNTY 1973

ACTIVITY NUMBER AND NAME WORK UNITPLANNED

QUANTITYMAN-HOUR

REQUIREMENTS

Surface and Shoulder

101 Joint and Crack Filling Gallon of Sealant 775 310102 Remove/Replace Concrete Pavement Lane Foot 250 750103 Premix Patching Ton of Premix 90 450104 Spot Sealing Lane Mile 45 1;125105 Bituminous Surface Replacement Ton of Premix 810 730111 Patching Base Cubic Yard of Material 300 360112 Spot Patching Shoulders Cubic Yard of Material 80 360113 Reshaping Shoulders Pass Mile 1,720 1,720119 C:.her Surface and Shoulder Maintenance Man-Hour 1 900 1,900

Roadside and Drainage

120 Tree Removal (Burning) Inch (Diameter) of Tree 1,895 640120 Tree Removal (Hauling) Inch (Diameter) of Tree 950 325121 Stump Removal Each Stump 160 480122 Clean Drainage Structures Each Structure 580 520123 Full-Width Litter Pickup Pass Mile 320 1,280124 Clean and Reshape Ditches Ditch Mile 14 2,240.7126 Machine Mowing Acre 2,205 2,205

Traffic Services

130 Replace Steel Beam Guardrail lineal Foot of Guardrail 85. 55131 Sweeping and Flushing Mile 125 200133 Sign Maintenance! Man-Hour 3,280 3,280134 Signal Maintenance Man-Hour 810 810

Maintenance Improvement

150 General Bridge Maintenance Man-Hour 605 605159 Other General Maintenance! Man-Hour 2,200 2,200

Snow and Ice Control

Pass Mile 4,010 400160 Spreading Sal!161 Plowing Snow Pass Mile 3,250 195

Administrative and Overhead

170 Building Maintenance Man-Hour 420 420171 Ground Maintenance Man-Hour 800 800180 Administrative Overhead Man-Hour 6,650 6,650

Total Planned Man-Hours 31,010

Includes 1,050 man-hours required to replace all directional signs.

! Includes 900 man-hours estimated to do special shoulder project,

M1141111

Page 11: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

CUMULATIVE WORK PROGRAM AND MAN-HOUR SUMMARY

FOR RYAN COUNTY

July 1, 1972 March 31, 1973

ACTIVITY NUMBER AND NAME

Surface and Shoulder

QUANTITY TO DATE MAN-HOURS TO DATE

WORK UNIT PLANNED ACTUAL PLANNED ACTUAL

101 Joint and Crack Filling Gallon 775 727 310 351

102 Remove/Replace Concrete Pavement Lane Foot 225 233 675 628

103 Premix Patching Ton 68 76 340 350

104 Spot Sealing Lane Mile 40 31 1,000 875

105 flitum;nous Surface Replacement Ton 600 605 540 531

111 Patching Base Cubic Yard 120 55 145 103

112 Spot Patching Shoulders Cubic Yard 60 63 270 288

113 Reshaping Shoulders Pass Mile 825 792 825 720

119 Other Surface and Shoulder Maintenance Man-Hour 1,425 1,685 1,425 1,685

Roadside and Drainage

120 Tree Removal (Burning) Inch (Diameter) 1,895 1,905 640 686

120 Tree Removal (Hauling) Inch (Diameter) 950 621 325 521

121 Stump Removal Each Stump 160 65 480 210

122 Clean Drainage Structures Each Structure 490 461 440 801

123 Full-Width Litter Pickup Pass Mile 150 145 600 550

124 Clean and Reshape Ditches Ditch Mile 12 14 760 729

126 Machine Mowing Acre 1,650 1,421 1,650 1,445

Traffic Services(....,..

130 Replace Steel Beam Guardrail Lineal Foot 65 35 40 38

131 Sweeping and Flushing Mile 75 75 120 115

133 Sign Maintenance' Man-Hour 2,100 2,875 2,100 2,875134 Signal Matntenance Man-Hour 730 586 730 586

Maintenance Improvement

150 General Bridge Maintenance159 Other General Maintenance2

Man-Hour 800 721 800 721

Man-Hour 1,650 1,280 1,650 1,280

Snow and Ice Control

160 Spreading Salt Pass Mile 4,010 6,051 400 621

161 Plowing Snow Pass Mile 3,250 3,720 195 256

Administrative and Overhead

170 Building Maintenance Man-Hour 310 252 310 252

171 Grounds Maintenance Man-Hour 600 651 600 651

180 Administrative Overhead Man-Hour 5,000 4,685 5,000 4,685

TOTAL CUMULATIVE MAN-HOURS

I

22,370 2,,553

In ides 1,050 man-hours required to replace all directional signs.

2 Inch. 'es 900 man-hours estimated to do special shoulder project.

-5-

Page 12: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

AC

TIV

ITY

NU

MB

ER

AN

D N

AM

E

Sur

face

and

Sho

ulde

r

WO

RK

SC

HE

DU

LIN

G C

ALE

ND

AR

JAN

FE

BM

AR

AP

RM

AY

JUN

EJU

LYA

UG

SE

PT

OC

TN

OV

DE

C

101

102

103

104

105

111

112

113

119

Join

t and

Cra

ck F

illin

g

Rem

ove/

Rep

lace

Con

cret

e P

avem

.

