d.o.o. Zenica

Solution for industrial furnace and process

ABOUT COMPANY

A company d o o Zenicatermomatik . . . was established in 1987. as a privateenterprise with an unlimited liability. A company from its establishment is engagedin engineering, manufacturing and installation of industrail furnaces and industrialautomation. The initial placement of products and services mainly related to thecustomers within the BiH.

Develoment of market sales caused intensive investment in equipment andfacilities as well as human resources of the company.

Development of resources of the company enabled the carrying out engineeringwork and for the foreign market from which we can emphasize engineering ofindustrial furnaces and automation, software for programmable machines( 5 and 7, its own system based on microcontroller),Siemens SIMATIC S Sengineering in the field of refractory and refractory lining as well as thedevelopment and manufacture of electronic equipment and steel constructionaccording to the order for their own purposes.

Today company employs highly professional staff of different types specializedfor industrial furnaces, automation, measurement and control, and refractory andcollaborate with leading domestic and foreign companies.

A company is trying to adjust to current standards of quality and environmentmanagement to ensure preconditions for the further development of the marketsales.

Business alignment to the standards of quality and environment in the field ofdevelopment of manufacture and sales of technological equipment and machineryas well as continuosly training of human resources in the application of methodsof quality and environmental protection are guarantee for the successfulpositioning of the company in the future.

Products and markets

We have not had trouble with suppliers in the purpose of performing our services,and environment analysis indicates that this trend will continue in the comingyears in business. Good business relations with suppliers and their concerns forquality is certainly facilitate the realization of our vision, mission and strategic andbusiness objectives. The company currently works with 60 users who are loyal tothe founding company. In the market we are recognized for quality, experienceand good business cooperation.

3

4

MANAGEMENT PROCESSES

M A N A G E M E N T P R O C E S S E S

M A I N P R O C E S S E S

S U P P O R T E D P R O C E S S E S

INTERNAL

AUDIT

MAINTENANCE

CONTROL

MEASURING CUSTOMER

SATISFACTION

PROCUREME

NT

CORRECTIVE AND

PREVENTIVE MEASURES

PROVIDING RESOURCES

CONTINUOUS

IMPROVEMENT

PROIZVODNJA IUGRADNJA AL

STOLARIJE

MARKET

RESEARCH

TECHNOLOGY

DEVELOPMENT, MANUFACTURE AND SALES OF

INDUSTRIAL,TECHNOLOGICAL AND EQUIPMENT FOR

ENVIRONMENTAL PROTECTION, AS WELL AS ELEKTRICAL,

MECHANICAL AND REFRACTORY SERVICES

ASSEMBLY

5

QUALITY POLICY AND ENVIRONMENTAL MANAGEMENT

Quality policy and environmental management is defined, documented andimplemented in the company Zenica on the following principles:termomatik

- Our moto is: “A satisfied client is what we aspire to and we are recognizedby the quality“;

- Our customers are in the central point of overall relations and activities, we wantto meet their requirements and exceed expectations;

- We strive to ensure the rights and environmentally friendly product with the rightprice and that he finds the right time on the market;

- We establish partnerships with our suppliers based on a fair basis in the purposeof long-term business cooperation, mutually beneficial, including the requirementsof environmental management system;

- company undertakes to persue the fulfillment of all requirementstermomatik

of quality management and environment policy (policy which corresponds to thenature, extent and impacts on the environment), and be responsible for their ownactivities, products and services in all phases of the business process, therebypreventing pollution of the environment;

- We provide continuous control of the complement system, quality andenvironmental management, and training and employees motivation;

- We will take care of the conserve of natural resources and will reduce energyconsumption;

- We ensure the satisfaction of the interests of all stakeholders (customers,owners, employees, suppliers, communities) including complying of theobligation with applicable legal and other requirements that the organizationhas signed in relation to its environmental aspects;

- With preventive and remedial measure we prevent repetition of mistakes andthe formation of new faults;

- Constantly provide a favorable environment for establishing and reviewing setgoals of quality and environment in which environmental policy is framework forpermanent installation and monitoring of the operational framework andenvironmental goals;

- We provide passing, understanding and achievement of quality policy andenvironmental in entire company;

- Periodically (at least annully) reviewing the adequacy of the quality policy andenvironmental as well as effectiveness of applied measures, within questioningof the quality system and environmental management by the top managementto the board for the quality and the environment.

Quality policy and environment is defined on the basis of experience from theprevious period and suggestions of carrier of business functions and agreed onthe level of the top management in accordance with vision and strategy of thecompany.

All employees are familiar with the quality policy and the environment throughdirect supervisors, and the same is placed on the visible places in the company,website as well as on the advertising materials of the company, includingimmediate comunity.Constantly analyzing and redefining policies and goals of the qualiy andenvironmental management provide the conditions for the continuousimprovement of quality and environmental management, and preventionand reduction of environmental pollution.

