INSTRUCTION MANUAL
for
DODGE SAF & SAFS*
Pillow
Blocks
l
S suffix stands for steel housing
- _.. - _-.
,
_. , A. -_
WARNING: Because of the possible danger to person(s) or property from accidents which may result from the improper use of products, it is
important that correct procedures be followed: Products must be used in accordance with the engineering information specified in the catalog.
Proper installation, maintenance and operation procedures must be observed. The instructions n the instruction manuals must be followed.
lnspectiins should be made as necessary to assure safe operation under prevailing conditions.Hoper guards and other suitable safety devices or
procedures as may be desirable or as may be specified n safety codes should be provided, and are neither provided by Reliance Electric ndustrial
Company nor are the responsibilityof Reliance Electric ndustrialCompany. This unit and its associated equipment must be installed, adjusted and
maintained by qualified personnel who are familiar with the constructionand operation of all equipment in the system and the potential hazards
involved. When risk to persons or property may be involved, a holding device must be an integral part of the driven equipment beyond the speed
reducer output shaft.
DODGE / P.O. Box 499 / 6040 Ponders Court / Greenville, S.C. 29602-0499 / 803-297-4800
Reliance ElectricCompany, lggl
DODGE is a registered
RELIANCE
trademark of Reliance ElectricCompany or its affiliates.
ELECTRIC B
Printed n U.S.A. InstructionManual 499718
-
7/26/2019 Dodge Saf Pillow Blocks
2/6
INSPECTION
Inspect shaft. Insure that the shaft is smooth, straight, clean and
within commercial tolerances.
Inspect bearing. Do not allow bearing to be exposed to
any dirt or moisture. Do not remove slushing compound as it
acts as both a protectant and lubricant and is also compatible with
standard greases.
INSTALLATION
Note: Housing caps and basea are not hrterchangeable, they
must be matched with mating half. Install non-expansion
bearing first.
1. Apply a light coating of oil or other rust inhibitor to the adap ter
area of the shaft.
2. Measure the I+ cle&r&Lf ths bearing%SEF*~
mounting. Place the beating in an upright position as shown in
Figure 1.
Seat the
inner ring and roller elemen ts by pressing
down
firmly on the inner ring bore while rotating he inner ring a few times.
Position the roller assemblies so that a roller is
at
the top most
positionon both sides. Press these top rollers inward insuring con-
tact with center guide flange (above 6V2 only). Using a feeler gage
measure the clearance for both sides by inserting as far as possible
and sliding over top of roller (Figure 1). Write down the measured
clearance for use in step 3d. NOTE: Do not rotate bearing when
moving feeler between roller and outer rlng.
e) Lockwasher and Locknut-Install the lockwasher (6 and
smaller sizes only) on the adapter sleeve with inner prong ocated
in the slot of the sleeve and awa y from he b earing. Install locknut,
chamfere d face toward bearing.
4 shaft and smaller--tighten locknut using a spanne r wrenc h
and ham mer until clearance noted in step 2 is reduced by
amount shown in Table 1. During this step shaft should be sup-
ported so all weight is off of the bearing.
Larger than 4shaft--tighten locknutby hand followed by light
tapping on a bar inserted in notches on O.D. of locknut.Tighten
all MICRO-MOUNT@ screws evenly in sequence and in small
increments 10to 15turns until clearance is reduced. Loosen all
screws untilthey are snug at large end of nut. Screws have been
staked at factory to prevent removal, however, restake if neces-
sary. Tighten locknut until it is tight against bearing, (use drift pin
and hammer).
Find a lockwasher ab that alignswitti a locknutslotand bend tab
into slot. If slot is past tab then tighten, not loosen, ocknut o meet
a washer tab. Sizes larger than 8require a lockplatebolted o the
locknutwith the inner prong of the plate located in the slot of the
adapter sleeve. If necessary tighten, not loosen, locknut o allow
prongo fit in adapter slot. Lock plates for 9 and
lOY2
must be
hand fitted on the job.
Shaft Diameter
Fhdiiction In
Internal
ChlranCe
47/rs;4'i2. 4'5/16. 5
I
.0025/.0035
53/w; 57/lS, 5'12 .0030/.0040
5'5/1s, 6, 67/18, 6% .0030/.0045
6'Vw, 7 .0035/.0050
7'12, 7vts, 0 .0040/.0055
87/10,0V2, EI*/,e, 9 .0045/.0060
9'/lS, 9'12, 10 .0045/.0065
lO'Vl6, 11 .005/.007
llV1s, 11'12, 11'VlS. 12 .0055/.0075
12'511s.13, 13'lrs. 13'12 .0060/.0080
13'Vts, 14 .0067/.0091
9 Seal
Ring-Install second seal ring with large O.D. toward
locknut.
g) V-ring Seal-Slide second V-ring seal onto the shaft, again
making certain lip is toward bearing. Note: Do not Install V-ring
seal on seal ring until housing cap has been set in place and
tightened.
4.