Pre

mix

Pat

chin

g

Spo

t Sea

ling

Bitu

min

ous

Sur

face

Rep

lace

men

t

Pat

chin

g B

ase

Spo

t Pat

chin

g S

houl

ders

Res

hapi

ng S

houl

ders

Oth

erS

urfa

ce/S

houl

der

Mai

non.

Page 13: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

AC

TIV

ITY

NU

MB

ER

AN

D N

AM

E

SUM

MA

RY

TA

BL

E O

F M

AIN

TE

NA

NC

E A

CT

IVIT

IES

CR

EW

DA

ILY

WO

RK

UN

ITSI

ZE

PRO

DU

CT

ION

0.4

3.0

5.0

25.0

0.9

1.2

4.5

1.0

0.3

0.3

3.0

0.9

4.0

160.

01.

0

0.6

1.6

0.1

0.1

Surf

ace

and

Shou

lder

Gal

lon

of s

eala

ntL

ane

foot

Ton

of

prem

ixL

ane

mile

Ton

of

prem

ixC

ubic

yar

d of

mat

eria

lC

ubic

yar

d of

mat

eria

lPa

ss m

ileM

an-h

our

Inch

(di

amet

er)

of tr

eeIn

ch (

diam

eter

) of

tree

Eac

h st

ump

Eac

h st

ruct

ure

Pass

mile

Ditc

h m

ileA

cre

Lin

eal f

oot o

f gu

ardr

ail

Mile

Man

-hou

rM

an-h

our

Man

-hou

rM

an-h

our

Pass

mile

Pass

mile

Man

-hou

rM

an -

hour

Man

-hou

r

7 6 2 8 7 2 1

(as

requ

ired

)

5 5 2 2 2-3 6 3 2 2 2 2-8

(as

requ

ired

)

1 1

(as

requ

ired

)(a

s re

quir

ed)

n.a.

100-

250

gallo

ns16

-22

lane

fee

t2-

4 ta

ns2-

3 la

ne m

iles

56-7

0 to

ns45

-50

cubi

c ya

rds

2.9-

4.5

cub

ic y

ards

7-9

pass

mile

sn.

a.

100-

140

inch

es11

0-13

0 in

ches

4-7

stum

ps18

-27

stru

ctur

es4-

6 pa

ss m

iles

0.2

- 0.

4 m

iles

7-9

acre

s

26-4

8 lin

eal f

eet

7-13

mile

sn

.a .

n.a.

n.a.

n.a.

70-9

0 pa

ss m

iles

100-

130

pass

mile

s

n.a.

n.a.

n.a.

101

Join

t and

Cra

ck F

illin

g10

2R

erna

ve/R

epla

ce C

oncr

ete

Pave

men

t10

3Pr

emix

Pat

chin

g10

4Sp

ot S

ealin

g10

5B

itum

inou

s Su

rfac

e R

epla

cem

ent

111

Patc

hing

Bas

e11

2Sp

ot P

atch

ing

Shou

lder

s11

3R

esha

ping

Sho

ulde

rs11

9O

ther

Sur

face

and

Sho

ulde

r M

aint

enan

ce

Roa

dsid

e an

d D

rain

age

120

Tre

e R

emov

al (

Bur

ning

)12

0T

ree

Rem

oval

(H

aulin

g)12

1St

ump

Rem

oval

122

Cle

an D

rain

age

Stru

ctur

es12

3Fu

ll-W

idth

Litt

er P

icku

p12

4C

lean

and

Res

hape

Ditc

hes

126

Mac

hine

Mow

ing

Tra

ffic

Ser

vice

s13

0R

epla

ce S

teel

Bea

m G

uard

rail

131

Swee

ping

and

Flu

shin

g13

3Si

gn M

aint

enan

ce13

4Si

gnal

Mai

nten

ance

Mai

nten

ance

Im

prov

emen

t15

0G

ener

al B

ridg

e M

aint

enan

ce15

9O

ther

Gen

eral

Mai

nten

ance

Snow

and

Ice

Con

trol

160

Spre

adin

g Sa

lt16

1Pl

owin

g Sn

ow

Adm

inis

trat

ive

and

Ove

rhea

d

170

Bui

ldin

g M

aint

enan

ce17

1G

roun

ds M

aint

enan

ce18

0A

dmin

istr

ativ

e O

verh

ead

NO

TE

: Whe

re h

aulin

g is

req

uire

d, s

tand

ard

crew

siz

e is

bas

ed o

n a

20-m

ile r

ound

trip

.A

s a

gene

ral g

uide

, add

to s

tand

ard,

one

truc

k (0

3/04

) an

d dr

iver

for

eac

had

ditio

nal 1

0 m

iles.

