dodds, maccracken, richard & stanton residence … hall upgrades 2012/specs... · dodds,...

135
MIAMI UNIVERSITY OXFORD, OHIO 45056 Physical Facilities Division Facilities Contracting Standard Conditions of Contract for Construction DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE HALL ROOM UPGRADE PROJECT PROJECT MANUAL TECHNICAL SPECIFICATIONS March 27, 2012 THE ARCHITECTURAL GROUP, INC. NORMAN D. BUTT, AIA, LEED AP 135 N. MAIN STREET DAYTON, OHIO 45402 937-223-2500, FAX 937-223-0888 EMAIL: [email protected] MU PROJECT MANAGER RICHARD RUSSELL COLE SERVICE BUILDING OXFORD, OHIO 45056 513-529-7000, FAX 513-529-1732 EMAIL: [email protected] MU CONTRACT ADMINISTRATOR TERRANCE L. PONDER 181 COLE SERVICE BUILDING OXFORD, OHIO 45056 513-529-1697, FAX 513-529-6846 ©2012 THE ARCHITECTURAL GROUP, INCORPORATED This Document is a service instrument of THE ARCHITECTURAL GROUP, INCORPORATED and is to be used only in conjunction with this project.

Upload: others

Post on 31-Aug-2019

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

MIAMI UNIVERSITY OXFORD, OHIO 45056

Physical Facilities Division Facilities Contracting

Standard Conditions of Contract for Construction

DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE HALL ROOM UPGRADE PROJECT

PROJECT MANUAL TECHNICAL SPECIFICATIONS

March 27, 2012

THE ARCHITECTURAL GROUP, INC. NORMAN D. BUTT, AIA , LEED AP 135 N. MAIN STREET DAYTON, OHIO 45402 937-223-2500, FAX 937-223-0888 EMAIL: [email protected]

MU PROJECT MANAGER RICHARD RUSSELL COLE SERVICE BUILDING OXFORD, OHIO 45056 513-529-7000, FAX 513-529-1732 EMAIL: [email protected]

MU CONTRACT ADMINISTRATOR TERRANCE L. PONDER 181 COLE SERVICE BUILDING OXFORD, OHIO 45056 513-529-1697, FAX 513-529-6846

©2012 THE ARCHITECTURAL GROUP, INCORPORATED

This Document is a service instrument of THE ARCHITECTURAL GROUP, INCORPORATED and is to be used only in conjunction with this project.

Page 2: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard and Stanton Residence Hall Room Upgrades TOC - 1 TABLE OF CONTENTS The Architectural Group, Inc.

TABLE OF CONTENTS

MIAMI UNIVERSITY DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE HALL ROOM UPGRADE PROJECT

DOCUMENTS PAGE

DIVISION 01 – GENERAL CONDITIONS 01 1000 Summary ........................................................................................................1-5 01 1250 Summary of the Contract ................................................................................1-4 01 1400 Work Restrictions ............................................................................................1-2 01 2200 Unit Prices ......................................................................................................1-2 01 3100 Project Management and Coordination ...........................................................1-6 01 3200 Construction Progress Documentation ............................................................1-5 01 3300 Submittal Procedures .....................................................................................1-7 01 4000 Quality Requirements .....................................................................................1-4 01 5000 Temporary Facilities and Controls ..................................................................1-4 01 6000 Product Requirements ....................................................................................1-6 01 7000 Execution Requirements .................................................................................1-3 01 7310 Cutting and Patching ......................................................................................1-3 01 7320 Selective Demolition .......................................................................................1-4 01 7700 Closeout .........................................................................................................1-4 01 7810 Project Record Documents & Products ...........................................................1-6

DIVISION 02 – EXISTING CONDITIONS 02 2000 Site Preparation ..............................................................................................1-2 02 8500 Section Abatement ....................................................................................... 1-17 DIVISION 3 – CONCRETE 03 0130 Resurfacing Concrete .....................................................................................1-2 DIVISION 6 – WOODS, PLASTICS, AND COMPOSITES 06 1000 Rough Carpentry. ...........................................................................................1-3 06 2000 Finish Carpentry Millwork. ...............................................................................1-2 06 4100 Architectural Wood Casework. ........................................................................1-4

DIVISION 7 – THERMAL AND MOISTURE PROTECTION 07 9000 Joint Sealers. ..................................................................................................1-2

DIVISION 8 – OPENINGS 08 7100 Door Hardware (Reference Specification) .......................................................1-2 08 8300 Mirrors. ...........................................................................................................1-3 DIVISION 9 – FINISHES 09 2100 Veneer Plaster Finishing System. ...................................................................1-2 09 2600 Gypsum Board Assemblies. ............................................................................1-4 09 5100 Acoustical Suspended Ceiling Systems. .........................................................1-4 09 5990 Wood Floor Refinishing. ..................................................................................1-4 09 6500 Resilient Base Flooring/Transition Strip. .........................................................1-2

Page 3: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard and Stanton Residence Hall Room Upgrades TOC - 2 TABLE OF CONTENTS The Architectural Group, Inc.

09 6600 Resilient Tile Flooring. ....................................................................................1-4 09 9000 Painting and Coatings .....................................................................................1-5

DIVISION 22 – PLUMBING .....................................................................................................1-2

DIVISION 26 – ELECTRICAL ..................................................................................................1-3

Page 4: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1000 - 1 SUMMARY The Architectural Group, Inc.

SECTION 01 1000

SUMMARY

PART 1 – GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions and other Division 01 Specification Sections, that applies to this Section.

1.2 SUMMARY A. This Section includes the following:

1. Work covered by the Contract Document 2. Type of the Contract 3. Use of premises 4. Owner's occupancy requirements 5. Work restrictions 6. Specification formats and conventions

B. Related Sections include the following: 1. Division 01 Section "Summary of Contract" for responsibilities for the Work. 2. Division 01 Section "Temporary Facilities and Controls" for limitations and

procedures governing temporary use of Miami University facilities.

1.3 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Miami University Residence Hall Room Upgrade Project

1. Project Location: a. Dodds Hall, 600 Maple Avenue, Oxford, Ohio 45056 b. MacCracken Hall, 500 Center Drive, Oxford, Ohio 45056 c. Richard Hall, 501 S. Oak Street, Oxford, Ohio 45056 d. Stanton Hall, 700 Maple Avenue, Oxford, Ohio 45056

B. Owner: Miami University 1. Owner's Representative:

Mr. Rick Russell Project Manager Cole Service Building Oxford, Ohio 45056 [email protected] 513-529-7000

C. Associate: The Architectural Group, Inc. 1. Project Manager: Andy Balow, Associate AIA 135 N. Main Street

Dayton, Ohio 45402 [email protected] 937-223-2500, ext. 30

2. Principal-in-Charge: Norman D. Butt, AIA, LEED AP 135 N. Main Street

Dayton, Ohio 45402 [email protected] 937-223-2500, ext. 18

D. This project will be governed by a single prime contract with Lead Contractor being the General Construction Contractor.

E. The Work consists of the following: 1. Floor improvements:

a. Rubber and wood shoe base removals, 9”x9” VAT removal and abatement, VCT removals, floor preparation, and installation of new VCT and rubber

Page 5: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1000 - 2 SUMMARY The Architectural Group, Inc.

base. b. Wood flooring refinishing.

2. Wood wardrobe removals. 3. Light fixture removals and new installations including change outs of switches. 4. Kitchenette modifications. 5. Minor accessory hardware removals and installations. 6. Painting

1.4 PROJECT SCHEDULE

A. The following dates represent the contractual start and completion obligations for this project:

1. Construction Start:

a. Tuesday, May 8, 2012: Stanton Hall b. Wednesday, May 9, 2012: Dodds Hall c. Thursday, May 10, 2012: MacCracken Hall d. Friday, May 11, 2012: Richard Hall

2. Milestone #1: Friday June 1, 2012:

a. Substantial Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes, but is not limited to, distribution of the Project Punch list for all spaces listed above.

3. Milestone #2: Friday, June 8, 2012:

a. Construction Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes Occupancy approval by the State of Ohio Department of Industrial Compliance.

4. Milestone #3: Friday July 20, 2012:

a. Substantial Completion: All Residence Halls b. Includes, but is not limited to, distribution of the Project Punch list for all

Residence Halls. 5. Milestone #4: Friday, July 27, 2012:

a. Construction Completion: All Residence Halls b. Includes Occupancy approval by the State of Ohio Department of

Industrial Compliance.

6. Milestone #5: Friday, August 24, 2012 a. Project Close-out Completion b. Includes, but is not limited to, the submission of all pay requests, As-built

Drawings, Operation & Maintenance Manuals and all final closeout documents including: 1. Certification of Warranty Commencement 2. Certification of Contract Completion 3. Payment Release Affidavit

Page 6: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1000 - 3 SUMMARY The Architectural Group, Inc.

B. All project schedules should reflect the above noted contractual obligation dates. C. Internal Building Scheduling should be planned to complete work from the upper

floors downward except for the ORL rooms outlined above.

1.5 TYPE OF CONTRACT A. Project will be constructed under a single prime contract. See Division 01 Section

"Summary of Contract" for a description of work included in the contract. Contracts for this Project include the following: 1. General Construction

1.6 WORKS UNDER OTHER CONTRACTS A. In the event that asbestos products or materials are found to be present, other than

those that are part of the VAT flooring and mastic removals, Miami University’s Project Manager is to be immediately contacted so that Miami can address any associated issues and removals.

B. Contractors should be aware that other contracting groups involved with other projects may be working in the same buildings on other projects concurrently with this project.

1.7 USE OF PREMISES A. General: Contractor shall have full building access for construction operations as

indicated on Drawings. The General Contractor is responsible for protecting all existing walls, ceilings and floors during construction operations including carpeting and other finishes that are to remain.

B. Use of Site: Use of premises should be confined as necessary to areas within the Contract limits indicated, with corridors and non-work areas being used for the transportation of materials as needed. Reduce disturbance to portions of the Project site beyond areas in which the Work is indicated. 1. Confine constructions primarily to operations in areas indicated in the Drawings

and as required by the project scope including those areas where plumbing valves require manipulation to control water flow during renovation and/or where electrical panels require access.

2. Owner Occupancy: Miami University personnel will require ongoing access to the buildings with public use during limited times as noted below:

Limited Public Access Periods: a. Resident Advisors’ Offices June 8, 2012: 1st Floor of each building will be occupied after

June 8, 2012. Access to, and protection of, pathways to these apartment and office areas must be maintained:

1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135& 139

b. Alumni Weekend: June 14-17, 2012: First floor access by the general public to the

sorority suites located in Richard and MacCracken Halls will be required during this period; consequently, construction operations will not be allowed in these areas. This area shall be “broom cleaned” by the end of operations on June 13. Access to the other floors for construction operations will be allowed during this period with additional safety precautions required in coordination with Miami University’s Project Manager.

3. Driveways and Entrances: Keep driveways, parking lots, loading areas and

Page 7: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1000 - 4 SUMMARY The Architectural Group, Inc.

entrances serving premises clear and available to Miami University, Miami University's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of

materials and equipment on-site. C. Use of Existing Building: Repair damage caused by construction operations. Protect

building during construction period. D. Building Access: Access to the building shall be by the use of Miami University

issued electronic security swipe control cards issued through the General Contractor following the submission of individual names and social security numbers to Miami’s Project Manager. Initial cards are issued at no charge. Subsequent cards issued due to loss or damage shall be issued only after a fee has been assessed by Miami University. It is imperative that the loss of any cards be immediately reported to Miami’s Project Manager. All cards shall be returned to Miami’s Project Manager at completion of the project.

E. Parking: a. Expense for parking shall be required by contractors and subcontractors following

guidelines and regulations set forth by Miami University’s Parking Services. b. Contractors and Subcontractors shall be eligible for parking access issued by

Parking Services at the Campus Avenue Building (Campus Map designation #21). Parking passes must be obtained prior to the start of work and parking must be maintained within allowable areas.

F. No storage or office trailers are allowed on Miami University’s main campus area. Miami will permit parking of these trailers at a designated offsite location as coordinated with Miami’s Project Manager.

1.8 OWNER'S OCCUPANCY REQUIREMENTS A. Partial-Owner Occupancy: Miami University will require access to the premises

during entire construction period. Cooperate with Miami University during construction operations to minimize conflicts and facilitate Miami University’s usage. Perform the Work so as not to interfere with Miami University's operations. Maintain existing exits, unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or

used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Miami University.

2. Provide not less than seventy two (72) hours notice to University’s Project Manager of activities that will affect the University's operations.

1.9 WORK RESTRICTIONS A. On-Site Work Hours: Work shall be generally performed inside the existing building

during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except otherwise indicated. To achieve required Milestones and Project Completion Deadlines, work hours can include evening, night and weekend work in coordination with Miami University regarding facility access. 1. Weekend Hours: As arranged a minimum seventy two (72) hours beforehand with

Miami University Project Manager. 2. Hours for Utility Shutdowns: As arranged a minimum seventy two (72) hours

beforehand with Miami University’s Project Manager. 3. Hours for noisy activity (including but not limited to core drilling and jack

hammering): As arranged a minimum seventy two (72) hours beforehand with Miami University’s Project Manager.

B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 1. Notify Miami University’s Project Manager not less than three (3) working days in

advance of proposed utility interruptions.

Page 8: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1000 - 5 SUMMARY The Architectural Group, Inc.

2. Do not proceed with utility interruptions without Miami University’s Project Manager’s written permission

1.10 SPECIFICATION FORMATS AND CONVENTIONS A. Specification Format: The Specifications are organized into Divisions and Sections

according to CSI/CSC's "MasterFormat" numbering system. 1. Division 01: Sections in Division 01 govern the execution of the Work of all

Sections in the Specifications. B. Specification Content: The Specifications use certain conventions for the style of

language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 2. Abbreviated Language: Language used in the Specifications and other Contract

Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

3. Imperative and streamlined language is generally used in the Specifications. Requirements expressed in the imperative language are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted. The words "shall," "shall be," or "shall comply with," depending on the context, implied where a colon (:) is used within a sentence or phrase.

1.11 SPECIFICATION FORMATS AND CONVENTIONS A. The State of Ohio Department of Industrial Compliance is reviewing the construction

documents, will approve them, and will issue general, plumbing and electrical CPA numbers for each of the four buildings included as part of this project.

B. Fees for these permits to be issued by the State of Ohio Department of Industrial Compliance have been paid for by Miami University. All others fees shall be the responsibility of the Contractors.

C. All inspections during construction shall be the responsibility of the General Contractor for their associated work efforts.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION

END OF SECTION

Page 9: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1250 - 1 SUMMARY OF THE CONTRACT The Architectural Group, Inc.

SECTION 01 1250

SUMMARY OF CONTRACT PART I GENERAL CONDITIONS 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes a summary of the contract, including responsibilities for

coordination and temporary facilities and controls. B. Specific requirements of the contract are also indicated in individual Specification

Sections and on Drawings. C. Related Sections include the following:

1. Division 01 Section "Summary" for the Work covered by the Contract Documents, restrictions on use of the premises, Owner-occupancy requirements, and work restrictions.

2. Division 01 Section "Project Management and Coordination" for general coordination requirements.

3. Division 01 Section "Temporary Facilities and Controls" for specific requirements for temporary facilities and controls.

1.3 DEFINITIONS A. Not applicable.

1.4 COORDINATION A. The Lead Contractor shall be the General Construction Contractor and be

responsible for coordination with all subcontractors and maintain all construction coordination responsibilities.

1.5 LEAD CONTRACTOR A. Lead Contractor: The Lead Contractor shall act as a full-time Project Coordinator

and shall be experienced in administration and supervision of building construction, including plumbing work and have full knowledge of the total project scope of work, schedule, and General and Special Conditions. The activities listed below shall be in addition to those listed for the Lead Contractor under the project General Conditions. 1. Coordination of activities of Lead Contractor include, but are not limited to, the

following: a. Provide overall coordination of the Work. b. Coordinate shared access to work spaces. c. Coordinate product selections for compatibility. d. Provide overall coordination of any temporary facilities and controls. e. Coordinate, schedule, and approve interruptions of permanent and temporary

utilities, including those necessary to make connections for temporary services.

f. Coordinate construction and operations of the Work with work performed by each contract.

g. Coordinate sequencing and scheduling of the Work. Include the following: 1. Initial Coordination Meeting: At earliest possible date, arrange and

conduct a meeting with separate contractors for sequencing and coordinating the Work; negotiate reasonable adjustments to schedules.

2. Prepare a combined Contractor's Construction Schedule for entire Project. Base schedule on Preliminary Construction Schedule. Secure time

Page 10: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1250 - 2 SUMMARY OF THE CONTRACT The Architectural Group, Inc.

commitments for performing critical construction activities from separate subcontractors. Show activities of self performed work and each subcontract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts. Update the schedule weekly and present at each project meeting.

3. See General Conditions, Article 4.3 Construction Schedule for details of schedule preparation. Schedule shall be updated prior to each construction meeting and before each payment request approvals.

4. Distribute copies of schedules to Associate, Miami University Project Manager, and separate subcontractors.

h. Provide quality-assurance and quality-control services specified in Division 01 Section "Quality Requirements."

i. Coordinate sequence of activities to accommodate inspections, and coordinate schedule of inspections.

k. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one subcontractor has worked.

l. Coordinate cutting and patching. m. Coordinate protection of the Work. n. Coordinate fire-stopping to assure all rated assemblies are maintained. o. Coordinate preparation of As-Built Project Record Documents from more than

one subcontractor and integrate with information from all subcontractors to form one combined record.

p. Print and submit Record CAD Drawings if installations by more than one subcontractor are indicated on the same Contract Drawing or Shop Drawing.

q. Collect Record Specification Sections from other Contractors, collate Section into numeric order, and submit complete set.

r. Coordinate preparation of operation and maintenance manuals if information from more than one Contractor is to be integrated with information from other subcontractors to form one combined record.

s. Develop and maintain the project construction schedule. t. Review payment applications for all prime contractors in conformance with

General Contract 4.2.5. 2. Responsibilities of Lead Contractor for temporary facilities and controls include,

but are not limited to the following: a. Provide common-use field office for use by all personnel engaged in

construction activities. b. Provide telephone service for common-use facilities. c. protection of existing finishes to remain.

1.6 CONTRACTS – GENERAL A. Extent of Contract: Unless the Contract Documents contain a more specific

description of the Work, names and terminology on Drawings and in Specification Sections determine which contract includes a specific element of Project. 1. Unless otherwise indicated, the Work described in this Section for the contract

shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents.

2. Local custom and trade-union jurisdictional settlements do not control the scope of the Work of each contract. When a potential jurisdictional dispute or similar interruption of work is first identified or threatened, affected subcontractors shall negotiate a reasonable settlement to avoid or minimize interruption and delays.

3. Cutting and patching for the Work of each contract shall be provided by the General Contractor or each subcontractor for its own Work unless otherwise noted as determined by the General Contractor.

4. Within five (5) working days after Preliminary Construction Schedule submittal

Page 11: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1250 - 3 SUMMARY OF THE CONTRACT The Architectural Group, Inc.

has been received from the Lead Contractor, submit a matching preliminary schedule showing construction operations sequenced and coordinated with overall construction.

B. Substitutions: Each subcontractor shall cooperate with other subcontractors and the General Contractor involved to coordinate approved substitutions with remainder of the Work.

C. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Division 01 Section "Temporary Facilities and Controls," each subcontractor is responsible for the following unless modified per the General Contractor: 1. Installation, operation, maintenance, and removal of each temporary facility -

usually considered as its own normal construction activity, and costs charges associated with each facility installation and maintenance.

2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities.

3. Its own storage facilities. 4. Temporary enclosures for its own construction activities. 5. Waste disposal facilities, including collection and legal disposal of its own

hazardous, dangerous, unsanitary, or other harmful waste materials. 6. Progress cleaning of its own areas on a daily basis. 7. Secure lockup of its own tools, materials, arid equipment. 8. Construction aids and miscellaneous services and facilities necessary

exclusively for its own construction activities.

1.7 GENERAL CONSTRUCTION CONTRACT A. Work in the General Construction Contract includes, but is not limited to the

following work as indicated on the drawings: 1. Selective demolition including wood wardrobe removals, 2. Interior construction and finish improvements, 3. VAT and mastic abatement, 4. Electrical and Plumbing removals and improvements including installation of new

light fixtures supplied by Miami University. B. Temporary facilities and controls in the General Construction Contract include, but

are not limited to, the following: 1. Temporary facilities and controls that are not otherwise specifically assigned to the

other contracts. 2. Temporary signs as required by Miami University and O.S.H.A. 3. General waste disposal facilities including dumpsters including all fees. 4. Pest control of site during construction. 5. Barricades, warning signs, and construction lights. 6. Restoration of the University's existing facilities used as temporary facilities. . 7. Job site trailer and associated equipment if applicable. See Temporary Facilities

and Controls. 8. Fire extinguishers protection during construction, in compliance with O.B.C.

C. Work Schedule Compliance 1. The General Contractor will direct activities of the subcontractors to maintain ad-

herence to the approved construction schedule.

1.8 ELECTRIC SUBCONTRACT A. Work in the Electric subcontract includes, but is not limited to the following:

1. Fixture and wiring removals, 2. Selective junction box removals as indicated on the drawings. 3. Installation of new surface mounted conduits, 4. Receipt inspection, relocation to project site and Installation of Miami University

supplied electrical fixtures, 5. Lighting switch removals and installation of new units with associated new wire

Page 12: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1250 - 4 SUMMARY OF THE CONTRACT The Architectural Group, Inc.

runs for double ballasting and bathroom light fixture grounding. B. Temporary facilities and controls in the Electric subcontract include, but are not

limited to, the following: 1. Temporary facilities and controls that are not otherwise specifically assigned to the

other contracts. 2. Coordination and temporary service shutoff for areas served to accommodate the

work required to achieve removals and new installations.

1.9 PLUMBING SUBCONTRACT A. Work in the Plumbing subcontract includes, but is not limited to the following:

1. Removal of kitchenette fixtures and capping of utilities within the wall. 2. Removal of kitchenette fixtures and installation of new in same location.

B. Temporary facilities and controls in the plumbing subcontract include, but are not limited to, the following: 1. Temporary facilities and controls that are not otherwise specifically assigned to the

other contracts. 2. Coordination and temporary service shutoff for areas served to accommodate the

work required to achieve removals and new installations.

1.10 ABATEMENT/REMOVALS SUBCONTRACT A. Work in the VAT removal abatement subcontract includes, but is not limited to the

following: 1. Removal of either wood shoe molding or 6” rubber base, 2. Removal and containment of VAT materials and mastics, 3. All permits and submittals as required as specified elsewhere.

B. Work shall progress so that the abatement contractor shall have first access to full floors of work starting at the buildings’ Third Floors and working downward as coordinated with the efforts of the General Contractor.

1.10 CONTRACT DOCUMENTS GENERAL RESPONSIBILITES Electric Division 26 Note: Electric Contractor to cross-reference with architectural

Contract Documents as indicated. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

END OF SECTION

Page 13: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1400 - 1 WORK RESTRICTIONS The Architectural Group, Inc.

SECTION 01 1400

WORK RESTRICTIONS

PART 1 - GENERAL

1.1 WORK RESTRICTIONS

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated.

B. Prime contractors are to provide to Miami University’s Project Manager’s office, home and cellular telephone numbers for project managers, field supervisors and key foreman to the before the first application for payment is submitted.

C. Storage of materials, when outside, shall be in orderly piles or storage boxes. No material shall be stored on grass or in areas that are to remain undisturbed. No storage or office trailers are allowed on Miami University’s Main Campus area. Miami will permit parking of these trailers at a designated offsite location as coordinated with Miami’s Project Manager.

D. The Contractor and Subcontractors shall execute the work in a manner that will not adversely disrupt the University's operations, this includes, but is not limited to all areas outside of the limits of construction, all buildings all utility services.

E. There shall be no deliveries exceeding thirty (30) feet in length, or wide loads within two (2) hours before, during and within two (2) hours after any special events. The Contractor shall provide the University's Project Manager a minimum of two (2) weeks written advance notice before any wide loads are scheduled to arrive on campus.

F. All Contractors’ personnel including subcontractors that desire to park on campus while working on campus shall only park in Project Manager designated areas. Contractor and subcontractor's personnel's’ vehicles shall display the University’s designated temporary parking permit on the dash board at all times while on campus. The University reserves the right to change the designated Contractor and subcontractor's personnel parking area and lot by providing forty eight (48) hours written notice to the Contractor. The Contractor is responsible for shuttling their personnel and subcontractors to and from the designated Contractor parking lot. Any Contractor employee who does not adhere to the requirements of this section, or who are parking anywhere else on campus are subject to ticketing, fines, towing and permanent expulsion from working on the current capital improvement .project without any further notice. Each Contractor is solely responsible for communicating the parking requirements to all of their employees and subcontractors while on campus, and issuing the temporary parking permits provided by the University.

G. Expense for parking shall be required by Contractor and subcontractors following guidelines and regulations set forth by Miami University’s Parking Services. Contractor and Subcontractors shall be eligible for parking access issued by Parking Services at the Campus Avenue Building (Campus Map designation #21). Parking passes must be obtained prior to the start of work and parking must be maintained within allowable areas.

H. Contractors’ and subcontractors’ vehicles including subcontractors and deliveries are not permitted to block or obstruct any active side walk, cross walk or roadway on campus. The driver of all delivery trucks shall remain with their vehicle at all times. Delivery trucks are not permitted to idle near public areas or in the vicinity of air intakes of the surrounding buildings. Delivery trucks shall only park within the limits of construction.

I. The only sign that the Contractor is permitted to post are warning, emergency egress signs and traffic route signs.

J. Access to the building shall be by the use of Miami University issued electronic security swipe control cards issued through the General Contractor following the submission of individual names and social security numbers to Miami’s Project

Page 14: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 1400 - 2 WORK RESTRICTIONS The Architectural Group, Inc.

Manager. Initial cards are issued at no charge. Subsequent cards issued due to loss or damage shall be issued only after a fee has been assessed by Miami University. It is imperative that the loss of any cards be immediately reported to Miami’s Project Manager. All cards shall be returned to Miami’s Project Manager at completion of the project.

1.2 HOURS OF OPERATION A. Normal working hours on campus shall be 7:00 A.M. until 5:00 P.M. Monday

through Friday. If any contractor desires to work beyond working the normal working hours, they shall request permission on a daily basis from the Miami’s Project Manager. To achieve required Milestones and Project Completion Deadlines, work hours can include evening, night and weekend work in coordination with Miami University regarding facility access.

B. Dumpsters must be located in coordination with Miami’s Project Manager.

1.3 UTILITIES A. Utility outages must be scheduled not less than seventy two (72) working days in

advance of proposed utility interruptions by filing a written request with the University's Project Manager. The information contained within the Contractor's request must be sufficient for the University to process the request. Only the University's personnel are authorized to close and open valves. Contractor's and subcontractors’ personnel are prohibited from operating any valve or breaker on the University's utility systems with the only exception being to save a life or prevent serous injury.

B. Contractors and subcontractors are to fully cooperate with the University during all utility outages and shut downs. Recognizing that the utility systems serve other facilities, the Contractors and/or subcontractors shall plan tying into existing utility services during times when the systems are not functional or in low demand. The following schedule shall be adhered to for utility tie-ins based upon coordination with Miami University’s Project Manager:

C. The storage of flammable liquids, and other hazardous materials, such-as flammable thinners, gasoline, oil, inside any occupied building or adjacent to mean of egress, or near air intakes for any building is prohibited.

D. The General Contractor is to maintain the staging area. E. Contractor’s and subcontractors’ employees are prohibited from entering into any

occupied building on campus, or riding a University shuttle bus unless specifically escorted by a representative of the University as coordinated through Miami’s Project Manager.

PART 2 - PRODUCTS

PART 3 EXECUTION (Not Used)

END OF-SECTION

Page 15: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 2200 - 1 UNIT PRICES The Architectural Group, Inc.

SECTION 01 2200

UNIT PRICES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. List of unit prices, for use in preparing Bids.

B. Measurement and payment criteria applicable to Work performed under a unit price payment method.

C. Defect assessment and non-payment for rejected work.

1.02 COSTS INCLUDED

A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.

1.03 UNIT QUANTITIES SPECIFIED

A. Quantities indicated in the individual specification sections are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.

1.04 MEASUREMENT OF QUANTITIES

A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.

B. Take all measurements and compute quantities. Measurements and quantities will be verified by Miami University.

C. Assist by providing necessary equipment, workers, and survey personnel as required.

D. Measurement by Area: Measured by square dimension using mean length and width or radius.

1.05 PAYMENT

A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Miami University, multiplied by the unit price.

B. Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from the transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work. 6. Loading, hauling, and disposing of rejected Products.

1.06 DEFECT ASSESSMENT

A. Replace Work, or portions of the Work, not conforming to specified requirements.

B. If, in the opinion of Miami’s Project Manager, it is not practical to remove and replace the Work, Owner will direct one of the following remedies: 1. The defective Work will be partially repaired to the instructions of the Miami’s Project

Manager, and the unit price will be adjusted to a new unit price at the discretion of Miami’s Project Manager.

Page 16: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 2200 - 2 UNIT PRICES The Architectural Group, Inc.

C. The individual specification sections may modify these options or may identify a specific formula

or percentage price reduction.

D. The authority of Miami University to assess the defect and identify payment adjustment is final.

1.07 SCHEDULE OF UNIT PRICES A. Item #01: VCT Removal per Square Foot B. Item #02: VAT Removal and Abatement per Square Foot C. Item #03: New VCT Installation per Square Foot D. Item #04: Rubber Base New Installation Per Lineal Foot E. Item #05: Plaster Scratch, Brown, and White Coat per Square Foot for Concealed Wardrobe

Areas F. Item #06: Pipe Insulation Wrap per Lineal Foot

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

Page 17: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 1 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

SECTION 01 3100

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 COORDINATION A. The General Contractor and each subcontractor shall participate in coordination

requirements. Certain areas of responsibility will be assigned to a specific contractor. B. Related Sections include the following:

1. Division 01 Section "Summary of the Contract" for a description of the division of Work among separate contracts and responsibility for coordination activities not in this Section.

2. Division 01 Section "Construction Progress Documentation" for preparing and submitting Contractor's Construction Schedule.

