YUCCA MOUNTAIN PROJECT Y-AD-075DOCUMENT TRANSMITTAL/ACKNOWLEDGMENT RECORD 5/90
,O: BELKE W L, NRC, 4H-3 FROM: Science Applications Int. Corp.Document Holder Name Document Control Center
1717 H STREET N.W, 101 Convention Center Drive1717__________STREET_______________ Suite 407, Mail Stop 517 / T-34
Organization Las Vegas, Nevada 89109
Address (f necessary) TRANSMITTAL DATE: September 17, 1990
WASHINGTON, DC 20555-0000 COPY NO.: 223
DOCUMENT TITLE: YUCCA MOUNTAIN PROJECT OFFICE QUALITY MANAGMENT PROCEDURES
DOCUMENT REVISION: 37 DOCUMENT IDENTIFICATION NUMBER: YMPO/88-1
DIRECTIONS
REPLACE: Table of Contents, Rev 36, dated 08/22/90, withTable of Contents, Rev 37, dated 09/12/90.
INSERT: ICN #3 to QMP-03-01 Peer Reviews, Rev 1, dated9/17/90, in front of ICN #2 to QMP 03-01.
REPLACE: QMP-15-01, CONTROL OF NONCONFORMANCES, Rev 1, dated5/23/88, with Rev 2, dated 9/29/90
REMOVE: ICN #1 to QMP-15-01, dated 4/24/90.
[1/'estroy or mark obsolete material "Superseded'] Return obsolete material with this transmittal record
f 3 ]New issue - no obsolete material
SIGN/DATE IN BLACK INK BELOW TO CONFIRM THAT THE ABOVE DIRECTIONS HAVE BEEN FOLLOWED,i AND RETURN THIS TRANSMITTAL RECORD, WITH THE OBSOLETE MATERIAL, AS APPROPRIATE, TO THE
ABO-VE. ADDRESS BY:
OBSOLETE MATERIAL RECEIVED: 0DCC Personnel Ini ials Date
. An~~~T-
f,.-
,
Lt--
iit
I,<
. i:1>4fizzl,0 >
I
�,7
0 3
-
1�
YMiVQuality Management Procedures w_2S)
Table of Contents
QMP-01-01 WMPO Organization
QMP-01-02 Stop Work
QMP-02-01 1 In Preparation
QMP-02-01 Qualification, Proficiency, Indoctrin- 1 (9/2/88)ation, and Training of Waste ManagementProject Personnel
QMP-02-02
QMP-02-02
QMP-02-02
1
2
(9/7/89)
(10/16/89)
1 (2/22/88)Qualification of Quality AssuranceProgram Audit Personnel
QMP-02-03
QMP-02-03
QMP-02-04
QMP-02-08
QMP-02-08
QMP-02-08
QMP-02-08
QMP-02-08
QMP-02-09
QMP-02-09
QMP-02-09
QMP-03-01
QMP-03-01
QMP-03-01
QMP-03-01
QMP-03-02
Quality Assurance Management Assessment
Qualification, Proficiency, Indoctrin-
ation">and Training of DOE YuccaMountain> 2Project Office Personnel
(8/4/89)
0 (7/12/89)
In Preparation
- (2/7/89)
(7/20/90)
(7/20/90)
(8/27/90)
Technical Assessment Review- 0 (8/8/88)
In Preparation
(5/18/90)
Development and Conduct of Training 0 (3/31/89)
(7/20/90)
(7/25/90)
(9/17/90)
Peer Reviews 1 (1/11/89)
Control of Scientific Investigations In Preparation
September 12, 1990, Rev. 37 Page 1
-
-I
YE;. Quality Management Procedures _LPs)
Table of Contents
QMP No.