AV

ER

AG

E P

RO

DU

CT

IVIT

Y

man

-hau

rs/,g

alla

n af

sea

lant

man

-hou

rs/la

ne f

oot

man

-hou

rs/to

n of

pre

mix

man

-hau

rs/I

ane

mile

man

-hou

rs/to

n of

pre

mix

man

-ho

urs

/cub

ic y

ard

of m

ater

ial

man

-hou

rs/c

ubic

yar

d of

mat

eria

lm

an-h

ours

/pas

s m

ilen.

a.

man

-hou

rs/in

ch (

diam

eter

) of

tree

man

-hou

rs/in

ch (

diam

eter

) of

tree

man

-hou

rs/s

tum

pm

an-

hour

s /s

truc

ture

man

-hou

rs/ p

ass

mile

man

-hou

rs/d

itch

mile

man

-hou

rs/a

cre

man

-hou

rs/li

neal

foo

t of

guar

drai

lm

an-h

ours

/mile

n.a.

n.a.

n.a.

n.a.

man

-hou

rs/p

ass

mile

man

-hou

rs/p

ass

mile

(ro

unde

d fr

om 0

.06)

n.a.

n.a.

n.a.

Page 14: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 11,1912

MAINTENANCE STANDARD

JOINT AND CRACK FILLING

DESCRIPTION AND PURPOSE

surface cracks which are greaterCleaning and filling with liquid sedant, asphaltthan 4-inch wide.

SCHEDULING : TYPE OF ACTIVITY :

Schedule this work when thetemperature is not expected Routine Maintenanceto be above 50°F.

CHEW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 7Work Unit : Gallon of sealant

(Add flagmen as needed.)

Equipment : Daily Production : 100-250 gallons

No. Description Group Average Productivity : 0.4 man-hours/gallon2 Trucks 031 Truck 021 Asphalt kettle 36

(600 or 300 as avail.)1 Compressor 19

(Flashing arrow, truck or trailer mounted,may be added as needed for traffic control .)

of sealantMATERIAL

SealantSand or 31C (3/8" stone maximum)

RECOMMENDED PROCEDURE :

air compressor.

application temperature.

top of the surface to allow for expansion,

or 3/8" stone depending on width of

THAN INCH (PENCIL DIAMETER)

1. Before filling, clean cracks with

2. Apply sealant heated to the specified

3. Fill cracks to within *4 inch of the

4. To prevent tracking, blot with sandjoint or crack.

CRITERION ONLY CRACKS GREATERWILL BE FILLED.

14

Page 15: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

REMOVE/REPLACE CONCRETE PAVEMENT

April 17,1972 Activity NO, 102

DESCRIPTION AND PURPOSE:

with compacted soils and premixRemoval of broken concrete slabs and replacementmaterial to achieve a level surface.

SCHEDULING : TYPE OF ACTIVITY :

Schedule primarily during summer, Emergency Maintenancebut perform as needed,

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew size : 6work Soli : Lane foot

(Add flagmen as needed.)

Equipment : Daily Production : 16-22 lane feet

NO. Description POOP Average PrOduCtiVily : 3.0 man-hours/lanefoot3 Trucks 03

1 Front-end loader 381 Air compressor 191 Steel roller 151 Vibratory compactor 15

(Flashing arrow, truck or trailer mounted,may be added as needed for traffic control.)

MATERIAL

PremixBond Coat AE-3Gravel 23-ASand

.RECOMMENDED PROCEDURE

for each lane width.

hammer to break up slab.to a minimum depth of 21".

where needed.

from hole.

-- maximum 3" layers, compacted.as necessary.

of 2" each, and complete with a wearingseparately. The finished surface should b.

and in line with pavem.Int edge.

material when complete, should not

under Activity 119, Other Surface and

1.

2.

3.

4.

5.

NOTES:

Remove full depth concrete slab

a. Use pavement breaker or airb. If a saw is used, cut the surface

Cut and remove reinforcing rod

Remove all large broken concrete

Perform necessary minor base repair.

Fill the hole:

a. Gravel or bituminous base courseb. Prime exposed edges of slabc. Place premix material in layers

course on top. Compact layersflush with adjacent pavement

(1) Minimum thickness of bituminousbe less than 21%

(2) Remove debris as necessary.

(3) Pavement sawing is performedShoulder Maintenance.

WYM

Page 16: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 17,1972

MAINTENANCE STANDARD

PREMIX PATCHINGActivity No, '103

DESCRIPTION AND PURPOSE :

material to collect scattered potholes,potential surface hazards,

Hand-tool patching with bituminous premixedge failures and severe depressions, to eliminate

SCHEDULING : TYPE OF ACTIVITY :

Schedule as necessary. Emergency Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Cm Site : 2Work Unit : Ton of premix

(Add flagmen as needed)

Equipment : Daily Production : 2-4 tons

No. Description Group AVera0 PrOdUCIIVNY : 5.0 man-hours/ton

1 Truck 03of premix

MATERIAL

PremixBond Coat AE3

RECOMMENDED PROCEDURE :

vertical cuts needed.