Remove any paint, dirt or burrs from the mating surfaces of
the housing halves. Thoroughly clean seal groovv ---
*it--h--all four cap bolts in place- -_
~l-lntemalc~rance
3.
Install he bearing parts n the followingsequence: (refer to parts
drawing).
a) V-ring Seal-Slide one of the V-ring seals onto the shaft,
making sure lip Is toward the bearing. Note: Do not Install V -
ring seal on seal ring until housing cap has been set in place
and tightened.
b) Seal Ring-install a seal ring on shaft with the largest O.D.
toward bearing.
c) Adapter S leeve-Slide adapter sleeve onto the shaft, thread-
ed end outboard o the approximate ocationof the bearing. Apply
light coating of oil to sleeve
O.D. Do Not
Use Grease.
d) Bearing-Make
sure that the internal clearance has been
.written down. Install bearing on adapter sleeve, large end of
tapered bore first. Locate bearing in proper position on shaft.
and apply oil to the bearing seats.
5. Apply grease to the bearing and seal rings. The lubricantshould
be smeared between the rolling elements (See Grease Lubrication
Section). This step and the first sentence of step 10 do not apply for
oil lubricatedbearings.
6. Place shaft with bearing into lower half while carefully guiding
the seal rings into the housing grooves.
7. Bolt lower half of the non-expansion bearing to the base. Move
shaft endwise so that spacer ring can be inserted as shown \on
page 5. Center
all other bearings on same shaft In their housing
seats. Note: Only one bearing per shaft is non-expanslon, other
bearings should be expansion.
6. When closed end is required, he end plug supplied should be fit
into the center seal ring groove of the housing.
-
7/26/2019 Dodge Saf Pillow Blocks
3/6
GREASE LUBRICATION
. On pillow blocks above 101/z bore a bead of silicone sealant
should be applied between the cap and the base.
10. Grease the bearing seal grooves in the housing cap and
place over the bearing after wiping the mating surfaces. The two
dowel pins will align the cap with the lower housing half.
Note:
Each cap must be matched with its mating lower half, as these
parts are not interchangeable.
11.
Tighten cap bolts and nuts to the recommended torque in
Table 2.
12. Assure that there is running clearance at seal rings as shown
on sketch 1.
13. Misalignment of pillow blocks must not exceed values shown
on Table 3.
TABLE 2 - Recommended Torque Values
Sire l-6 I IN-7
I
IVb-7
SAF and SAFS bearings are specifcally designed for dirty, dusty or
wet environments. n order to properlyprotectbearingsduring nstal-
lation pack the bearing insert 100% full immediately after having
properly mounted bearing on the shaft.
If the RPM of the application falls between 20% and 80% of maxi-
mum RPM (Table
8),
pack the lower half of the housing one third to
one half full. If the RPM of the application s less than 20% of maxi-
mum RPM, pack bearing housing cavity 100% full. If the RPM ex-
ceeds 80% of maximum RPM, do not add grease in the lower half of
the housing nor in the cap.
WARNING
Regreasing requires rotating parts to be exposed. Exer-
cise extreme care during such operations. Failure to
observe these precautions could result in bodily injury.
At each regreasing cycle, for applications up to 80% of maximum
RPM, slowly add grease until fresh grease is seen purging at the
seals. Regreasing should be done while running. Remote regreas-
ing lines should be added to avoid endangering personnel.
?f$$~of $W&?krm~PM, add 4 strokesof
TABLE 3
Static or Dynamic Allowable Misalignment Degrees
Spherical Roller Bearings*
Triple-Ted
Se&
0057
0%
I%6
LW
Auxiliary
seal
-
0040
-
0039
O52 o35
a handgun at-each regreasing cycle for bores up to 2 For bores
greater than 2 up to 5add 8 strokes of handgun at each regreas-
ing cycle. For bores greater than 5up to 101/aadd 16 strokesof a
handgun at each regreasing cycle. For units running above 80% of
maximum RPM running emperature should be monitored. f a dras-
tic change in running temperature is noted, it is recommended to
remove the used grease completely and recharge with fresh grease
per the above instructions.
Shaft Blodc
Size Size
1 ta
509
1 /Is
510
1 YM
511
Su -5vz , ,
5Vrs - 6
I 534 I
Select a grease with a viscosity at operating temperature which will
provide ull film lubrication. See Table 4). Use a 50-100F increase
in bearing temperature above ambient, depending on R.P.M. and
load. Use Table 5 as a genera/guide for regreasing he bearings. A
small amount of grease at frequent intervals is preferable to a large
amount of grease at infrequent intervals. For special applications
involving high speeds or high temperatures consult DODGE.
TABLE 4 - Viscosity of Oil in the Grease
Sizes above 10% bore consult DODGE C.O. Engineming Bearing Group
MAINTENANCE
WARNING
To ensure that drive is not unexpectedly started, turn
offandlockoutortagpowersourcebeforeproceed~
1;
%od
. F+iure to observe these precautions could result
11ynjury.
Remove the housing cap in order to
inspect bearing and grease.
Before reassembly It Is important that the V-ring seals be re-
moved. This will insure that seal lip will not be damaged while
setting cap in place. Reassemble per installation steps Othru 11.