QMP-03-03
QMP-03-04
QMP-03-05
QMP-03-06
QMP-03-07
QMP-03-08
QMP-03-09
QMP-03-10
QMP-04-01
QMP-04-01
QMP-04-02
QMP-05-03
QMP-06-04
QMP-07-03
QMP-07-03
QMP-07-04
QMP-07-04
QMP-07-04
QMP-07-04
QMP-07-04
ICN No. QMP Title
Software Classification, Installatioiand Use
Software Development and Maintenance
Software Verification and Validation
Software Configuration ManagementSystem
Software Documentation Control andReview
Qualification and Acquisition ofExisting Software
Project Change Control Board Process
FieldExchange Control Procedure1~~~~~
Procutnemnt Document Control
YMP/DOE Procurement Actions
Preparation and Control of the NNWSIProject QAP and the V4PO QAPP
Project Office Doc'iffent Development,Review, Approval and RevisionProcess
1,
Revision No.
In Preparation
In Preparation
In Preparation
In Preparation
In Preparation
In Preparation
In Preparation
In Preparation
(7/14/89)
0 (4/11/88)
In Preparation
0 (5/27/88)
0 (5/29/90)
, , fn I IIII 1
Control of Purchased Items and Ser
1
2
3
4
I /ZJ/ 1)
vices 0 (4/11/88)
(7/3/90)
-~k- - (7/9/90)
(8/20/90)
(8/20/90)
0 (11/29/89)Supplier Evaluation/QualifiedSuppliers List
QMP-15-01
QMP-15-01
September 12,
1
Control of Nonconformances
1990, Rev. 37
Superseded by IRev. 2 |
2 (9/29/90) I
Page 2
-
I IYWvi Quality Management Procedures APs)
l of Co-n .
Table of Contents- ,
QMP No.
QMP-16-01
QMP-16-02
QMP-16-02
QMP-16-03
QMP-16-03
QMP-17-01
QMP-17-01
QMP-17-01
QMP-18-01
QMP-18-02
QMP-18-02
QMP-18-02
QMP-18-02
QMP-18-02
QMP-18-02
ICN No. QMP Title
Corrective Action
1
Trend Analysis
Revision No.
0 (12/10/84)
(6/23/89)
2 (5/27/88)
In Preparation
System 1 (6/5/89)
(5/29/90)
(7/25/90)
1
Standard Deficiency Reporting
1
2
1
2
3
4
5
Records Management:Record Source Implementation
Audit System for the Waste ManagementProDect Office
As.
3 (10/3/88)
(2/6/89)
(4/2/8 9)
(4/20/89)
(4/20/8 9)
(8/18/89)
1 (5/27/88)
1 (10/30/89)
Surveillances
September 12, 1990, Rev. 37 Page 3
-
REQUIRED CHANGE(S): (Minor [E1 Yes No)
PARAGRAPH
ICN #1, Page 1 of 4
ICN #2, Page 3 of 3
CHANGE TO
Change Rev. O to "Rev. 1."
Change "ICN Number: 1" to ICN Number: 2.
-10 k
AFF V�
I 1
NPPROVALS
-
,'; . . , !, ':!�- -Dole,...I , I , - ' ': I
..". : '. , N '.. '. -
- . -- -
, - YUA MOUNTAIN PROJECTDOCUMENT APPROVAL SI
TitleQUALITY MANAGEMENT PROCEDURE QMP-l5-01 CONTROLNONCONFORMANCES
APPROVAL
PROJECT MANAGER:
DIRECTOR OF QUALITY ASSURANCE:
M. R. Kunich -NSignature
John RinaldiSignature
S. H. Klein
10/29/84
Date
11/19/84Date
QASC QA Manager 10/16/84.
(OTHER, AS REQUIRED) Signature Date
REVISION 0 EFFECTIVE DATE: 12/10/84
REVISIONS
INITIAL AND DATE
REVISION 1 REVISION 2 REVISION 3 REVISION 4
PROJECT MANAGER: M. E. Spaeth 4 N/A5/16/88 -:ame/ a ock I'
James Blaylock I
-
DIRECTOR, OA:5/23/88
Vi/f /9 DWMPO Pro ject Man.(OTHER, AS REQUIRED)
M- ii Kuieh
5/18/88 '/ ";'1v49v
EFFECTIVE DATE: 5/27/88 I,_ ..