3. Division 01 Section "Execution Requirements" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

4. Division 01 Section "Closeout Procedures" for coordinating Contract closeout.

1.2 COORDINATION A. Coordination: The General Contractor shall coordinate its own construction operations

and those of the subcontractors and entities to ensure efficient and orderly installation of each part of the Work. Each subcontractor shall coordinate its operations with operations, included in different Sections, which depend on each other for proper installation, connection, and operation. 1. Schedule construction operations in sequence required to obtain the best

results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other subcontractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including plumbing.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. Prepare similar memoranda for Miami University and separate subcontractors if

coordination of their Work is required. C. Administrative Procedures: Coordinate scheduling and timing of required

administrative procedures with other construction activities and activities of subcontractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Project closeout activities. 7. Startup and adjustment of systems. 8. Project closeout activities and documentation.

D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. 1. Salvage materials - and equipment involved in performance of, but not actually

incorporated into, the Work. Refer to other Sections for disposition of salvaged

Page 18: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 2 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

materials that are designated as Miami University's property.

1.3 PROJECT SCHEDULE A. The following dates represent the contractual start and completion obligations for this

project: 1. Construction Start:

a. Tuesday, May 8, 2012: Stanton Hall b. Wednesday, May 9, 2012: Dodds Hall c. Thursday, May 10, 2012: MacCracken Hall d. Friday, May 11, 2012: Richard Hall

2. Milestone #1: Friday June 1, 2012: a. Substantial Completion: ORL ( Office of Resident Life) Rooms listed

below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes, but is not limited to, distribution of the Project Punch list for all spaces listed above.

3. Milestone #2: Friday, June 8, 2012:

a. Construction Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes Occupancy approval by the State of Ohio Department of Industrial Compliance.

4. Milestone #3: Friday July 20, 2012:

a. Substantial Completion: All Residence Halls b. Includes, but is not limited to, distribution of the Project Punch list for all

Residence Halls.

5. Milestone #4: Friday, July 27, 2012: a. Construction Completion: All Residence Halls b. Includes Occupancy approval by the State of Ohio Department of Industrial

Compliance.

6. Milestone #5: Friday, August 24, 2012 a. Project Close-out Completion b. Includes, but is not limited to, the submission of all pay requests, As-built

Drawings, Operation & Maintenance Manuals and all final closeout documents including: 1. Certification of Warranty Commencement 2. Certification of Contract Completion 3. Payment Release Affidavit

B. All project schedules should reflect the above noted contractual obligation dates. C. Internal Building Scheduling should be planned to complete work from the upper floors

downward except for the ORL rooms outlined above.

1.4 SUBMITTALS

Page 19: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 3 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation bf products and materials fabricated by separate entities. 1. Drawing Preparation: As Lead Contractor, the General Construction Contractor

is responsible for preparing the Coordination Drawings. Each subcontractor shall supply the General Construction Contractor with any and all necessary documentation for the accurate preparation of the Coordination Drawings.

2. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable: a. Indicate functional and spatial relationships of components of architectural

and electrical systems; b. Indicate required installation sequences; c. Indicate dimensions shown on the Contract Drawings and -make specific

note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Associate for resolution of such conflicts.

3. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 mm), but no larger than 24 by 36 inches (750 by 1000 mm). a. Number of Copies: Submit two (2) opaque copies of each submittal. Associate will return one (1) copy. b. Submit five (5) copies where Coordination Drawings are required for

operation and maintenance manuals. Associate will retain one (1) copy and submit one (1) copy to Miami University; remainder will be returned. Mark up and retain one (1) returned copy as a Project Record Drawing.

c. Submittals may be submitted electronically to Associate. 4. Refer to individual Sections for Coordination Drawing requirements for Work in

those Sections. B. Key Personnel Names: Within five (5) days of starting construction operations, submit

to both the Associate and Miami’s Project Manager to a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses, email addresses, and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project. 1. Post copies of list in Project meeting room, in temporary field office, and by each

temporary telephone. Keep list current at all times. 2. Personnel name list should be presented in a manner that lists primary contacts

first.

1.5 ADMINISTRATIVE AND SUPERVISORY PERSONNEL A. General: In addition to Project superintendent, provide other administrative and

supervisory personnel as required for proper performance of the Work. 1. Include special personnel required for coordination of operations with other

contractors.

1.6 PROJECT MEETINGS A. General: Lead contractor to schedule and conduct meetings and conferences at

Project site, unless otherwise indicated as noted below. 1. Attendees: Inform participants and others involved, and individuals whose

presence is required, of date and time of each meeting. Notify Miami’s Project Manager and Associate of scheduled meeting dates and times.

2. Agenda; Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Miami’s Project Manager

Page 20: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 4 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

and Associate, within three (3) days following the meeting.

B. PRE-CONSTRUCTION CONFERENCE: Schedule a pre-construction conference before starting construction, at a time convenient to Miami’s Project Manager and Associate, but no later than five (5) days after execution of the Agreement. Hold the conference at the Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. Attendees: Authorized representatives of Miami University and Associate;

Contractor and its superintendent, major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following: a. Tentative construction schedule b. Critical work sequencing and long-lead items c. Designation of key personnel, duties, and contact verifications d. Procedures for processing field decisions and Change Orders e. Procedures for requests for interpretations (RFIs) f. Procedures for testing and inspecting g. Procedures for processing Applications for

Payment. h. Distribution of the Contract Documents i. Submittal procedures j. Preparation of Record Documents k. Use of the premises and existing building l. Work restrictions m. Owner's occupancy requirements n. Responsibility for temporary facilities and controls o. Construction waste management and recycling p. Parking availability q. Office, work, and storage areas r. Equipment deliveries and priorities s. First aid t. Security u. Progress cleaning v. Working hours

3. Minutes: Record and distribute meeting minutes. C. PRE-INSTALLATION CONFERENCES: Conduct a pre-installation conference at

Project site before each construction activity that requires coordination with other construction. 1. Attendees: Installer and representatives of manufacturers and fabricators

involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Associate of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

3. a. The Contract Documents a. Related requests for interpretations (RFIs) b. Related Change Orders c. Purchases d. Deliveries e. Submittals f. Possible conflicts g. Compatibility problems

Page 21: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 5 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

h. Time schedules i. Manufacturer's written recommendations j. Warranty requirements k. Acceptability of substrates l. Temporary facilities and controls m. Space and access limitations n. Regulations of authorities having jurisdiction and inspections o. Installation procedures p. Coordination with other work q. Required performance results r. Protection of adjacent work s. Protection of construction and personnel

4. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

5. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

6. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. PROGRESS AND COORDINATION MEETINGS: Conduct progress meetings at weekly intervals or at intervals approved by Miami’s Project Manager. Coordinate dates of meetings with preparation of payment requests. 1. Attendees: In addition to representatives of Miami University and Associate,

each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. 1. Review schedule for next period.

b. Review present and future needs of each entity present, including the following: 1. Sequence of operations 2. Status of submittals 3. Deliveries 4. Off-site fabrication 5. Access 6. Site utilization 7. Temporary facilities and controls 8. Work hours 9. Hazards and risks 10. Progress cleaning 11. Quality and work standards 12. Status of correction of deficient items 13. Requests for interpretations (RFIs). 14. Status of proposal requests

c. Pending changes

Page 22: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3100 - 6 PROJECT MANAGEMENT AND COORDINATION The Architectural Group, Inc.

1. Status of Change Orders 2. Pending claims and disputes 3. Documentation of information for payment requests

3. Minutes: Record and distribute to Contractor the meeting minutes. 4. Reporting: Distribute minutes of the meeting to each party present and to parties

who should have been present. a. Schedule Updating: Revise Contractor's Construction Schedule after each

progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used) END OF SECTION

Page 23: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3200 - 1 CONSTURCTION PROGRESS DOCUMENTATION The Architectural Group, Inc.

SECTION 01 3200

CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for documenting the

progress of construction during performance of the Work, including the following: 1. Preliminary Construction Schedule 2. Contractor's Construction Schedule 3. Field condition reports 4. Special reports

B. Related Sections include the following: 1. Division 01 Section "Summary of the Contract" for preparing a combined

Contractor's Construction Schedule 2. Division 01 Section "Project Management and Coordination" for submitting and

distributing meeting and conference minutes 3 Division 01 Section "Submittal Procedures" for submitting schedules and reports 4. Division 01 Section "Quality Requirements" for submitting a schedule of tests and

inspections

1.3. DEFINITIONS A. Activity: A discrete part of a project that can be identified for planning, scheduling,

monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources. 1. Critical activities are activities on the critical path. They must start and finish on the

planned early start and finish times. 2. Predecessor Activity: An activity that precedes another activity in the network. 3. Successor Activity: An activity that follows another activity in the network.

B. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

Event: The starting or ending point of an activity. Float: The measure of leeway in starting and completing an activity. 1. Float time is not for the exclusive use or benefit of either Miami University or

Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

C. Major Area: A story of construction, a separate building, or a similar significant construction element.

D. Milestone: A key or critical point in time for reference or measurement.

1.4 PROJECT SCHEDULE

A. The following dates represent the contractual start and completion obligations for this project: 1. Construction Start:

a. Tuesday, May 8, 2012: Stanton Hall b. Wednesday, May 9, 2012: Dodds Hall

Page 24: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3200 - 2 CONSTURCTION PROGRESS DOCUMENTATION The Architectural Group, Inc.

c. Thursday, May 10, 2012: MacCracken Hall d. Friday, May 11, 2012: Richard Hall

2. Milestone #1: Friday June 1, 2012: a. Substantial Completion: ORL ( Office of Resident Life) Rooms listed

below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes, but is not limited to, distribution of the Project Punch list for all spaces listed above.

3. Milestone #2: Friday, June 8, 2012:

a. Construction Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes Occupancy approval by the State of Ohio Department of Industrial Compliance.

4. Milestone #3: Friday July 20, 2012:

a. Substantial Completion: All Residence Halls b. Includes, but is not limited to, distribution of the Project Punch list for all

Residence Halls.

5. Milestone #4: Friday, July 27, 2012: a. Construction Completion: All Residence Halls b. Includes Occupancy approval by the State of Ohio Department of Industrial

Compliance.

6. Milestone #5: Friday, August 24, 2012 a. Project Close-out Completion b. Includes, but is not limited to, the submission of all pay requests, As-built

Drawings, Operation & Maintenance Manuals and all final closeout documents including: 1) Certification of Warranty Commencement 2) Certification of Contract Completion 3) Payment Release Affidavit

B. All project schedules should reflect the above noted contractual obligation dates. C. Internal Building Scheduling should be planned to complete work from the upper floors

downward except for the ORL rooms outlined above.

1.5 SUBMITTALS A. Submittals shall be submitted to the Associate with copies to be retained to be later

submitted as part of project closeout submittal manual. B. Preliminary Construction Schedule: Submit three (3) opaque copies. C. Contractor's Construction Schedule: Submit three (3) opaque copies of initial schedule,

large enough to show entire schedule for entire construction period and electronically. D. Field Condition Reports: Submit two (2) copies at time of discovery of differing

conditions. E. Special Reports: Submit two (2) copies at time of unusual event. F. Qualification Data: For scheduling consultant.

Page 25: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3200 - 3 CONSTURCTION PROGRESS DOCUMENTATION The Architectural Group, Inc.

1.6 QUALITY ASSURANCE A. Pre-scheduling Conference: Conduct conference at Project site to comply with

requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to the Preliminary Construction Schedule and Contractor's Construction Schedule, Including, but not limited to, the following: 1. Discuss constraints, including work stages, area separations, and interim milestones. 2. Review time required for review of submittals and re-submittals. 3. Review requirements for tests and inspections. 4. Review time required for completion and startup procedures. 5. Review and finalize list of construction activities to be included in schedule. 6. Review submittal requirements and procedures. 7. Review procedures for updating schedule.

1.7 COORDINATION A. Coordinate preparation and processing of schedules and reports with performance of

construction activities and with scheduling and reporting of separate contractors. B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of

subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports 1. Secure time commitments for performing critical elements of the Work from parties

involved. 2. Coordinate each construction activity in the network with other activities and

schedule them in proper sequence.

PART 2- PRODUCTS

2.1 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, re-submittal, ordering, manufacturing, fabrication, and delivery when establishing dates. 1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values,

and Contractor's Construction Schedule. 2. Final Submittal: Submit concurrently with the first complete submittal of

Contractor's Construction Schedule.

2.2 CONTRACTOR’S CONSTRUCTION SCHEDULE, GENERAL A. Procedures: Comply with procedures contained in AGC's "Construction Planning &

Scheduling" B. Time Frame: Extend schedule from date established for the Notice to Proceed to date of

construction Final Completion and to date of close out documents Final Completion. 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

C. Activities: Treat each building and restroom area as a separate numbered activity for each principal element of the Work. Comply with the following: 1. Activity Duration: Define activities so no activity is longer than twenty (20) days,

unless specifically allowed by Miami University. 2. Procurement Activities: Include procurement process activities for the following long

lead items and major items, requiring a cycle of more than thirty (30) days, as separate activities in schedule. Procurement cycle activities include, but are not limited to submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and re-submittal times indicated in Division 01 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.

4. Startup and Testing Time: Include not less than five (5) days for startup and testing. 5. Substantial Completion: Indicate completion in advance- of date established for

Substantial Completion, and allow time for Associate’s administrative procedures

Page 26: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3200 - 4 CONSTURCTION PROGRESS DOCUMENTATION The Architectural Group, Inc.

necessary for certification of Substantial Completion. 6. Constraints: Include constraints and work restrictions indicated in the Contract

Documents and as follows in schedule, and show how the sequence of the Work is affected.

B. Work under One Contract: Include a separate activity for each subcontract. 1. Products Ordered in Advance: Include a separate activity for each product. Include

delivery date indicated in Division 01 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date.

2. Work Restrictions: Show the effect of the following items on the schedule: a. Coordination with existing construction. b. Limitations of continued occupancies. c. Uninterruptible services. d. Use of premises restrictions. e. Environmental control.

4. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:

a. Submittals b. Fabrication c. Installation d. Tests and inspections e. Adjusting f. Startup and placement into final use and operation

5. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, Miami University Occupancy Requirements and Final Completion.

2.3 PRELIMINARY CONSTRUCTION SCHEDULE A. Bar-Chart Schedule: Submit preliminary horizontal bar-chart-type construction schedule

within seven (7) days of date established for the Notice to Proceed. B. Preparation: indicate each significant construction activity separately. Identify first workday

of each week with a continuous vertical line. Outline significant construction activities for the entire length of construction.

2.4 REPORTS A. Daily Construction Reports: Prepare a daily construction report recording the following

information concerning events at Project site: 1. List of subcontractors at Project site 2. List of General Contractor employees at Project site 3. Approximate count of personnel at Project site 4. Material deliveries 5. Accidents 6. Meetings and significant decisions 7. Unusual events (refer to special reports) 8. Stoppages, delays, shortages, and losses 9. Emergency procedures 10. Orders and requests of authorities having jurisdiction 11. Change Orders received and implemented 12. Construction Change Directives received and implemented 13. Services connected and disconnected 14. Equipment tests and startups 15. Partial Completions and occupancies 16. Substantial Completions authorized

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

Page 27: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3200 - 5 CONSTURCTION PROGRESS DOCUMENTATION The Architectural Group, Inc.

2.5 SPECIAL REPORTS A. General: Submit special reports directly to Miami University within one (1) day of an

occurrence. Distribute copies of report to parties affected by the occurrence. B. Reporting Unusual Events: When an event of an unusual and significant nature

occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, responses by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Miami University in advance when these events are known or predictable.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE A. Contractor's Construction Schedule Updating: At weekly intervals, update schedule to

reflect actual construction progress and activities. Issue schedule one (1) day before each regularly scheduled progress meeting. 1. Revise schedule immediately after each meeting or other activity where revisions

have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses indicate Actual Completion percentage for each activity. B. Distribution: Distribute copies of approved schedule to Associate, Miami’s Project Manager,

separate contractors, and other parties identified by Contractor with a need-to-know schedule responsibility. 1. Post copies in temporary field office. 2. When revisions are made, distribute updated schedules to the same parties and post

in the same locations. Delete parties from distribution when they have completed their, assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION

Page 28: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 1 SUBMITTAL PROCEDURES The Architectural Group, Inc.

SECTION 01 3300

SUBMITTAL PROCEDURES

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop

Drawings, Product Data, Samples, and other submittals. B. Related Sections include the following:

1. Division 01 Section "Project Management and Coordination" for submitting and distributing meeting and conference minutes and for submitting Coordination Drawings.

2. Division 0I Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule and the Submittals Schedule.

3. Division 01 Section "Quality Requirements" for submitting test and inspection reports and for mockup requirements.

4. Division 01 Section "Closeout Procedures" for submitting warranties. 5. Division 01 Section "Project Record Documents" for submitting Record Drawings,

Record Specifications, and Record Product Data. 6. Division 01 Section "Operation and Maintenance Data" for submitting operation and

maintenance manuals. 7. Division 01 Section "Demonstration and Training" for submitting videotapes of

demonstration of equipment and training of Miami University's personnel. 8. Divisions 02 through 22 Sections for specific requirements for submittals in those

Sections.

1.3 DEFINITIONS A. Action Submittals: Written and graphic information that requires Associate’s responsive

action. B. Informational Submittals: Written information that does not require Associate’s responsive

action. Submittals may be rejected for not complying with requirements.

1.4 SUBMITTAL PROCEDURES A. General: Electronic copies of CAD Drawings of the Contract Drawings will be provided by

Associate for Contractor's use in preparing submittals. B. Coordination: Coordinate preparation and processing of submittals with performance of

construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other

submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work

so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Associate reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Submittals Schedule: Comply with requirements in Division 01 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities.

D. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Associate’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

Page 29: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 2 SUBMITTAL PROCEDURES The Architectural Group, Inc.

1. Initial Review: Allow five (5) days for initial review of each submittal. Allow additional

time if coordination with subsequent submittals is required. Associate will advise Contractor when a submittal being processed must be delayed for coordination:

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Re-submittal Review: Allow five (5) days for review of each re-submittal. 4. Sequential Review: Where sequential review of submittals by Associates

consultants, Miami University, or other parties is indicated, allow ten (10) days total for initial review of each submittal.

5. Concurrent Consultant Review: When transmitted simultaneously to Associate and to Associate’s consultants, allow five (5) days for review of each submittal. Submittal will be returned to Associate before being returned to Contractor.

E. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 4 inches (150 by 200 mm) on label or beside

title block to record Contractor's review and approval markings and action taken by Associate.

3. Include the following information on label for processing and recording action taken: a. Project name b. Date c. Name and address of Associate d. Name and address of Contractor e. Name and address of subcontractor f. Name and address of supplier g. Name of manufacturer h. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).

i. Number and title of appropriate Specification Section j. Drawing number and detail references, as appropriate k. Location(s) where product is to be installed, as appropriate l. Other necessary identification

Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals.

F. Additional Copies: Unless additional copies are required for final submittal, and unless Associate observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Submit one (1) copy of submittal to concurrent reviewer in addition to specified number of copies to Associate.

2. Additional copies submitted for maintenance manuals will be marked with action taken and will be returned.

G. Transmittal: Package each submittal individually and appropriately for-transmittal and handling. Transmit each submittal using .a transmittal form. Associate will return submittals, without review, received from sources other than Contractor.

1. Transmittal Form: Provide locations on form for the following information: a. Project name b. Date c. Destination (To:) d. Source (From:) e. Names of subcontractor, manufacturer, and supplier f. Category and type of submittal g. Submittal purpose and description h. Specification Section number and title

Page 30: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 3 SUBMITTAL PROCEDURES The Architectural Group, Inc.

i. Drawing number and detail references, as appropriate j. Transmittal number k. Submittal and transmittal distribution record I. Remarks m. Signature of transmitter

2. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Associate on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same label information as related submittal.

H. Re-submittals: Make re-submittals in same form and number of copies as initial submittal. 1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of

revision. 3. Resubmit submittals until they are marked "NO EXCEPTION" or "REVIEWED AND

NOTED" I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers,

fabricators, installers, and authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

Use for Construction: Use only final submittals with mark indicating "NO EXCEPTION" or "REVIEWED AND NOTED" taken by Associate.

1.5 CONTRACTOR'S USE OF ASSOCIATE'S CAD FILES

A. General: At Contractor's written request, copies of Associate's CAD files will be provided to Contractor for Contractor's use in connection with Project, subject to the following conditions:

1. Acceptance and signing of the Associate's CADD Disclaimer prior to the release of any electronic files.

2. CAD file platform, Associates (plug, DGN) specifically is not required by either Associate or Contractor.

PART 2- PRODUCTS

2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification

Sections. B. Product Data: Collect information into a single submittal for each element of construction

and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed

data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are

applicable: 3. Include the following information, as applicable:

a. Manufacturer's written recommendations b. Manufacturer's product specifications c. Manufacturer's installation instructions. d. Standard color charts e. Compliance with specified referenced standards f. Testing by recognized testing agency. Application of testing agency labels and

seals. Notation of coordination requirements. 4. Submit Product Data before or concurrent with Samples. 5. Number of Copies: Submit three (3) copies of Product Data, unless otherwise

indicated. Associate will return two (2) copies. Mark up and retain one (1) returned copy as a Project Record Document.

6. Electronic submittals may be submitted to Associate with receipt documentation required from associate confirming delivery of information.

Page 31: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 4 SUBMITTAL PROCEDURES The Architectural Group, Inc.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Dimensions b. Identification of products c. Fabrication and installation drawings d. Roughing-in and setting diagrams e. Shopwork manufacturing instructions f. Templates and patterns g. Schedules h. Design calculations i. Compliance with specified standards j. Notation of coordination requirements I. Notation of dimensions established by field measurement m. Relationship to adjoining construction clearly indicated

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm), but no larger than 30 by 40 inches (750 by 1000 mm).

3. Number of Copies: Submit three (3) opaque copies of each submittal, unless copies are required for operation and maintenance manuals. Submit five (5) copies where copies are required for operation and, maintenance manuals. Associate will retain two (2) copies; remainder will be returned.

4. Coordinate with Associate regarding electronic submissions. D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of

these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples - that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample b. Product name and name of manufacturer c. Sample source d. Number and title of appropriate Specification Section

3. Disposition: Maintain sets of approved Samples at Project site, available for quality control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit three (3) full sets of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Associate will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited .to, the following: partial sections of manufactured or fabricated

Page 32: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 5 SUBMITTAL PROCEDURES The Architectural Group, Inc.

components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three (3) sets of Samples. Associate will retain one (1) sample set; remainder will be returned. 1) Submit a single Sample where assembly details, workmanship,

fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.

E. Submittals Schedule: Comply with requirements specified in Division 01 Section "Construction Progress Documentation."

F. Application for Payment: Comply with requirements specified in Division 01 Section "Payment Procedures."

G. Schedule of Values: Comply with requirements specified in Division 01 Section "Payment Procedures." Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information In tabular form:

1. Name, address, email addresses, and telephone number of entity performing subcontract or supplying products.

2. Number of Copies: Submit one (1) copy of subcontractor list to Miami’s Project Manager and one (1) copy to the Associate, unless otherwise indicated.

a. Mark up and retain one returned copy as a Project Record Document.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three (3) copies of each submittal, unless otherwise indicated. Associate will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and inspection Reports: Comply with requirements specified in Division 01 Section "Quality Requirements."

B. Coordination Drawings: Comply with requirements specified in Division 01 Section "Project Management and Coordination."

C. Contractor's Construction Schedule: Comply with requirements specified Division 01 Section "Construction Progress Documentation."

D. Qualification Data: Prepare written. Information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

E. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

F. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

G. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

H. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

I. Material Test Reports: Prepare reports written by a qualified testing agency, on testing

Page 33: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 6 SUBMITTAL PROCEDURES The Architectural Group, Inc.

agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

J. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

K. Schedule of Tests and Inspections: Comply with requirements specified in Division 0I Section "Quality Requirements."

L. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Division 01 Section "Operation and Maintenance Data."

M. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page-numbers.

N. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable:

1. Preparation of substrates 2. Required substrate tolerances 3. Sequence of installation or erection 4. Required installation tolerances 5. Required adjustments 6. Recommendations for cleaning and protection

O. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles; if any, and term of the coverage. Coordinate with Miami’s Project Manager and contracting service regarding these submittals.

P. Material Safety Data Sheets (MSDSs): Submit information directly to Miami’s Project Manager; do not submit to Associate.

1. Associate will not review submittals that include MSDSs and will return them for re-submittal.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for coordination with other Work of the Contract and for

compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Associate.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ASSOCIATE’S ACTION

A. General: Associate will not review submittals that do not bear Contractor's approval stamp and will return them without action

B. Action Submittals: Associate will review each submittal, make marks to indicate corrections or modifications required, and return it. Associate will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows:

1. NO EXCEPTION 2. REVIEWED AND NOTED 3. REVISE AND RESUBMIT

Page 34: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 3300 - 7 SUBMITTAL PROCEDURES The Architectural Group, Inc.

4. REJECTED C. Informational Submittals: Associate will review each submittal and will not return it, or will

return it if it does not comply with requirements. Associate will forward each submittal to appropriate party.

D. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.

E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

END OF SECTION

Page 35: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 4000 - 1 QUALITY REQUIREMENTS The Architectural Group, Inc.

SECTION 01 4000

QUALITY REQUIREMENTS PART 1 - GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for quality assurance

and quality control. B. Testing and inspecting services are required to verify compliance with requirements

specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements. 1. Specific quality-assurance and control requirements for individual construction

activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractors other quality assurance and control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality assurance and control services required by Associate, Miami University, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Sections include the following: 1. Division 01 Section "Construction Progress Documentation" for developing a schedule

of required tests and inspections. 2 Division 01 Section "Cutting and Patching" for repair and restoration of construction

disturbed by testing and inspecting activities. 3. Divisions 02 through 26 Sections for specific test and inspection requirements.

1.3 DEFINITIONS A. Quality Assurance Services: Activities, actions, and procedures performed before and

during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Associate.

C. Preconstruction Testing: Tests and inspections that are performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

D. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

E. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of-the Work and for completed Work.

F. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

G. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Using a term such as "carpentry" does not imply that certain construction activities must

Page 36: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 4000 - 2 QUALITY REQUIREMENTS The Architectural Group, Inc.

be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." it also does not imply that requirements specified apply exclusively to trades people of the corresponding generic name.

H. Experienced: When used with an entity, "experienced" means having successfully completed a minimum of five previous projects similar in size and scope to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS A. General: If compliance with two or more standards is specified and the standards establish

different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Associate for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements Refer uncertainties to Associate for a decision before proceeding

1.5 Submittals

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent. Report on the inspection of the testing agency by a recognized authority

B. Schedule of Tests and Inspections: Prepare In tabular form and include the following: 1. Specification Section number and title 2. Description of test and inspection 3. Identification of applicable standards 4. Identification of test and inspection methods 5. Number of tests and inspections required 6. Time schedule or time span for tests and inspections 7. Entity responsible for performing tests and inspections 8. Unique characteristics of each quality-control service

C. Reports: Prepare and submit certified written reports that include the following: 1. Date of issue 2. Project title and number 3. Name, address, and telephone number of testing agency 4. Dates and locations of samples and tests or inspections 5. Names of individuals making tests and inspections 6. Description of the Work and test and inspection method 7. Identification of product and Specification Section 8. Complete test or inspection data 9. Test and inspection results and an interpretation of test results 10. Comments or professional opinion on whether tested or inspected Work complies with

the Contract Document requirements 11. Name and signature of inspector 12. Recommendations on retesting and re-inspecting

D. Permits, Licenses, and Certificates: For Miami University's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

Page 37: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 4000 - 3 QUALITY REQUIREMENTS The Architectural Group, Inc.

1.6 QUALITY ASSURANCE A. General: Qualifications paragraphs in this Article establish the minimum qualification levels

required; individual Specification Sections specify additional requirements. B. Installer Qualifications: A firm or individual experienced in installing, erecting, or

assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record- of successful in-service performance, as well as sufficient production capacity to produce required units.

E. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation- of manufacturer’s products that are similar in material, design, and extent to those indicated for this Project.

F. Preconstruction Testing: Where preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following:

1. Contractor responsibilities include the following: When testing is complete, remove test assemblies, do not reuse products on Project.

2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Associate, with copy to Contractor. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

1.7 QUALITY CONTROL A. Tests and inspections not explicitly assigned to Miami University are Contractor's

responsibility. Unless otherwise indicated, provide quality control services specified and those required by authorities having jurisdiction. Perform quality control services required of Contractor by authorities having jurisdiction, whether specified or not. 1. Where services are indicated as Contractor's responsibility, engage a qualified

testing agency to perform these quality-control services. 2. Notify testing agencies at least twenty four (24) hours in advance of time when

Work that requires testing or inspecting will be-performed. 3. Where quality-control services are indicated as Contractor's responsibility, submit a

certified written report, in duplicate, of each quality control service. 4. Testing and inspecting requested by Contractor and not required by the Contract

Documents are Contractor's responsibility. 5 Submit additional copies of each written report directly to authorities having

jurisdiction, when they so direct. B. Manufacturer's Field Services: Where indicated, engage a factory-authorized service

representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 01 Section "Submittal Procedures."

C. Retesting & Re-inspecting: Regardless of whether original tests or inspections were\ Contractor's responsibility, provide quality-control services, including retesting and re-inspecting, for construction that replaced Work that failed to comply with the Contract Documents.

F. Associated Services: Cooperate with agencies performing tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work.

Page 38: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 4000 - 4 QUALITY REQUIREMENTS The Architectural Group, Inc.

2. Incidental labor and facilities necessary to facilitate tests and inspections. G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance

and control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. 1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG A. Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted. 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Associate. 4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and inspection log for Associate’s reference during normal working hours.

3.2 REPAIR AND PROTECTION A. General: On completion of testing, inspecting and similar services, repair damaged

construction and restore substrates and finishes. 1. Comply with the Contract Document requirements for Division 01 Section "Cutting

and-Patching." B. Protect construction exposed by or for quality-control service activities. C. Repair and protection are Contractor's responsibility, regardless of the assignment of

responsibility for quality-control services.

END OF SECTION

Page 39: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 5000 - 1 TEMPORARY FACILITIES AND CONTROL The Architectural Group, Inc.

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL

1.1 RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes requirements for temporary utilities, support facilities, and

security and protection facilities. B. Related Sections include the following:

1. Division 01 Section "Summary" for limitations on utility interruptions and other work restrictions.

2. Division 01 Section "Summary of the Contract" for division of responsibilities for temporary facilities and controls.

3. Division 01 Section "Submittal Procedures" for procedures for submitting copies of implementation and termination schedule and utility reports.