6

General

Manager

PRKAdvisor

Manager for electricaldepartment

Manager for mechanicaldepartment

department

Human ResourceManager

ProcurementEngineering

Manufacture

Engineering

Manufacture

Sales

PROTechnicalManager

Training

Administration andlegal

Finance andaccounting

Assembly /disassembly Assembly /

disassembly

MaintenanceMaintenance

FUNCTIONAL ORGANISATIONAL CHART

7

CONTACT PERSONS:

Faruk Babić [email protected](Manager)

Electrotechnical works:

Damir Hadžiđulbić [email protected]

Mechanical works:

Saud Beganović [email protected]

Measuring and regulation:

Laris Babić [email protected]

BASIC ACTIVITIES

ENGINEERING

- Industrial furnaces and automation- Defining project tasksof the- ing -technicalScreen of thermo characteristics- Optimization- Copyright monitoring

PROJECT ENGINEERING

- Heating technique- Steel constructions- Mechanical engineering- Hydraulics- Automation- Measurements and controls

PROGRAMMING SUPPORT FOR PROGRAMMABLE AUTOMATION

- Siemens SIMATIC S5, S7, PCS7 and WinCC

DEVELOPMENT AND PRODUCTION

- Development of electronic devices for own needs- Development of electronic devices on the basis of order- Low-serial production of advanced electronic devices- Low-serial production furnaces for heat treatment of plastic,heat treatment of metals and melting of non-ferrous metal

REALIZATION OF INVESTMENT PROJECTS IN THECOUNTRY AND ABROAD

- ,Industrial automation- Measurements and control,- Refractory lining

REPRESENTATIVE FOR FOREIGN COMPANIES

- Furnaces, industrial automation and devices for measuring and control(SIEMENS; KROMSCHRODER)

8

REFERENCE LIST - ELECTRICAL WORKS

Reconstruction and modernization of lime , 1997/1998shaft kilnInvestor: KALUN, Drniš, CroatiaSubcontractor to “Pomak” company, SplitValue: 25.000 €

E basic- laboration of the projectInstallation-

- Commissioning

F spark plugsurnace for , 1998Investor: ENKER, Tešanj, B&H

Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Proving guaranteed parameters

LV project of overheads ports and external lighting, 1998Investor: USAID for JP “VODOVOD” Zenica, B&H

- Partially engineering- Delivery of equipment- Installation- Commissioning

Measuring station Vitez with telemetry and visualisation, 1999in the dispatch centre in Zenica

Investor: USAID for JP “VODOVOD” Zenica, B&HValue: 56.000 BAM (approx. 28.632 €)

- Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters

9

Annealing 40 tfurnaceILIJAInvestor: Steel factory “ , B&HŠ” Ilijaš

10

Tunnel furnace No. 1, 1999Investor: ENKER Tešanj, B&HValue: 33.000 BAM (approx. 16.873 €)

- Modernisation of equipment for measuring and control- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters

Mud thickener, 1999Investor: USAID for JP “VODOVOD” Zenica, B&HSubcontractor to “Metalno” company, Zenica

- Delivery of equipmentnstallation- I

- Commissioning

Construction of furnace for galvanisation, 1999Investor: KALIM, Jelah, B&H

- Engineeringelivery of equipment- D

nstallation- I- Commissioning- Optimisation

Reconstruction , 1999of the Annealing Furnace 40tInvestor: Steel factory “ Š” Ilijaš, B&HILIJAValue: 64.000 BAM (approx. 32.723 €)

- Delivery of equipment- Installation- Commissioning- Detection parameters

Pump station Guča Gora, construction of water supplyInvestor: USAID for Municipality Travnik, B&H

- EngineeringDelivery of equipment-

- Work performance on construction of water supplies,pump station and water route

11

Reconstruction o furnacef control offor heat treatment of plates

VOEST-ALPINE Linz, AustriaInvestor: ,12

R oneconstruction of the heating and automation the furnace for enameling, 1999Investor: , B&HHELIOS, BanovićiValue: .000 BAM (approx. . €)18 9 203

Reconstruction and modernisation of the automaticcontrol of atomizer, 2000Investor: ENKER, Tešanj, B&H

- Designing- Delivery of equipment- Work performace

Equipment for construction of exhausted ladles,2000Reconstruction of the automatic control,

Investor: , , B&HVOLKSWAGEN VogošćaValue: .000 BAM (approx. . €)74 37 836

- Engineering- Delivery of equipment- Installation

F , 2000urnace for thermal treatment of “MACRALON” V=500lInvestor: TRZ HADŽIĆI, Hadžići, B&HValue: 8.000 BAM (approx. 4.090 €)

- Designing- Engineering- Construction

Automation and reconstruction of Annealing furnace K-9 (60 t), 2001Investor: “ ” , B&HBH STEEL - Steel factory ZENICA ZenicaValue: 2 . BAM (approx. 1 . €)98 813 52 780

More then 90 % of furnace is completely new !