Page 1 of 17
-
YUCCA MOUNTAIN PROJECT Y-AD-001PROCEDURE 4/90
tleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
1.0 PURPOSE AND SCOPE
1.1 PURPOSE
This procedure establishes the Yucca Mountain Project Office (ProjectOffice) method for the identification, segregation, documentation,evaluation, notification, disposition, and verification of corrective actionof nonconforming items as required by AP-5.27Q, Control of NonconformingItems and Office of Civilian Waste Management (OCRWM) Quality Assurance (QA)Requirements Document and Section 15 of the OCRWM Quality Assurance ProgramDescription Document (QAPD). Stop Work actions and Corrective Action Reports(CARs) justified by nonconformances shall be controlled by QMP-01-02, StopWork and QMP-16-01, Corrective Action, respectively.
1.2 SCOPE
This procedure also describes the system for the Project Office reviewand approval of nonconformance reports (NCRs) submitted by ProjectParticipants, Nevada Test Site (NTS) ^and Project Office Support Contractors(Contractors) to the Project Office As4Tequired by Administrative Procedure,AP-5.27Q. These interactions are deribed in Section 5, Steps 11 and 12.
2.0 APPLrCABILITt'
This procedure applies to Project Office items which have beenidentified by Project Office personnel as nonconforming and to Project Officereview and approval of NCR actions which are subittel by a Participant orContractor.
It applies to the control of nonconforming items identified at asupplier's facility dispositioned Use-As-Is or Repair which are covered byQMP-07-03, Control of Purchased Items and Services, and to nonconformances ofpurchased items identified during receiving inspection, acceptance testing orinstallation.
It does not apply to CARs resulting from nonconformances considered tobe Significant Conditions Adverse to Quality (SCAQs), which shall beprocessed in accordance with QMP-16-01, "Corrective Action Requests. Thisprocedure does assign the responsibility for deciding if CARs are appropriatebecause of nonconformances, to the managers and QA personnel involved in thenonconformance process.
V~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Effective Date Revision Supersedes Page No.9/29/90 2 2 of 17 QMP-15-01
-
I' YUCCA MOUNTAIN PROJECT Y-AD-001PROCEDURE 4/90
itleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
3.0 DEFINITIONS
NOTE: Terms in this procedure are used as defined in OCRWM QARequirements and Program Description Documents or the Project Glossary. Thefollowing additional definitions are adopted for the purposes of thisprocedure.
3.1 REJECT/SCRAP
The disposition that is authorized when the nonconforming item cannot bereworked or repaired and is considered unacceptable for its intended use.Reject may include the return of an item to its original supplier.
3.2 REPAIR
The process of restoring a nonconforming item to a condition such thatthe capability of the item to function reliably and safely is unimpaired,even though the item still does niot conform to the original requirements.
3.3 VERBAL DISPOSITION
The judicious use of verbal communication subsequently documented, toexpedite the disposition of a nonconforming item when it is essential to work
'flow.
3.4 PROJECT OFFICE PERSONNEL
Any Project Office staff member assigned to fh Project.
3.5 DISPOSITIONERS
A Dispositioner is any Project Office staff member assigned throughdocumentation by Project Office Division Directors to determine appropriatedispositions of nonconformances. Dispositioners shall have demonstratedcompetence in the specific areas they are evaluating, have an adequateunderstanding of the requirements, and have access to pertinent backgroundinformation.
4.0 RESPONSIBLE PARTIES
The following Project Office individuals or organizations areresponsible for activities identified in Section 5.0 of this procedure:
1. Project Office Personnel
2. Director, Quality Assurance (DQA)/Designee
Affective Date Revision Supersedes Page No.
9/29/90 2 3 of 17 QMP-15-01
-
YUCCA MOUNTAIN PROJECTPROCEDURE
Y-AD-0014/90
tieQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
3. QA Division Personnel (QA Personnel)
4. Division Directors (DD)
5. Dispositioner
Dispositioner shall be assigned through documentation by Project Office.
6. Yucca Mountain Site Manager (YMSM)
5.0 PROCEDURE
NOTE: The steps described in this section are illustrated in Figure 1,Flowchart of Project Office Nonconforming Items Process.