4. Division 01 Section "Execution Requirements" for progress cleaning requirements. 5. Divisions 02 through 26 Sections for ventilation, and humidity requirements for

products in those Sections.

1.3 USE CHARGES A. General: Cost or use charges for temporary facilities shall be included In the

Contract Sum. Allow other entities to use temporary services and facilities without cost, including, but not limited to Miami University, Associate, testing agencies, and authorities having jurisdiction.

B. Water and Sewer Service: Water and Sewer from Miami University’s existing water and sewer system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C. Electric Power Service: Electric power from Miami University’s existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

1.4 SUBMITTALS

A. Site Plan: Show staging areas and parking areas for construction personnel. Coordinate with Miami’s Project Manager regarding acceptable parking, storage and staging areas.

1.5 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.

1.6 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Miami University’s acceptance, regardless of previously assigned responsibilities.

Page 40: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 5000 - 2 TEMPORARY FACILITIES AND CONTROL The Architectural Group, Inc.

PART 2- PRODUCTS

2.1 TEMPORARY FACILITIES A. Storage: Provide storage area to accommodate materials and equipment for

construction operations. 1. Store combustible materials apart from building.

2.3 EQUIPMENT Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

2.4 OFFICE The General Contractor will coordinate the location within one of the four buildings where contracting office will be located.

PART 3 – EXECUTION 3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Connect to existing service: 1. Arrange with Miami’s Project Manager for time when service can be interrupted,

if necessary, to make connections for services. B. Water Service: Use of Miami’s existing water service facilities will be permitted, as

long as facilities are cleaned and maintained in a condition acceptable to Miami University. At Substantial Completion, restore these facilities to condition existing before initial use. 1. Where installations below an outlet might be damaged by spillage or leakage

provide a drip pan of suitable size to minimize water damage. Drain accumulated water promptly from pans.

2. Toilets: Use of existing toilet facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Miami University. At Substantial Completion, restore these facilities to condition existing before initial use.

D. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

E. Electric Power Service & Lighting: Use of Miami University’s existing electric power service and lighting will be permitted, as long as equipment is maintained in a condition acceptable to Miami University.

F. The Contractor shall be responsible for temporary project lighting during the period of time after the existing fixtures have been removed and prior to the installation and use of the new light fixtures.

3.3 SUPPORT FACILITIES INSTALLATION

A. Traffic Controls: Comply with requirements of authorities having jurisdiction. 1. Protect existing site including curbs, pavement, and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants.

B. Parking: Use designated areas of Miami University’s existing parking areas for construction personnel.

Page 41: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 5000 - 3 TEMPORARY FACILITIES AND CONTROL The Architectural Group, Inc.

1. Project Identification and Temporary Signs: Provide Project identification and other signs. Install signs where indicated to inform public and individuals seeking entrance to Project. Unauthorized signs are not permitted: Provide temporary, directional signs for construction personnel and visitors.

2. Maintain and touchup signs so they are legible at all times. C. Waste Disposal Facilities: Lead contractor will provide waste-collection containers in

sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with Division 01 Section "Execution Requirements" for progress cleaning requirements.

D. Existing Stair Usage: Use of Miami University’s existing stairs will be permitted, as long as stairs are cleaned and maintained in a condition acceptable to Miami University. At Substantial Completion, restore stairs to condition existing before initial use. 1. Provide protective coverings, barriers, devices, signs, or other procedures to

protect stairs and to maintain means of egress. If, despite such protection, stairs become damaged, restore damaged areas so no evidence remains of correction work.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air or water contamination or pollution or other undesirable effects.

1. Comply with work restrictions specified in Division 01 Section "Summary." B. Site Control: Maintain security by limiting number of access cards, keys and/or key

cards and restricting distribution to authorized personnel. C. Security: Install safety and security barriers ongoing areas of construction. Prevent

unauthorized entrance, vandalism, theft, and similar violations of security. D. Barricades, Warning Signs, and Lights: Comply with requirements of authorities

having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

E. See Section 02-8500 Sitework Abatement for requirements related to the VAT and mastic abatement.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Elevator Use: 1. Use of the elevator shall be permitted for the transportation of materials and

personnel. 2. The Contractor is responsible of the protection of the elevator and must maintain

it in a neat and clean condition. 3. Upon completion of the project, the elevator must be returned to its original

condition with all protective items removed and the elevator cleaned. B. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste

and abuse, limit availability of temporary facilities essential and intended uses. C. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a twenty four (24) hour basis where required to achieve indicated results and to avoid possibility of damage.

D. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

E. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction -that may have been delayed because of interference with temporary facility.

F. Repair damaged Work, clean exposed surfaces, and replace construction that

Page 42: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 5000 - 4 TEMPORARY FACILITIES AND CONTROL The Architectural Group, Inc.

cannot be satisfactorily repaired. 1. Materials and facilities that constitute temporary facilities are property of

Contractor. 2. At Substantial Completion, clean and renovate permanent facilities used

during construction period. Comply with final cleaning requirements specified in Division 01, Section "Closeout Procedures."

G. See Section 02-8500 Sitework Abatement for requirements related to the VAT and mastic abatement.

END OF SECTION

Page 43: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 1 PRODUCT REQUIREMENTS The Architectural Group, Inc.

SECTION 01 6000

PRODUCT REQUIREMENTS PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for selection of

products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.

B. Related Sections include the following: 1. Division 01 Section "Closeout Procedures" for submitting warranties for Contract closeout. 2. Divisions 02 through 22 Sections for specific requirements for warranties on

products and installations specified to be warranted.

1.3 DEFINITIONS A. Products: Items purchased for incorporating into the Work, whether purchased for Project

or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 1. Named Products: Items identified by manufacturer's product name, including make

or model number or other designation shown or listed in manufacturer's published-product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process, or where indicated as a product substitution, to have the indicated qualities related to type, function, dimension, In-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers.

1.4 SUBMITTALS A. Substitution Requests: Submit three (3) copies of each request for consideration. Identify

product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Substitution requests should be submitted to Associate 2. Documentation: Show compliance with requirements for substitutions and the

following, as applicable: a. Statement indicating why specified material or product cannot be provided.

Page 44: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 2 PRODUCT REQUIREMENTS The Architectural Group, Inc.

b. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated. d. Product Data, including drawings and descriptions of products and fabrication and installation procedures. e. Samples, where applicable or requested. f. If list of similar installations for completed projects with, project names and addresses and names and addresses of architects and owners. g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated. h. Research/evaluation reports evidencing compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction. i. Detailed comparison of Contractor's Construction Schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating lack of availability or delays in delivery. j. Cost information, including a proposal of change, if any, in the Contract Sum, k. Contractor's certification that proposed substitution complies with requirements in the Contract Documents and is appropriate for applications indicated. l. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results:

3. Associate’s Action: If necessary, Associate will request additional information or

documentation for evaluation within two (2) days of receipt of a request for substitution. Associate will notify Contractor of acceptance or rejection of proposed substitution within two (2) days of receipt of request, or two (2) days of receipt of additional information or documentation, whichever is later. a. Use product specified if Associate cannot make a decision on use of a

proposed substitution within time allocated. B. Comparable Product Requests: Submit three (3) copies of each request for consideration.

Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Associate's Action: If necessary, Associate will request additional information or

documentation for evaluation within one week of receipt of a comparable product request. Architect will notify Contractor of approval or rejection of proposed comparable product request within two (2) days of receipt of request, or two (2) days of receipt of additional information or documentation, whichever is later. a. Form of Approval: As specified in Division 01 Section "Submittal Procedures." b. Use product specified if Architect cannot make a decision on use of a

comparable product request within time allocated. C. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01

Section "Submittal Procedures." Show compliance with requirements.

1.5 QUALITY ASSURANCE A. Compatibility of Options: if Contractor is given option of selecting between two or more

products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options.

Page 45: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 3 PRODUCT REQUIREMENTS The Architectural Group, Inc.

1. Each contractor is responsible for providing products and construction methods compatible with products and construction methods of other contractors.

2. If a dispute arises between contractors over concurrently selectable but incompatible products, Associate will determine which products shall be used.

1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle products using means and methods that will prevent damage,

deterioration, and loss, including theft. Comply with manufacturer's written instructions. B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

C. Storage: 1. Store products to allow for inspection and measurement of quantity or counting of units:

Store materials in a manner that will not endanger Project structure. 2. Store products that are subject to damage by the elements, under cover in a weather

tight enclosure above ground, with ventilation adequate to prevent condensation. 3. Store cementitious products and materials on elevated platforms. Comply with product

manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

4. Protect stored products from damage and liquids from freezing. 5. Provide a secure location and enclosure at Project site for storage of materials and

equipment by Miami University’s construction forces. Coordinate location with Miami University’s Project Manager.

1.7 PRODUCT WARRANTIES A. Warranties specified in other Sections shall be in addition to, and run concurrent with,

other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. 1. Manufacturer's Warranty: Preprinted written warranty published by individual

manufacturer for a particular product and specifically- endorsed by manufacturer to Miami University.

2. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Miami University.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution. 1. Manufacturer's Standard Form: Modified to include Project-specific information and

properly executed. 2. Specified Form: When specified forms are included with the Specifications, prepare

a written document using appropriate form properly executed. 3. Refer to Divisions 02 through 22 Sections for specific content requirements and

particular requirements for submitting special warranties. C. Submittal Time: Comply with requirements in Division 1 Section "Closeout Procedures."

Page 46: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 4 PRODUCT REQUIREMENTS The Architectural Group, Inc.

PART 2 – PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES A General Product Requirements: Provide products that comply with the Contract Documents

that are undamaged and, unless otherwise indicated, that are new at time of installation. 1. Provide products complete with accessories, trim, finish, fasteners, and other items

needed for a complete Installation and indicated use and effect. 2. Standard Products: If available, and unless custom products or nonstandard options

are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Miami University reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Associate will make selection.

5. Where products are accompanied by the term "match sample," sample to be matched is Associate’s.

6. Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products.

7. Or Equal: Where products are specified by name and accompanied by the term "or equal" or "or approved equal" or "or approved," comply with provisions in Part 2 "Comparable Products" Article to obtain approval for use of an unnamed product.

B. Product Selection Procedures: 1. Product: Where Specifications name a single product and manufacturer, provide the

named product that complies with requirements. 2. Manufacturer/Source: Where Specifications name a single manufacturer or source,

provide a product by the named manufacturer or source that complies with requirements.

3. Products: Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

4. Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

5. Available Products: Where Specifications include a list of names of both- products and manufacturers, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product.

6. Available Manufacturers: Where Specifications include a list of manufacturers, provide a product by one of the manufacturers listed, or an unnamed manufacturer, that complies with requirements. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product.

7. Product Options: Where Specifications indicate that sizes, profiles, and dimensional requirements on Drawings are based on a specific product or system, provide the specified product or system. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

8. Basis-of-Design Product: Where Specifications name a product and include a list of manufacturers, provide the specified product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics, that are based on the product named. Comply with provisions in Part 2 "Comparable Products" Article for consideration of an unnamed product by the other named manufacturers.

9. Visual Matching Specification: Where Specifications require matching an established Sample or “built-in” existing item, select a product that complies with requirements and matches existing conditions Associate’s sample. Associate’s decision will be final on whether a proposed product matches.

a. If no product available within specified category matches and complies with

Page 47: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 5 PRODUCT REQUIREMENTS The Architectural Group, Inc.

other specified requirements, comply with provisions in Part 2 "Product Substitutions" Article for proposal of product.

10. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, and textures" or a similar phrase; select a product that complies with other specified requirements.

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Associate will select color, pattern, density; or texture from manufacturer's product line that does not include premium items.

b. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Associate will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 PRODUCT SUBSTITUTIONS A. Timing: Associate will consider requests for substitution if received within two (2) days

after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Associate.

B. Conditions: Associate will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Associate will return requests without action, except to record noncompliance with these requirements:

1. Requested substitution offers Miami University a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Miami University must assume. Miami University's additional responsibilities may include compensation to Associate for redesign and evaluation services, increased cost of other construction by Miami University, and similar considerations.

2. Requested substitution does not require extensive revisions to the Contract Documents.

3. Requested substitution is consistent with the Contract Documents and will produce indicated results.

4. Substitution request is fully documented and properly submitted. 5. Requested substitution will not adversely affect Contractor's Construction Schedule. 6. Requested substitution has received necessary approvals of authorities having

jurisdiction. 7. Requested substitution is compatible with other portions of the Work. 8. Requested substitution has been coordinated with other portions of the Work. 9. If requested substitution involves more than one contractor, requested substitution

has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

2.3 COMPARABLE PRODUCTS A. Conditions: Associate will consider Contractor's request for comparable product when the

following conditions are satisfied. If the following conditions are not satisfied, Associate will return requests without action, except to record noncompliance with these requirements: 1. Evidence that the proposed product does not require extensive revisions to the

Contract Documents that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2 Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include' attributes such as performance, weight, size, durability, visual effect, and specific features and requirements

Page 48: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 6000 - 6 PRODUCT REQUIREMENTS The Architectural Group, Inc.

indicated. 3. Evidence that proposed product provides specified warranty. 4. List of similar installations for completed projects with project names and addresses

and names and addresses of architects and owners, if requested. 5. Samples, if requested.

PART 3 – EXECUTION (Not Used)

END OF SECTION

Page 49: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7000 - 1 EXECUTION REQUIREMENTS The Architectural Group, Inc.

SECTION 01 7000

EXECUTION REQUIREMENTS PART 1 – GENERAL

1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following: General installation of products, progress cleaning, starting and adjusting, protection of installed construction, correction of the Work. B. Related Sections include the following: Division 01 Section "Project Management and

Coordination" for procedures for coordinating field engineering with other construction activities: Division 01 Section "Submittal Procedures" for submitting surveys and Division 01 Section "Cutting and Patching" for procedural requirements for cutting and patching necessary for the installation or performance of other components of the Work.

C. Division 01 Section "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Miami University accepted deviations from indicated lines and levels, and final cleaning.

1.3 SUBMITTALS A. Landfill Receipts: Submit copy of receipts issued by a landfill facility for waste disposal.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical systems and other construction affecting the Work.

1. Before construction, verify the location and points of connection of utility services. B. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or

Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following: a. Description of the Work b. List of detrimental conditions, including substrates c. List of unacceptable installation tolerances d. Recommended corrections

2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

3. Examine roughing-in for mechanical systems to verify actual locations of connections before equipment and fixture installation.

4. Examine walls for suitable conditions where products and systems are to be installed. 5. Proceed with installation only after unsatisfactory conditions have been corrected.

Proceeding with the Work indicates acceptance of surfaces and conditions.

Page 50: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7000 - 2 EXECUTION REQUIREMENTS The Architectural Group, Inc.

3.2 PREPARATION A. Field Measurements: Take field measurements as required to fit the Work properly.

Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Associate. Include a detailed description of problem encountered, together with recommendations for changing Documents.

3.3 INSTALLATION A. General: Locate the Work and components of the Work accurately, in correct alignment

and elevation, as indicated. 1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for

maintenance and ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. F. Templates: Obtain and distribute to the parties involved templates for work specified to be

factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work. 1. Mounting Heights: Where mounting heights are not indicated, mount components at

heights directed by Associate. 2. Allow for building movement, including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings, templates, and

directions for installing anchorages, including inserts, anchor bolts, and items with integral anchors, that are to be embedded in masonry or other materials. Deliver such items to Project site in time for installation.

H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

3.4 PROGRESS CLEANING A. General: Clean Project site and work areas daily, including common areas. Coordinate

progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully. 1. Comply with requirements in NFPA 241 for removal of combustible waste materials

and debris. 2. Containerize unsanitary waste materials separately from other waste. Mark containers

appropriately and dispose of legally, according to regulations.

Page 51: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7000 - 3 EXECUTION REQUIREMENTS The Architectural Group, Inc.

B. Site: Maintain Project site free of waste materials and debris. C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary

for proper execution of the Work. 1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the

entire work area, as appropriate. 3. Installed Work: Keep installed work clean. Clean installed surfaces according to

written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

D. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. E. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to

ensure freedom from damage and deterioration at time of Substantial Completion. F. Waste Disposal: Washing waste materials down sewers or into waterways will not be

permitted. G. During handling and installation, clean and protect construction in progress and adjoining

materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

H. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

I. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.5 STARTING AND ADJUSTING A. Start equipment and operating components to confirm proper operation. Remove

malfunctioning units, replace with new units, and retest. B. Adjust operating components for proper operation without binding. Adjust equipment for

proper operation. C. Test each piece of equipment to verify proper operation. Test and adjust controls and

safeties. Replace damaged and malfunctioning controls and equipment.

3.6 PROTECTION OF INSTALLED CONSTRUCTION A. Provide final protection and maintain conditions that ensure Installed Work is without

damage or deterioration at time of Substantial Completion. B. Comply with manufacturer's written instructions for temperature and relative humidity.

3.7 CORRECTION OF THE WORK A. Repair or remove and replace defective construction. Restore damaged substrates and

finishes. Comply with requirements in Division 1 Section "Cutting and Patching" 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching

up with matching materials, and properly adjusting operating equipment. B. Restore permanent facilities used during construction to their specified condition. C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot

be repaired without visible evidence of repair. D. Repair components that do not operate properly. Remove and replace operating

components that cannot be repaired. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

END OF SECTION

Page 52: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7310 - 1 CUTTING AND PATCHING The Architectural Group, Inc.

SECTION 01 7310

CUTTING AND PATCHING PART 1 - GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes procedural requirements for cutting and patching. B. Related Sections include the following:

1. Division 01 Section "Selective Demolition" for demolition of selected portions of the building.

2. Divisions 02 through 26 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

1.3 DEFINITIONS A. Cutting: Removal of in-place construction necessary to permit installation or performance

of other Work. B. Patching: Fitting and repair work required to restore surfaces to match existing visual and

subsurface conditions.

1.4 QUALITY ASSURANCE A. Structural Elements: Do not cut and patch structural elements in a manner that could

change their load-carrying capacity or load-deflection ratio. B. Operational Elements: Do not cut and patch operating elements and related

components in a manner that results in reducing their capacity to perform as intended or those results in increased maintenance or decreased operational life or safety. Operating elements include the following: 1. Primary operational systems and equipment; 2. Air or smoke barriers; 3. Mechanical systems piping; 4. Control systems; 5. Communication systems; 6. Electrical wiring systems; 7. Fire alarm systems and equipment.

C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. Miscellaneous elements include, but are not limited to, the following: 1. Water, moisture, or vapor barriers; 2. Membranes and flashings; 3. Equipment supports; 4. Piping, ductwork, vessels, and equipment. 5. Noise and vibration-control elements and systems. 7. Visual Requirements: Do not cut and patch construction in a manner that results

in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Associate's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

Page 53: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7310 - 2 CUTTING AND PATCHING The Architectural Group, Inc.

1.5 WARRANTY A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or

damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties.

PRODUCTS 2.1

MATERIALS A. General: Comply with requirements specified in other Sections. B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces,

use materials that visually match in-place adjacent surfaces to the fullest extent possible. 1. If identical materials are unavailable or cannot be used, use materials that, when

installed, will match the visual and functional performance of in-place materials upon pre-approval of selected product and finish characteristics by Associate.

PART 3 - EXECUTION

3.1 EXAMINATION A. Examine surfaces to be cut and patched and conditions under which cutting and

patching are to be performed. 1. Compatibility: Before patching, verify compatibility with and suitability .of

substrates, including compatibility with in-place finishes or primers. 2. Proceed with installation only after unsafe or unsatisfactory conditions have

been corrected. 3. Prime contractors to coordinate extend of removals prior to starting work.

3.2 PREPARATION A. Temporary Support: Provide temporary support of Work to be cut. B. Protection: Protect in-place construction during cutting and patching to prevent

damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Existing Utility Services and Mechanical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent interruption to occupied areas.

3.3 PERFORMANCE A. General: Employ skilled workers to perform cutting and patching: Proceed with cutting

and patching at the earliest feasible time, and complete without delay. 1. Cut in-place construction to provide for installation of other components or

performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. 1. In general, use hand or small power tools designed for sawing and grinding, not

hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core

Page 54: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7310 - 3 CUTTING AND PATCHING The Architectural Group, Inc.

drill. 4. Mechanical Services: Cut off pipe or conduit in walls or partitions to be removed.

Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

5. Proceed with patching after construction operations requiring cutting are complete. 6. Plumbing contractor shall be responsible for repair of subsurface structural

conditions following mechanical modifications so that general contractor may complete finish surface patching. Plumbing contractor and general contractor to coordinate regarding demolition, subsurface repairs and finish patching prior to commencing work.

C. Patching: Patch finish surface construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Provide materials and comply with installation requirements specified in other Sections. 1. Inspection: Where feasible inspect patched areas after completion to demonstrate

integrity of installation. 2. Concealed Sub-structure: Plumbing Contractor to restore concealed wall area(s)

in a manner that General Construction Contractor can complete finish tile work in patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Exposed Finishes: General Construction Contractor to restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

4. Where patching occurs in a painted surface, apply primer and intermediate paint coats over the patch and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

5. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.

END OF SECTION

Page 55: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7320 - 1 SELECTIVE DEMOLITION The Architectural Group, Inc.

SECTION 01 7320

SELECTIVE DEMOLITION PART 1 - GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes the following:

1. Demolition and removal of selected portions of building or structure. B. Related Sections include the following:

1. Division 01 Section "Summary" for use of premises and Owner-occupancy requirements. 2. Division 01 Section “Temporary Facilities and Controls" for temporary construction

and environmental protection measures for selective demolition operations. 3. Division 01 Section "Cutting and Patching" for cutting and patching procedures. 4. Division 02 Section “Sitework Abatement” for processes related to the removals and abatement of VAT material and mastics.

1.3 DEFINITIONS A. Remove: Detach items from existing construction and legally dispose of them off-site,

unless indicated to be removed and salvaged or removed and reinstalled. B. Remove and Salvage: Detach items from existing construction and deliver them to Miami

University. C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse,

and reinstall them where indicated. D. Existing to Remain: Existing items of construction that are not to be removed and that are

not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.4 MATERIALS OWNERSHIP A. Items of interest or value to Miami University that may be encountered during selective

demolition will remain Miami University's property and are indicated on the construction documents. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Miami University. 1. Coordinate with Miami University's Project Manager, who will establish special

procedures for removal and salvage.

1.5 SUBMITTALS A. Qualification Data: For demolition firm. B. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Miami University's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted. 3. Coordination for shutoff, capping, and continuation of utility services. 4. Use of stairs. 5. Locations of proposed dust and noise control temporary partitions and means of

egress, including for other occupants affected by selective demolition operations. 6. Coordination of Miami's continuing occupancy of portions of existing building. 7. Owner's partial occupancy of completed Work. 8. Means of protection for items to remain and items in path of waste removal from

building. 9. Inventory: After selective demolition is complete, submit a list of items that have

been removed and salvaged.

Page 56: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7320 - 2 SELECTIVE DEMOLITION The Architectural Group, Inc.

C. Landfill Records: Indicate receipt and acceptance of wastes by a landfill.

1. Comply with submittal requirements in Division 01 Section "Construction Waste Management."

1.6 QUALITY ASSURANCE A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition

work including vinyl asbestos tile and asbestos containing mastic removal to the extent indicated for this Project.

B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

C. Standards: Comply with ANSI A10.6 and NFPA 241. D. Pre-demolition Conference: Conduct a conference at Project site to comply with

requirements in Division 01 Section "Project Management and Coordination." Review methods, procedures, and coordination related to selective demolition including, but not limited to, the following: 1. Inspect and discuss condition of construction to be selectively demolished and extent of both the General Construction Contractor and the Plumbing Contractor. 2. Review structural load limitations of existing structure. 3. Review and finalize selective demolition schedule and verify availability of

materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.7 PROJECT CONDITIONS A. Miami University will occupy portions of building immediately adjacent to selective

demolition area. Conduct selective demolition so Miami University's operations will not be disrupted.

1. Comply with requirements specified in Division 01 Section "Summary." B. Conditions existing at time of inspection for bidding purpose will be maintained by Miami

University as far as practical. C. Notify Associate of discrepancies between existing conditions and Drawings before

proceeding with selective demolition. D. Hazardous Materials: It is not expected that hazardous materials will be encountered in

the Work. 1. If materials suspected of containing hazardous materials are encountered, do not

disturb; immediately notify Miami University’s Project Manager. Owner will remove hazardous materials under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted. F. Utility Service: Maintain existing utilities indicated to remain in service and protect them

against damage during selective demolition operations. 1. Maintain fire-protection facilities in service during selective demolition operations.

1.8 WARRANTY A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or

damaged during selective demolition, by methods and with materials so as not to void existing warranties.

Page 57: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7320 - 3 SELECTIVE DEMOLITION The Architectural Group, Inc.

PART 2 - PRODUCTS (Not Used) PART 3 – EXECUTION

3.1 EXAMINATION A. Verify that utilities have been disconnected and capped. B. Survey existing conditions and correlate with requirements indicated to determine extent

of selective demolition required. C. Inventory and record the condition of items to be removed and reinstalled and items to

be removed and salvaged. D. When unanticipated mechanical or structural elements that conflict with intended function

or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Associate.

E. Survey of Existing Conditions: 1. Before selective demolition or removal of existing building elements that will be

reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

F. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.2 UTILITY SERVICES AND MECHANICAL SYSTEMS A. Existing Services/Systems: Maintain services/systems indicated to remain and protect

them against damage during selective demolition operations. 1. Comply with requirements for existing services/systems interruptions specified in

Division 01 Section "Summary." B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated

utility services and mechanical systems serving areas to be selectively demolished. 1. Plumbing subcontractor will coordinate with Miami University’s Project Manager

regarding the inspection and testing of existing shut-off valves. Shut-offs and reactivation to be performed by Plumbing subcontractor.

2. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.

4. Where entire wall areas are to be removed, existing services may be removed with partial removal of the wall. Plumbing subcontractor to coordinate extent with General Construction Contractor.

3.3 PREPARATION A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal

operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Comply with requirements for access and protection specified in Division 01 Section “Temporary Facilities and Controls."

B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent facilities to remain where required.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

3. Cover and protect equipment that has not been removed.

Page 58: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7320 - 4 SELECTIVE DEMOLITION The Architectural Group, Inc.

4. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01 Section "Temporary Facilities and Controls."

3.4 SELECTIVE DEMOLITION, GENERAL A. General: Demolish and remove existing construction only to the extent required by new

construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. Proceed with selective demolition systematically, from higher to lower levels or in

coordination with Miami University’s Project Manager 2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use

cutting methods least likely to damage construction to remain or-adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches. 6. Remove structural framing members and lower to ground by.method suitable to

avoid free fall and to prevent ground impact or dust generation. 7. Locate selective demolition equipment and remove debris and materials so as not to

impose excessive loads on supporting walls, floors, or framing. 8. Dispose of demolished items and materials promptly.

3.5 DISPOSAL OF DEMOLISHED MATERIALS A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or

otherwise indicated to remain Miami's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.

B. See Section 02-8500 Sitework Abatement for requirements related to the VAT and mastic abatement.

END OF SECTION

Page 59: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7700 - 1 CLOSEOUT PROCEDURES The Architectural Group, Inc.

SECTION 01 7700

CLOSEOUT PROCEDURES

PART 1-GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general provisions -of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for contract closeout,

including, but not limited to the following: 1. Inspection procedures 2. Warranties 3. Final cleaning

B. Related Sections include the following: 1. Division 01 Section "Execution Requirements" for progress cleaning of Project site. 2. Division 01 Section "Project Record Documents" for submitting Record Drawings,

Record Specifications, and Record Product Data. 3. Division 01 Section "Operation and Maintenance Data" for operation and

maintenance manual requirements. 4. Divisions 02 through 26 Sections for specific closeout and special cleaning

requirements for the Work in those Sections.

1.3 PROJECT SCHEDULE A. The following dates represent the contractual start and completion obligations for this

project: 1. Construction Start:

a. Tuesday, May 8, 2012: Stanton Hall b. Wednesday, May 9, 2012: Dodds Hall c. Thursday, May 10, 2012: MacCracken Hall d. Friday, May 11, 2012: Richard Hall

2. Milestone #1: Friday June 1, 2012:

a. Substantial Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes, but is not limited to, distribution of the Project Punch list for all spaces listed above.

3. Milestone #2: Friday, June 8, 2012:

a. Construction Completion: ORL ( Office of Resident Life) Rooms listed below: 1. Dodds: Suite 120-123 & 153-155 2. MacCracken: Suite 129-131 & 130-132 3. Richard: Suite 137-137A, 4. Stanton: Suite 135-137& 139/111

b. Includes Occupancy approval by the State of Ohio Department of Industrial Compliance.

Page 60: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7700 - 2 CLOSEOUT PROCEDURES The Architectural Group, Inc.

4. Milestone #3: Friday July 20, 2012:

a. Substantial Completion: All Residence Halls b. Includes, but is not limited to, distribution of the Project Punch list for all

Residence Halls. 5. Milestone #4: Friday, July 27, 2012:

a. Construction Completion: All Residence Halls b. Includes Occupancy approval by the State of Ohio Department of

Industrial Compliance.

6. Milestone #5: Friday, August 24, 2012 a. Project Close-out Completion b. Includes, but is not limited to, the submission of all pay requests, As-built

Drawings, Operation & Maintenance Manuals and all final closeout documents including: 1) Certification of Warranty Commencement 2) Certification of Contract Completion 3) Payment Release Affidavit

B. All project schedules should reflect the above noted contractual obligation dates. C. Internal Building Scheduling should be planned to complete work from the upper floors downward.