- Project of measuring, regulation and electro motor drive- Delivery of equipment- nstallationI- Engineering- Delivery of application software for PLC and OP- Commissioning

Detection of parameters-- Copyright supervision- Delivery manuals for handling and maintenance

13

T gubular reactor for testin combustion-characteristics of bio mass and coal

Investor: Faculty of MechanicalSarajevoEngineering, , B&H14

Tunnel furnace No. , 12 200Investor: ENKER Tešanj, B&HValue: 33. 00 BAM (approx. 1 . €)6 7 179

- Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Optimisation- Proving of guaraneed parameters

Automation and reconstruction of Annealing furnaceŽ-25-B 10 /2002( 0 t), 2001Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)521 329 266 551

More then 90 % of furnace is completely new !

- Project of measuring, regulation and electro motor drive- Delivery of equipment- nstallationI- Engineering- Delivery of application software for PLC and OP- Copyrights- Commissioning- Proving of guaranteed parameters- Delivery manuals for handling and maintenance

Reconstruction of automation of Annealingfurnace Ž-30-B (100 t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)67 950 34 742

- Designing- Delivery of equipment- Engineering- Installation- Commissioning

Furnaces H-60 (60 t) and H-100(100t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: .3 BAM (approx. . €)99 30 50 786

Reconstruction of automatic controls on furnaces H-60 and H-100- Designing- Delivery of equipment- nstallationI- Engineering- Commissioning

15

Press 10/2,5 MN and srespective manipulatorUNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

16

Reconstruction of PLC equipment, sensors and hydraulic valvesof press SMS 25/31,5 MN and 5 MN manipulator of 250 kNDANGO&DIENNENTHALL in the Blacksmith department, 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)1.154.000 590 030

- Designing- Delivery of equipment- Engineering- Upgrade from SIMATIC S5-150 to S7-400- nstallationI- Commissioning- Parameters detection

R siloseconstruction and automation of transportedsystem in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)166.411,00 85.085,00

- Designing- Delivery of equipment- nstallationI- Engineering- Commissioning

Automation and reconstruction of steamgeneration facilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)83.182,00 42.530,00

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Automation and reconstruction of Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)435.492,00 222.664,00

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

17

Press «Ivo Lola Ribar»Investor: , V , B&HPRETIS NIS ogošća-Sarajevo

18

Automation and reconstruction of oil supply plantfacilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)21.000,00 10.737,00

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Automation and reconstruction of filtering intoprocessvinterisatio facilities in Oil rafinery, 2003n

Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)22.402,00 11.454,00

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Clean water supply system, 2004Investor: , B&HBOSNALIJEK, SarajevoValue: 10.500,00 BAM (approx. 5.369,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Cable factory –Testing device for breakdown voltage 4, 200KAPIS TKT, TomislavgradInvestor: , B&H

Value: BAM (approx. €)16.032,00 8.197,00

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Reconstruction o combustion, measurementf the equipment forand regulation in the furnace for normalisation of propane-butanebottles, 2004

,Investor: ,ĐURO ĐAKOVIĆ Slavonski brod CroatiaValue: €26.800,00

- Delivery of equipment- Engineering- Commissioning

19

Furnace for testing fire-resistant materialInvestor: , B&HPROTUPOŽARNI INSTITUT Sarajevo,

20

21

Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

Refrigeration factory - filling machine for PUR-foam, 2004Investor: ” - refrigeration factory, Bihać, B&H“BIRA

- Delivery of equipment- Installation- Commissioning

, 200Reconstruction of automation on milling machine 4Investor: Steel factory Š” IlijašILIJA“ , B&H

- Designing- Delivery of equipment- Installation- Commissioning

Reconstruction on furnace for thermal treatmentof controlssheetof s 4, 200

VOEST-ALPINE Linz, AustriaInvestor: ,Value: €190.000,00

- Designing- Delivery of equipment- nstallationI- Commissioning- Parameters detection

Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H

Value: BAM (approx. €)25.500,00 13.038,00

- Designing- Delivery of equipment- Engineering- Installation- Parameters detection

Friction press,Investor: , B&HPIROMETAL Brčko

22

23

Heating furnace BH STEEL, 2004UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

- Delivery of burner equipment- Installation- P of furnaceroject regulation and keeping the- Commissioning- Parameters detection

Maintenance of electro-resistant in annealing furnace 4, 200IGMAN, Konjic BInvestor: , &H

