Doing Business withKaman Integrated Structures & Metallics
Kaman Aerosystems
For more than 50 years, Kaman Integrated Structures & Metallics (KISM) has provided total aerostructures solutions, from composite and metallic detail parts to fully integrated assemblies for civilian and military aerospace applications.
2
Purchasing Documentation
KISM purchase orders should contain the following:• Kaman assigned supplier code and name• Billing and shipping addresses• Kaman purchasing contact information• Item number
• Part number, quantity, price, and shipping date• Vendor Instruction (VI) by revision found near the end of the Item Number Description
• Project number• Supplement number listed above purchase order number• Purchase order number
3
Purchasing Documentation
4
1
2
3
4 4a 4a 4a
4a
5
6
4b
67
EXAMPLE ONLY
Product Configuration/Process Control
Vendor Instruction
• Issues for each part number and controlled by revision• General contents as applicable per part and program
• Engineering data, including configuration revisions• Model Base Definition (MBD), as required• Applicable ECs• Special instructions• Tools required, as applicable• Quality requirements• KISM SQRM and link
5
Controlled Processes & Customer Approved Process Suppliers
Suppliers are responsible for sub-tier supplier control.
• Verify current approval status from the appropriate customer approval list, as required. Approval list(s) will be provided by KISM, as needed.
• Using customer-approved sources does not relieve supplier of sub-tier’s performance or product performance.
• Refer to Kaman’s SQRM as needed for quality requirements.
6
AS9102 First Article Inspection Report (FAIR)
FAIR is imposed by KISM SQRM (SQ.M.01.SQRM)/Vendor Instruction (VI), AS9102
Supplier’s FAIR to comply with KISM SQ.M.01.SQRM• Latest released version of AS9102 document format (electronic format preferred
• All Boeing FAIRs will need to be completed in NetInspect (forms #1, 2, 3) and attach all applicable certifications
• Per KISM.SQ.M.01, a pre-production approval is required, unless waived
• Bubble drawings are required with FAIR package
• Black or blue ink is required for manual entries
• Unique FAIR requirements are listed on vendor instruction (VI)
• Complete document package required: PO, VI, B/P, certifications, etc.
• Final FAIR approval is granted by KISM Quality Inspection Group
7
Pre-production Approval Process (PPA)
• PPA checklist location: https://www.kaman.com/aerosystems/solutions/integrated-structures-metallics/suppliers
• https://www.kaman.com/sites/default/files/kism.sq_.f.01-pre-poduction-qualification-record-replaced-qF41-413.pdf
• Contract review is required per AS9100 and KISM.SQ.M.01.SQRM
8
Certificate of Compliance (C of C) Requirements
Identified in Supplier Quality Requirements Manual (SQRM)
9
• Part name• Part number• Quantity of parts• Signature/stamp• Title of signee• Date• Purchase order number
• Engineering blueprint and parts list revision• Serial number (when applicable)• Manufacturer• Lot code• Vendor instruction (VI) revision• Vendor processes and specifications with revision levels• Heat, melt, or lot number
CAUTION: Errors on Certificate of Compliance will affect your quality rating
Vendor Request for Variation (VRV) J198
• Submitted for defects found by the supplier
• Data is included in supplier quality rating
• MRB dispositions must be from approved design authority, flowed to supplier by Kaman
SUPPLIERS HAVE NO MRB AUTHORITY
• Form is available at https://www.kaman.com/sites/default/files/form-j198-instructions-fillable.pdf
10
Vendor Request for Variation
11
Where to get more information?
Contact your Kaman buyer or supplier quality rep for:• Required customer specifications, drawings, etc.• Vendor instruction (VI) documents• Purchase order issues• Submittal of VRB (MRB) documents• Shipping/delivery information• Tech help submittal
12