7. Project Close-out Completion: a. Includes but is not limited to the submission of all pay requests, As-built

Drawings, Operation & Maintenance Manuals and all final closeout documents including:

1. Certification of Warranty Commencement 2. Certification of Contract Completion 3. Payment Release Affidavit

C. All project schedules should reflect the above noted contractual obligation dates.

1.4 SUBSTANTIAL COMPLETION A. Preliminary Procedures: Before requesting inspection for determining date of Substantial

Completion, complete the following. List items below that are incomplete in request: 1. Prepare a list of items to be completed and corrected (punch list), the value of items on

the list, and reasons why the Work is not complete. 2. Submit specific warranties, workmanship bonds, maintenance service agreements, final

certifications, and similar documents. 3. Obtain and submit releases permitting Miami University unrestricted use of the Work and

access to services and utilities. Include occupancy permits, and similar releases. 4. Prepare and submit Project Record Documents, operation and maintenance manuals. 5. Deliver tools, spare parts, extra materials, and similar items to location designated by

Miami University. Label with-manufacturer's name and model number where applicable. 6. Deliver keys and swipe card(s) to Miami’s Project Manager. Advise Miami University’s

project Manager of changeover in security provisions. 7. Terminate and remove temporary facilities from Project site, construction tools, and similar

elements. 8. Advise Miami University of changeover in utilities. 9. Submit changeover information related to Miami University's occupancy, use, operation,

and maintenance. 10. Complete final cleaning requirements, including touchup painting. 11. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual

defects. B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt

Page 61: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7700 - 3 CLOSEOUT PROCEDURES The Architectural Group, Inc.

of request, Associate will either proceed with inspection or notify Contractor of unfulfilled requirements. Associate will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Associate, that must be completed or corrected before certificate will be issued. 1. Re-inspection: Request re-inspection when the Work identified in previous

inspections as incomplete is completed or corrected. 2. Results of completed inspection will form the basis of requirements for Final Completion.

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST) A. Preparation: Submit three (3) copies of list. Include name and identification of each space and

area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order. 2. Organize items applying to each space by major element, including categories for

ceiling, individual walls, floors, equipment, and building systems. 3. Include the following information at the top of each page:

a. Project name b. Date c. Name of Associate d. Name of Contractor e. Page number

1.6 FINAL COMPLETION A. Preliminary Procedures: Before requesting final inspection for determining date of Final

Completion, complete the following: 1. Submit a final Application for Payment according to Division 01 Section "Payment

Procedures." 2. Submit certified copy of Associate's Substantial Completion inspection list of items to

be completed or corrected (punch list), endorsed and dated by Associate. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with Insurance requirements.

4. Instruct Miami University's personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Associate will either proceed with inspection or notify Contractor of unfulfilled requirements. Associate will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued. 1. Re-inspection: Request re-inspection when the Work identified in previous

inspections as incomplete is completed or corrected. C. Finalized Certificate of Warranty Commencement Certificate of Contract Completion and

the Payment Release Affidavit.

1.7 WARRANTIES A. Submittal Time: Submit written warranties on request of Associate for designated portions

of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual. 1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders,

thickness as necessary to accommodate contents, and sized to receive 8-1/2” by 11” inch paper.

Page 62: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7700 - 4 CLOSEOUT PROCEDURES The Architectural Group, Inc.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor and subcontractors.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2-PRODUCTS

2.1 MATERIALS A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or

fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 FINAL CLEANING A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to

comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 1. Complete the following- cleaning operations before requesting inspection for

certification of Substantial Completion for entire Project or for a portion of Project: a. Clean Project site in areas disturbed by construction activities, including

rubbish, waste material, litter, and other foreign substances. b. Remove spills, stains, and other foreign deposits. c. Remove tools, construction equipment, machinery, and surplus material from

Project site. d. Clean exposed interior hard-surfaced finishes to a dirt-free condition, free of

stains, films, and similar foreign substances. Restore reflective surfaces to their original condition.

e. Remove debris and surface dust from limited access spaces, including plenums, shafts, and similar spaces.

f. Sweep floors broom clean in unoccupied spaces. g. Clean transparent materials, including mirrors. h. Remove labels that are not permanent. i. Touch up and otherwise repair and restore marred, exposed finishes and

surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.

j. Replace parts subject to unusual operating conditions. k. Clean plumbing fixtures to a sanitary condition, free of stains, including stains

resulting from water exposure. l. Leave Project-clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not bum waste materials. Do not bury debris or excess materials on Miami's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of - lawfully.

END OF SECTION

Page 63: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 1 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

SECTION 01 7810

PROJECT RECORD DOCUMENTS PART 1 - GENERAL

1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY A. This Section includes administrative and procedural requirements for Project Record

Documents, including the following: 1. Record Drawings. 2. Record Specifications. 3. Record Product Data.

B. Related Sections include the following: 1. Division 01 Section "Summary of the Contract" for coordinating Project Record

Documents covering the Work of multiple contracts. 2. Division 01 Section "Closeout Procedures" for general closeout procedures. 3. Division 01 Section "Operation and Maintenance Data" for operation and

maintenance manual requirements. 4. Divisions 02 through 26 Sections for specific requirements for Project Record

Documents of the Work in those Sections.

1.3 SUBMITTALS A. Record Drawings: Comply with the following:

1. Number of Copies: Submit one (1) set of marked-up Record Prints. B. Record Specifications: Submit one (1) copy of Project's Specifications, including addenda

and contract modifications. C. Record Product Data: Submit one (1) copy of each Product Data submittal.

1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in manual instead of submittal as Record Product Data.

D. Record Management Data: Submit one (1) copy of the following: 1. Safety Meeting Minutes 2. Site Field conditions record 3. RFIS 4. Change orders 5. Change directives

PART 2 – PRODUCTS

2.1 RECORD DRAWINGS A. Record Prints: Maintain one (1) set of black-line white prints of the Contract Drawings and

Shop Drawings. 1. Preparation: Mark Record Prints to show the actual installation where installation

varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. Give particular attention to information on concealed elements that would be

difficult to identify or measure and record later. b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup

before enclosing concealed installations.

Page 64: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 2 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

2. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Revisions to routing of piping and conduits. d. Actual equipment locations. e. Locations of concealed internal utilities. f. Changes made by Change Order or Construction Change Directive. Changes

made following Associate's written orders. g. Details not on the original Contract Drawings. h. Field records for variable and concealed conditions. i. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings.

4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

5. Mark important additional information that was either shown schematically or omitted from original Drawings.

6. Note: Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.

B. Record CAD Drawings: immediately before inspection for Certificate of Substantial Completion, review marked-up Record Prints with Associate. When authorized, prepare a full set of corrected CAD Drawings of the Contract Drawings, as follows:

1. Format: Same CAD program, version, and operating system as the original Contract Drawings.

2. Incorporate changes and additional information previously marked on Record Prints. Delete, redraw, and add details and notations where applicable.

3. Refer instances of uncertainty to Associate for resolution. 4. Associate will furnish Contractor one (1) set of CAD Drawings of the Contract

Drawings for use in recording information. a. Associate makes no representations as to the accuracy or completeness of

CAD Drawings as they relate to the Contract Drawings. b. CAD Software Program: The Contract Drawings are available in DWG format.

C. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.

1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.

2. 3. Record CAD Drawings: Organize CAD information into separate electronic files that correspond to each sheet of the Contract Drawings. Name each file with the 'sheet identification. Include identification in each CAD file.

4. Identification as follows: a. Project name b. Date c. Designation "PROJECT RECORD DRAWINGS" d. Name of Associate e. Name of Contractor f. Name of Owner

2.2 RECORD SPECIFICATIONS A. Preparation: Mark Specifications to Indicate the actual product installation where installation

varies from that indicated in Specifications, addenda, and contract modifications. 1. Give particular attention to information on concealed products and installations that

cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and

Page 65: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 3 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

equipment furnished, including substitutions and product options selected. 3. Record the name of manufacturer, supplier, Installer, and other information

necessary to provide a record of selections made. 4. For each principal product, indicate whether Record Product Data has been

submitted in operation and maintenance manuals instead of submitted as Record Product Data.

5. Note related Change Orders, Record Product Data, and Record Drawings where applicable.

2.3 RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation

varies substantially from that indicated in Product Data submittal. 1. Give particular attention to information on concealed products and Installations that

cannot be readily identified and recorded later. 2. Include significant changes in the product delivered to Project site and changes in

manufacturer's written instructions for installation. 3. Note related Change Orders, Record Specifications, and Record Drawings where

applicable. B. Miscellaneous Record Submittals

1. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

PART 3 – EXECUTION

3.1 RECORDING AND MAINTENANCE A. Recording: Maintain one (1) copy of each submittal during the construction period for

Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project.

B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Associate's reference during normal working hours.

1. Operation and maintenance documentation directory. 2. Emergency manuals. 3. Operation manuals for systems, subsystems, and equipment. 4 Maintenance manuals for the care and maintenance of products, materials, finishes,

systems, and equipment. C. Related Sections include the following:

1. Division 01 Section "Summary of the Contract" for coordinating operation and maintenance manuals covering the. Work of multiple contracts.

2. Division 01 Section "Submittal Procedures" for submitting copies of submittals for operation and maintenance manuals.

3. Division 01 Section "Closeout Procedures" for submitting operation and maintenance manuals.

4. Division 01 Section "Project Record Documents" for preparing Record Drawings for operation and maintenance manuals.

5. Divisions 02 through 26 Sections for specific operation and maintenance manual requirements for the Work in those Sections.

Page 66: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 4 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

3.2 DEFINITIONS A. System: An organized collection of parts, equipment, or subsystems united by regular

interaction. B. Subsystem: A portion of a system with characteristics similar to a system.

3.3 SUBMITTALS A. Final Submittal: Submit one (1) copy of each manual in final form at least five (5) days

before final inspection. Associate will return copy with comments within five (5) days after final inspection. 1. Correct or modify each manual 'to comply with Associate's comments. Submit three (3)

copies of each corrected manual within five (5) days of receipt of Associate's comments.

3.4 COORDINATION A. Where maintenance documentation includes information on installations by more than

one factory-authorized service. representative, assemble and coordinate information furnished by representatives and prepare manuals.

3.5 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY A. Organization: Include a section in the directory for each of the following:

1. List of documents 2. List of systems 3. List of equipment 4. Table of contents

B. Tables of Contents: Include a table of contents for each emergency and maintenance manual.

3.6 MANUALS, GENERAL A. Organization: Unless otherwise indicated, organize each manual into a separate section for

each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed: 1. Title page 2. Table of contents 3. Manual contents

B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:

1. Subject matter included in manual 2. Name and address of Project 3. Name and address of Owner 4. Date of submittal 5. Name, address, and telephone number of Contractor 6. Name and address of Associate 7. Cross-reference to related systems in other operation and maintenance manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder. 1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary

to accommodate contents, sized to. hold 8 ½ by ll inch (215-by-280-rnm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. Identify binder on front and spine, with printed title "OPERATION- AND

MAINTENANCE MANUAL," Project title or name, and subject matter of contents.

2. Dividers: Heavy paper.dividers with plastic-covered tabs for each section. Mark each

Page 67: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 5 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

tab to indicate contents. Include typed list of products and. major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual. .

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.

4. Supplementary Text: Prepared on 8 ½ by 11-inch (215-by-280-mm) white bond paper. 5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

3.7 EMERGENCY MANUALS A. Content: Organize manual into a separate section for each of the following:

1. Type of emergency 2. Emergency instructions 3. Emergency procedures

B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:

1. Fire 2. Water leak. 3. Power failure. 4. Water outage. 5. Chemical release or spill.

C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Miami University’s operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.

3.8 OPERATION MANUALS A. Descriptions: Include the following:

1. Product name and model number 2. Manufacturer's name 3. Equipment identification with serial number of each component 4. Limiting conditions 5. Complete nomenclature and number of replacement parts

3.9 PRODUCT MAINTENANCE MANUAL A. Content: Organize manual into a separate section for each product, material, and finish.

Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

B. Source Information: List each product included in manual, identified by product name .and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.

C. Product Information: Include the following, as applicable: 1. Product name and model number; 2. Manufacturer’s name; 3. Color, pattern, and texture; 4. Material and chemical composition; 5. Reordering information for specially manufactured products; Maintenance Procedures: Include manufacturer's written recommendations and the

Page 68: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 01 7810 - 6 PROJECT RECORDS DOCUMENTS The Architectural Group, Inc.

following: 1. Types of cleaning agents to be used and methods of cleaning 2. List of cleaning agents and methods of cleaning detrimental to product 3. Repair instructions

D. Repair Materials and Sources: Include lists of materials and local sources of materials and related services

E. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. 1. Include procedures to follow and required notifications for warranty claims.

3.10 MANUAL PREPARATION A. Emergency Manual: Assemble a complete set of emergency information Indicating

procedures for use by emergency personnel and by Miami University’s operating personnel for types of emergencies indicated.

B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

C. Maintenance Manuals: Assemble a complete set of maintenance data indicating maintenance of each system, subsystem, and piece of equipment not part of a system.

D. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

E. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.

Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation. 1. Do not use original Project Record Documents as part of operation and maintenance

manuals. 2 Comply with requirements of newly prepared Record Drawings in Division 01

Section "Project Record Documents."

F. Comply with Division 01 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

END OF SECTION

Page 69: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 2000 - 1 SITE PREPARATION The Architectural Group, Inc.

SECTION 02 2000

SITE PREPARATION

PART 1 GENERAL

1.01 SECTION INCLUDES A. Selective demolition of built building elements.

1.02 REFERENCES A. 29 CFR 1926 - U.S. Occupational Safety and Health Standards; current edition. B. NFPA 241 – Std. for Safeguarding Construction, Alteration, and Demolition Operations;

2000.

1.03 QUALITY ASSURANCE A. Demolition Firm: Company specializing in the type of work required.

1. Minimum of five (5) years of documented experience.

1.04 PROJECT CONDITIONS A. Minimize production of dust due to demolition operations.

PART 2 EXECUTION

2.01 EXISTING UTILITIES A. Protect existing utilities to remain from damage. B. Do not disrupt utilities without permit from Miami University Project Manager having

jurisdiction. C. Do not close, shut off, or disrupts existing life safety systems that are in use without

prior written notification by Miami University’s Project Manager. D. Do not close, shut off, or disrupt existing utility branches or take-offs that are in use

without prior written notification by Miami’s Project Manager.

2.02 EXISTING BUILT ELEMENTS A. Scope:

1. Removals as indicated on the drawings. B. Comply with applicable codes and regulations for demolition operations and safety of

adjacent structures and the public. 1. Comply with applicable requirements of NFPA 241. 2. Take precautions to prevent uncontrolled collapse of structures to be removed; do

not allow worker or public access within range of potential collapse of unstable structures.

3. Conduct operations to minimize interference with adjacent structures and occupants.

4. Conduct operations to minimize obstruction of private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits during removals.

C. Do not begin removal until receipt of notification to proceed from Miami’s Project Manager.

D. Protect existing structures and other elements that are not to be removed. 1. Provide bracing and shoring where wall openings occur in Dodds Hall during

demolition. 2. Prevent movement of adjacent structures.

F. See Section 02-8500 Sitework Abatement for requirements related to the VAT and mastic abatement.

G. Perform demolition in a manner that maximizes salvage and recycling of materials. 1. Comply with requirements of Miami University regarding debris, refuse removal,

Page 70: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 2000 - 2 SITE PREPARATION The Architectural Group, Inc.

and recycling. 2. Dismantle existing construction and separate materials. 3. Set aside reusable, recyclable, and salvageable materials; store and deliver to

collection point or point of reuse. 2.03 DEBRIS

A. Remove debris and trash from site.

2.04 WASTE REMOVAL A. Remove from site all materials not to be reused on site; comply with requirements of

Miami University. All refuse materials to be moved from Miami University property at the Contractor's expense.

B. Leave site in clean condition, ready for subsequent work.

END OF SECTION

Page 71: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 1 SITEWORK ABATEMENT The Architectural Group, Inc.

SECTION 02 8500

SITEWORK ABATEMENT

PART 1 GENERAL CONDITIONS 1.1 SUMMARY OF WORK

The project work described in this specification involves the removal of asbestos-containing floor tile/mastic from Dodds, MacCracken, Richard, and Stanton Halls. The contractor is resonsible for removal of all rubber base or wood mouldings, asbestos floor tile and mastics in areas designated on the drawings Fluorescent light bulbs and light ballasts are to be removed intact and placed in appropriate containers supplied and disposed by the University. For purposes of preparing EPA and ODH Notifications the following building information is provided:

Dodds Hall

a. Address: 600 Maple Avenue, Oxford, Ohio 45056 b. Building size: 42,599 Gross ft2 over 4 floors (including basement) c. Year built: 1961 d. Present use: Residence Hall e. Inspected by: Ohio Certified Asbestos Hazard Evaluation Specialist (Gerald Beaudion,

Certification # 3359) in 1996

MacCracken Hall a. Address: 500 Center Drive, Oxford, Ohio 45056 b. Building size: 80,609 Gross ft2 over 4 floors (including basement) c. Year built: 1964 d. Present use: Residence Hall e. Inspected by: Ohio Certified Asbestos Hazard Evaluation Specialist (Douglas

Beaudion, Certification # 32265) in 1996 Richard Hall

a. Address: 501 South Oak Street, Oxford, Ohio 45056 b. Building size: 78,085 Gross ft2 over 4 floors (including basement) c. Year built: 1940 d. Present use: Residence Hall e. Inspected by: Ohio Certified Asbestos Hazard Evaluation Specialist (Gerald Beaudion,

Certification # 3359) in 1996 Stanton Hall

a. Address: 700 Maple Avenue, Oxford, Ohio 45056 b. Building size: 50,758 Gross ft2 over 4 floors (including basement) c. Year built: 1961 d. Present use: Residence Hall e. Inspected by: Ohio Certified Asbestos Hazard Evaluation Specialist (Gerald Beaudion,

Certification # 3359) in 1996 1.1.1 WORK SPECIFIED

Page 72: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 2 SITEWORK ABATEMENT The Architectural Group, Inc.

The Contractor will furnish all labor, materials, employee training, services, insurance, and equipment in accordance with the requirements of the Building Owner, United States Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), State of Ohio, and the contract documents to complete, as specified, removal of materials in areas designated on the drawings.

1.1.1.1 PROJECT SEQUENCE:

1. Pre-abatement activities including notification, permits, submittals, preparations, and emergency procedures.

2. Abatement activities including removal and disposal of contaminated waste materials, miscellaneous construction debris, record keeping, inspection, and monitoring.

3. Cleaning (HEPA vacuum and wet-wiping) and decontamination activities including final inspection, testing, and certification of decontamination.

4. Submission of Final Documentation outlined in Part 4 of this specification.

1.1.2 CONTRACTOR RESPONSIBILITIES

The Contractor is responsible for obtaining and complying with all applicable regulations, permits, licenses, fees, notifications, and other requirements related to this work. The Contractor is responsible for removing the specified ACM in accordance with these specifications and Federal and State of Ohio asbestos regulations and guidelines.

1.1.3 WORK PERFORMANCE

The University will closely and continuously monitor the performance and execution of work. The surveillance will be inside the work areas and the surroundings to ensure full compliance with these specifications and all applicable regulations. The continuous monitoring and checking could include review of data from workspace, area air samples, personal samples at the breathing zone of a number of workers, air samples in the area surrounding the work area or outside the building, checking of standard operating procedures, engineering control systems, respiratory protection devices, transportation and disposal of asbestos materials, decontamination facilities, and procedures, and any other aspects of the abatement process that may impact the health and safety of people and the quality of the environment.

1.1.4 TIME SCHEDULE

See project work schedule as indicated in specification 01 100 Summary of Work. Removal of all asbestos-containing materials and decontanmination of the work area must be complete in accordance with this schedule as coordinated with the general contractor. The contractor is responsible for providing appropriate manpower to accomplish the work.

1.1.5 CONTRACTOR QUALIFICATIONS

The contractor and all on-site employees must be licensed and Certified by the Ohio Department of Health (ODH) in accordance with Chapter 3701-34 of the Ohio Administrative Code.

1.1.6 SUBMITTALS

The Contractor shall submit the following information with the bid documents: 1. The name and certification of person dedicated to carry out the function of the Competent Person. 2. Proof that the Abatement Contractor is certified and licensed in the State of Ohio as an Asbestos Abatement Contractor. 3. Notice: Failure to comply with Section 1.1.6 will be grounds for bid isqualification.

Page 73: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 3 SITEWORK ABATEMENT The Architectural Group, Inc.

1.1.7 SUBMITTALS UPON AWARD OF CONTRACT Before abatement work begins the contractor shall submit the following information: 1.1.7.1 Written notification of proposed asbestos work to the Building Owner, Consultant, the U.S.

EPA Regional office, and the State of Ohio. Asbestos abatement work shall not commence until the above-mentioned representatives are satisfied that the notification requirements have been met.

1.1.7.2 A description of construction plans to Miaimi University and Accociate for decontamination

enclosure systems and isolation of the work areas in compliance with this specification and applicable regulations. (This information may be submitted verbally at the pre-construction conference.)

1.1.7.3 Submit documentation to Miami University indicating that all employees have had medical

examinations [per 29 CFR 1926.1101] and instructions on the hazards of asbestos exposure, on use and fitting of respirators, on protective clothing, on use of showers, on entry and exit from work areas, and on all aspects of work procedures and protective measures.

1.1.7.4 Submit to the Associate names and certifications of workers assigned to the project.

Documentation should include a physician's statement indicating that the employee has been examined and deemed fit to perform work while wearing a respirator.

1.1.7.5 The crew size to be dedicated to the project and a milestone schedule of work area

preparation, removal, decontamination, and completion dates. 1.1.7.6 Name, location, and phone number of the landfill being used for disposal of ACM and proof

that the landfill is licensed for asbestos-waste disposal. 1.1.8 Not Used 1.1.8 TERMINOLOGY AND DEFINITIONS 1.1.9.1 Abatement refers to the various processes used to control asbestos-containing materials,

i.e., removal, encapsulation, or enclosure. 1.1.9.2 Asbestos-containing material (ACM)) is a material that contains asbestos fibers in an amount

greater than 1 percent by weight, according to the U.S. EPA. 1.1.9.3 Air Lock is a system for permitting ingress or egress without permitting air movement

between a contaminated area and an uncontaminated area; typically consists of two curtained doorways at least 6 feet (2 meters) apart.

1.1.9.4 Air Monitoring means the process of measuring the fiber content of a specific volume of air in

a stated period of time. Phase-contrast microscopy (in accordance with NIOSH Method No. 7400) is the prescribed method of sampling and analysis.

1.1.9.5 Air Sampling Technician is a person trained and experienced in air sampling techniques and

schemes who performs air sampling under the direction of the Asbestos Project Manager or C.I.H.

1.1.9.6 Amended water means water to which a surfactant has been added. 1.1.9.7 Authorized Visitor means the building owner or his representatives, air sampling technician,

asbestos project manager, consultant, or a representative of any regulatory or other agency having jurisdiction over the project.

Page 74: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 4 SITEWORK ABATEMENT The Architectural Group, Inc.

1.1.9.8 Barrier means plastic sheeting and/or other materials used along with the floors, ceilings, and walls of a structure to form an isolated work environment that separates the contaminated work area from uncontaminated areas.

1.1.9.9 Bridging Encapsulant means a liquid designed to form a tough membrane over the surface of

asbestos-containing materials. 1.1.9.10 Clean Room means an uncontaminated area or room that is part of the workers'

decontamination enclosure system, with provisions for storage of workers' street clothes and protective equipment.

1.1.9.11 Competent Person means a contractor's employee (typically the foreman or superintendent)

who, by virtue of his special training and certification, is capable of operating an asbestos hazard abatement project in accordance with current EPA and OSHA regulations and standard work practices established for asbestos removal. Duties of the competent person are defined in OSHA Regulation 29 CFR 1926.1101(b).

1.1.9.12 Consultant means a Certified Industrial Hygienist (C.I.H), industrial hygienist or an industrial

hygiene technician, accredited by the EPA and certified in the State of Ohio as an Asbestos Hazard Abatement Specialist and Asbestos Hazard Evaluation Specialist.

1.1.9.13 Contaminated means containing or coated with asbestos. 1.1.9.14 Curtained doorway a device that allows ingress or egress from one room to another while

minimizing air movement between the rooms, typically constructed by placing two overlapping sheets of plastic over an existing or temporarily formed doorway, securing the vertical edge of one sheet along one vertical side of the doorway, and securing the vertical edge of the other sheet along the opposite vertical side of the doorway.

1.1.9.15 Decontamination Enclosure System - A series of connected rooms, with curtained doorways

between any two adjacent rooms, for the decontamination of workers or of materials and equipment. A decontamination enclosure system always contains at least one airlock.

1.1.9.16 Encapsulant means a liquid agent used to seal the surface (bridging encapsulate) or

penetrate the bulk (penetrating) of ACM to control the release of airborne asbestos fibers. 1.1.9.17 EPA means The United States Environmental Protection Agency. 1.1.9.18 Equipment Decontamination Enclosure System means a decontamination enclosure system

for materials and equipment; typically consists of a designated area of the work area, a washroom, a holding area, and an uncontaminated area.

1.1.9.19 Equipment Room means a contaminated area or room that is part of the worker

decontamination enclosure system, with provisions for storage of contaminated clothing and equipment.

1.1.9.20 f/cc means fibers per cubic centimeter of air. 1.1.9.21 Facility Component means any pipe, duct, boiler, tank, fan, engine, or furnace at or in a

facility, or any structural member of a facility. 1.1.9.22 Fixed Object means a piece of equipment or furniture in the work area that cannot be

removed from the work area. 1.1.9.23 Glove-bag Technique means a method with limited applications for removing small amounts

of friable asbestos-containing material from HVAC ducts, short piping runs, valves, joints, elbows, and other nonplanar surfaces in an uncontaminated (plasticized) work area. The

Page 75: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 5 SITEWORK ABATEMENT The Architectural Group, Inc.

glove-bag assembly is a manufactured or fabricated device consisting of a glove bag (typically constructed of 6-mil transparent plastic); two inward-projecting, long-sleeve, rubber gloves; one inward projecting water wand sleeve; an internal tool pouch; and an attached, labeled receptacle for asbestos waste. The glove bag is constructed and installed in such a manner that it surrounds the object or area to be decontaminated and contains all asbestos fibers released during the removal process. All workers who are permitted to use the glove-bag technique must be highly trained, experienced, and skilled in this method.

1.1.9.24 HEPA Filter means a high-efficiency particulate air (absolute) filter capable of trapping and

retaining 99.97 percent of test aerosol particles greater than 0.3 micrometer in diameter. 1.1.9.25 HEPA Vacuum means a high-efficiency particulate air (absolute) filtered vacuuming

equipment with a filter system capable of collecting and retaining asbestos fibers. 1.1.9.26 Holding Area means a chamber between the washroom and an uncontaminated area in the

equipment decontamination enclosure system. The holding area comprises an airlock. 1.1.9.27 Negative-pressure Ventilation System means a local exhaust system capable of maintaining

a detectable pressure differential across containment barriers relative to adjacent unsealed areas.

1.1.9.28 NESHAPS means the National Emission Standards for Hazardous Air Pollutants (40 CFR

Part 61). 1.1.9.29 NIOSH means the National Institute for Occupational Safety and Health. 1.1.9.30 OSHA means Occupational Safety and Health Administration. 1.1.9.31 Penetrating Encapsulant means a liquid designed to saturate the material, thereby binding

asbestos fibers to one another and to other substances in the material. 1.1.9.32 Plasticize means to cover floors and walls with plastic sheets as herein specified. 1.1.9.33 Removal means all herein specified procedures necessary to strip or clean up

asbestos-containing materials from designated areas and to dispose of these materials at an acceptable disposal site.

1.1.9.34 Sealant means a liquid material that is applied to cleaned substrates and other surfaces

following the removal of asbestos-containing materials to prevent the possible release of residual asbestos fibers.

1.1.9.35 Shower Room means a room between the clean room and the equipment room in the worker

decontamination enclosure system, with hot and cold running water and suitably arranged for complete showering during decontamination. The shower room comprises an airlock between contaminated and clean areas.

1.1.9.36 Staging Area means either the holding area or an area near the waste-transfer airlock where

containerized asbestos waste has been placed prior to removal from the work area. 1.1.9.37 Stripping means all herein specified procedures necessary to remove asbestos-containing

materials or asbestos-contaminated materials from their substrate or from any component of the facility. ,

1.1.9.38 Substrate means the underlying surface (e.g., pipe, wall, ceiling) to which

asbestos-containing material has been applied.

Page 76: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 6 SITEWORK ABATEMENT The Architectural Group, Inc.

1.1.9.39 Surfacing Material means ACM sprayed or trawled on surfaces (e.g., walls, ceilings, structural members) for acoustical, decorative, or fireproofing purposes. This includes plaster and fireproofing insulation.

1.1.9.40 Surfactant means a chemical wetting agent added to water to reduce surface tension and

improve penetration. 1.1.9.41 Thermal System Insulation means insulation used to prevent heat loss from pipes, boilers,

tanks, breaching, heat exchangers, etc. 1.1.9.42 Washroom means a room between the work area and the holding area in the equipment

decontamination enclosure system. A washroom comprises an airlock. 1.1.9.43 Wet Cleaning means the process of eliminating asbestos contamination from building

surfaces and objects by using cloths, mops, or other cleaning tools that have been dampened with water, and the disposing of these cleaning tools as asbestos-contaminated waste.

1.1.9.44 Work Area means designated rooms, spaces, or areas of the project in which asbestos

abatement actions are to be undertaken or which may be contaminated as a result of such abatement actions. A contained work area is one that has been sealed, plasticized, and equipped with a decontamination enclosure system. An isolated work area is a controlled-access work area that has been isolated by plastic curtains and in which the openings to the outside are sealed with plastic sheeting. An isolated work area is not an airtight containment area and is not equipped with a decontamination enclosure system.

1.1.9.45 Worker Decontamination Enclosure System means a decontamination enclosure system for

workers, typically consisting of a clean room, a shower room, and an equipment room. 1.2 APPLICABLE REFERENCE DOCUMENTS The current issue of each document shall govern. If there is a conflict among requirements or with

these specifications, the more stringent requirement shall apply. 1.2.1 REGULATIONS Compliance is required in strict accordance with applicable Federal, State, municipal, and local

regulations, which includes, but is not limited to the following: 1.2.1.1 CODE OF FEDERAL REGULATIONS (CFR) 1. Title 29, Section 1910.1020 “Access to Employee Exposure and Medical Records.” 2. Title 29, Section 1910.145 “Specifications for Accident Prevention Signs and Tags.” 3. Title 29, Section 1910.134 “Respiratory Protection.” 4. Title 29, Section 1910 (Subpart 2) 1000 “Toxic and Hazardous Substances” (US OSHA). 5. Title 29, Section 1910.1200 “Hazardous Communications Regulations.” 6. Title 29, Section 1926.1101 “Asbestos, Tremolite, Anthophylite, and Actinolite.” 7. Title 29, Section 1926.1-.1051 “Construction Industry Safety & Health Standards” (US

OSHA). 8. Title 40, Section 61 Subpart A & B “General Provisions.” 9. Title 40, Section 61.145 Subpart M “National Emissions Standards for Asbestos.” 10. Title 40, Section 241 “Guidelines for the Land Disposal of Solid Wastes.” 11. Title 40, Section 257 “Criteria for Classification of Solid Waste Disposal Facilities and

Practices.” 12. EPA 560/5-83-002 “Guidance for Controlling Friable ACM in Buildings.” 1.2.1.2 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) 1. Z9.2-79 “Fundamentals Governing the Design and Operation of Local Exhaust Systems.”