NOTE: DDs and the DQA may delegate the following responsibilities andauthorities. This delegation must be documented. Personnel authorized toapprove dispositions shall have their signatures documented.
RESPONSIBLE PARTY STEPS AMCEDURE
Project Office Personn(Originator)
INITIATING NONCONFOIffMCE REPORTS
el 1. Identify a nonconforming item andinform-a" supervisor and/or ProjectOffice QA Personnel of thenonconformance.-
The supervisor must relay the concern toQA personnel.
QA Personnel (Initiator) 2. Initiate a Nonconformance Report(Attachment 1) by obtaining an NCRnumber from the QA AdministrativeAssistant (QAAA), who enters NCR in theNonconformance Log. Apply a Hold Tag(Attachment 2) or similar device toprevent further processing, installationor use of the nonconforming item.
Ensure identification method used doesnot adversely affect the end use of theitem and will include the NCR number.Ensure that when practical, non-conforming items will be segregated byplacing them in a clearly identifiedhold area until dispositioned. If
.tifective Date
9/29/90
S pesede PagRevision
2
Supersedes Page
4
No.
of 17 QMP-15-01I
-
' - /}
YUCCA MOUNTAIN PROJECT Y-AD-001I| PROCEDURE 4/90itle
QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
segregation is impractical or impossiblebecause of physical conditions such assize, weight or access limitations,other visible precautions shall be usedto preclude use of the item.
Review the nonconformance to determineif it is a significant condition adverseto quality and warrants a CAR, and ifclosure of the CAR affects removal ofthe Hold Tag.
Transmit the NCR form to the DDresponsible for the item.
DD 3. Review and accept or reject NCR.
M May initiate a technical review toassist in evaluation of the NCR.
If DD accepts NCR, assignDispositioner(s) to the NCR. Go to Step
.,
Determine if the nonconformance deservesa CAR. If it does, processes inaccordance with MP-16-01 and has itcross referenced on the NCR and HoldTag.
Determine if CAR resolution controlsclosure of NCR and removal of Hold Tag.
Request signatory concurrence of DQA onverifying and completing correctiveaction proposed by CAR in accordancewith QMP-16-01.
If DD rejects NCR, forwards NCR withjustification for rejection to DQA andthe QA Personnel who initiated the NCR.Go to Step 4.
A1 ffective Date Revision Supersedes Page No.
9/29/90 2 5 of 17 QMP-15-01
-
YUCCA MOUNTAIN PROJECTPROCEDURE
Y-AD-0O 14/90
tieI\.- / QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
DQA/Designee 4. Settle rejection dispute with DD or ifin agreement with DD, copies NCR to QA(Initiator) and the Originator, signingthe NCR "closed," and has the Hold Tagremoved. If DQA cannot resolve disputewith DD, refers the NCR to highermanagement of the Project in accordancewith QMP-01-01, Organization.
Dispositioner(s)
Concur by signature or reject the actionproposed by a CAR resulting from anonconformance as required by QMP-16-01.
5. Determine disposition required tocorrect the nonconforming item and thecorrective action necessary to prevent
^ recurrence.,.w-/
The disposition shall:
a. .Reference approved design documents,.wprocedures, plans, and work orders
that-'re necessary for correction ofthe-condition.
b. Comply with latest design documents,procedures, plans and work orders.
c. Identify revisions to affecteddocuments.
d. Identify the organizationresponsible for the disposition.
NOTE: Verbal Dispositions will be permittedonly where Project needs warrant theexpeditious action and will bedocumented within two working days afterthe disposition has been given. Go toStep 6.
E'[•ffective Date
| 9/29/ 90
Revision
2
Supersedes Page
6
No.
of 17 QMP-15-01I
-
YUCCA MOUNTAIN PROJECTPROCEDURE
Y-AD-0014/90
Ie-- QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
NOTE: Conditional Release Dispositions requiredocumented justifications thatnonconforming items can be removedsubsequently without any damage to theassociated facility, remain accessiblefor inspection, limitations for use havebeen set, can be traced and identifiedand use will not endanger personnel. Goto Step 6.