1. Remove loose or broken material.

2. Square up the area and make any

3. Tack the area.

4. Place premix in layers.

5. Tamp each layer.

6. Check the finished surface,

7. Broom loose, excess material.

-10-

Page 17: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SPOT SEALINGApril 11,1972 Activity No. 104

0101110111114, lialMar

DESCRIPTION AND PURPOSE:

to protect the existing surface, toSurface sealing with liquid asphalt and aggregateadd skid resistance and to seal open cracks.

SCHEDULIND . TYPE OF ACTIVITY :

Do not schedule during winter months. Special Authority

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 8Work Unit : Lane mile

(Add flagmen as needed.)

EIIIIIIM1e111: Daily Production : 2-3 lane miles

No. Description Group Average Productivity : 25.0 man-hours/lane

3 Dump trucks 041 Asphalt distributor 371 Roller 151 Chip spreader 401 Power broom 10

- mile

MATERIAL

Liquid asphaltGravel 31-C

RECOMMENDED PROCEDURE :

before sealing.

proper temperature. Work one lane at agal. per square yard)

spreader immediately.of stone per square yard,)

if necessary,

1. CorreQt distorted or settled areas

2. Sweep all loose debris from pavement.

3. Apply liquid asphalt heated totime, (Application rate of .25

4. Apply cover material with mechanical(Application rate of 23 pounds

5. Roll entire sealed area.

6. Remove excess stone from pavement

Page 18: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 11,1912

MAINTENANCE STANDARD

BITUMINOUS SURFACE REPLACEMENT

Activity No. 105

DESCRIPTION AND PURPOSE :

Removal and disposal of bituminous surfacing from deteriorated areas and replacementwith premix material -- to correct broken and crumbled surface.

SCHEDULING : TYPE OF ACTIVITY

Schedule according to scheduling Routine Maintenancecalendar.

CREW /EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size 7

(Add flagmen as needed.)

Equipment :

No. Description Group

3 Trucks 041 Asphalt kettle 361 Roller 151 Motor grader 32

Work Unit : Ton of premix

Daily Production : 56-70 tons

Average Productivity : 0.9 man-hours/t"of premix

MATERIAL

PremixBond Coat AE-3

RECOMMENDED PROCEDURE :

1. Break up and remove the old surface material from the cracked or brokenarea .

2. Shape up the hole and trim edges back into good solid surface with verticalsides.

3. Apply a tack coat of liquid bituminous material.

4. Place premix in the hole, first around the sides, then toward the center, inlayers not to exceed 3 inches in depth.

5. Compact each layer before placing the next.

6. Shape the final layer until it is smooth and level with the surroundingsurface.

7. Broom loose, excess material from roadway surface.

MI IN

'.)A 8

Page 19: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

PATCHING BASEApril 17,1972 Activity No. 11 L,

DESCRIPTION AND PURPOSE:

pavements through the excavationwith concrete, aggregate or other materialthe roadway.

Repair of base or subgrade ;ailures under bituminousof unsatisfactory material and replacementto correct possible hazards and to preserve

SCHEDULING : TYPE OF ACTIVITY :

Schedule primarily during summer. Routine Maintenance

CREW /EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 7Work Unit : Cubic yard of material

(Add flagmen as needed.)

Equipment : Daily MOOR : 45-50 cubic yards

No. Description DIN Average Productivity : 1.2 man-hours/cubicmaterial

3 Dump trucks 031 Pickup truck 011 Gradall 11

1 Rubber-tire roller 16

yard ofy

MATERIAL

Crushed concrete, pit-run gravel oraggregate

RECOMMENDED PROCEDURE :

or other suitable equipment.

material.

truck, haul away and dispose at

failure, build a small trench outgranular material before resurfacing.

in cut-out section.

and roller.

is level with the surrounding base.

No. 105.

1. Cut out surface failures with Gradall

2. Remove unsatisfactory base or 4ubgrade

3. Load unsatisfactory material intopredesignated area.

4. If water under the pavement causedto the ditch and fill with coarse

5. Place new base material in layers

6. Compact each layer with hand tamps

7. Compact the final layer until it

8. Replace surfacing as under Activity

-13-

Page 20: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SPOT PATCHING SHOULDERS

April 17,1972 Activity NO. 112041DESCRIPTION AND PURPOSE :

edge rutting and minor repair.Patching of non-paved shoulders, to include

SCHEDULING : TYPE OF ACTIVITY :

Schedule this work as an alternate Routine Maintenanceactivity. Perform during rainy weather.

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2Work Unit: Cubic yard of material

Equipment : Daily Production : 2.9-4.5 cubic yards

NO, Description Group Average Productivity :4.5 man-hours/cubic

of material1 Truck 03

yard

MATERIAL

Pitrun gravel

RECOMMENDED PROCEDURE :

shoulder.

1. Spread pit-run gravel from truck.

2. Hand rake until level with surroundinc

A.

Page 21: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

RESHAPING SHOULDERS

April 17,1912 Activity No. 113

manowereemileimlnlimmemlw

DESCRIPTION AND PURPOSE:

without additional material to keepout ruts and provide the proper grade.