Page 77: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 7 SITEWORK ABATEMENT The Architectural Group, Inc.

2. Z88.2-80 “Practices for Respiratory Protection.” 1.2.1.3 National Institute of Occupational Safety and Health (NIOSH) 1. Manual of Analytical Methods, 2nd Ed., Vol. 1, “Physical and Chemical Analysis Method”

(P&CAM): 2. Method 7400 Fibers (N1, 3rd Ed., Vol. 1). 3. Respiratory Protection - “An Employer’s Manual & Respiratory Protection - A Guide for

the Employee.” 1.2.1.4 US Department of Transportation 1. CFR Title 49 Parts 172.101 & 173.1090 “Hazardous Material Regulations.” 1.2.1.5 UNDERWRITERS LABORATORIES, INC. (UL) PUBLICATIONS

1. 586-77 (R 1982) “Test Performance of High Efficiency, Particulate, Air Filter Units.”

1.2.1.6 Other Regulations: All other federal, state, county, municipal, and local statutes, ordinances, regulations, or rules pertaining to asbestos, including its abatement, storage, transportation, and disposal; construction safety and health and hazard communication (worker right -to -know), and contractor or other license, certification and regulation, which are now in effect or which may come into effect prior to project completion.

1.3 AIR MONITORING 1.3.1 GENERAL 1.3.1.1 The Consultant shall collect area air samples outside the work area (inside the building)

throughout the removal, cleanup, and decontamination phases of the project. This monitoring will be conducted to verify the integrity of the work area enclosure system, adequacy of cleaning and decontamination procedures, and the effectiveness of the air filtration units.

1.3.1.2 The Contractor or his representative shall conduct personal monitoring (as specified in 29

CFR 1926.1101 and this section) throughout the preparation, removal, and decontamination phases of this project as specified in the table of section 1.3.2. Air monitoring shall be conducted to ensure compliance with OSHA regulations and to evaluate the adequacy of 1) the type of respiratory protection used by workers, 2) work practices and engineering controls, and 3) containment barriers and decontamination procedures.

1.3.1.3 The Contractor's competent person or party responsible for the collection of air samples shall

be technically competent to perform the work and experienced in the prescribed procedures for collecting representative air samples. The monitoring shall comply with OSHA regulation 29 CFR 1926.1101.

1.3.1.4 Should air sampling data reveal elevated airborne fiber concentrations outside of the

contained work area, the Contractor shall stop work immediately. Decontamination of the area shall be performed by the Contractor and work practices and engineering controls shall be reviewed by the Consultant.

1.3.2 AIR MONITORING SCHEDULE AND SCHEDULE SAMPLING The Contractor's air monitoring schedule and sampling strategy for the designated work areas shall

be as follows:

Page 78: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 8 SITEWORK ABATEMENT The Architectural Group, Inc.

Project Phase

When to sample

Asbestos Sample

Minimum # of

Samples1

Location

PREPARATION (Pre-cleaning)

Each day of operation

Personal Excursion

1 1

Inside each work area Inside each work area

REMOVAL Each day of operation

Personal Excursion

1 1

Inside each work area Inside each work area

DECONTAMINATION Each day of operation

Personal Excursion

1 1

Inside each work area Inside each work area

1 At a minimum, one out of four workers involved in abatement activities shall be monitored for asbestos during all preparation, gross removal, decontamination, and load-out of this Project. Short-term excursion samples shall also be collected per activity. 1.3.3 METHODS OF COLLECTION AND ANALYSIS 1.3.3.1 All air monitoring shall be conducted in accordance with NIOSH Method No. 7400.

Sampling shall be performed for the full work shift, except for the determination of excursion levels and on abbreviated work shifts. The flow rate for the sampling pump shall be 0.5 to 2 liters/minute. Sampling pumps shall be checked daily for proper flow-rate calibration.

1.3.3.2 All samples collected by the Contractor or his representative shall be submitted for analysis

daily. Completed data sheets must be submitted to the laboratory along with each day's filter samples. Sampling results shall be reported to the Consultant within 24 hours from the end of the previous work shift. A written laboratory report for all sample analyses performed for this project must be submitted to the Consultant within 5 days following completion of the project.

1.3.3.3 Multiple personal or area samples may have to be collected during the workshift to accurately

characterize a worker's exposure level. The number of samples taken will depend on the degree of fiber contamination in the work area and the effectiveness of work practices and engineering controls. Overloaded filter samples with "fibers too numerous to count or filter holder cassettes containing loose particulate matter are unacceptable. The air samples must be properly collected and be representative of actual fiber concentrations in the work area.

1.4 PERSONNEL PROTECTION 1.4.1 GENERAL Post caution signs in and around the work area to comply with OSHA Regulation 29 CFR

1926.1101(k)(1). 1.4.2 WORKER INSTRUCTION

Prior to commencement of work, the workers shall be trained in accordance with requirements in Chapter 3701-34 of the Ohio Administrative Code and shall have received the OSHA required medical examination, per 29 CFR 1910.134.

1.4.3 RESPIRATORY EQUIPMENT Workers shall be provided with personally issued and marked respiratory equipment approved by

NIOSH and MSHA and suitable for the asbestos exposure level in the work area according to OSHA Standard 29 CFR 1926.1101(h). At a minimum, all workers within the contained work area shall wear half-face respirators equipped with high-efficiency filter cartridges. Single-use and/or reusable/disposable respirators are not acceptable and shall not be used on this project. Sufficient P-100 filter cartridges for replacement shall be provided as required by the employer.

Page 79: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 9 SITEWORK ABATEMENT The Architectural Group, Inc.

Prevalent airborne fiber concentrations in the work area shall govern the type of respiratory protection required. No change in the respiratory protection worn by workers shall occur without prior approval by the Consultant.

1.4.4 PROTECTIVE CLOTHING Per OSHA Standard 1926.1101(i), workers shall be provided with sufficient sets of protective

full-body clothing. Such clothing shall consist of full-body coveralls and headgear. Eye protection and hard hats shall be provided as required by applicable safety regulations. Contaminated non-disposable protective clothing and footwear shall be left in the contaminated equipment room until the end of asbestos abatement work, at which time such items shall be disposed of as asbestos waste.

1.4.5 VISITOR PROTECTION Authorized visitors shall be provided with suitable clean respirators with new filters or cartridges

and protective clothing, headgear, eye protection, and footwear whenever required up to a maximum of two (2) sets per day.

1.4.6 PROTECTION PROCEDURES The Contractor shall provide and post in the equipment room and the clean room, the

decontamination and work procedures to be followed by workers. 1.4.7 WORKER PROTECTION FOR FULL CONTAINMENT 1.4.7.1 Each worker and authorized visitor, upon entering the job site, shall remove street clothes in

the clean change room or airlock and put on a respirator with new filters and clean protective clothing before entering the work area.

1.4.7.2 Each worker shall, each time he leaves the work area, remove visible gross contamination

from clothing using a HEPA vacuum; proceed to the equipment room and remove and dispose of all clothing except respirators; proceed to the showers; clean the outside of the respirator with soap and water while showering; remove the respirator; thoroughly shampoo and wash himself; remove filters, wet them, and dispose of them; and wash and reuse the respirator.

1.4.7.3 Following showering and drying off, each worker shall proceed directly to the clean change

room and dress in street clothing at the end of each work shift or before eating, smoking, or drinking.

1.4.7.4 Workers shall not eat, drink, smoke, or chew gum or tobacco at the worksite except in a

designated smoking area outside the building. 1.4.7.5 Workers shall be fully protected with respirators and protective clothing at the

commencement of the disturbance of asbestos-containing or contaminated material, and until final cleanup is completed and approved.

1.4.7.6 Contaminated work footwear shall not be allowed outside of the work area unless thoroughly

decontaminated. Leather work boots must remain inside of the work area throughout the abatement process.

1.5 EQUIPMENT REMOVAL PROCEDURES 1.5.1 CLEANING Clean external surfaces of contaminated equipment to include, but not limited to ladders,

scaffolding, shovels, extensions cords, hose, and vacuums. Materials shall be thoroughly cleaned by wet wiping, sponging, mopping, or HEPA vacuuming before moving into the decontamination enclosure system for final cleaning.

Page 80: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 10 SITEWORK ABATEMENT The Architectural Group, Inc.

1.6 EMERGENCY PRECAUTIONS 1.6.1 WRITEN CONTINGENCY PLAN Prepare a written contingency plan for emergencies including fire, accident, power failure, pressure

differential system failure, supplied air system failure (if applicable), or any other event that may require modification of decontamination or work area isolation procedures. Include in the plan specific procedures for decontamination or work area isolation. Supply copies of the plan to the Environmental Health and Safety Offices and post a copy in the clean room.

1.6.2 MEDICAL EMERGENCY PERSONNEL NOTIFICATION Local medical emergency personnel should be notified prior to commencement of abatement

activities as to the likelihood of having to handle contaminated or injured workmen and shall be advised on safe decontamination.

1.6.3 FIRE EXTINQUISHER PROVISION The Contractor shall be responsible for providing a minimum of one fire extinguisher rated not less

than 2A in accordance with 29 CFR 1926.150. Substitution of fire extinguishers shall be approved in advance by the University Fire Marshal located in the Environmental Health and Safety Offices.

1.6.4 EVACUATION TRAINING Employees shall be trained in evacuation procedures in the event of work area emergencies. 1.6.4.1 For non-life -threatening situations, employees injured or otherwise incapacitated shall

decontaminate themselves following normal procedures with assistance from coworkers, if necessary, before exiting the work area to obtain proper medical treatment.

1.6.4.2 For life-threatening injury, worker decontamination shall take least priority, after measures to

stabilize the injured worker. 1.6.5 TELEPHONE NUMBERS Telephone numbers of all emergency response personnel shall be prominently posted in the clean

room outside the decontamination enclosure system along with the location of the nearest telephone.

1.7 SITE SECURITY 1.7.1 CONTAINMENT AREA DEMARCATION The containment area shall be demarked as a Regulated Area. The Contractor shall post warning

signs at designated entrances to the work area as required by 29 CFR 1926.1101(k). 1.7.2 ACCESS RESTRICTIONS The work area is to be restricted to authorized, trained, and protected personnel only. These may

include the Contractor’s employees, employees of Subcontractors, University employees and representatives, State and local inspectors, and other individuals designated as such by the Environmental Health and Safety Offices.

1.7.3 REPORTING UNAUTHORIZED ENTRY Entry into the work area by unauthorized individuals shall be reported immediately to the

Environmental Health and Safety Offices by the Contractor. The Contractor shall maintain a sign-in sheet for all visitors to each abatement site.

1.7.4 SITE SECURITY CONTROL The Contractor shall have control of site security during abatement activities in order to protect

work efforts and equipment. The University shall maintain building security of the facility after work hours.

Page 81: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 11 SITEWORK ABATEMENT The Architectural Group, Inc.

PART 2 MATERIALS AND EQUIPMENT 2.1 MATERIALS 2.1.1 MATERIAL DELIVERY All materials shall be delivered clean, in proper working order, and shall bear the name of the

manufacturer and brand. Material Safety Data Sheets (MSDSs) shall be required for all chemicals brought on site by the Contractor.

2.1.1.1 All materials subject to damage shall be stored off the ground, away from wet or damp

surfaces, and under sufficient cover to prevent damage or contamination 2.1.1.2 Damaged or deteriorating materials shall not be used and shall be removed from the

premises. Material that becomes contaminated shall be disposed of in accordance with this Specification.

2.1.2 PLASTIC SHEETING Plastic sheeting for all uses shall be a minimum of 6-mil thick or equivalent. All plastic sheeting

shall be sized in appropriate lengths and widths to minimize the frequency of joints 2.1.2.1 Plastic sheeting used for worker decontamination enclosure systems should be black in

color. 2.1.3 TAPE Must be capable of sealing joints of adjacent plastic sheets, capable of attaching plastic sheets to

wood surfaces, and capable of adhering under dry and wet conditions, including use of amended water.

2.1.4 SURFACANT A surfactant shall be mixed with water to provide a concentration of 1 ounce surfactant to 5 gallons

of water, according to manufacturer’s specifications. 2.1.5 IMPERMEABLE CONTAINERS Must be suitable for receiving and retaining asbestos-containing and/or asbestos-contaminated

materials. All asbestos waste shall be labeled in accordance with 29 CFR 1926.1101(k)(7), 49 CFR Parts 171 and 172, and 40 CFR Part 61, Subpart M. Containers must be both water and air tight.

2.1.6 WARNING LABELS AND SIGNS Must be posted or affixed as required by 29 CFR 1926(k)(6) and (k)(7). 2.1.7 ENCAPSULANTS The Contractor shall provide before start of work the manufacturer’s technical data for the type of

that will be used on this project. The Contractor shall also provide a current MSDS for each in accordance with OSHA Standard 29 CFR 1910.1200.

2.1.8 OTHER MATERIALS The Contractor shall provide all other materials, such as lumber, nails, and hardware, that may be

required to construct and dismantle the decontamination unit and the barriers that isolate the work area.

2.2 TOOLS AND EQUIPMENT 2.2.1 TOOLS AND EQUIPMENT PROVISION The Contractor shall provide suitable tools and equipment for all phases of work for this project.

Page 82: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 12 SITEWORK ABATEMENT The Architectural Group, Inc.

2.2.1.1 Air movement equipment shall be in compliance with ANSI Z9.2, Local Exhaust Ventilation. No air movement system or air equipment shall discharge outside the work area into the building.

2.2.1.2 Each HEPA filter shall be individually tested and certified by the manufacturer to have an

efficiency of not less than 99.97 percent when challenged with 0.3 micron dioctylphthalate (DOP) particles. Each filter shall be marked with the name of the manufacturer, serial number, air flow rating, efficiency and resistance, and the direction of test air flow.

2.2.1.3 Mechanical exhaust equipment shall be used to keep airborne fibers confined to the work

area, reduce fiber levels in the work area, and achieve acceptable final air monitoring results. The mechanical equipment shall exhaust through a HEPA filter to the outside of the building. The equipment shall remain in operation twenty-four (24) hours a day until decontamination of the work area and/or final air sampling and analysis is completed.

2.2.1.4 Backup air filtration units shall be available at the site in the event of unit failure and need to

substitution. 2.2.2 AIRLESS SPRAYER An airless sprayer shall be used for the application of amended water and encapsulants. 2.2.3 SCAFFOLDING AND LADDERS Scaffolding and ladders shall be used as required to accomplish work specified and shall meet or

exceed all applicable OSHA requirements and safety regulations. 2.2.4 VACUUMS All vacuums used to clean up asbestos-containing materials in the work area shall be equipped

with HEPA filters. 2.2.5 MISCELLANEOUS TOOLS AND EQUIPMENT The Contractor shall provide all other tools suitable for the removal of specified ACM and

associated clean up activities. These tools include, but are not limited to scrapers, utility knives, brushes, sprayers, and shovels.

2.2.6 DIGITAL PRESSURE DIFFERENTIAL METER The Contractor shall continuously measure the pressure differential between the clean area and

work area using a pressure differential meter. 2.3 WATER SERVICE 2.3.1 TEMPORARY WATER SERVICE CONNECTION All connections to the University’s water system shall include backflow protection. Valves shall be

temperature and pressure rated for operation of the temperatures and pressures encountered. After completion of use, connections and fittings shall be removed without damage or alteration to existing water piping and equipment.

2.3.2 WATER HOSES Employ heavy duty, abrasion resistant hoses with a pressure rating greater than the maximum

pressure of the water distribution system to provide water into each work area. 2.3.3 HOT WATER Hot water may be secured from the building hot water system, if available, provided backflow

protection is installed at the point of connection as described in 2.3.1. If hot water is not available at the building, provide UL rated 40-gallon electric hot water heater to supply hot water for the work area containment decontamination unit.

Page 83: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 13 SITEWORK ABATEMENT The Architectural Group, Inc.

2.4 ELECTRICAL SERVICE 2.4.1 GENERAL Comply with applicable NEMA, NEC, and UL standards and regulations for materials and layout of

temporary electrical service. 2.4.2 ELECTRIC TOOLS Electrical tools and equipment shall meet all applicable codes and regulations. GFCIs shall be

used at all times for electrical equipment. 2.4.3 ELECTRIC POWER CORDS Use only grounded extension cords; use “hard service” cords where exposed to abrasion and

traffic. Use single lengths or use waterproof connectors to connect separate lengths of electric cords, if single lengths will not reach areas of work.

2.4.4 LAMPS AND LIGHT FIXTURES Provide general service incandescent or halogen lamps or wattage indicated or required for

adequate illumination. Protect lamps with guard cages or tempered glass enclosures. Provide lighting fixtures suitable for wet environments.

2.5 TEMPORARY LIGHTING Where natural lighting does not meet the required light level, provide one (1) 200 watt halogen

light every 500 square feet of floor area. In stairways, provide one 100 watt incandescent lamp so as to illuminate each landing and flight. Provide sufficient temporary lighting to ensure proper workmanship everywhere; by combined use of general lighting and portable plug-in task lighting.

PART 3 EXECUTION OF ASBESTOS ABATEMENT 3.1 PRE-ABATEMENT INSPECTION Before any work begins at the Project site, the Contractor will conduct an inspection to verify

condition of materials and quantities to be removed. 3.2 SEQUENCE OF EXECUTION 3.2.3 Work area sequence for removal of asbestos floor tile/mastic The sequence of execution for removal of asbestos floor tile/mastic shall occur in the following

order: A. Prepare the work area per section 3.3.1, 3.3.2, and 3.3.3. B. Remove ACM per section 3.4. C. Remove and discard of ACM waste per section 3.5. D. Decontaminate work area and clean work site per Section 3.6.] E. Establish clearance criteria per section 3.7.

3.3 PREPARATION 3.3.1 WORK AREA PREPERATION Prepare the work area in the order presented below: 3.3.1.1 Coordinate with the University on shutting down building systems. 3.3.1.2 Shut down and isolate HVAC systems. Diffusers shall be sealed with polyethylene. 3.3.1.3 Seal off all openings (including, but not limited to, doorways to rooms not covered by this

Specification, windows, and any other penetrations of the work area) with 6-mil plastic sheeting sealed with tape. Protect fire alarm switch and bell using plastic sheeting and tape.

Page 84: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 14 SITEWORK ABATEMENT The Architectural Group, Inc.

3.3.1.4 Introduce scaffolding, ladders, and other large equipment into the work area. 3.3.1.5 Install a worker (3-stage) decontamination enclosure system per Section 3.3.2, Once the

personnel decontamination enclosure facility is in place, it shall be used as specified for the entrance and exit of all persons within the work area.

3.3.1.6 Install HEPA-filtered air-movement equipment in the work area and vent exhaust ducts to the

outside atmosphere. No exhaust from the negative-air-movement equipment shall be allowed to be released within the building.

3.3.1.7 Warning signs will be posted and barrier tape erected at entrance to the regulated area per

OSHA regulations. 3.3.1.8 In areas where mastic is to be removed cover walls with one layer of 4-mil plastic sheeting.

The sheeting should extend a minimum of 3 feet from the floor. 3.3.2 DECONTAMINATION ENCLOSURE SYSTEMS 3.3.2.1 GENERAL- Build suitable framing and line with plastic, sealing with tape at all lap joints for

each decontamination enclosure system. Access between contaminated and uncontaminated areas shall be through decontamination enclosure system.

3.3.2.3 MAINTENANCE OF ENCLOSURE SYSTEM:

A. Ensure that barriers and plastic linings are effectively sealed and taped. Repair damaged barriers and remedy defects immediately upon discovery.

B. Visually inspect enclosures at the beginning, during and following each work shift. C. Use smoke methods to determine the effectiveness of barriers when directed by the

University and/or their representative. 3.3.2.4 ABATEMENT WORK SHALL NOT COMMENCE UNTIL:

A. Arrangements have been made and approval granted for disposal of asbestos waste at an acceptable site.

B. Work area, decontamination enclosure systems and parts of the building required to remain uncontaminated are effectively segregated.

C. Tools, equipment, and material waste receptors are on hand. 3.3.3 AIR FILTRATION SYSTEM 3.3.3.1 A pressure differential between the outside and inside work area shall be maintained at all

times while abatement activity is in progress. The Contractor shall not allow any air flow out of the work area except through HEPA air filtration devices.

3.3.3.2 The pressure differential shall be maintained so that the movement of tools, equipment,

employees and waste containers through the decontamination enclosure systems do not result in air flow out of the work area.

3.3.3.3 The Contractor shall position the air filtration devices in the work area away from entrances

to the decontamination enclosure systems. The discharge air shall be exhausted directly outdoors through windows or doors.

3.3.3.4 Reinforced heavy-duty flexible ducting shall be used for the discharge air. The ducting shall

be equivalent to or larger than the shape and dimension of the exhaust port of the air filtration device. All ducting shall be sealed to maintain airtight joints.

3.3.3.5 Air circulation throughout the work area shall be maintained by the air filtration devices to

reduce dead air spaces and provide appropriate ventilation inside the work area. If the

Page 85: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 15 SITEWORK ABATEMENT The Architectural Group, Inc.

Contractor cannot maintain an adequate pressure differentiate inside the work area all work shall be stopped until the problem is corrected.

3.3.3.6 The Contractor shall use a pressure differential meter to show a measurable pressure

differentiate between the work area and adjacent areas at a minimum of -0.02 inches of water.

3.4 ASBESTOS REMOVAL PROCEDURES NOTE: Asbestos abatement work shall be performed without contamination to adjacent areas. If an

adjacent area in the building becomes contaminated, the Contractor shall stop work immediately and isolate that entire area, and immediately clean the contaminated area in accordance with procedures specified elsewhere in these specifications. The Contractor may continue work after the area passes a thorough visual inspection by the Consultant.

3.4.1 REMOVAL OF ASBESTOS-CONTAINING FLOOR TILE Tiles shall be removed intact, unless the Contractor proves that intact removal is not possible.

Wet the floor tiles with amended water before, during and after removal. Care must be taken to avoid excessive use of water. Sections shall be scraped-up, wetted again with amended water, and immediately placed into appropriate disposal containers. The tiles shall not be allowed to dry out before they are inserted into the disposal containers. No visible tile shall remain prior to the removal of mastic.

3.4.2 REMOVAL OF ASBESTOS-CONTAINING MASTIC Upon removal of floor tile (in areas where floor tile was removed from concrete) remove asbestos-

containing mastic with commercially available mastic remover and collect as asbestos-containing waste. There shall be no visible debris following removal of mastic.

3.5 REMOVAL AND DISPOSAL OF ASBESTOS WASTE 3.5.1 DISPOSAL CONTAINERS Fill disposal containers (i.e., plastic bags) to a level that workers can handle safely and with ease. 3.5.2 SEALING DISPOSAL CONTAINERS As disposal containers are filled, seal and move them to a staging area adjacent to the equipment

decontamination system. 3.5.3 CONTAINER DECONTAMINATION AND TRANSPORT Move each container into the dirty room of the decontamination system. Clean external surfaces

of each container thoroughly using a wet sponge or damp cloth. Move containers through the airlock to the second room and re-wipe each container thoroughly. After the second cleaning, move each container out of the clean room to a worker outside who can carry the container to a disposal container located on the parking lot. Ensure that containers are removed from the clean room by workers, dressed in clean coveralls, who have entered from uncontaminated areas.

All waste shall, at a minimum, be double bagged in 6-mil labeled bags. Move all disposal

containers to the holding area to await disposal at an approved landfill. Place caution labels on containers in accordance with 29 CFR 1926.1101(k)(7). Identification labels shall also be placed on the outside of the first bag in accordance with 40 CFR Part 61, Subpart A.

3.5.4 CONTAINER DISPOSAL Remove sealed and labeled containers of asbestos waste, as necessary, and dispose of such

containers at an authorized disposal site in accordance with disposal regulatory requirements. 3.5.5 ASBESTOS WASTE STORAGE Asbestos waste shall not be stored outside the work area or inside the building. Asbestos waste

stored outside the building must be stored in a locked secure truck, trailer, or waste shipping

Page 86: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 16 SITEWORK ABATEMENT The Architectural Group, Inc.

container. Waste shipping containers shall have secure lockable metal covers. Except when loading and unloading asbestos waste, storage vehicles/containers shall be kept locked.

3.5.6 ASBESTOS WASTE TRANSPORT After the waste containers are decontaminated, the Contractor may make arrangements for a

hauler or truck driver from the waste disposal site to transport the asbestos waste and contaminated material to the disposal site. Transportation of all materials from the work area shall be in accordance with all applicable DOT and EPA regulations.

3.5.7 ASBESTOS WASTE MODE OF TRANSPORT Transportation shall be by enclosed truck, trailer, or waste shipping container with the cargo area

free of debris and lined with 6-mil polyethylene sheeting on floors and walls. Bags shall be placed in the cargo area so as to prevent shifting and damage during transport. Asbestos warning signs shall be prominently posted during loading and unloading.

3.5.8 REMOVAL OF WASTE BEFORE WORK AREA CLEANUP All asbestos-containing waste shall be removed from the work area and items decontaminated

before any cleanup work is started and before the isolation structures are dismantled. 3.5.9 COMPLIANCE WITH DISPOSAL REGULATIONS The Contractor shall be responsible for determining current waste handling and disposal

regulatory requirements and must comply with these regulations. 3.5.10 WASTE HANDLER PROTECTION REQUIREMENTS The Contractor shall ensure that all employees handling and discarding asbestos waste wear

approved respiratory equipment and protective clothing. 3.6 CLEANUP AND DECONTAMINATION OF THE ASBESTOS WORK AREA Remove all visible accumulations of ACM and debris with a HEPA-filtered vacuum and, where

feasible wet wiping with amended water. This cleaning shall be conducted with the plastic critical barriers in place, and with the HEPA air filtration devices and the personnel and equipment/waste decontamination facilities in service.

3.6.1 CLEANUP OF WORK AREA 3.6.1.1 Remove all visible accumulations of asbestos-containing material, and all loose debris on the

floor and other walking surfaces with a HEPA-filtered vacuum. 3.6.1.2 Wet wipe critical barriers covering the windows, pipes, and other surfaces. Wash all walls,

ceilings, and floors to ensure that the area is free of visible debris. 3.6.1.3 After cleaning the work area, the supervisor shall visually inspect the entire work area to

ensure that it is free of visible asbestos debris. After the supervisor has determined that the area is visible clean, Miami University shall conduct an inspection to determine whether the area is acceptably clean.

3.6.1.4 Sealed containers and all equipment used in the work area shall be included in the cleanup

and shall be removed from work areas as an appropriate time in the cleaning sequence. 3.6.1.5 If the Miami University finds visible dust or accumulations of asbestos debris in the work area

after cleaning, the contractor shall repeat the cleaning (at his own expense) until the work area is in compliance. The cleaning shall be repeated at 24-hour intervals until no residue is visible.

3.6.1.6 When final inspection determines that the area is free of visible asbestos debris the critical

barriers and the decontamination facilities shall be removed, all areas shall be thoroughly wet cleaned, and materials from the equipment room and shower shall be disposed of as

Page 87: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 02 8500 - 17 SITEWORK ABATEMENT The Architectural Group, Inc.

contaminated waste. A final check shall be carried out by Miami University to ensure that no dust or debris remains on surfaces as a result of dismantling operations.

3.7 DETERMINING ABATEMENT COMPLETION 3.7.1 Visual inspection 3.7.1.1 Miami University shall conduct a thorough visual inspection of each work area after the

Contractor has indicated that all asbestos-containing material has been completely removed. 3.7.1.2 Items to be checked during the visual inspection include, but are not limited to, the following:

• The adequacy of removal of asbestos-containing materials from their substrates. • Cleanliness of the work area and decontamination areas; accumulations of loose dust or

debris on exposed surfaces, walls, and floors. • Damage to the building or immovable objects that remain in the work area. If any accumulation of dust or debris is observed, the Contractor will be required to

wet-clean and/or HEPA vacuum the work area again and pass a repeat inspection.

PART 4 FINAL DOCUMENTATION REQUIREMENTS 4.1 PROJECT DOCUMENTATION Comprehensive and regular documentation is required so that the "Project Record Documents"

can be annotated to provide factual information regarding all aspects of the abatement work. 4.1.1 REQUIRED DOCUMENTATION Throughout this project, the Contractor shall compile the following documentation, which shall be

submitted to Miami University upon project completion: 4.1.1.1 All air monitoring data collected during the project. The data should include sample number

and description, sample period and volume, and measured concentration. 4.1.1.2 Original disposal manifests signed by the operator of the licensed landfill. 4.1.1.3 EPA and State of Ohio required notifications. 4.1.1.4 Copies of all asbestos abatement certificates required by the State of Ohio for all personnel

directly involved in the project. 4.1.1.5 Copy of the Contractor's daily sign-in site log.

END OF SECTION

Page 88: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 03 0130 - 1 RESURFACING CONCRETE The Architectural Group, Inc.

SECTION 03 0130

RESURFACING AND REHABILITATION OF CONCRETE

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Resurfacing of concrete floors.

1.02 REFERENCES

A. AASHTO M 148 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete; 2001.

B. ASTM C 309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete; 2003.

1.03 SUBMITTALS

A. See Document 00 72 16 – General Requirements, Article 13 – Action Submittals, for submittal procedures.

B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Store products in manufacturer's unopened packaging until ready for installation.

B. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.

1.05 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Basis of Design Manufacturer: Mapei Corporation; 1144 East Newport Center Drive, Deerfield Beach, FL 33442. ASD. Tel: (954) 246-8888 or (800) 42-MAPEI. Fax: (954) 246-8800. www.mapei.com

2.02 APPLICATIONS/SCOPE

A. See drawings for extent of work where existing VCT and VAT was removed.

B. Interior Floors: 1. For Overall Topping: Use Self-Leveling Exposed Topping, Self-Leveling Thick Topping

Underlayment, or Self-Leveling Thin Topping Underlayment compatible with new VCT manufacturer’s prod cut recommendations.

2. For Patching: Use Traffic Surface Repair Mortar, Interior Repair Mortar, or Interior Repair Mortar compatible with new VCT manufacturer’s prod cut recommendations.