-q NOTE: Repair and Use-As-Is dispositionsrequire technical justification and besubject to the same design controls asthose applied to the original design ifthe nonconformance affects designrequirements. Go to Step 6.
NOT:- .epair, Use-As-Is and Reworkdispositions require an impactassessment of consequences of themalfunctioning or nonconforming items.Go h'to Step 6.
NOTE: Repair and Rework dispositions requirereexamination in accordance withoriginal acceptance criteria, unlessalternate acceptance criteria arespecified in the disposition. Go toStep 6.
NOTE: Reject or Scrap dispositions ensure thatthe items are not used on the Projecteither by scrapping or being returned tothe original suppliers. Go to Step 6.
DDs 6. Evaluate the proposed disposition andjustification.
If acceptable, issue NCR with designateddisposition to responsible parties forperforming the disposition. A copy shallbe sent to the DQA for evaluation ofreinspection criteria (Step 7), andlogging.
r ffective Date9/29/90
Revision
2
Supersedes Page No.
7 of 17 QMP-15-01
-
w-.YUCCA MOUNTAIN PROJECT
PROCEDUREY-AD-0014/90
itlex_-,- QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
If rejected, return NCR toDispositioner(s) for rework.
DISPOSITIONING NCRS
DQA/Designee 7. Evaluate reinspection criteria of Repairand Use-As-Is disposition.
If acceptable, assign QA Personnel totrack progress of disposition.
If unacceptable, return to DD forrevision.
QA Personnel 8. Track progress of disposition, verify,,.adequacy and acceptability ofcompletion of disposition, remove HoldTag (except for Reject/Scrap items andif prevented by a CAR) and forward NCRto DD with acknowledgment ofverification.
For Repair disposition, verificationshall assure that the repaired itemswere re-rm mined to the originalrequirements ess alternate acceptancecriteria were appfroved in thedisposition.
Add Reject/Scrap~entry to Hold tags forsuch items.
9. Process necessary documents (drawings,specifications, plans and work orders)through the original review cycle of theaffected documents.
DD
Rework items should not require documentchanges, while Reject/Scrap items mayrequire Procurement document changes.
Document changes shall reference the NCRand be cross-referenced on the NCR.
ffective Date
9/29/90
Revision
2
Supdrsedes Page
8
No.
of 17 QMP-15-01
-
-IYUCCA MOUNTAIN PROJECT
PROCEDUREY-AD-0014/90
;tieI QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
Close NCR with signature,and forward NCRpackage to DQA and a copy NCR to theOriginator.
DQA/Designee 10. Review completed NCR for proceduralcompliance, log closure and forwardpackage to the Local Records Center inaccordance with QMP-17-01, RecordsManagement: Record SourceImplementation.
(Go to Logging and Trending, Step 13)
Repair and Use-As-Is dispositions mayoriginate at a Project Office "supplier"as described in QMP-07-03, Section 5.6..They are supported with technicaljustification and evaluated by the DD asin- Step 5.6.
PROJECT PARTICIPANT 6W1GINATED NCRs
NCRs originating with ProjectParticipants in accordance withAP-5.27Q, pass through the TPO's(Initiator) oKf'(Dispositioner) of thoseorganizations to the Project Office asshown on Figure 2, Flowchart of ProjectOffice Interface With ProjectParticipant Initiated NCRs and thefollowing steps.
INITIATED NCR
(From Step 5.3 of AP-5.27Q)
YMSM or DD 11. Review and accept or reject NCR.
If accepted, forward to TPO ofParticipant responsible for assignmentand processing of disposition. (Step 5.6of AP-5.27Q)
ffective Date9/29/90
Revision
2
Supersedes Page
9 of 17 1No.