Blading and shaping of non-paved shouldersthe shoulder flush with the pavement, smooth

SCHEDULING : TYPE OF ACTIVITY :

Schedule during spring and fall. Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : IWork Unit : pass mite

Equipment : Daily Production : 7-9 pass miles

No. Description Group Average Productivity : 1.0 man-hour/pass

1 Motor grader 32mile

MATERIAL

None

RECOMMENDED PROCEDURE :

corner of the blade flush with orgrade.

surface and spread without

to take advantage ofto ensure compaction.

work procedures.

1. Perform routine binding with outsideslightly above existing shoulder

2. Remove all material from the pavementleaving a windrow.

NOTES: (1) Blading should be schedulednatural moisture on the shoulders,

(2) See training guide for additional

11..............................-15.

Page 22: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 17,1972

MAINTENANCE STANDARD

OTHER SURFACE AND SHOULDER MAINTENANCE

Activity N0. 119

DESCRIPTION AND PURPOSE:

not covered by Activities 101-113.Other surface and shoulder maintenance activitiesSee list of activities below.

SCHEDULINO : TYPE OF ACTIVITY :

Schedule as required. Routine Maintenance

CREWIEOUIPMENT ACCOMPLISHMENT

Recommended Crew Site : (as required)Work Unit : Man-hour

Equipment : Daily Production : N/A.

No. Descriptionar°1111 Average Pronuctivity : N/A

(as required)..,

MATERIAL

(as required)

RECOMMENDED PROCEDURE :

includes:

discovered, sweep up debris.is heaved, relieve pressure when possible;

temporary (emergency) patch as soon asis authorized.) At first opportunity,

permanent patch.

Activity 102.

irregularities.

OTHER SURFACE AND SHOULDER MAINTENANCE

Temporary repairs, including blowups.

CRITERION: As blowup isif pavementand completepossible. (Overtimecomplete with

Bump burning

Cleaning holes with compressor

Sawing concrete prior to performing

Frost boring

Premix leveling to correct surface

4^7 r)fr.0%te

Page 23: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 17,1972

MAINTENANCE STANDARD

TREE REMOVAL.Activity No. 120

4,............

DESCRIPTION AND PURPOSE :

.......................................,

(except stumps), including cleanup toto cars that leave the roadway.

Removal of trees greater than 8" in diameterensure that the remaining stump is not hazardous

SCHEDULING : TYPE OF ACTIVITY :

Schedule as fill-in work. Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Site : 5WON nil: Inch (of diameter) of tree

(Add flagmen as needed.)

Equipment :. 100-140 inches (burning)

Daily Production . 110 -130 inches (hauling)

No. Description Group Average Productivity : 0'3 na

1 Truck 031 Truck 021 Loader 382 One-man chain saws1 Two-man. chain saw

) of tree

MATERIAL

None

....RECOMMENDED PROCEDURE :

./...arma..

before felling a tree.

proper direction of fall.

the roadway of debris as required.

it is done well off the roadway.on site, haul wood for burning or

The burning of trees, logs, brush anddone only where it does not create aand does not restrict traffic vision.

close to the ground as possible.

tree is not on Department right-of-way.

areas for open burning.similar materials to help start fires.

1. If necessary, remove branches

2. If necessary, attach a line to ensure

3. Cut and fell the tree, then clear

4. If on-site burning is possible, ensureIf burning is unsafe or impossibledisposal to an authorized area.stumps in rural areas should benuisance, fire or health hazard(See Note 2 be

5. If required, recut the stump as

NOTES:(1) Contact property owner if

(2) Permits are required in someNEVER use tires, plastics and

Page 24: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

STUMP REMOVAL

April 17,1972 Activity No.121

DESCRIPTION AND PURPOSE:

Removal of tree stumps to eliminate potential roadside hazards and improve theappeararic,:of the roadside.

SCHEDULING :

Schedule as fill-in work.TYPE OF ACTIVITY :

Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2

Equipment :

No. Description Group

1 Pickup 021 Stump chipper 17

RECOMMENDED PROCEDURE :

WON( Unit : Each stump

Daily Production : 4-7 stumps

Average PrOdUCliVilY 3.0 man-hours/stump

MATERIAL

TopsoilGrass seedMulch

011111111-0

1. (Remove stump with stump chipper to 6" below final ground elevation.

2. Remove stump chips.

3. Backfill area with suitable topsoil.

4. Seed and mulch area.

CAUTION: Stump chippers should be operated only by adequatelytrained personnel wearing appropriate safety apparel.

- 1 8..IIISPIIMMININ11111111111111V

Page 25: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

CLEAN DRAINAGE STRUCTURES

April 11,181211,1812122

Activity No.

DESCRIPTION AND PURPOSE :

manholes by removal of accumulated dirtCleaning of catch basins, culverts andand debris to ensure proper drainage.