C. Patching Other Interior Concrete: Use Interior Repair Mortar.

D. Bonding New Concrete to Old Concrete: Use Epoxy Adhesive.

Page 89: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 03 0130 - 2 RESURFACING CONCRETE The Architectural Group, Inc.

2.03 INTERIOR MATERIALS

A. Self-Leveling Thick Topping Underlayment: Pre-blended cementitious, for thicknesses from 1/4 inch minimum. 1. Acceptable Product: Mapei Novo/Plan 5, fast setting; for over cured concrete and exterior

grade plywood. 2. Primer: As recommended by topping manufacturer.

B. Self-Leveling Thin Topping Underlayment: Pre-blended cementitious, for thicknesses from feather edge to 1/2 inch. 1. Acceptable Product: Mapei Novo/Plan 5, fast setting; for over cured concrete and exterior

grade plywood. 2. Primer: As recommended by topping manufacturer.

C. Interior Repair Mortar: Pre-blended cementitious patching mortar for concrete. 1. Acceptable Product: Mapei Planitop 22; two-component, fast-setting, polymer-modified,

synthetic fiber reinforced; for vertical and horizontal surfaces, 1/8 inch to 1-5/8 inches per coat.

2. Acceptable Product: Mapei Quickcem Top 101; one-component, fast-setting, non-shrinking, self-curing; for horizontal surfaces, feather edge to 1 inch per coat.

3. Acceptable Product: Mapei Planitop 10; one-component, fast-setting; for floor surfaces, feather edge to 1/4 inch thick.

4. Acceptable Product: Portland cement, sand, and Mapei Planicrete AC or SB mix; for minimum 3/8 inch thickness.

5. Primer: As recommended by topping manufacturer.

PART 3 EXECUTION

3.01 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

3.02 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 INSTALLATION

A. Install in accordance with manufacturer's instructions.

3.04 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products after Substantial Completion.

END OF SECTION

Page 90: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 1000 - 1 ROUGH CARPENTRY The Architectural Group, Inc.

SECTION 06 1000

ROUGH CARPENTRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preservative treatment of wood.

B. Fire retardant treatment of wood for use in all concealed locations.

1.02 REFERENCES

A. AFPA T10 - Wood Frame Construction Manual; American Forest and Paper Association; 2001.

B. ASTM D 2898 - Standard Test Methods for Accelerated Weathering of Fire-Retardant-Treated Wood for Fire Testing; 1994 (Reapproved 1999).

C. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2001.

D. AWPA C9 - Plywood -- Preservative Treatment by Pressure Processes; American Wood-Preservers' Association; 2003.

E. AWPA C20 - Structural Lumber -- Fire Retardant Treatment by Pressure Processes; American Wood-Preservers' Association; 2002.

F. AWPA C27 - Plywood -- Fire-Retardant Treatment by Pressure Processes; American Wood-Preservers' Association; 2003.

G. AWPA U1 - Use Category System: User Specification for Treated Wood; American Wood-Preservers' Association; 2003.

H. PS 20 - American Softwood Lumber Standard; National Institute of Standards and Technology (Department of Commerce); 1999.

I. SPIB (GR) - Grading Rules; Southern Pine Inspection Bureau, Inc.; 2002.

J. WCLB (GR) - Standard Grading Rules for West Coast Lumber No. 17; West Coast Lumber Inspection Bureau; 1996, Suppl. VII (1996) & VIII (1997).

K. WWPA G-5 - Western Lumber Grading Rules; Western Wood Products Association; 1998.

1.03 SUBMITTALS

A. Manufacturer's Certificate: Certify that wood products supplied for rough carpentry meet or exceed specified requirements.

1.04 QUALITY ASSURANCE

A. Lumber: Comply with PS 20 and approved grading rules and inspection agencies. 1. Acceptable Lumber Inspection Agencies: Any agency with rules approved by American

Lumber Standards Committee. 2. Acceptable Lumber Inspection Agencies: RIS, SPIB, WCLB, and WWPA. 3. Lumber of other species or grades, or graded by other agencies, is acceptable provided

structural and appearance characteristics are equivalent to or better than products specified.

B. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an ALSC-accredited testing agency, certifying level and type of treatment in accordance with AWPA standards.

C. Fire-Retardant Treated Wood: All concealed wood framing and blocking must be fire-retardant.

Page 91: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 1000 - 2 ROUGH CARPENTRY The Architectural Group, Inc.

Mark each piece of wood with producer's stamp indicating compliance with specified requirements.

1.05 DELIVERY, STORAGE, AND HANDLING

A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

B. Fire Retardant Treated Wood: Prevent exposure to precipitation during shipping, storage, or installation.

PART 2 PRODUCTS

2.01 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Grading Agency: Southern Pine Inspection Bureau, Inc. (SPIB).

B. Sizes: Nominal sizes as indicated on drawings, Rough (unsurfaced).

C. Moisture Content: S-dry or MC19.

D. Miscellaneous Blocking: 1. Fire Retardant Treated Lumber: S4S, No. 1 or Construction Grade.

2.02 ACCESSORIES

A. Fasteners and Anchors: 1. Metal and Finish: Hot-dipped galvanized steel for high humidity and preservative-treated

wood locations, unfinished steel elsewhere. 2. Drywall Screws: Bugle head, hardened steel, power driven type, length three times

thickness of sheathing. 3. Anchors: Toggle bolt type for anchorage to hollow masonry; Expansion shield and lag bolt

type for anchorage to concrete.

2.03 FACTORY WOOD TREATMENT

A. Treated Lumber: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

B. Fire Retardant Treatment: 1. Manufacturers:

a. Arch Wood Protection, Inc.: www.wolmanizedwood.com. b. Hoover Treated Wood Products, Inc.: www.frtw.com. c. Osmose, Inc.: www.osmose.com. d. Substitutions: See Section 01 6000 - Product Requirements.

2. Interior Type A: AWPA Use Category UCFA, Commodity Specification H (Treatment C20 for lumber), low temperature (low hygroscopic) type, chemically treated and pressure impregnated; capable of providing a maximum flame spread rating of 25 when tested in accordance with ASTM E 84, with no evidence of significant combustion when test is extended for an additional 20 minutes. a. Kiln dry wood after treatment to a maximum moisture content of 19 percent for

lumber. b. Treat rough carpentry items as indicated. c. Do not use treated wood in applications exposed to weather or where the wood may

become wet.

C. Preservative Treatment: 1. Manufacturers:

a. Arch Wood Protection, Inc.: www.wolmanizedwood.com. b. Chemical Specialties, Inc.: www.treatedwood.com. c. Osmose, Inc.: www.osmose.com.

Page 92: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 1000 - 3 ROUGH CARPENTRY The Architectural Group, Inc.

d. Substitutions: See Section 01 6000 - Product Requirements.

D. Preservative Pressure Treatment of Lumber Above Grade: AWPA Use Category UC3B, Commodity Specification A (Treatment C2) using waterborne preservative to 0.25 lb/cu ft retention. 1. Kiln dry lumber after treatment to maximum moisture content of 19 percent. 2. Treat lumber in contact with waterproofing. 3. Treat lumber in contact with masonry or concrete.

PART 3 EXECUTION

3.01 FRAMING INSTALLATION

A. Provide miscellaneous members as indicated or as required to support finishes, fixtures, specialty items, and trim.

3.02 SITE APPLIED WOOD TREATMENT

A. Apply preservative treatment compatible with factory applied treatment at site-sawn cuts, complying with manufacturer's instructions.

B. Allow preservative to dry prior to erecting members.

END OF SECTION

Page 93: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrade 06 2000 - 1 FINISH CARPENTRY MILLWORK The Architectural Group, Inc.

SECTION 06 2000

FINISH CARPENTRY MILLWORK

PART 1 GENERAL

1.01 DESCRIPTION

A. This section specifies interior finish carpentry.

1.02 RELATED WORK

A. Framing and blocking: Section 06 1000, Rough Carpentry.

1.03 SUBMITTALS

A. Trim Sample: 1. Submit two (2) samples each no less than 1’-0” in length representational of the full length

runs of both the picture rail (to match existing) and chair rail material. 2. Show construction, backing, installation details inclusive of connection hardware type for

review prior to installation.

B. Manufacturer's literature and data: 1. Finish hardware and/or attachment hardware.

1.04 DELIVERY, STORAGE AND HANDLING

A. Protect wood material from dampness, maintaining moisture content specified both during and after delivery at site.

B. Store finishing lumber in weather tight, well ventilated, structures or in space in existing buildings designated by the Owner’s Project Representative. Store at a minimum temperature of 210C (700F) for not less than (ten) 10 days before installation.

C. Pile material in stacks in such manner as to provide air circulation around surfaces of each piece.

1.05 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American National Standards Institute (ANSI/and) 1. Bldrs. Hardware Manufacturers Association (ANSI/BHMA): A156.16-89 - Auxiliary Hardware

C. Architectural Woodwork Institute (AWI): 1. Architectural Woodwork Quality Standards, Guide Specifications and Quality Certification

Program - 1994

1.06 QUALITY ASSURANCE

A. Finish Carpentry - Minimum three (3) years continuous documented experience on products of equivalent size, quality and complexity.

B. Millwork - Minimum three (3) years experience fabricating AWI - millwork on products of equivalent scale and complexity.

PART 2 PRODUCTS

2.01 INTERIOR STANDING AND RUNNING TRIM FOR TRANSPARENT FINISH

A. Grade: Premium

B. Wood Species and Cut: Match species and cut indicated for other types of transparent-finished architectural woodwork located in the same area, unless otherwise indicated.

Page 94: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrade 06 2000 - 2 FINISH CARPENTRY MILLWORK The Architectural Group, Inc.

C. Backout or groove backs of flat trim members and kerf backs of other wide, flat members, except for members with exposed ends.

2.02 WOOD PANELING AND WAINSCOTING

A. Grade: Premium

B. Wood Species and Cut: To match existing. Lumber Trim Edges: At fabricator’s option, trim and edges may be either lumber or veneered construction compatible with grain and colored veneered panels.

2.03 ADHESIVE

A. Adhesive: Construction adhesive to be used along with screw fasteners for installation of continuous wood picture rail where applicable.

2.04 HARDWARE

A. Hardware: Wood or metal screws as required and coordinated with back type for installation of chair rail and picture rails.

2.05 FABRICATION

A. Edging & Fitting: At trim exposed termination locations, bevel final exposed edge as indicated in the drawings. Mechanically fasten back splash to countertops with steel brackets at 16 inches (400 mm) on center.

B. Finish Carpentry Work: 1. All trim work and moldings shall be installed straight and true with running profiles such as

picture molds and chair rails. Utilizing glued and screwed compound bevel splices for long runs.

2. All painted trim work shall be caulked into adjacent surfaces (walls, ceilings, etc.) with paintable siliconize acrylic sealant tooled to a maximum 1/8” bead.

3. All painted trim work shall be back-painted prior to installation

PART 3 EXECUTION

3.01 EXAMINATION & INSTALLATION

A. Verify adequacy of backing and support framing.

B. Secure trim and moldings to walls with glue and screws at all locations as indicated on the drawings. New chair rail shall be continuous with existing in all corridors.

C. Mounting screws shall be concealed following installation and prior to base and final paint coats.

3.03 ADJUSTING & CLEANING

A. Adjust installed work.

B. Adjust moving or operating parts to function smoothly and correctly.

C. Clean casework, counters, shelves, hardware, fittings, and fixtures.

END OF SECTION

Page 95: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 4100 - 1 ARCHITECTURAL WOOD CASEWORK The Architectural Group, Inc.

SECTION 06 4100

ARCHITECTURAL WOOD CASEWORK

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Specially fabricated cabinet units.

B. Countertops.

C. Cabinet hardware.

D. Preparation for installing utilities.

1.02 RELATED REQUIREMENTS

A. Section 06 1000 - Rough Carpentry: Support framing, grounds, and concealed blocking.

B. Section 07 9000 Joint Sealers

1.03 REFERENCE STANDARDS

A. ANSI A208.1 - American National Standard for Particleboard; 1999.

B. ANSI A208.2 - American National Standard for Medium Density Fiberboard for Interior Use; 2002.

C. AWI/AWMAC (QSI) - Architectural Woodwork Quality Standards Illustrated; Architectural Woodwork Institute and Architectural Woodwork Manufacturers Association of Canada; 2005, 8th Ed., Version 2.0.

D. BHMA A156.9 - American National Standard for Cabinet Hardware; Builders Hardware Manufacturers Association; 2003 (ANSI/BHMA A156.9).

E. NEMA LD 3 - High-Pressure Decorative Laminates; National Electrical Manufacturers Association; 2005.

F. NHLA G-101 - Rules for the Measurement & Inspection of Hardwood & Cypress; National Hardwood Lumber Association; 2007.

G. PS 20 - American Softwood Lumber Standard; National Institute of Standards and Technology (Department of Commerce); 2005.

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Shop Drawings: Indicate materials, component profiles and elevations, assembly methods, joint details, fastening methods, accessory listings, hardware location and schedule of finishes.

C. Product Data: Provide data for hardware accessories. D. Samples: Submit actual sample items of proposed pulls, hinges, and locksets, demonstrating

hardware design, quality, and finish.

1.05 QUALITY ASSURANCE

A. Perform work in accordance with AWI/AWMAC Architectural Woodwork Quality Standards Illustrated, Custom quality.

B. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three (3) years of documented experience.

Page 96: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 4100 - 2 ARCHITECTURAL WOOD CASEWORK The Architectural Group, Inc.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Protect units from moisture damage.

1.07 FIELD CONDITIONS

A. During and after installation of custom cabinets, maintain temperature and humidity conditions in building spaces at same levels planned for occupancy.

PART 2 PRODUCTS

2.01 WOOD-BASED COMPONENTS

A. Wood fabricated from old growth timber is not permitted.

2.02 LUMBER MATERIALS

A. Softwood Lumber: NIST PS 20; Graded in accordance with AWI/AWMAC Architectural Woodwork Quality Standards Illustrated, Grade II/Custom; average moisture content of 5-10 percent; species as recommended by manufacturer.

B. Hardwood Lumber: NHLA; Graded in accordance with AWI/AWMAC Architectural Woodwork Quality Standards Illustrated, Grade II/Custom; average moisture content of 5-10 percent; species as recommended by manufacturer.

2.03 PANEL MATERIALS

A. Particleboard: ANSI A208.1; medium density industrial type as specified in AWI/AWMAC Architectural Woodwork Quality Standards Illustrated, composed of wood chips bonded with moisture resistant adhesive under heat and pressure; sanded faces; thickness as required; use for concealed components.

B. Medium Density Fiberboard (MDF): ANSI A208.2; type as specified in AWI/AWMAC Architectural Woodwork Quality Standards Illustrated; composed of wood fibers pressure bonded with moisture resistant adhesive to suit application; sanded faces; thickness as required. 1. Use for painted components and components not indicated as another material. 2. Use as backing for plastic laminate unless otherwise indicated.

2.04 LAMINATE MATERIALS

A. Manufacturers: 1. Formica Corporation: www.formica.com. 2. Panolam Industries International, Inc\Nevamar: www.nevamar.com. 3. Wilsonart International, Inc: www.wilsonart.com.

B. High Pressure Decorative Laminate (HPDL): NEMA LD 3, types as recommended for specific applications.

C. Provide specific types as follows: 1. Horizontal Surfaces: HGS, 0.048 inch nominal thickness, color as selected, finish as

selected. 2. Vertical Surfaces: VGS, 0.028 inch nominal thickness, color as selected, finish as selected. 3. Cabinet Liner: CLS, 0.020 inch nominal thickness, color as selected, finish as selected. 4. Laminate Backer: BKL, 0.020 inch nominal thickness, undecorated; for application to

concealed backside of panels faced with high pressure decorative laminate.

2.05 COUNTERTOPS

A. Plastic Laminate Countertops: Medium density fiberboard substrate covered with HPDL, conventionally fabricated and self-edge banded.

Page 97: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 4100 - 3 ARCHITECTURAL WOOD CASEWORK The Architectural Group, Inc.

2.06 ACCESSORIES

A. Fasteners: Size and type to suit application.

B. Bolts, Nuts, Washers, Lags, Pins, and Screws: Of size and type to suit application; chrome-plated finish in concealed locations and finish in exposed locations to be selected by Architect.

C. Concealed Joint Fasteners: Threaded steel.

2.07 HARDWARE

A. Hardware: BHMA A156.9, types as recommended by fabricator for quality grade specified.

2.08 SHOP TREATMENT OF WOOD MATERIALS

A. Provide UL approved identification on fire retardant treated material.

B. Deliver fire retardant treated materials cut to required sizes. Minimize field cutting.

2.09 FABRICATION

A. Cabinet Style: As indicated for each location.

B. Cabinet Doors and Drawer Fronts: As indicated.

C. Drawer Construction Technique: As recommended by fabricator.

D. Assembly: Shop assemble cabinets for delivery to site in units easily handled and to permit passage through building openings.

E. Edging: Fit shelves, doors, and exposed edges with specified edging. Do not use more than one piece for any single length.

F. Fitting: When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide matching trim for scribing and site cutting.

G. Plastic Laminate: Apply plastic laminate finish in full uninterrupted sheets consistent with manufactured sizes. Fit corners and joints hairline; secure with concealed fasteners. Slightly bevel arises. Locate counter butt joints minimum 2 feet from sink cut-outs.

I. Provide cutouts for plumbing fixtures, inserts, appliances, outlet boxes, and fixtures and fittings. Verify locations of cutouts from on-site dimensions. Prime paint cut edges.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify adequacy of backing and support framing.

B. Verify location and sizes of utility rough-in associated with work of this section.

3.02 INSTALLATION

A. Set and secure custom cabinets in place, assuring that they are rigid, plumb, and level.

B. Use fixture attachments in concealed locations for wall mounted components.

C. Use concealed joint fasteners to align and secure adjoining cabinet units and countertops.

D. Carefully scribe casework abutting other components, with maximum gaps of 1/32 inch. Do not use additional overlay trim for this purpose.

E. Secure cabinets and counter bases to floor using appropriate angles and anchorages.

F. Countersink anchorage devices at exposed locations. Conceal with solid wood plugs of species to match surrounding wood; finish flush with surrounding surfaces.

Page 98: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 06 4100 - 4 ARCHITECTURAL WOOD CASEWORK The Architectural Group, Inc.

3.03 ADJUSTING

A. Test installed work for rigidity and ability to support loads.

B. Adjust moving or operating parts to function smoothly and correctly.

3.04 CLEANING

A. Clean casework, counters, shelves, hardware, fittings, and fixtures.

END OF SECTION

Page 99: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 07 9005 - 1 JOINT SEALERS The Architectural; Group, Inc.

SECTION 07 9005

JOINT SEALERS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Sealants and joint backing.

1.02 RELATED SECTIONS

A. Section 06 2000 – Finish Carpentry Millwork

B. Section 06 4100 – Architectural Wood Casework

C. Section 09 9000 – Paniting and Coatings

1.03 REFERENCES

A. ASTM C 834 - Standard Specification for Latex Sealants; 2000.

B. ASTM C 920 - Standard Specification for Elastomeric Joint Sealants; 2002.

C. ASTM C 1193 - Standard Guide for Use of Joint Sealants; 2000.

1.04 SUBMITTALS

A. See Section 01 3100 – Project Management and Coordination, for submittal procedures.

B. Product Data: Provide data indicating sealant chemical characteristics, performance criteria, substrate preparation, limitations, and color availability.

C. Manufacturer's Installation Instructions: Indicate special procedures, surface preparation, and perimeter conditions requiring special attention.

1.05 ENVIRONMENTAL REQUIREMENTS

A. Maintain temperature and humidity recommended by the sealant manufacturer during and after installation.

1.06 COORDINATION

A. Coordinate the work with all sections referencing this section.

1.07 WARRANTY

A. See Section 01 7700 - Closeout Procedures, for additional warranty requirements.

B. Correct defective work within a five (5) year period after Date of Substantial Completion.

PART 2 PRODUCTS

2.01 SEALANTS

A. Sealants and Primers - General: Provide only products having lower volatile organic compound (VOC) content than required by the more stringent of the South Coast Air Quality Management District Rule No.1168 and the Bay Area Air Quality Management District Regulation 8, Rule 51.

B. Provide only products having lower volatile organic compound (VOC) content than required by South Coast Air Quality Management District Rule No.1168.

C. Type D - General Purpose Interior Sealant: Acrylic emulsion latex; ASTM C 834, Type OP,

Page 100: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 07 9005 - 2 JOINT SEALERS The Architectural; Group, Inc.

Grade NF single component, paintable. 1. Color: Standard colors matching finished surfaces as provided by Associate. 2. Product: Manufactured by Pecora, Inc.: www.pecora.com. 3. Applications: Use for:

a. Interior wall and ceiling control joints. b. Joints between door frames and wall surfaces. c. Other interior joints for which no other type of sealant is indicated.

D. Type G - Interior Floor Joint Sealant: Polyurethane, self-leveling; ASTM C 920, Grade P, Class 25, Uses T, M and A; single component. 1. Approved by manufacturer for wide joints up to 1-1/2 inches. 2. Color: Standard colors matching finished surfaces. 3. Product: Manufactured by Pecora, Inc.: www.pecora.com. 4. Applications: Use for:

a. Expansion joints in floors.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that substrate surfaces and joint openings are ready to receive work.

B. Verify that joint backing and release tapes are compatible with sealant.

3.02 PREPARATION

A. Remove loose materials and foreign matter which might impair adhesion of sealant.

B. Clean and prime joints in accordance with manufacturer's instructions.

C. Perform preparation in accordance with manufacturer's instructions and ASTM C 1193.

D. Protect elements surrounding the work of this section from damage or disfigurement.

3.03 INSTALLATION

A. Perform work in accordance with sealant manufacturer's requirements for preparation of surfaces and material installation instructions.

B. Perform installation in accordance with ASTM C 1193.

D. Measure joint dimensions and size joint to achieve width-to-depth ratio, neck dimension, and surface bond area as recommended by manufacturer, except where specific dimensions are indicated.

F. Install sealant free of air pockets, foreign embedded matter, ridges, and sags.

G. Apply sealant within recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges.

H. Tool joints concave.

3.04 CLEANING

A. Clean adjacent soiled surfaces.

3.05 PROTECTION OF FINISHED WORK

A. Protect sealants until cured.

END OF SECTION

Page 101: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 08 7100 - 1 DOOR HARDWARE The Architectural Group, Inc.

SECTION 08 7100

DOOR HARDWARE

(Note: Specification for Reference Only related to Stanley access door hardware regarding modifications to Dodds Hall Rooms 120-123.)

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Hardware for interior wood doors.

1.02 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum five (5) years of documented experience.

B. Hardware Supplier Qualifications: Company specializing in supplying commercial door hardware with five years of documented experience and approved by manufacturer.

C. Hardware Installer Qualifications: Staff specializing in installing commercial door hardware with three (3) years of documented experience.

1.03 WARRANTY

A. All components of each door shall be protected against failure and/or performance deficiencies by a product manufacturer’s installation and materials warranty. Said warranties shall be specific to each system required and shall be non-prorated warranties which guarantee against material and labor defects for a minimum period of one (1) year.

B. Hardware including: hinges required for the proper installation of all interior doors shall be provided with a manufacturers minimum one (1) year guarantee against defects in labor and materials.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Hinges (Standard): 4 1/2" x 4 1/2" five knuckle wrought steel, standard weight, bottom tips for mortise door and frame application: 1. Basis of Design: Bommer Industries, Inc: www.bommer.com. 2. Assa Abloy McKinney: www.assaabloydss.com. 3. Hager Companies: www.hagerco.com. 4. Stanley Hardware: www.stanleyworks.com.

B. Hinges (Variant): 4" x 4" five knuckle wrought steel, standard weight, bottom tips for mortise door and frame applications for 1 3/8” width doors. Field conditions to be verified.

C. View Finder 1. Basis of Design: Hager Companies: www.hagerco.com. 2. Assa Abloy Emtek: www.emtek.com. 3. Stanley Hardware: www.stanleyworks.com.

D. Latches & Access Control Devices: CBORD Group, Inc. access device hardware. 1. Door hardware:

a. Ingersoll Rand, Schlage AD-400 series mortise locksets for student room (Chassis: MS Mortise)

2. Function: 70 Storeroom 3. Reader: SM Smart Card 4. Lever: SPA Sparta

Page 102: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 08 7100 - 2 DOOR HARDWARE The Architectural Group, Inc.

2.02 HINGES

A. Hinges: Provide and install hinges on every replacement swinging door. 1. Provide and install two (2) spring-loaded heavy-duty hinges at middle and bottom

replacement locations within existing frames where existing hinges were removed. 2. Provide and install one (2) heavy weight (0.180) ball bearing loading hinge at top

replacement location within existing frames where existing hinge was removed. 3. Comply with BHMA A156.1 and A156.7; standard weight, unless otherwise indicated. 4. Spring-loaded hinges: Bommer Industries 4 ½”x 4 ½” size (unless field verification reveals

a different mortise condition) concealed lube bearing hinge model LB4300C-450. 5. Ball-bearing hinge: Bommer Industries 4 ½”x 4 ½” size (unless field verification reveals a

different mortise condition) model BB5000C-450.

2.03 VIEW FINDER

A. View Finder: Provide and install on every replacement swinging door. 1. Provide and install one (1) 200 degree field of view view finder on every replacement door.

Install at center of door height equal to that recorded from field verified replacement door. 2. Brass US4 finish - stain brass clear coated. 3. Adjustable from 1 3/8” to 2 ¼’ thickness.

2.04 LOCKS AND LATCHES

A. Latch/Lock Device: An electronic access Ingersoll Rand, Schlage AD-400 series locksets device provided and installed by others.

B Ingersoll Rand SM Smart Card reader devices on designated interior and exterior door locations as coordinated with Miami University.

C. Locks: Provided and installed by others. 1. Hardware Sets indicate locking functions required for each door. 2. Trim: Provide lever handle on all locks. 3. Lock Cylinders: Key access on outside of all locks unless specifically stated to have no

locking or no outside trim.

D. Lock Cylinders: Per manufacturer’s standard in coordination with Miami University and provided and installed by others

2.05 GENERAL REQUIREMENTS FOR DOOR HARDWARE PRODUCTS

A. Provide products that comply with the following: 1. Applicable provisions of Federal, State, and local codes. 2. ANSI/ICC A117.1, American National Standard - Accessible & Usable Buildings. 3. Applicable provisions of NFPA 101, Life Safety Code. 4. All Hardware on Fire-Rated Doors: Listed and classified by UL as suitable for the purpose

specified and indicated.

B. Hinge Material: Steel

C. Hinge Finishes: Verify with University Project Manager before shipping and installation. 1. Standard: Satin bronze, clear coat on steel, 639 – US10

D. Hinge Tip Type: 1. Standard: top tip to be standard flat.

E. Hinge Screws: 1. Machine: 12 – 24x12. or as recommended by manufacturer. 2. Wood: 12 x 1 ¼ . or as recommended by manufacturer.

END OF SECTION

Page 103: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 08 8300 - 1 MIRRORS The Architectural Group, Inc.

SECTION 08 830

MIRRORS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Glass mirrors.

1.02 RELATED SECTIONS (Not used)

1.03 REFERENCES

A. ANSI Z97.1 - American National Standard for Safety Glazing Materials Used in Buildings, Safety Performance Specifications and Methods of Test; 2004.

B. ASTM C 1036 - Standard Specification for Flat Glass; 2001.

C. GANA (GM) - GANA Glazing Manual; Glass Association of North America; 2004.

D. GANA (TIPS) - Mirrors Handle with Extreme Care: Tips For the Professional on the Care and Handling of Mirrors; National Association of Mirror Manufacturers; 2004.

1.04 PERFORMANCE REQUIREMENTS

A. Limit mirrored glass deflection to 1/200 or flexure limit of glass with full recovery of glazing materials, whichever is less.

1.05 SUBMITTALS

A. Product Data on Mirror Types: Provide structural, physical and environmental characteristics, size limitations, special handling or installation requirements.

B. Warranty: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

C. Shop Drawings: Indicate heights, widths and joints, mounting hardware, and room locations.

D. Samples: Mirror clips and Mirror Trim (12”).

1.06 QUALITY ASSURANCE

A. Perform Work in accordance with GANA Glazing Manual for glazing installation methods.

B. Fabricate, store, transport, receive, install, and clean mirrors in accordance with GANA recommendations.

1.07 ENVIRONMENTAL REQUIREMENTS

A. Do not install mirrors when ambient temperature is less than 50 degrees F (10 degrees C).

B. Maintain minimum ambient temperature before, during and 24 hours after installation of glazing compounds.

1.08 WARRANTY

A. Provide five (5) year manufacturer warranty for reflective coating on mirrors and replacement of same.

PART 2 PRODUCTS

2.01 MANUFACTURERS

Page 104: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 08 8300 - 2 MIRRORS The Architectural Group, Inc.

A. Mirrors: 1. Arch Aluminum & Glass Co., Inc: www.arch.amarlite.com 2. Guardian Industries Corp: www.guardian.com 3. Lenoir Mirror Co: www.lenoirmirror.com. 4. Gilded Mirrors, Inc. 5. Substitutions: Per specification for substitution procedures.

2.02 SILVER FLAT GLASS MIRROR MATERIALS

A. Tempered Clear Glass Mirrors: Comply with ASTM C 1503, Mirror Glazing Quality for blemish requirements in annealed float glass before silver coating is applied, for coating requirements, and with other requirements not affected by tempering processes. Comply with ASTM C 1048 for Kind FT, Condition A, tempered float glass before silver costing is applied.

B. Clear Glass Mirrors: ASTM C 1503, Mirror Select Quality

1. Nominal Thickness: 3.0 mm.

C. Mirror Edge Treatments: Flat polished edge

1. Seal edges of mirrors after edge treatment to prevent chemical or atmospheric penetration of glass coating.

2. Require mirror manufacturer to perform edge treatment and sealing in factory immediately after cutting to final sizes.

2.03 MISCELLANEOUS MATERIALS

A. Setting Blocks: Elastomeric material with a Type A Shore durometer hardness of 85, plus or minus 5.

B. Edge Sealer: Coating compatible with glass coating and approved by manufacturer for use in protecting against edge silver deterioration.

C. Mirrors to have vertical butt joints at 4’-0” on center with full perimeter stainless steel channels.

2.04 MIRROR HARDWARE

A. Top and Bottom Aluminum J-Channels: Aluminum extrusions with a return deep enough to produce a glazing channel to accommodate mirrors of the thickness indicated and in lengths required to cover bottom and top edges of each mirror in a single pane.