QMP-15-01
-
IYUCCA MOUNTAIN PROJECT
PROCEDUREY-AD-00 14/90
tie_ QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
RESPONSIBLE PARTY STEPS PROCEDURE
DD
DQA/Designee
If rejected, return NCR to TPO ofParticipant who initiated the NCR, withexplanation and reason for rejection.(Step 5.3 of AP-5.27Q)
DISPOSITIONED NCR
(From Step 5.9 of AP-5.27Q)
12. Review and approve or reject NCR.In either case, return NCR to TPO ofParticipant responsible for processingof Disposition. (Step 5.11 of AP-5.27Q)
CLOGGING AND TRENDING
13. F Through an assigned position of QAAA, orNequivalent, keep the Project Office NCRE6og that contains the followinginformation:
a,.NCR number
b. A brief description of then6nconforming item and condition
c. The person(s)'jor organization(s)responsible for determining andimplementing the'disposition andcorrective action
d. The status of each Project OfficeNCR, whether it is open, approved,rejected, voided, completed orclosed
e. Initiator's name and organization
f. Conditional Release in effect, ifappropriate
g." -CAR identification if issued
DQA/Designee 14. Develop an NCR trend process inaccordance with QMP-16-02.
V fective Date9/29/90
Revision
2
Supersedes Page
10 of 17
No.
QMP-15-01
-
J
It J ̂ * YUCCA MOUNTAIN PROJECT Y-AD-001PROCEDURE 4/90
QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
6.0 REFERENCES
NOTE: Refer to the latest revision of the documents listed below unlessotherwise stated.
6.1 REQUIREMENTS DOCUMENTS
OCRWM Quality Assurance Requirements Document, DOE/RW-0214
OCRWM Quality Assurance Program Description, DOE/RW-0215
Project Glossary
6.2 INTERFACE DOCUMENTS
AP-5.27Q, Control of Non-conforming Items
QMP-01-01, Organization-
QMP-01-02, Stop Work
QMP-07-03, Control of Purchased Items and Services
QMP-16-01, Corrective Action
QMP-16-02, Trend Analysis
QMP-17-01, Records Management: Record Source'tmplementation
7.0 FIGURES AND ATTACHMENTS
Figure 1, Flowchart of Project Office Nonconforming Items Process
Figure 2, Flowchart of Project Office Interface with Participant InitiatedNCRs
Attachment 1, Project Office Nonconformance Report Form
Attachment 2, Project Office Hold Tag
fective Date Revision Supersedes Page No.
9 /90 2 11 of 17 QMP-15-01
-
i -
YUCCA MOUNTAIN PROJECT 4/90PROCEDURE
:tleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
8.0 RECORDS
The following documents used or generated in the implementation of thisprocedure have been identified as QA Records and shall be forwarded to theCRF for processing in accordance with QMP-17-01, Records Management: RecordSource Implementation:
1. Closed, dispositioned Project Office NCRs and associateddocumentation such as technical justifications and Hold Tags
2. Voided Project Office NCRs
3. Conditional Releases
4. Project Office NCR Log
1 - M-f �&-
--A"
't4
104W7,--1-:1 n'
-,--v- z
Effective Date
9/29/90
Revision
2
Suporsedes Page
12 of 17
No.
QMP-15-01
-
K> K-I
I YUCCA MOUNTAIN PROJECTPROCEDUREY-AD-00 14/90.
TitleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
A/
Figure 1 - Flowchart of Project Office Nonconforming Items Process
Effective Date
9,:
Revision
29/90 2
Supersedes Page
13
No.