SCHEDULING : TYPE OF ACTIVITY :

All drainage structures will be cleanedonce annually with a second cleaning Routine Maintenanceperformed if necessary. Check schedulingcalendar,

CREW /EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2Work Unit : Each structure

Equipment : Daily Production : 18-27 structures

No. Descrip11011 DOW Average PrOdUCIIIIY : 0,9 man-hours/struct.Mechanical

MATERIAL1 Sewer rooter 16

Manual None

1 Truck 03(A truck-mounted flashing arrow should beused where traffic conditions warrant.

RECOMMENDED PROCEDURE :

check depth of solid debris to determine

water pressure (agitator).

then check the condition of the structure.

replacing cover.

of cover, remove solid debris with a long-

for sewer gas prior to entering structure.for further removal of debris.

the structure interior to determine if further

replacing cover.

,---

MECHANICAL

1. After removing and cleaning cover,what cleaning is necessary.

2. As required, loosen solids with

3. Check interior for sewer gas and

4. Carefully clean ring seat before

MANUAL

1. Following removal and cleaninghandled shovel.

2. If the structure is deep, checkUse the rope and pail technique

3. Conduct a visual inspection ofcleaning or repair is necessary.

4. Carefully clean ring seat before

Page 26: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

FULL-WIDTH LITTER PICKUP

April 17,1972

DESCRIPTION AND PURPOSE :

of right -of -way to remove unsightly orScheduled litter pickup of the full widthhazardous objects.

SCHEDULING : TYPE OF ACTIVITY :

The litter pickup of the full width is to Routine Maintenancebe performed once a year.Check the schedulin calendar.

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2 - 3Work Unit : Pass mile

2 R/W less than 100 feet3 -- RAN greater than 100 feet

Equipment : Daily Production : 4-6 pass miles

No. DescriptionGroup Average Productivity : 4.0 man-hours/pass

1 Truck 03mile

MATERIAL

None

RECOMMENCED PROCEDURE :

when necessary.

areas.

1. Collect small debris with containers.

2. Place large items directly on truck.

3. Cover truck box to contain litter

4. Dispose of litter at designated

-20-

Page 27: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

CLEAN AND RESHAPE DITCHES

April 17,1972 _124Activity No.

DESCRIPTION AND PURPOSE

restore the original flow line and grade;of ditch sediment.

Cleaning and reshaping roadway ditches toto include loading, hauling and disposal

OSIVAMIIMO 1.1wbermeo 04M0*SCHEDULING : TYPE OF ACTIVITY :

Check scheduling calendar. Special Authority

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 6Work Unit: Ditch mile

(Add flagmen as needed.)

Equipment : Daily Production : 0.2- 0.4 miles

No, Description Group Average Productivity: 160 man-hours/ditch

3 Trucks 041 Front-end loader 381 Motor grader 31

mileMATERIAL

None

RECOMMENDED PROVAME :

establish flowline of ditch, and

and windrow on shoulder for pickup bytraffic at a minimum.

Six-foot, flat-bottom ditches are minimum

needed for erosion cootmi.

1. Provi3e, adequate outlet for water,provide dumping spot for dirt removed.

2. Remove excess dirt with graderloader. Keep interference with

3. Do not cut V-bottom ditches.requirements.

4. Dress, mulch and seed slopes as

14,.............

Page 28: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

MACHINE MOWINGApril 17,1972 126Activity No.

DESCRIPTION AND PURPOSE :

mowing) to accomplish neat, uniformMachine mowing (except guardrail or sloperoadside grassy,area.

SCHEDULING : TYPE OF ACTIVITY :

Schedule according to the Routine Maintenancescheduling calendar.

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 1

,Work Unit : Acre(See note below.)

Equipment : Daily Production : 7-9 acres

No. Description Group Average Productivity : 1.0 man-hours/acre

1 Mower 05

or

1 Mower 06

1 Service Truck 08

MATERIAL

None

RECOMMENDED PROCEDURE .

work independently, butmowers.

of acres to be mowed and develop

each type of mower on any sectionpasses and mower congestion. When

with bat wings) work bestexist. Assign these mowers

five and other odd number passes.

and under, work best on wideMowing around signs, ramps, etc.

less productive and work best fornarrow shoulders, "V" ditches, etc.

basic equipment and crew size -- wheneverindicate that a section of roadside can

4 mowers.

Mowing is machine-paced. Each mower shouldshould remain within visual contact of other

1. Each garage should compute the numbera plan for mowing.

2. Designate a specific area of work forso as to reduce turning, unnecessarymaking assignments, consider the following:

+ Fifteen-foot rotary mowers (single-uniton the wider areas where few obstructionswhere they can mow one, three,

+ Single-unit rotary mowers, 8-footshoulders and foreslopf s and for

+ Sickle-bar mowers bmically aremowing around obstmctions, on

NOTE: Add 1 to 3 mowers and men to thethe mowable width and type of terrainbest be mowed by a team of 2 to

Page 29: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

REPLACE STEEL BEAM. GUARDRAIL

April 11,1972 Activity No. 130

4...,..DESCRIPTION AND PURPOSE:

sections, posts and hardware, andas well as routine replacement needs.

Replacement of damaged steel beam guardrailrealignment as a result of traffic accidents

_..---............SCHEDULING : TYPE OF ACTIVITY :

Scheduling of guardrail repair Emergency Maintenancehas top priority.