1. Bottom Trim: J-channel formed with front leg and back leg not less than 3/8 and 7/8 inch in height, respectively, and a thickness of not less than 0.04 inch.

2. Top Trim: J-channel formed with front leg and back leg not less than 5/8 and 1 inch in height, respectively, and a thickness of not less than 0.04 inch.

3. Available Products: a. Bottom Trim

1. Laurence, C.R. Co., Inc.; CRL Standard “J” Channel 2. Sommer & Maca Industries, Inc.; Medium Gauge Aluminum Shallow Nose

“J” Moulding Lower Bar. 3. Sommer & Maca Industries, Inc.; Heavy Gauge Aluminum Shallow Nose

“J” Moulding Lower Bar. b. Top Trim

1. Laurence, C.R. Co., Inc.; CRL Deep “J” Channel 2. Sommer & Maca Industries, Inc.; Medium Gauge Aluminum Deep Nose “J”

Page 105: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 08 8300 - 3 MIRRORS The Architectural Group, Inc.

Moulding Upper Bar. 3. Sommer & Maca Industries, Inc.; Heavy Gauge Aluminum deep Nose “J”

Moulding Upper Bar.

B. Anchors and Inserts: Provide devices as required for mirror hardware installation. Provide toothed or lead-shield expansion-bolt devices for drilled-in-place anchors.

PART 3 EXECUTION

3.01 PREPARATION

A. Clean contact surfaces with solvent and wipe dry.

B. Perform installation in accordance with ASTM C 1193 for solvent release sealants. Install sealant in accordance with manufacturer's instructions.

3.02 INSTALLATION - GENERAL

A. Install mirrors in accordance with GANA recommendations.

B. Set mirrors plumb and level, free of optical distortion.

C. Set mirrors with edge clearance free of surrounding construction including countertops or backsplashes.

D. Framed Mirrors: Set mirrors with mechanically concealed fasteners adhered to substrate, applied in accordance with adhesive manufacturer's instructions. Coordinate with Miami University’s Project Manager and Associate regarding any optional mounting considerations.

3.03 CLEANING

A. Remove labels after Work is complete.

B Clean mirrors and adjacent surfaces.

3.04 PROTECTION

A. After installation, mark pane with an 'X' by using removable plastic tape or paste.

END OF SECTION

Page 106: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2100 - 1 VENEER PLASTER FINISHING SYSTEMS The Architectural Group, Inc.

SECTION 09 2100

VENEER PLASTER FINISHING SYSTEM

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Gypsum plaster over reinforced core gypsum, moisture-resistant panels.

1.02 RELATED SECTIONS

A. Section 09 2600 - Gypsum Board Assemblies: Metal stud framing for plaster.

B. Section 09 9000 – Paints and Coatings

1.03 REFERENCES

A. ASTM C 28/C 28M - Standard Specification for Gypsum Plasters; 2000.

B. ASTM C 842 - Standard Specification for Application of Interior Gypsum Plaster; 1999.

1.04 SUBMITTALS

A. Product Data: Provide data on plaster materials, characteristics, and limitations of products specified.

B. Samples: Submit two (2) samples, 12 x 12 inch in size illustrating finish color and texture.

C. See Document 00 72 16 – General Requirements, Article 13 – Action Submittals, for submittal procedures.

1.05 QUALITY ASSURANCE

A. Perform Work in accordance with ASTM C 842. 1. Maintain one (1) copy on site.

B. Installer Qualifications: Company specializing in performing the work of this section with minimum five (5) years of documented experience.

1.06 ENVIRONMENTAL REQUIREMENTS

A. Do not apply plaster when substrate or ambient air temperature is under 55 degrees F or over 80 degrees F.

B. Maintain minimum ambient temperature of 55 degrees F during and after installation of plaster.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Gypsum Plaster: 1. USG Corporation; Product Imperial Brand Plaster, or approved equal:

www.usg.com.

2.02 PLASTER MATERIALS

A. Ready-Mixed Gypsum Plaster: ASTM C 28; mill-mixed type, requiring only the addition of water; Imperial Brand Plaster manufactured by USG Corporation. 1. 3,000 lb/sq.in. compressive finish.

B. Joint Tape: Pressure sensitive tape at all joints without overlap.

C. Water: Clean, fresh, potable and free of mineral or organic matter which can affect plaster.

Page 107: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2100 - 2 VENEER PLASTER FINISHING SYSTEMS The Architectural Group, Inc.

2.03 PLASTER MIXES

A. Over Reinforced Core Gypsum Board: Three-coat troweled finish application, ready-mixed plaster, mixed and proportioned in accordance with ASTM C 842 and manufacturer's instructions.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing conditions are satisfactory before starting work for repair work where required.

3.02 PREPARATION

A. Apply bonding agent, if required, in accordance with manufacturer's instructions.

3.03 PLASTERING

A. Confirm installation of all joint tape prior to primary finish coat application.

B. Apply gypsum plaster in accordance with ASTM C842 and manufacturer's instructions.

C. Dub out: On damaged areas apply a preliminary dubbing out coat (using a 3-4mm down well graded aggregate) to provide a relatively level surface. Hydraulic lime mix, of one part NHL 3.5 to two parts grit sand

D. Thickness of Plaster including Finish Coat: 1. One (1) base “Brown” coat of 1/16 inch troweled over reinforced moisture resistant

gypsum board or dubbed out repaired base surface: 2. Two (2) finish coats at 1/32 inch each. Provide smooth trowel finish with all

surfaces straight, level and plumb with all lines true and sharp to match adjacent conditions.

E. Finish Texture: Provide a consistent appearance toweled to match adjacent existing condition surfaces.

3.04 ERECTION TOLERANCES

A. Maximum Variation from True Flatness: 1/8 inch in 10 feet.

END OF SECTION

Page 108: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2600 - 1 GYPSUM BOARD ASSEMBLIES The Architectural Group, Inc.

SECTION 09 2600

GYPSUM BOARD ASSEMBLIES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Metal stud wall framing.

B. Acoustic insulation.

C. Gypsum wallboard.

D. Joint treatment and accessories.

1.02 RELATED SECTIONS

A. Section 06 1000 - Rough Carpentry: Building framing and sheathing.

B. Section 07 9000 - Joint Sealers: Acoustic sealant.

C. Section 09 2100 - Veneer Plaster Finishing System

1.03 REFERENCES

A. ASTM C 1396/C 1396M - Standard Specification for Gypsum Board; 2003a.

B. ASTM A 653/A 653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2003.

C. ASTM C 475/C 475M - Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board; 2002.

D. ASTM C 514 - Standard Specification for Nails for the Application of Gypsum Board; 2001.

E. ASTM C 557 - Standard Specification for Adhesives for Fastening Gypsum Wallboard to Wood Framing; 2003.

F. ASTM C 645 - Standard Specification for Nonstructural Steel Framing Members; 2004.

G. ASTM C 665 - Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing; 2001.

H. ASTM C 754 - Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products; 2000.

I. ASTM C 840 - Standard Specification for Application and Finishing of Gypsum Board; 2004.

J. ASTM C 954 - Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs From 0.033 in. (0.84 mm) to 0.112 in. (2.84 mm) in Thickness; 2000.

K. ASTM C 1002 - Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs; 2001.

L. ASTM C 1047 - Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base; 1999.

M. GA-214 - Recommended Levels of Gypsum Board Finish; Gypsum Association; 1996.

Page 109: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2600 - 2 GYPSUM BOARD ASSEMBLIES The Architectural Group, Inc.

1.04 SYSTEM DESCRIPTION

A. Acoustic Attenuation for Interior Partitions: 1” Minimum thermafiber SAFB made specifically to absorb sound vibrations for the purposes of noise control.

1.05 SUBMITTALS

A. Product Data: Provide data on metal framing, gypsum board, accessories, and joint finishing system.

B. Product Data: Provide manufacturer's data on partition head to structure connectors, showing compliance with requirements.

1.06 QUALITY ASSURANCE

A. Perform in accordance with ASTM C 840. Comply with requirements of GA-600 for fire-rated assemblies.

B. Applicator Qualifications: Company specializing in performing gypsum board application and finishing, with minimum five (5) years of experience.

PART 2 PRODUCTS

2.01 METAL FRAMING MATERIALS

A. Metal Framing Manufacturers: 1. Clark Steel Framing Systems: www.clarksteel.com. 2. Dietrich Metal Framing: www.dietrichindustries.com. 3. National Gypsum Company. www.nationalgypsum.com. 4. USG: www.usg.com.

B. Metal Framing Connectors and Accessories: 1. Same manufacturer as framing. 2. Dietrich Metal Framing: www.dietrichindustries.com. 3. The Steel Network Inc: www.SteelNetwork.com.

C. Non-Loadbearing Framing System Components: ASTM C 645; galvanized sheet steel, of size and properties necessary to comply with ASTM C 754 for the spacing indicated, with maximum deflection of wall framing of L/360 at 5 psf. 1. Studs: C shaped with sizes indicated on the drawings. 2. Runners: U shaped, sized to match studs. 3. Ceiling Channels: C shaped. 4. Rated Wall Assembly Acoustic Control Channels: Channel sections with minimum

depth as indicated on the drawings

2.02 GYPSUM BOARD MATERIALS

A. Manufacturers: 1. G-P Gypsum Corporation: www.gp.com/gypsum. 2. National Gypsum Company: www.nationalgypsum.com. 3. USG: www.usg.com.

B. Gypsum Wallboard: ASTM C 1396/C 1396M. Sizes to minimize joints in place; ends square cut. 1. Regular Type: Inner wall layers of double layer construction

a. Application: Use for vertical surfaces, unless otherwise indicated. b. Thickness: Minimum ½” inch, unless noted otherwise, as required to develop

surface flush with adjacent areas on infill applications, 5/8” gypsum wallboard all other locations.

c. Edges: Tapered and featured.

Page 110: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2600 - 3 GYPSUM BOARD ASSEMBLIES The Architectural Group, Inc.

2.03 ACCESSORIES

A. Acoustic Insulation: 1” Thermafiber SAFB

B. Finishing Accessories: ASTM C 1047, galvanized steel or rolled zinc, unless otherwise indicated. 1. Types: As detailed or required for finished appearance. 2. Special Shapes: Provide U-bead, L-bead, LC-bead, and J-bead at exposed panel

edges.

D. Joint Materials: ASTM C 475 and as recommended by gypsum board manufacturer for project conditions. 1. Tape: 2 inch wide, creased paper tape for joints and corners, except as otherwise

indicated. 2. Ready-mixed vinyl-based joint compound.

E. Screws: ASTM C 1002; self-piercing tapping type; cadmium-plated for exterior locations.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that project conditions are appropriate for work of this section to commence.

3.02 FRAMING INSTALLATION

A. Metal Framing: Comply with ASTM C 754 and manufacturer's instructions.

B. Studs: Space studs and ceiling joists as indicated in infill areas and abandoned telephone alcove wall and ceiling areas. 1. Extend partition framing to structure where indicated in infill areas. 2. Partitions Terminating at Structure: Attach top runner to structure and connect

studs to track using specified mechanical devices in accordance with manufacturer's instructions. Do not leave studs unattached to track.

3.03 ACOUSTIC ACCESSORIES INSTALLATION

A. Acoustic Insulation: Place tightly within spaces, around cut openings, behind and around electrical and mechanical items within partitions, and tight to items passing through partitions.

B. Acoustic Sealant: Install in accordance with manufacturer's instructions. 1. Place two beads continuously on substrate before installation of perimeter framing

members. 2. In non-fire-rated construction, seal around all penetrations by conduit, pipe, ducts,

and rough-in boxes.

3.04 GYPSUM BOARD INSTALLATION

A. Comply with ASTM C 840 and manufacturer's instructions. Install to minimize butt end joints, especially in highly visible locations.

B. Double-Layer Rated: Install gypsum board in most economical direction, with ends and edges occurring over firm bearing. 1. Exception: Tapered edges to receive joint treatment at right angles to framing.

C. Installation on Metal Framing: Use screws for attachment of all gypsum board.

D. Curved Surfaces: Apply gypsum board to curved substrates in accordance with GA-226.

Page 111: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 2600 - 4 GYPSUM BOARD ASSEMBLIES The Architectural Group, Inc.

3.05 INSTALLATION OF TRIM AND ACCESSORIES

A. Control Joints: Place control joints consistent with lines of building spaces and as indicated. 1. Not more than 24 feet apart on walls over 50 feet long.

B. Corner Beads: Install at external corners, using longest practical lengths.

C. Edge Trim: Install at locations where gypsum board abuts dissimilar materials and as indicated.

3.06 JOINT TREATMENT

A. Paper Faced Gypsum Board: Use paper joint tape, bedded with ready-mixed vinyl-based joint compound and finished with ready-mixed vinyl-based joint compound.

B. Finish all gypsum board in accordance with GA-214 Level: as scheduled.

C. Tape, fill, and sand exposed joints, edges, and corners to produce smooth surface ready to receive finishes. 1. Feather coats of joint compound so that camber is maximum 1/32 inch. 2. Taping, filling, and sanding is not required at surfaces behind adhesive applied

ceramic tile. 3. Taping, filling and sanding is not required at base layer of double layer

applications.

3.09 TOLERANCES

A. Maximum Variation of Finished Gypsum Board Surface from True Flatness: 1/8 inch in 10 feet in any direction.

3.10 FINISH LEVEL SCHEDULE

A. Walls in exposed areas to receive Level 5 finish: All joints and interior angles shall have tape embedded in joint compound and two separate coats of joint compound applied over all flat joints and one separate coat of joint compound applied over interior angles. Fastener heads and accessories shall be covered with three separate coats of joint compound. A thin skim coat of joint compound, or a material manufactured especially for this purpose, shall be applied to the entire surface. The surface shall be smooth and free of tool marks and ridges. It is recommended that the prepared surface be coated with a drywall primer prior to the application of finish paint. The skim coat is a final leveling agent suitable to smooth out a surface to be used under the harshest lighting conditions that may otherwise highlight any imperfections under the finished surface.

END OF SECTION

Page 112: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5100 - 1 ACOUSTICAL CEILINGS The Architectural Group, Inc.

SECTION 09 5100

ACOUSTICAL SUSPENDED CEILINGS SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS A. Drawings and general conditions of Contract, including General and Supplementary

Conditions and Divisions 01 Specification sections apply to work of this section.

1.2 SUMMARY A. Section Includes:

1. Acoustical ceiling panels. 2. Exposed grid suspension system. 3. Wire hangers, fasteners, main runners, cross tees, and wall angle moldings.

B. Related Sections: 1. Section 09 2100 – Veneer Plaster Finishing System

1.3 REFERENCES A. American Society for Testing and Materials (ASTM):

1. ASTM A 1008 Standard Specification for Steel, Sheet, Cold Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability.

2. ASTM A 641 Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire.

3. ASTM A 653 Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process.

4. ASTM C 423 Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method.

5. ASTM C 635 Standard Specification for Metal Suspension Systems for Acoustical Tile and Lay-in Panel Ceilings.

6. ASTM C 636 Recommended Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels.

7. ASTM E 84 Standard Test Method for Surface Burning Characteristics of Building Materials.

8. ASTM E 1111 Standard Test Method for Measuring the Interzone Attenuation of Ceilings Systems.

9. ASTM E 1264 Classification for Acoustical Ceiling Products. 10. ASTM E 1477 Standard Test Method for Luminous Reflectance Factor of

Acoustical Materials by Use of Integrating-Sphere Reflectometers. 11. ASTM D 3273 Standard Test Method for Resistance to Growth of Mold on the

Surface of Interior Coatings in an Environmental Chamber. 12. ASTM E 119 Standard Test Methods for Fire Tests of Building Construction and

Material.

1.4 SUBMITTALS A. Product Data: Submit manufacturer's technical data for each type of acoustical ceiling

unit and suspension system required. B. Samples: Minimum 6 inch x 6 inch samples of specified acoustical panel; 8 inch long

samples of exposed wall molding and suspension system, including main runner and four (4) foot cross tees.

C. Shop Drawings: Layout and details of acoustical ceilings. Show locations of items which are to be coordinated with, or supported by the ceilings.

D. Certifications: Manufacturer's certifications that products comply with specified requirements, including laboratory reports showing compliance with specified tests and standards. For acoustical performance, each carton of material must carry an approved independent laboratory classification of NRC, CAC, and AC.

Page 113: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5100 - 2 ACOUSTICAL CEILINGS The Architectural Group, Inc.

E. If the material supplied by the acoustical subcontractor does not have an Underwriter's Laboratory classification of acoustical performance on every carton, subcontractor shall be required to send material from every production run appearing on the job to an independent or NVLAP approved laboratory for testing, at the Associate's or Miami Uiversity's discretion. All products not conforming to manufacturer's current published values must be removed, disposed of and replaced with complying product at the expense of the Contractor performing the work.

1.5 QUALITY ASSURANCE A. Single-Source Responsibility: Provide acoustical panel units and grid components by a

single manufacturer. B. Fire Performance Characteristics: Identify acoustical ceiling components with appropriate

markings of applicable testing and inspecting organization. 1. Surface Burning Characteristics: As follows, tested per ASTM E 84 and

complying with ASTM E 1264 for Class A products. a. Flame Spread: 25 or less b. Smoke Developed: 50 or less

C. Updraft resistance: Ceiling system must be designed to resist an updraft of 1 lb. per SF. D. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any

way. E. Seismic Standard: Comply with the following:

1. Standard for Ceiling Suspension Systems Requiring Seismic Restraint: Comply with ASTM E 580.

2. ASCE 7, “Minimum Design Loads for Buildings and Other Structures”: Section 9, “Earthquake Loads.”

1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver acoustical ceiling units to project site in original, unopened packages and store

them in a fully enclosed space where they will be protected against damage from moisture, direct sunlight, surface contamination, and other causes.

B. Before installing acoustical ceiling units, permit them to reach room temperature and stabilized moisture content.

C. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any way.

1.7 PROJECT CONDITIONS A. Space Enclosure:

1. Do not install interior ceilings until space is enclosed and weatherproof; wet work in place is completed and nominally dry; work above ceilings is complete; and ambient conditions of temperature and humidity are continuously maintained at values near those intended for final occupancy.

1.8 WARRANTY A. Acoustical Panel: Submit a written warranty executed by the manufacturer, agreeing to

repair or replace acoustical panels that fail within the warranty period. Failures include, but are not limited to:

1. Acoustical Panels: Sagging and warping 2. Grid System: Rusting and manufacturer's defects

B. Warranty Period Standard: 1. Acoustical panels: One (1) year from date of substantial completion. 2. Cirrus Acoustical panels: Ten (10) year from date of substantial completion.

Note Space Enclosure requirements 3. Grid: Ten (10) years from date of substantial completion.

C. The Warranty shall not deprive Miami University of other rights Miami University may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under the requirements of the Contract Documents.

Page 114: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5100 - 3 ACOUSTICAL CEILINGS The Architectural Group, Inc.

1.9 MAINTENANCE A. Extra Materials: Deliver extra materials to Miami University. Furnish extra materials

described below that match products installed. Packaged with protective covering for storage and identified with appropriate labels.

1. Acoustical Ceiling Units: Furnish quality of full-size units equal to 5.0 percent of amount installed.

2. Exposed Suspension System Components: Furnish quantity of each exposed suspension component equal to 2.0 percent of amount installed.

Part 2-PRODUCTS

2.1 MANUFACTURERS A. Ceiling Panels: Provide the product indicated on the drawings or a comparable product

by one of the following in accordance with submission review requirements: 1. Armstrong World Industries, Inc. 2. USG Interiors, Inc.

2.2. ACOUSTICAL CEILING UNITS A. Basis of Design: USG Rock Face - ClimaPlus Acoustical Panels

1. Panel Size: 2’x2’ x 5/8” 2. Edge: SLT 3. NRC: 0.55 4. CAC Min.: 35 5. LR: 0.86 6. Color: White 7. ASTM E1264 Classification, Type III, Form 2, Pattern CE 8. ASTM E88 Surface Burning Characteristics: Class A, Flame Spread 25, Smoke

Developed: 50 9. Weight: 1.0-1.3 lb/SF 10. Durability Tests: ASTM D1037 tested for 45 lbf. For a ¼” depression by a Janka

ball and ASTM D5420 tested to 3.5 in/lbf. For impaction

2.3 SUSPENSION SYSTEMS (STANDARD) A. Components: All main beams and cross tees shall be commercial quality hot-dipped

galvanized steel as per ASTM A 653. Main beams and cross tees are double-web steel construction with type exposed flange design. Exposed surfaces chemically cleansed, capping pre-finished galvanized steel in baked polyester paint. Main beams and cross tees shall have rotary stitching.

1. Structural Classification: ASTM C 635 Intermediate Duty. 2. Color: White and match the actual color of the selected ceiling tile, unless noted

otherwise. 3. Acceptable Product: Prelude XL 15/16" Exposed Tee as manufactured by

Armstrong World Industries, Inc. B. Attachment Devices: Size for five times design load indicated in ASTM C 635, Table 1,

Direct Hung unless otherwise indicated. C. Wire for Hangers and Ties: ASTM A 641, Class 1 zinc coating, soft temper, pre-

stretched, with a yield stress load of at least times three (3) design load, but not less than 12 gauge.

D. Edge Moldings and Trim: Metal of types and profiles indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations, including light fixtures, that fit type of edge detail and suspension system indicated. Provide moldings with exposed flange of the same width as exposed runner.

Page 115: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5100 - 4 ACOUSTICAL CEILINGS The Architectural Group, Inc.

PART 3 - EXECUTION

3.1 EXAMINATION A. Do not proceed with installation until all wet work such as painting have been completed

and thoroughly dried out, unless expressly permitted by manufacturer's printed recommendations.

3.2 PREPARATION A. Measure each ceiling area and establish layout of acoustical units to balance border

widths at opposite edges of each ceiling. Avoid use of less than half width units at borders, and comply with reflected ceiling plans. Coordinate panel layout with mechanical and electrical fixtures.

3.3 INSTALLATION A. Install suspension system and panels in accordance with the manufacturer's instructions,

and in compliance with ASTM C 636 and with the authorities having jurisdiction. B. Suspend main beam from overhead construction with hanger wires spaced 4’-0” on

center along the length of the main runner. Install hanger wires plumb and straight. C. Install wall moldings at intersection of suspended ceiling and vertical surfaces. Miter

corners where wall moldings intersect or install corner caps. D. For standard edge panels: Cut edges of ceiling panels at border areas and seal fresh

edges with flat white latex paint. E. For reveal edge panels: Cut and reveal or rabbet edges of ceiling panels at border areas

and seal fresh edges with flat white latex paint. F. Install acoustical panels in coordination with suspended system, with edges resting on

flanges of main runner and cross tees. Cut and fit panels neatly against abutting surfaces. Support edges by wall moldings.

G. Grid shall be supported at all four corners of each light fixture.

3.4 ADJUSTING AND CLEANING A. Replace damaged and broken panels. B. Clean exposed surfaces of acoustical ceilings, including trim, edge moldings, and

suspension members. Comply with manufacturer's instructions for cleaning and touch up of minor finish damage. Remove and replace work that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage.

END OF SECTION

Page 116: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5990- 1 WOOD FLOOR REFINISHING The Architectural Group, Inc.

SECTION 09 5990

WOOD FLOOR REFINISHING PART 1 GENERAL

1.1 SECTION INCLUDES A. Hardwood flooring preparation, finishing, and maintenance of the following types:

1. Waterborne finishes and sealers 2. Floor care and maintenance products

1.2 RELATED SECTIONS A. Drawings and general provisions of Contract, including General and

Supplementary Conditions and Division 01 Specification sections, apply to work of this section.

B. Section 09 9000 -Painting and Coating

1.3 DESCRIPTION A. Removal of existing wood base mouldings in preparation of floor refinishing in

Richard Hall. B. Sanding and refinishing of existing wood floor areas indicated on the construction

drawings. C. Installation of new hardwood shoe base.

1.4 SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.

B. Selection Samples: For each finish product specified, two (2) complete sets of color chips representing manufacturer's full range of available colors and patterns.

C. Verification Samples: For each finish product specified, two (2) samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Trained in application of the manufacturer's floor products. Flooring contractor shall be a company exhibiting a minimum of five (5) years continuous experience in wood floor refinishing. Flooring contractor shall submit a list of at least three (3) completed projects of similar magnitude and complexity where this work has been performed. Include owner references with this submittal.

B. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

1. Finish areas designated on drawings 2. Do not proceed with remaining work until workmanship, color, and sheen

are approved by Associate. 3. Refinish mock-up area as required to produce acceptable work.

1.6 DELIVERY, STORAGE, AND HANDLING A. Materials shall not be delivered to the jobsite until all painting work is complete. B. Store products in manufacturer's unopened packaging until ready for installation. C. Store and dispose of solvent-based materials, and materials used with solvent

based materials, in accordance with requirements of local authorities having jurisdiction.

Page 117: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5990- 2 WOOD FLOOR REFINISHING The Architectural Group, Inc.

1.7 PROJECT CONDITIONS A. Maintain environmental conditions (temperature, humidity, and ventilation) within

limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's limits. PART 2 PRODUCTS

2.1 MANUFACTURERS A. Acceptable Manufacturer:

Bona US, 2550 S. Parker Rd. Suite 600 Aurora, CO 80014 Toll Free Tel: 800-872-5515; Tel: 303-371-1411 Email: [email protected]) Web: www.bona.com

B. Substitutions: Not permitted. C. Requests for substitutions may be received per Division 01 requirements.

2.2 WATERBORNE FlNlSHES AND SEALERS A. Premium Commercial Hardwood Floor Finish:

1. Product: Bona Traffic. a. Ingredients: Water, polymeric resin, dipropylene glycolmonomethyl

ether,2,6,8-trimethyl-4-nonypolyethylene glycol ether, and amorphous silica.

b. Color: Milky white (wet). c. Clarity: Clear and colorless when dry. d. pH: 7.9. e. Solids: 34% (with hardener). f. Density: 8.70 lbs./gallon (1.04 S.G.). g. US Regulatory VOC Compliant: 210 g/L (with hardener). h. Coefficient of Friction: 0.5. i. Gloss Level (60 degree): 15-20 for Commercial Satin, 40-45 for

Commercial Semi-Gloss j. Odor: Non-offending, slight ammonia. k. Certification: Greenguard Certified for Indoor Air Quality. l. LEED: Complies with USGBC LEED low-VOC requirements. m. Stain color: Selected by Miami University from standard colors.

2.3 FLOORING DEEP CLEAN SYSTEM A. Deep Clean System:

1. Product: Bona Deep Clean Solution as manufactured by Bona US. a. Ingredients - Water, Ethoxylated alcohol, Diethylene glycol n-butyl

ether, and Phenoxyethanol. b. Color - Aquamarine. c. pH - 7.0 - 8.0. d. Solids - 1%. e. Density - 8.35 lbs./gallon (1.0 S.G.) f. VOC - <1% . g. Odor - Slight solvent. h. Certification: Greenguard Children & Schools Certified for Indoor Air

Quality. i. LEED: Complies with USGBC LEED low-VOC requirements.

2.4 FLOOR CARE AND MAINTENANCE A. Wood Floors:

Page 118: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5990- 3 WOOD FLOOR REFINISHING The Architectural Group, Inc.

1. Product: Bona Pro Series Hardwood Cleaner as manufactured by Bona US.

a. Ingredients: Water, Glycol Ether Solvents, Non-ionic and Anionic Surfactants.

b. Color: Light purple (wet). c. pH: 7.0 to 8.0. d. Solids: <1%. e. Density: 8.34 lb/gallon (1.0 S.G.). f. VOC: <1%. g. Odor: Non-Offending. h. Certification: Greenguard Children & Schools Certified for Indoor Air

Quality. i. LEED: Complies with USGBC LEED low-VOC requirements.

PART 3 EXECUTION

3.1 EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. If substrate preparation is the responsibility of another installer, General

Contractor of unsatisfactory preparation before proceeding.

3.2 PREPARATION A. Protection: Protect adjacent finish surface to prevent damage during sanding and

floor system application. B. Surface Preparation:

1. Vacuum thoroughly and make sure floor is free of moisture. 2. Sand and prepare floor using NWFA or industry accepted methods. 3. Sand with heavy, power driven type sander. Use dust accumulator on

machine. 4. Sand with No. 40 or 36 grit sandpaper if boards are uneven heights. First

pass shall be on a diagonal angle to the direction of the floor. 5. Make sure floor is sanded smooth and level before sanding with medium

grit (50 or 60 grit) sandpaper. This cut and all subsequent cuts shall be sanded in the direction of the grain of the floor.

6. Sand edges with No. 60 or 80 grit spinner paper. 7. Sand entire floor with No. 80 or 100 grit sandpaper. 8. Disk sand entire floor with No. 100 disk paper. 9. Scrape and hand-sand corners and other areas not reached by machine. 10. Use a Tampico Brush on a buffer and vacuum thoroughly. 11. Tack with a dry Bona Microfiber Mop or cloth to remove dust. 12. Apply finish system.

3.3 APPLICATION A. Comply with the instructions and recommendations of the floor finish system

manufacturer. B. Finish System:

1. 3-coat system. 2. For a stained floor, apply a stain according to label directions, followed

by 2 coats of polyurethane. 4. Add third coat of finish in heavy-traffic areas or as scheduled.

C. Finishing: 1. Apply finish going with the grain of the wood. 2. Feather out each stroke to avoid applicator marks. 3. Use the recommended coverage of sq ft per gallon recommended by

manufacturer.

Page 119: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 5990- 4 WOOD FLOOR REFINISHING The Architectural Group, Inc.

4. Allow each coat to dry thoroughly (approximately 8 to 12 hours). High humidity and/or low temperature conditions will extend dry time while

increased ventilation and airflow will reduce dry time (recommended conditions of 65 to 80 degree F (18 degree C to 27 degree C)/ 40 to 60% relative humidity).

5. Abrade in-between all coats with a 120 - 150 grit screen or maroon pad. 6. Thoroughly vacuum and wipe with a clean, lint-free, water dampened

cloth between coats of finish. 7. Allow final coat to dry a minimum of 24 hours before use and avoid

heavy traffic for 72 hours. D. Install hardwood base mouldings with wood grain and finish to match existing

base following floor refinishing.

3.4 PROTECTION A. After application, protect floor finish from damage during subsequent work. B. After floors are finished, area is to be secured to allow time for curing of the

finish. Do not allow foot traffic until floor is sufficiently dried and cured. Contractor shall protect finished floor until inspection and acceptance.

