DOCUMENTASI TRUNK LINE 6 “ & GAS LINE 4 “ FROM SP-NNY TO PPP FIELD SANGASANGA 1 AREA SP-NONNY AREA LINE NONNY UNDERPASS 1 HOLYDAY TEST ROAD CROSSING LINE CLEARING

Upload: dzikry-haviedz

Post on 30-Jan-2016

229 views

Category:

Documents


0 download

DESCRIPTION

poto sangasanga

TRANSCRIPT

Page 1: DOK TR NNY KE PPP

DOCUMENTASI TRUNK LINE 6 “ & GAS LINE 4 “ FROM SP-NNY TO PPP FIELD SANGASANGA

1

AREA SP-NONNY

AREA LINE NONNY

UNDERPASS 1

HOLYDAY TEST

ROAD CROSSING

LINE CLEARING

Page 2: DOK TR NNY KE PPP

DOCUMENTASI TRUNK LINE 6 “ & GAS LINE 4 “ FROM SP-NNY TO PPP FIELD SANGASANGA

2

STRINGING PIPE

LINE 6” SECT 1 TO TANK SP-F2

SP-F2

AREA SECT 2 FROM PUMP SPU-F TO PPP

LINE SECT 2 FROM SPU-F TO PPP