CREW /EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 3Work Unit: Lineal foot of guardrail

(Add flagmen as needed.)

Equipment : Daily Production : 26-48 lineal feet

No, Description Group Average Productivity : 0.6 man-hours/linealfoot

1 Truck 031 Chain saw

Under frost conditions, add one compressor.

Equipment for larger jobs to include:generator, post-hole auger, compressor, orfront-end loader as needed.

of guardrail

MATERIAL

Beam sections; straight and/or curvedend shoes.

Treated timber or steel posts andhardware.

RECOMMENDED PROCEDURE :

repair materials from stores.

repair, replace parts:

earth around them.

4 feet.

standard plan.

necessary.

1. Survey damage and draw necessary

2. After removing parts damaged beyond

a. Realign loose posts and compact

b. Install new posts to depth of

c. Install hardware according to

3. Clean up debris and regrade shoulders

-23- 29

Page 30: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SWEEPING AND FLUSHING

April 17,1972

DESCRIPTION AND PURPOSE :

material. Includes the sweeping ofRoutine mechanical sweeping to remove loosecurbs, gutters and roadway.

SCHEDULING : TYPE OF ACTIVITY :

Schedule during the summer months. Routine Maintenance

CRECOUIPM.NT ACCOMPLISHMENT

Recommended Crp,'.1 Size : 2Work Unit : Mile

Equipment : Daily Production :' 7-13 miles

NO, Description Group Average Productivity : 1.6 man-hours/mile

1 Tractor 051 Broom 10

or

1 Mechanical sweeper 181 Dump truck 04

MATERIAL

None

RECOMMENDED PROCEDURE :

can be caused by accidents or stormsMaintenance.

See operator's manual.

NOTE: Emergency sweeping of debris whichfalls under Activity 159, Other General

-...................-24...

O

Page 31: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SIGN MAINTENANCEApril 17,1972 Activity No, 133

DESCRIPTION AND PURPOSE :

signs whose state of disrepair endangersRepair or replacement of all traffic controlthe safety of the motorist.

SCHEDULING : TYPE OF ACTIVITY :

See procedure below. Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2Work Unit : Man-hour

Equipment : Daily Production : N/A

No. Description Group Average Productivity : N/A1 Truck 08

or

1 Truck 03

MATERIAL

Regulatory, directional or warning signs

RECOMMENDED PROCEDURE :

to receive first priority maintenance --

advisory speed panelfor same curve.

shall be turned 90 degrees facing awaythe month of May, and returned to face

supply of first priority signs andsigns which, if damaged by accident,

1. The following traffic signs areimmediate service 24-hour basis:

STOPYIELDCURVE withTARGET ARROW

2. "Watch for ICE on bridge" signsfrom the appropriate roadway intraffic during October each year.

3. Each garage shall carry a minimumany other regulatory or warningwould endanger the safety of motorists.

Page 32: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SIGNAL MAINTENANCE

April 17,1972134Activity No.

DESCRIPTION AND PURPOSE :

devices whose state of disrepair endangersRepair or replacement of all traffic controlthe safety of the motorist.

SCHEDULING : TYPE OF ACTIVITY :

See procedure below. Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 2 Work Unit : Man-hour

Equipment : Daily Production : N/A

No. Description Group Average ProduCtivity : N/A

1 Truck 08

or

1 Truck 03

MATERIAL

(as required)

RECOMMENDED PROCEDURE :

perform only necessary emergencyhighway open and as safe as possible

and/or the local law enforcement

control devices shah be referred

1. Direct maintenance personnel shallsignal maintenance to keep theuntil the Head Office Electricianagent arrives.

2. Maintenance of electrical trafficto the Head Office Electrician.

-26-

Page 33: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE SUMGENERAL BRIDGE MAINTENANCE

April 17,1012 ACIIVIIY NO,150

DESCRIPTION AND PURPOSE:

to include repairs to piling, decking,Maintenance or replacement of all bridges,abutments and railing.

...----....................................._-__

SCHEDULING : TYPE OF ACTIVITY :

Schedule according to the Maintenance Improvementscheduling calendar.

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crow Size : 2 - 8 *Work Unit : Man-hour

(Add flagmen as needed.)

Equipment : Daily Production : N/A

No. Description Group Average Productivity : N/A

(as required) MATERIAL

(as required)

RECOMMENDED PROCEDURE :

to be published in December 1973.

crew, especially in the case of

NOTE! Complete bridge standards are

* This work usually can be done by a smallpainting and abutment repair.

Page 34: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

OTHER GENERAL MAINTENANCEApril 17,1972 Activity Na. 359

...

DESCRIPTION AND PURPOSE:

shoulders and roadside, not covered byAll other general maintenance to surface,Activities 101-134.

SCHEDULING : TYPE OF ACTIVITY :

Schedule as necessary. Routine Maintenance

CRFW/EOUIPMENT ACCOMPLISHMENT

Recommended Crew Size : (as required)Work Unit : Man-hour

Equipment : Daily Production : N/A

No. Description Group Average Productivity: N/A

(as required) MATERIAL

(as required)

RECOMMENDED PROCEDURE :

includes:

markers

work

pavement striping.

betterments.