END OF SECTION

Page 120: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6500 - 1 RESILIENT BASE FLOORING The Architectural Group, Inc.

SECTION 09 6500

RESILIENT BASE FLOORING/TRANSITION STRIP

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Resilient base.

B. Installation accessories.

1.02 REFERENCES

A. ASTM F 1861 - Standard Specification for Resilient Wall Base; 2002.

1.03 SUBMITTALS

A. See Section 01 330 – SUBMITTAL PROCEDURES.

B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.

C. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.

1.04 DELIVERY, STORAGE, AND PROTECTION

A. Protect roll materials from damage by storing on end.

1.05 ENVIRONMENTAL REQUIREMENTS

A. Maintain temperature in storage area between 55 degrees F and 90 degrees F.

B. Store materials for not less than forty eight (48) hours prior to installation in area of installation at a temperature of 70 degrees F to achieve temperature stability. Thereafter, maintain conditions above 55 degrees F.

1.06 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: As required by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency.

1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sg.cm.

1.07 EXTRA MATERIALS

A. See Section 01 6000 – Product Requirements

B. Provide not less than ten (10) lineal feet of base of each 500 linear feet of type and color specified.

PART 2 PRODUCTS

2.01 MATERIALS - BASE

A. Resilient Base: ASTM F 1861, Type TS rubber, vulcanized thermoset; top set 4” Cove, 0.125 minimum thickness, and per Finish Schedule on drawings with color to match existing. Material as follows: 1. Manufacturers:

a. Basis of Design: Johnsonite, Inc: www.johnsonite.com. 2. Resilient Base Standard: ASTM F 1861

a. Material Requirement: Type IV (vinyl, thermoplastic). b. Manufacturing Method: Group I (solid, homogeneous). c. Style: Cove (base with toe).

Page 121: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6500 - 2 RESILIENT BASE FLOORING The Architectural Group, Inc.

2.02 ACCESSORIES

A. Subfloor Filler: White premix latex; type recommended by adhesive material manufacturer.

B. Primers and Adhesives: Waterproof; types recommended by flooring manufacturer.

C. Transition Strips: Rubber.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that wall surfaces are smooth and flat and are ready to receive resilient base and transition strips.

3.02 PREPARATION

A. Clean substrate.

B. Apply primer as required to prevent "bleed-through" or interference with adhesion by substances that cannot be removed prior to base installation.

3.03 INSTALLATION - BASE

A. Fit joints tightly and make vertical. Maintain minimum dimension of 48 inches between joints.

B. Miter internal corners. At external corners, 'V' cut back of base strip to 2/3 of its thickness and fold. At exposed ends, use pre-molded units. Millwork reveal base must be miter cut at both internal and external corners.

C. Install base on solid backing. Bond tightly to wall and floor surfaces.

D. Scribe and fit to door frames and other interruptions.

3.04 CLEANING

A. Remove excess adhesive base and wall surfaces without damage.

END OF SECTION

Page 122: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6600 - 1 RESILIENT TILE FLOORING The Architectural Group, Inc.

SECTION 09 6600

RESILIENT TILE FLOORING PART 1 GENERAL

1.01 THIS SECTION INCLUDES

A. Flooring and accessories as shown on the drawings and schedules and as indicated by the requirements of this section.

1.02 RELATED DOCUMENTS

A. Drawings and General Provisions of the Contract (including General and Supplementary Conditions and Division 01 sections) apply to the work of this section.

1.03 RELATED SECTIONS

A. Other Division 09 sections for floor finishes related to this section but not the work of this section.

1.04 QUALITY ASSURANCE AND REGULATORY REQUIREMENTS

A. Select an installer who is competent in the installation of Armstrong resilient tile flooring or tile flooring manufacturer of final selected product.

B. If required, provide types of flooring and accessories supplied by one manufacturer, including leveling and patching compounds, and adhesives.

C. If required, provide flooring material to meet the following fire test performance criteria as tested by a recognized independent testing laboratory:

a. ASTM E 648 Critical Radiant Flux of 0.45 watts per sq. cm. or greater, Class I.

b. ASTM E 662 (Smoke Generation) Maximum Specific Optical Density of 450 or less.

1.05 SUBMITTALS

A. Submit shop drawings, seaming plan, coving details, and manufacturer's technical data, installation and maintenance instructions (latest edition of "Armstrong Guaranteed Installation System," F-5061) for flooring and accessories.

B. Submit the manufacturer's standard samples showing the required colors for flooring and applicable accessories.

C. If required, submit the manufacturer's certification that the flooring has been tested by an independent laboratory and complies with the required fire tests.

1.06 ENVIRONMENTAL CONDITIONS

A. Deliver materials in good condition to the jobsite in the manufacturer's original unopened containers that bear the name and brand of the manufacturer, project identification, and shipping and handling instructions.

B. Store materials in a clean, dry, enclosed space off the ground, and protected from the weather and from extremes of heat and cold. Protect adhesives from freezing. Store flooring, adhesives and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.

C. Maintain a minimum temperature in the spaces to receive the flooring and accessories of 65ºF (18ºC) and a maximum temperature of 100ºF (38ºC) for at least 48 hours before, during, and for not less than 48 hours after installation. Thereafter, maintain a minimum temperature of 55ºF (13ºC) in areas where work is completed. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances.

Page 123: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6600 - 2 RESILIENT TILE FLOORING The Architectural Group, Inc.

D. Install flooring and accessories after the other finishing operations, including painting, have been completed. Close spaces to traffic during the installation of the flooring. Do not install flooring over concrete slabs until they are sufficiently dry to achieve a bond with the adhesive, in accordance with the manufacturer's recommended bond and moisture tests.

PART 2 PRODUCTS

2.01 RESILIENT TILE FLOORING MATERIALS

A. Provide Standard EXCELON® Tile Flooring manufactured by Armstrong World Industries, Inc., as the design standard, having a nominal total thickness of 1/8"/0.125in. (3.2mm), 12 in. x 12 in. (305 mm x 305 mm), composed of polyvinyl chloride resin binder, plasticizers, fillers, and pigments with colors and texture dispersed uniformly throughout its thickness. Vinyl composition tile shall conform to the requirements of ASTM F 1066, Class 2 – through pattern. Color to be determined by Associate in coordination with Miami University.

B. The Centiva Event Series shall be heterogeneous, resilient flooring with a .030" high density wearlayer. All products shall have an overall gauge of .120" (3 mm) nominal. See individual product specification for sizes offered in each style. The resilient tile shall be manufactured in accordance with ASTM Specification F-1700 and shall be asbestos free. All products shall have a Commercial Limited 20-yearWear Warranty and Residential Lifetime Wear Warranty. The adhesive shall be CENTI 200 I WET SET, CENTI 2000 EP, or CENTI 6000 SP. Installation shall be in accordance with the latest Centiva Installation Guidelines found at www.centiva.com.

Classification: ASTM F 1700 Class III SolidVinyl Tile

Construction: Layered plank consisting of wearlayer; film, and backing

Overall Thickness: . 120" / 3 mm (nominal)

Wearlayer Thickness: 030" clear; rigid high density PVC

Size: 4" x 36" or 6" x 36"

Edge: Square

Surface Textures: Selection per Miami University.

Standard Colors: Selection per Miami University.

Warranty: 20 years Commercial, Lifetime Residential

Test Performance: ASTM E 648 Critical Radiant Flux Class I CRF>0.45 ASTM E 662 Smoke Density <450; Good ASTM F 925 Chemical Resistance Excellent ASTM C 102B" Slip Resistant Very Good ('textures) ASTM D 2047 Passes ADA Compliant FTC Slip Resistant Classified Product

2.03 ADHESIVES

A. For Tile Installation System, Full Spread: Provide Armstrong Resilient Tile Adhesive under the tile as recommended by the flooring manufacturer.

B. For Centiva Installation System, Full Spread: As recommended by the flooring manufacturer.

Page 124: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6600 - 3 RESILIENT TILE FLOORING The Architectural Group, Inc.

2.04 ACCESSORIES

A. For patching, smoothing, and leveling monolithic subfloors (concrete, terrazzo, quarry tile, ceramic tile, and certain metals), provide Armstrong Cement-Based Underlayment as recommended by the flooring manufacturer. If subsurface conditions other than of materials noted above are encountered, coordinate with associate regarding subsurface requirements to meet manufacturer’s installation specifications.

PART 3 EXECUTION

3.01 INSPECTION

A. Examine subfloors prior to installation to determine that surfaces are smooth and free from cracks, holes, ridges, and other defects that might prevent adhesive bond or impair durability or appearance of the flooring material.

B. Inspect subfloors prior to installation to determine that surfaces are free from curing, sealing, parting and hardening compounds; residual adhesives; adhesive removers; and other foreign materials that might prevent adhesive bond. Visually inspect for evidence of moisture, alkaline salts, carbonation, dusting, mold, or mildew.

C. Report conditions contrary to contract requirements that would prevent a proper installation. Do not proceed with the installation until unsatisfactory conditions have been corrected.

D. Failure to call attention to defects or imperfections will be construed as acceptance and approval of the subfloor. Installation indicates acceptance of substrates with regard to conditions existing at the time of installation.

3.02 PREPARATION

A. Smooth concrete surfaces, removing rough areas, projections, ridges, and bumps, and filling low spots, control or construction joints, and other defects with Armstrong underlayment as recommended by the flooring manufacturer.

B. Remove paint, varnish, oils, release agents, sealers, and waxes. Remove residual adhesives as recommended by the flooring manufacturer. Remove curing and hardening compounds not compatible with the adhesives used, as indicated by a bond test or by the compound manufacturer's recommendations for flooring. Avoid organic solvents.

C. Perform subfloor moisture testing in accordance with ASTM F 2170, “Standard Test Method for Determining Relative Humidity in Concrete Slabs Using in-situ Probes” or ASTM F 1869,“Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride” and Bond Tests as described in publication F-5061, "Armstrong Guaranteed Installation System," to determine if surfaces are dry; free of curing and hardening compounds, old adhesive, and other coatings; and ready to receive flooring. Relative humidity shall not exceed 80%. MVER shall not exceed 5 lbs./1000 sq. ft./24 hrs. On installations where both the Percent Relative Humidity and the Moisture Vapor Emission Rate tests are conducted, results for both tests shall comply with the allowable limits listed above. Do not proceed with flooring installation until results of moisture tests are acceptable. All test results shall be documented and retained.]

D. Perform pH tests on concrete floors regardless of their age or grade level. All test results shall be documented and retained

E. Vacuum or broom-clean surfaces to be covered immediately before the application of flooring. Make subfloor free from dust, dirt, grease, and all foreign materials.

3.03 INSTALLATION OF TILE FLOORING

A. Install flooring in strict accordance with the latest edition of "Armstrong Guaranteed Installation System", F-5061.

Page 125: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 6600 - 4 RESILIENT TILE FLOORING The Architectural Group, Inc.

B. Install Centiva flooring in strict accordance with the manufacturer’s recommendations.

C. Install flooring wall to wall before the installation of floor-set cabinets. Extend flooring into toe spaces, door recesses, closets, and similar openings as shown on the drawings.

D. Scribe, cut, and fit to permanent fixtures, columns, walls, partitions, pipes, outlets, and built-in furniture and cabinets.

E. Install flooring with adhesives, tools, and procedures in strict accordance with the manufacturer's written instructions. Observe the recommended adhesive trowel notching, open times, and working times.

3.04 INSTALLATION OF ACCESSORIES

A. Place resilient edge/ transition strips tightly butted to flooring, and secure with adhesive recommended by the edge strip manufacturer. Install edge strips at edges of flooring that would otherwise be exposed.

3.05 CLEANING AND PROTECTION

A. Perform initial maintenance according to the latest edition of "Armstrong Guaranteed Installation System," F-5061.

B. Protect installed flooring as recommended by the flooring manufacturer against damage from rolling loads, other trades, or the placement of fixtures and furnishings. which includes but is not limited to the application of two coats of Armstrong S-480 Commercial Floor Polish. (See Finishing The Job in "Armstrong Guaranteed Installation System," F-5061.)

C. The floor finishing contractor shall obtain written approval from Miami University’s Project Manager that the first coat of floor polish is acceptable, before subsequent coats are applied.

D. Perform initial Centiva maintenance according to the manufacturer’s recommendations.

END OF SECTION

Page 126: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 9000 - 1 PAINTING AND COATING The Architecural Group, Inc.

SECTION 09 9000

PAINTING AND COATINGS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Surface preparation.

B. Field application of paints, and other coatings including staining and varnishing of historic wood.

C. Scope: Finish all interior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated.

D. Do Not Paint or Finish the Following Items: 1. Items fully factory-finished unless specifically so indicated; materials and products having

factory-applied primers are not considered factory finished. 2. Items indicated to receive other finishes. 3. Items indicated to remain unfinished. 4. Fire rating labels, equipment serial number and capacity labels, and operating parts of

equipment. 5. Stainless steel, anodized aluminum, bronze, terne, and lead items.

1.02 RELATED REQUIREMENTS

A. Section 09 2100 - Veneer Plaster Finishing System

B. Section 09 2600 - Gypsum Board Assemblies

1.03 DEFINITIONS

A. Conform to ASTM D 16 for interpretation of terms used in this section.

1.04 REFERENCE STANDARDS

A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for Architectural Coatings; U.S. Environmental Protection Agency; current edition.

B. ASTM D 16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications; 2007.

C. ASTM D 4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Base Materials; 1992 (Reapproved 2003).

D. SSPC (PMI) – Good Painting Practice; SSPC Painting Manual, Vol. 1; Society for Protective Coatings; Fourth Edition.

1.05 SUBMITTALS

A. See Document 00 72 16 – General Requirements, Article 13 – Action Submittals, for submittal procedures.

B. Product Data: Provide data on all finishing products and special coatings, including VOC content.

C. Samples: Submit two (2) paper chip samples, 6 x 6 inch in size illustrating range of colors and textures available for each surface finishing product scheduled.

E. Manufacturer's Instructions: Indicate special surface preparation procedures and substrate conditions requiring special attention.

F Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated

Page 127: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 9000 - 2 PAINTING AND COATING The Architecural Group, Inc.

surfaces.

G. Maintenance Materials: Furnish the following for Miami University's use in maintenance of project. 1. Extra Paint and Coatings: one (1) gallon of each color, type, and surface texture; store

where directed. 2. Label each container with color, type, texture, and room locations in addition to the

manufacturer's label.

1.06 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the products specified, with minimum seven (7) years documented experience.

B. Applicator Qualifications: Company specializing in performing the type of work specified with minimum seven (7) years experience.

C. Warranty: All components of each finish product/system shall be protected against failure and/or performance deficiencies by a product manufacturer’s installation and materials warranty. Said warranties shall be specific to each system required and shall be non-prorated warranties which guarantee against material and labor defects for a minimum period of five (5) years.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F, in ventilated area, and as required by manufacturer's instructions.

1.08 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Minimum Application Temperatures for Latex Paints: 45 degrees F for interiors; 50 degrees F for exterior; unless required otherwise by manufacturer's instructions.

F. Provide lighting level of 80 ft candles measured mid-height at substrate surface.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Provide all paint and coating products from the same manufacturer to the greatest extent possible.

B. Paints: 1. Basis of Design: Porter PPG: www.ppgporterpaints.com 2. Sherwin William: www.sherwin-williams.com 3. Benjamin Moore: www.benjaminmoore.com 4. Substitutions: See Section 01 6000 - Product Requirements.

Page 128: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 9000 - 3 PAINTING AND COATING The Architecural Group, Inc.

2.02 PAINTS AND COATINGS - GENERAL

A. Paints and Coatings: Ready mixed. 1. Provide paints and coatings of a soft paste consistency, capable of being readily and

uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags.

2. Provide materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

3. For opaque finishes, tint each coat including primer coat and intermediate coats, one-half shade lighter than succeeding coat, with final finish coat as base color.

4. Supply each coating material in quantity required to complete entire project's work from a single production run.

5. Do not reduce, thin, or dilute coatings or add materials to coatings unless such procedure is specifically described in manufacturer's product instructions.

B. Primers: Where the manufacturer offers options on primers for a particular substrate, use primer categorized as "best" by the manufacturer.

C. Volatile Organic Compound (VOC) Content: 1. Provide coatings that comply with the most stringent requirements specified in the

following: a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission Standards for

Architectural Coatings. b. Ozone Transport Commission (OTC) Model Rule, Architectural, Industrial, and

Maintenance Coatings; www.otcair.org; specifically: 1. Opaque, Flat: 50 g/L, maximum. 2. Opaque, Nonflat: 150 g/L, maximum. 3. Opaque, High Gloss: 250 g/L, maximum. 4. Primers , Sealers and Undercoaters: 200 g/L., maximum 5. Floor Coatings: 100 g/L, maximum 6. Shellacs, Clear: 730 g/l, maximum 7. Shellacs, Pigmented: 550 g/L, maximum.

c. Architectural coatings VOC limits of State in which the project is located. 2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59,

Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

D. Flammability: Comply with International Building Code for surface burning characteristics.

E. Colors: Custom color to match existing adjacent color 1. Test color match sample against adjacent walls, to be reviewed and approved by

University project representative.

2.04 PAINT SYSTEMS

A. Interior Woodwork: Interior woodwork shall receive one coat of primer and two (2) coats of semi-gloss enamel.

B. Metal Doors and Frames: In addition to the shop coat of paint, metal doors and frames shall receive two (2) coats of semi-gloss enamel.

C. Plaster Coated Gypsum Wallboard: Semi-gloss alkyd enamel shall be used for gypsum wallboard surfaces.

1. New Wallboard: New wallboard shall receive one coat of primer and two (2) coats of finish.

2. Existing Construction: Existing construction shall receive one (1) coat of primer and one coat of finish paint, except where old finish is removed to substrate.

Page 129: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 9000 - 4 PAINTING AND COATING The Architecural Group, Inc.

2.05 ACCESSORY MATERIALS

A. Accessory Materials: Provide all primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required to achieve the finishes specified whether specifically indicated or not; commercial quality.

B. Patching Material: Latex filler.

C. Fastener Head Cover Material: Latex filler.

PART 3 EXECUTION

3.01 EXAMINATION

A. Do not begin application of coatings until substrates have been properly prepared, including properly sanding and priming.

B. Verify that surfaces are ready to receive work as instructed by the product manufacturer.

C. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

D. If substrate preparation is the responsibility of another installer, notify Associate of unsatisfactory preparation before proceeding.

E. Test shop-applied primer for compatibility with subsequent cover materials.

F. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums: 1. Gypsum Wallboard: 12 percent. 2. Interior Wood: 15 percent, measured in accordance with ASTM D 4442.

3.02 PREPARATION

A. Clean surfaces thoroughly and correct defects prior to coating application.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Remove or repair existing coatings that exhibit surface defects.

D. Remove surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings, prior to preparing surfaces or finishing.

E. Seal surfaces that might cause bleed through or staining of topcoat.

F. Seal voids between pipe penetrations and wall surfaces before painting as indicated on the drawings.

G. Plaster Coated Gypsum Board Surfaces to be Painted: Fill minor defects with filler compound. Spot prime defects after repair.

3.03 APPLICATION

A. Apply products in accordance with manufacturer's instructions.

B. Where adjacent sealant is to be painted, do not apply finish coats until sealant is applied.

C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.

D. Apply each coat to uniform appearance.

E. Sand wood and metal surfaces lightly between coats to achieve required finish.

Page 130: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 09 9000 - 5 PAINTING AND COATING The Architecural Group, Inc.

F. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

G. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.04 CLEANING

A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site.

3.05 PROTECTION

A. Protect finished coatings until completion of project.

B. Touch-up damaged coatings after Substantial Completion.

END OF SECTION

Page 131: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 22 0000 - 1 PLUMBING The Architectural Group, Inc. .

DIVISION 22

PLUMBING SPECIFICATIONS 22 0500 – COMMON WORK RESULTS

A. Cutting of existing or new construction related to the plumbing scope of work, including access to concealed piping by sawing, drilling, breaking, chipping, grinding, and similar operations, to install any piping, or equipment, shall be the responsibility of the Plumbing Subcontractor after coordination with the General Construction Contractor regarding scope of removals and demolition.

B. Patching of the cutting procedures is required by the Plumbing Subcontractor to restore sub-surfaces to a similar structural condition to adjacent construction in a manner that will allow the General Construction Contractor to replace and repair glazed tile surface areas to eliminate evidence of patching and refinishing. Provide an even sub-surface of uniform texture and appearance acceptable to the General Construction Contractor.

C. Demolition of existing items or materials shall be completely removed unless otherwise indicated to be reused, salvaged, or reinstalled. Any salvaged items or materials shall be turned over to the owner.

D. Remove, replace, patch, and repair materials and sub-surfaces cut or damaged during demolition, by methods and with materials so as not to void existing warranties.

E. Maintain and do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by Miami Project Manager and authorities having jurisdiction.

F. Closeout procedures shall be conducted before requesting inspection for Substantial Completion. Plumbing Subcontractor shall prepare a Punch List of items to be completed and corrected, and reasons why the work is not complete. Punch List to be provided to General Construction Contractor to subsequently be presented to the Associate.

G. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

H. Manufacturer’s standard warranties shall be provided for each piece of equipment unless noted otherwise. Plumbing Subcontractor shall provide a warranty for his work for a minimum of one (1) year after date of completion.

I. Coordination among all trades is mandatory. Any cost changes resulting from the lack of coordination,

shall be borne by the Plumbing Subcontractor creating the conflict. J. All equipment and materials shall be delivered, stored and handled with care. Any damage resulting

from improper storage or handling of equipment and materials shall be repaired or replaced at contractor’s expense.

K. Finish painting shall be furnished by General Construction Contractor. Marred or damaged factory-

painted finishes shall be Plumbing Subcontractor’s responsibility and shall match original factory finish.

22 0700 – PLUMBING INSULATION

A. Insulation shall be mineral-fiber with all-purpose jacket or flexible elastomeric which meets or exceeds the 25/50 flame spread/smoke developed ratings.

Page 132: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 22 0000 - 2 PLUMBING The Architectural Group, Inc. .

22 1116 – DOMESTIC WATER PIPING

A. Water piping shall be ASTM B 88 Type “K” copper tube (below floor or grade) and Type “L” copper tube (above grade). Fittings shall be cast copper or wrought copper. Joints shall be soldered with 95-5 Tin Antimony solder.

B. Clean and disinfect piping as per code. 22 1316 – SANITARY WASTE AND VENT PIPING

A. Above grade sanitary piping shall be ASTM A 888 hubless cast iron with stainless steel Type 301 couplings or ASTM D 2665 Schedule 40 PVC with solvent cemented joints as verified with Miami University.

B. Hanger spacing and rod sizing as per local code. 22 4000 – PLUMBING FIXTURES

A. Double Bowl Sink: Plumbing Subcontractor to supply and install Elkay Model Number BPSR2317 Double Bowl Sink.

B. Fixture: Plumbing Subcontractor to supply and install Kohler Model Number K-10433 Single Hole Mounted Faucet. Provide and install 1/4 turn full port shut off valve under sink cabinet.

END OF SECTION

Page 133: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 26 5000 - 1 ELECTRICAL The Architectural Group, Inc. .

SECTION 26 0500

COMMON WORK RESULTS FOR ELECTRICAL PART 1 – GENERAL

26 0500 - COMMON WORK RESULTS A. Cutting of existing or new construction by sawing, drilling, breaking, chipping, grinding, and

similar operations, including excavation, shall be the responsibility of each contractor.

B. Patching of the cutting procedures is required to restore surfaces to their original condition and adjacent construction in a manner that will eliminate evidence of patching and refinishing. Provide an even surface of uniform finish, color, texture, and appearance.

C. Demolition of existing items DR material shall be completely removed unless otherwise

indicated to be reused, salvaged, or reinstalled. Any salvaged items or material shall be turned over to the owner.

D. Remove, replace, patch, and repair materials and surfaces cut or damaged during

demolition, by methods and with materials so as not to void existing warranties.

E. Maintain and do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by owner and authorities having jurisdiction.

F. Closeout procedures shall be conducted before requesting inspection for substantial

completion. Contractor shall prepare a list of items to be completed and corrected (punch list), and reasons why the work is not complete.

G. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

H. Prepare and submit project record drawings and documents including operation and maintenance manuals

I. Operation and maintenance manuals shall include O&M information for each piece of equipment including: mfr's information; list of spare parts; name, address, and telephone number of installer or supplier; maintenance procedures; copies of maintenance service agreements. Warranties and bonds. Bind and index data in heavy-duty, 3-ring, vinyl-covered, loose -leaf binders.

J. Warranties: provide manufacturer's standard warranties for each piece of equipment unless noted otherwise. Contractor shall provide a warranty for his work for a minimum of 1 year after date of completion.

K. Coordination among all trades is mandatory. Any cost changes resulting from the lack of

coordination, shall be borne by the contractor creating the conflict.

L. Submittals shall include all product data, specialties, accessories, power, signal, and control wiring diagrams.

M. Electrical components, devices, and accessories: listed and labeled as defined in NFPA 70,

article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. Comply with NFPA 70 and all other applicable local, state, and federal laws, ordinances and regulations.

Page 134: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 26 5000 - 2 ELECTRICAL The Architectural Group, Inc. .

N. Conductors, no. 10 AWG and smaller shall be solid or stranded; larger than no. 10 AWG

shall be stranded. All conductors shall be copper. Insulation type THW, or THHN-THWN.

O. Install materials level, plumb, and parallel and perpendicular to other building systems.

P. Install all wiring in EMT, IMC, RMC, RNC, or LFMC. Conduits shall be 3/4" minimum size. Conceal raceways and cables 'within finished walls, ceiling, and floors. Utilize short metallic flexible conduit whips for connections to light fixtures.

Q. Apply fire stopping to cable-raceway sleeves and other penetrations of fire-rated floor and wall assemblies to restore original undisturbed fire-resistance ratings of assemblies.

26 5260 - GROUNDING FOR ELECTRICAL SYSTEMS

A. Install insulated grounding conductors in all branch circuits

26 7260 - WIRING DEVICES

A. Wiring devices by cooper wiring devices, Hubbell Inc. Or pass & Seymour/Legrand.

B. Receptacles and toggle switches shall be heavy-duty or industrial specification grade, ivory. Switches shall be 20A, 120/277V AC or 15A, 120/277V AC. Receptacles shall be duplex. 20A receptacles shall be NEMA 5-20R.

C. Wall plates: 0.035" thick, satin-finished stainless steel with metal screws. Heads to match

plate finish.

D. Straight blade receptacles 1. Convenience receptacles, 125V, 20A; provide one of the following:

a. Cooper; 5351 (single), 5352 (duplex). b. Hubbell; HBL5351 (single), CR5352 (duplex). c. Pass & Seymour; 5351 (single), 5352 (duplex).

E. GFCI Receptacles

1. Duplex GFCI convenience receptacles, 125V, 20A; provide one of the following: a. Cooper; GF20. b. Hubbell; GF20 series. c. Pass & Seymour; 2084.

F. Toggle Switches

1. 20A switches, provide one of the following: a. Cooper; AH1221 (single pole), AH1222 (two pole). AHl223 (three way),

AHl224 (four way). b. Hubbell; CS1221 (single pole), CS1222 (two pole), CS1223 (three way),

CS 1224 (four way). c. Pass & Seymour; 2DACl (SINGLE POLE), 20AC2 (double pole), 20AC3

(three way), 20AC4 (four way)

G. Occupancy Sensors 1. Provide occupancy sensors in the public toilet rooms at Richard Hall only.

a. Wall mounted multi-technology infrared/ultrasonic sensor, equal to Leviton decor style wall switch HOSSMT-MD, fluorescent 120DVA @ 120V, 2700VA @ 277V, ivory.

Page 135: DODDS, MacCRACKEN, RICHARD & STANTON RESIDENCE … Hall Upgrades 2012/specs... · dodds, maccracken, richard & stanton residence hall room upgrade project project manual technical

1201 Dodds, MacCracken, Richard, and Stanton Residence Hall Room Upgrades 26 5000 - 3 ELECTRICAL The Architectural Group, Inc. .

26 5100 – LIGHTING A. Install fixtures provided by Miami University as noted on the drawings. All fixtures shall be UL

labeled. B. In acoustical ceiling applications, coordinate fixture locations and fixture weights with the trade

installing the ceiling system to assure adequate hangers are installed to support the weight of the ceiling plus twice the weight of each fixture. Fasten support clips to fixtures and to ceiling grid members at or near each fixture corner. Fixtures of sizes less than ceiling grid shall be supported with at least two 3/4" metal channels spanning and secured to ceiling tees.

C. Fixture Type Table (For Reference)

Fixtures and lamps provided by Miami University. See drawing General Notes on New Work sheets for additional information regarding Contractor’s responsibilities.

FIXTURE

Manufact.: Scott

Manufact.: Scott

Manufact.: Scott

Manufact.: Scott

Manufact.: Scott

Manufact.: Day-Brite

MUDR 71JM WH WH M1 MOD 2C 

MUSR 61GM WH WH M1

MOD

MUBR 57JK WH

WL 1C 

MUOS 83DG 54W WH DL 1C 

MUOS 73DG 24W WH DL

1C 

2TG8 2 31U6 R-01-UNV-1/2-

EB (Resident Room Ceiling 22" Fixture)

(Resident Room Ceiling 13 1/2" Fixture)

(Bathroom Ceiling Fixture)

(4' Over Sink

Fixture) (2' Over Sink

Fixture)

(24"x24" Recessed

T8 Flr. Fixture)

LOCATION

Fixture Type "A"

Fixture Type "B"

Fixture Type "C"

Fixture Type "D"

Fixture Type "E"

Fixture Type "F"

DODDS Basement 0 0 0 0 0 0 1st Floor 35 0 6 0 0 0 2nd Floor 58 0 6 0 0 0 3rd Floor 36 0 6 0 0 0 MacCracken Basement 0 0 0 0 0 12 1st Floor 3 0 0 0 0 0 2nd Floor 50 1 7 6 0 0 3rd Floor 47 0 14 6 0 0 Richard Ground 0 2 0 0 0 0 1st Floor 17 0 7 3 2 0 2nd Floor 54 4 16 9 0 0 3rd Floor 49 4 17 9 2 0 Stanton Basement 0 0 0 0 0 0 1st Floor 41 0 1 0 1 0 2nd Floor 49 0 0 0 0 0 3rd Floor 44 0 0 0 0 0