A DN = bore diameter ins.) x RPM)
l For loadsabove 18% of dynamiccapaMy an EP
grease with the abov e vi6~0sity
oil
is recommended.
TABLE 5 - Regreaslng intervals (Months)*
(Based on 12 hour per day 180F max.)
For conttnuous -ion, 24 hrsJday, decrease greasing Interval by 50%.
Above 14 hors consult DODGE engineering.
-
7/26/2019 Dodge Saf Pillow Blocks
4/6
., .
c.
.
.
.,:,.
2
L
._.a~~.--,~,
,
-
7/26/2019 Dodge Saf Pillow Blocks
5/6
.
TABLE 6
Maximum RPM (Grease Lubrication)
shan
f3Elg
Max.RPM
size
Descfiptk.n
Grease
oil
1711s
22209K
5600
7000
1'Vra
2221OK 5300
6700
SYe.6 22234K 1300
1700
W/M, 6'11 22236K 1200
1600
BW..7 22236K 950
1300
LONG=TERM STORAGE OF
PRE-ASSEMBLED BEARINGS
Applicationssuch as conveyor pulleys and fans are shipped to a jo
site with bearings already mounted to the shafts. Since these unit
may be stored for long periods of time in unprotectedareas subjec
to rain, dust, etc. bearings should be packed 100% full and so tagge
at bearing assembly to prevent contamination or corrosion of th
bearings.
Prior to installationon the structure, f the application RPM is greate
than 20% of catalog maximum speed, excess grease must be re
moved to the levels outlined previously. Removal of excess greas
must be done in a clean, protectedenvironment.
OIL LUBRICATION
SAF and SAFS bearings are specifically designed to handle both
grease and oil lubrication.Oil lubrication s normally required at high
speeds as well as high loads, or whenever heat from an externa
source is flowing into the bearing. Oil lubrication may be static o
circulating. With static oil, fill the bearing cavity with oil up to the
centerline of the lower roller. The dimension is identified as w and
ount an oi
&deoftb@
9vmp 9% 23052K 750 950
9'Y*, 10, I.
IO'la, 1O'h 23066K 700
900
ltwr.11 2306OK 630
600
ll'k, ll'lz,
llVrs, 12 23064K 600
750
12'5/m, 13.
13'l/(s.13% 23072K 530
670
13"h. 14
23076K 500
630
&o&for visual indication of this level. The oil level may drop o
rise during operation depending on the rotation of the bearing. Oi
should only be added when the bearing is not operating. Both the
static olflevel-and the running oil level should be marked on the oi
sight gauge and properly identified.
With circulatingoil, the flow rate, type of oil, and size of return drains
must be determined for each application. Consult DODGE applica
tion engineering for recommendations.
-
7/26/2019 Dodge Saf Pillow Blocks
6/6
REPLACEMENT PARTS FOR SAF 8 SAFS PILLOW BLOCKS
NON-EXPANSION TYPE
EXPANSION TYPE
SAF & SAFS PILLOW BLOCKS
SAF 8 SAFS PILLOW BLOCKS
400698s
timsil9Asaan.*
I
2BdtEase
Houains(Sm
I
I I I
u2420
1
422l34 42207 42212
122124
zii
2
M3369lwm642ml 1 IWM6t
Mm2
2 M2243 M2224 M22? n2m Mm
1
641967 M2333 64231
I42316
x1174
1
642613 ml4 M23lf IW311 I41110
1
419167 419l66 419lB
119la5 W6l
1
419180 419161 41918
I19163 I19150
N6KlS
-
OfPert
&,
4% 5 5% 57/w
5Vle 6
-
-
49dtBaae
HCUitl9& 3Uil.*
1 M4w46ua?4M4mM4Ml
1 IMO43 MM9
4902bae
HarsineWS)
5 I n246-9
1
izz
iziz
I Iworn
w2671
.&
b@xj
1 j IEt z
1
5 I 41127 w1126
6 I
41667 w1667
1 119172 119172
Nan6
OfPall
49029asa
- -
1 42264342ml
SealRing 2
VW&l
2 422547 642241
NorcExpspeca
1
Adapterleeve 1
NUIA 1
427639
641073 641073
1
4zzws
419179$419179$
- -
Housin g assembly consists of cap. base, roll pins, bolts, nuts and spacers.
Lccking plate used instead of lo&washer (not shown ).
Two
required for thess sizes.
@ml 42all3
MaBt 012082
342231 642232
341177 641165
341116 Ml119
160906 64liJ7l
ll9166 419l62
422u.Y 42m
v_ p12oA
M2246 642&l
M1161* 641161
042329 Ml679
Ml674 641674
419177~419l77
424%
044234
22oBcim7
42056Mm57
42229042m
41176
641173
41113
641114
6Q9934Rm
19164
419166
7th 7
44237
642477
2262942m9
42081
642676
w&Bwm
ill63 Ml10
w46
641137
41669
Mlo66)
19176
419178
I41172
I41169
6%
-
119176 119176
5