Maintenance work coveted by this activity

+ Isolated litter pickup

+ Painting of sign posts and bridge

+ Hand-mowing

+ Other roadside and drainage

+ Other traffic services, to include

+ Maintenance improvements and

16..................

Page 35: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

SPREADING SALT

April 17,1972160Activity No.

DESCRIPTION AND PURPOSE:

to eliminate general slipperyApplying salt on continuous stretches of highwaysconditions.

SCHEDULING : TYPE OF ACTIVITY :

Schedule as necessary. Emergency Maintenance

CREW/EilUIPMENT ACCOMPLIMMENT

Recommenced Crew Size : 1

Wen hit: Pass mile

Equipment : Daily Production : 70-90 pass miles

No. Description Group Average Productivity : 0.1 man-hours/pass

1 Truck 03/04

1 Tailgate augerand spreader 57

mile

MATERIAL

Salt

RECOMMENDED FROCEDURE :

of 450 lbs. per two-lane mile under mostshould be set for the average traveling

mph, depending on location and conditions)]UNIFORM APPLICATIONS.

weather conditions in deciding which

is recommended.

and salting are recommended.

is recommended.

to the Winter Operations Guide.

extreme cold and falling temperature.create icy conditions.

a pattern 18' wide except on narrow streetsCenter of pattern should be on center-ramps and widened sections of

1. Apply salt at an application rateconditions. Cab application settingsspeed maintained (15 mph or 20MAINTAIN AVERAGE SPEED FOR

2. Consider general temperature andwinter operation to perform:

+ Below 10°F -- plowing+ 10 - 20° F plowing

+ Above 20°F -- saltingFor changing conditions, refer

3. Avoid salting too early duringSalt wets the pavement and may

4. Spreader spinner should createwhere a 12' pattern should be used.line except on superelevated curves,roadway.

49--

14:44.1

Page 36: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

PLOWING SNOWApril 17,1972 Activity No, 161

DESCRIPTION AND PURPOSE :

surfaces or shoulders.Clearing of snow, ice or slush from roadway

SCHEDULING : TYPE OF ACTIVITY :

Schedule as necessary. Emergency Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : 1

Work Unit : Pass mile

Equipment : Daily Production : 100-130 pass miles

No. Description Group Average productivity : 0.06 man-hours/pass

I Truck 03/041 Snow plow 55

mile

MATERIAL

RECOMMENDED PROCEDURE :

plow to throw snow.

Occasionally stop to allow traffic

and turnarounds too tight for a

and remove snow accumulated on the

1. Maintain adequate speed for the

2. Do not blind following vehicles.to clear.

3. Be careful.of obstacles, soft shoulderstruck and plow.

4. At railroad crossings, raise plowcrossing.

5. Do not throw snow off overpasses.

-30-

Page 37: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MMNTENANCE STANDARD

BUILDING MAINTENANCE

April 11,1912 Activity No, 170

4,......,

DESCRIPTION AND PURPOSE :

_

to the Head Office as per currentpainting and other maintenance

Time, equipment and materials chargeableregulations. This work includes all cleaning,of buildings, shops and garages.

SCHEDULING : TYPE OF ACTIVITY :

This is "rainy weather" work. Non-MaintenanceDo not schedule during fair weather.

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : (as required)Work WM : _ Man-hour

Equipment : Daily Production : N/A

No. Description Group Average Productivity : N/A

(as required)MATERIAL

(as required)

RECOMMENDED PROCEDURE :

37

Page 38: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

April 17,1972

MAINTENANCE STANDARD

GROUNDS MAINTENANCEActivity No. 171

A

DESCRIPTION AND PURPOSE :

areas except those used specifically formaintenance materials are kept.

The maintenance and cleaning of all outsidemaintenance operations or storage areas where

SCHEDULING : TYPE OF ACTIVITY 4,

This work includes normal parkand sidewalk maintenance. Routine Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : (as required)Work Unit: Man-hour

Equipment : Daily Production : n.a.

No. Description Group Average Productivity : n.a.

(as required)MATERIAL

(as required)

RECOMMENDED PROCEDURE :

J-32-

Page 39: DOCUMENT RESUME TITLE Managing Highway Maintenance ... · DOCUMENT RESUME ED 103 639 CB 003 237 TITLE Managing Highway Maintenance: Management Data and. Maintenance Standards; Levels

MAINTENANCE STANDARD

ADMINISTRATIVE OVERHEAD

April 17,1972 Activity NO, 180

DESCRIPTION AND PURPOSE :

to maintenance activities,and

visaionn rnaaotdycwhaargiendspteiTahisucariactivityandincludes

leave,1 supervision

SCHEDULING : TYPE OF ACTIVITY :

N/A Non-Maintenance

CREW/EQUIPMENT ACCOMPLISHMENT

Recommended Crew Size : N/A

Oren

Work Unit: Man-Hour

Equipment : Daily Production : N/A

No. Description Average Productivity : N/A

N/A

.

MATERIAL

RECOMMENDED PROCEDURE :

0

-33-