of 17 QMP-15-01-
-
KJ K)~~~~~~~~~~~~~'1-
I YUCCA MOUNTAIN PROJECTPROCEDUREY-AD-0014/90
TitleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
(Step 3 OF AP-S.270) (St" 9 OF AP-5.270)
I TPO (INITIATOR) ]PRELIMINARY NCR
ACCEPTED BY TPO.WITHOUT DISPOSITION
Stop 11
oYMSMKREJECT DO
TPO(INITLATOR) REVEW
CR
TPO (DISPOSITIONER)
TPO (DISPOSrTIONER)
VER8AL, CONDITIONALRELEASE, REPAIR,
USE-AS-IS NCR$
ilep 12 t D
DOD
APPROVE/REJECTNCR
TPO (DISPOSITIONER)
�- N-11IV A�
---
Figure 2 - Flowchart of Project Office Interfacewith Participant Initiated NCRS
I Effective Date Revision9/29/90 2 Supersedes Page14 No.of 17 Q [P-15-0]
-
I~~~~~~~~~-w~ ./l
YUCCA MOUNTAIN PROJECTPROCEDURE
Y-AD-00 14/90
TitleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
YUCCA MOUNTAIN PROJECT OFFICE N-OA-009NONCONFORMANCE REPORT 5/90
'NCR NO. DATE 2 ORIGINATOR AND ORGANIZATION 3 POOA (INITIATOR)
4 ITEM, NONCONFORMANCE, AND SOURCE OF REQUIREMENT:
5 PROJECTOFFICE DIVISION DIRECTOR (DO) NCR: O Accept, ORejecl; CAR REOUIRED: Dyes ONOEXPLANATION IF REJECTING NCR: Rejectlon Requires DOA Review) CAR No.:
SIGNATURE: DATE:
6 DIRECTOR oUALITY ASSURANCE (DOA) NCR: 0 Accept, 0 Reject;EXPLANATION FOR DECISION
SIGNATURE:- DATE:7YMPO MANAGEMENT (IF REOUIRED) D NCR: Accept. Reject;
EXPLANATION FOR DECISION:
~SIS~ATURE DATE:BDISPOSITION: [ VERBAL. a CONDITIONALRELEASE. 0 REWORK
REPAIR, *0 USE-AS1W b REJECT/SCRAP
DISPOSTONED ,BY: DATE: :_-_-- O DATE:* REQUIRES TECHNICAL JUSTIFICATION - USE CONTINYATIO~E IF NECESSARY
9 DDDISPOSmON ASSIGNED TO:
SIGNATURE __ DATE:
t0 PO OA VERIFICATION OF DISPOSMON 0 Accept 0 Reject; REMOVE HOLD TAG: Yes 0 NoJUSTIFICATION FOR ACTION:
SIGNATURE: DATE:
1DO
SIGNATURE DOCUMENTATION PROCESSED: 0 Yes 0 NoNCR CLOSED: a Yes No
DATE12 DOA
SIGNATURE PROCESS AND DOCUMENTSIN COMPLIANCE: Ye No
DATE
Attachment 1 - Project Office Nonconformance Report Form
.
Date Revision
9/29/90 2
Sopersedes Page
15 of
No.
QMP-15-0117
-
I k
7,�, -W -,
I ,
YUCCA MOUNTAIN PROJECTPROCEDURE
Y-AD-0014/90
TitleQUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
YUCCA MOUNTAIN PROJECT N-OA-009NONCONFORMANCE REPORT t90
NCR NO. CONTINUATION PAGE Page_ o
COMMENTS:
i'--t'' As
,C''' As
i of
�
M. A
Beg- As
y --+
. A
- ..
X.as He
_w .5w
,4w_' 'Fief is .rE
_ _aS
Attachment 1 - Project Office Nonconformance Report Form (continued)
Effective Date
9,
Revision
29/90 2
SupersedesI _
Page
16 of
No.
QMP-15-0117
-
YUCCA MOUNTAIN PROJECT Y-AD-001PROCEDURE 4/90
TitleI QUALITY MANAGEMENT PROCEDURE: CONTROL OF NONCONFORMANCES
TAG __ OF_YMPO HOLD TAG
NCR NO.: DATE:
CAR NO.: CAR CLOSURE REQUIRED: a YES NOITEM DESCRIPTION:-
ITEM IDENTIFICATION NO.:
NONCONFORMANCE: -
-e PO OA/DATE
CONDITIONAL RELEASE RESTRICTIONS OR-ISE:
DISPOSITION COMPLETE AND VERIFIED:
0
- VA, a. PO OA/DATE
REJECT/ SCRAP(Not to be removed) - - IL
~'PO OA/DATE.
Attachment 2 - Project Office Hold tag
I Effective Date9,
Supersedes Page
Revision
/29/90 2
Su�ersedes 1 Page
_17 of 7
No.
QMP-15-01