Value: €15.500,00 BAM (approx. 7.925,00 )

- Construction and delivery of heaters(made from KANTHAL A-1)

- Installation of the heaters

General r 5 in Maintenanceepair o electro-resistant furnaces nDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection2 ,2004/2005Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. €)53.750,00 27.481,00

- Construction and delivery (made KANTHAL A-1)of heaters from- Installation of material and equipment- Project of control of maintenance of atmosphere protection- Commissioning

Press 10/2,5 MN and s 5respective manipulator , 200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

Reconstruction of PLC equipment, sensors and hydraulic valves of press- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Heating furnace 1000kg/h, 5200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

- ingDesign- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Steel Plant - Station for tundish heatingInvestor: , , B&HARCELORMITTAL Zenica

24

25

Remote control steam starting block 7for of “ ” in ThermalPower Plant Kakanj, 2005Investor: JP “ELKROPRIVREDA BIH”, Sarajevo, B&H

C P 5oncrete lant, 200,Investor: , B&HINGRUP Donji Vakuf

Value: BAM (approx. €)36.900,00 18.867,00

- Automation engineering- Delivery of equipment- Installation- Commissioning

Automatically controlled tubular reactor for testing- 5combustion characteristics of bio mass and coal, 200

aculty of Mechanical Engineering,Investor: , B&HF SarajevoValue: BAM (approx. €)35.000,00 17.895,00

- Designing- fDelivery o equipment- Engineering- Installation- Commissioning- Parameters detection

F 2005urnace for melting non-ferrous metals 25l/6.3kW,Investor: , B&HUNIVERZAL PROGRES, VisokoValue: BAM (approx. €)6.000,00 3.068,00

- Designing- Construction- Commissioning

Laboratory furnace 20l/8kW, 5200,Investor: , B&HTMD Gradačac

Value: BAM (approx. €)4.000,00 2.045,00

- ingDesign- Construction

A , 2005nnealing chamber furnaceInvestor: HES-HENNINGSDORF, GermanyHenningsdorf,

- Designing- WinCC SCADA system- Delivery of equipment- Installation- Commissioning

Sugar factory“STUDEN-AGRANA”, BrčkoInvestor: , B&H

26

27

C P 5oncrete lant - Reconstruction, 200,Investor: , B&HINGRUP Donji Vakuf

- Engineering- Delivery of equipment- Installation- Commissioning

Recontruction and automation of level measuringin Oil factory 5, 200Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)15.486,00 7.917,00

- Designing- Delivery of ultrasonic sensors- Installation- Commissioning

F , 200urnace for melting non-ferrous metals 30,6l/6,3kW 6Investor: UNIVERZAL PROGRES, Visoko, B&H

- Designing- Construction- Engineering

F , 200urnace for melting non-ferrous metals 180l/14kW 6Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)11.000,00 5.625,00

- Designing- Construction- Engineering

R 200econstruction and automation of hydrogenation drives, 6ADIDA TunisInvestor: J ,

Value:51.680,00 €

- Designing- Delivery of equipment- Engineering- Installation- Commisioning

Chamber for baking varnish 6, 200S-PRETIS NIS ogo a-SarajevoInvestor: , B&HUNI , V šć

Value: BAM (approx. €)35.000,00 17.895,00

- Designing- Engineering- Installation- Commissioning

Coke Oven Battery Plant - Biologicalwaste water treatmentI ARCELORMITTAL Zenicanvestor: , , B&H28

29

Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&HZenica

- ingDesign- Installation- Engineering- Commissioning

Peeling facility in Oil factory, 6200,Investor: , B&HBIMAL d.d Brčko

Value: BAM (approx. €)212.704,00 108.753,00

- ingDesign- Engineering- Installation- Commissioning- Parameters detection

Cable factory, Extruder 2,5", 2006Investor: , B&HKAPIS TKT Tomislavgrad,Value: BAM (approx. €)79.564,00 40.680,00

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Cable factory, Machine for rough drag-out of copper, 2007Investor: , B&HKAPIS-TKT Tomislavgrad,Value: BAM (approx. €)350.000,00 178.952

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Press «Ivo Lola Ribar» 7, 200Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)75 38 347.000,00 . ,00

- Designing- Engineering- Installation- Commissioning

Mobile stations for a heating of caldronsMetalska industrija Varaždin-MIV,Investor:Varaždin, Croatia30

31

“ “ 200Emcotest machine for measuring hardness 7,Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)130 66 468.000,00 . ,00

- Designing- Engineering- Installation- Commissioning

Pellet dryer Machine 2007,Investor: , B&HFIS, VitezValue: BAM (approx. €)111.000,00 56.753,00

- Designing- Engineering- Installation- Commissioning

Automatic foundry for vehicles parts 8, 200Investor: , B&H“CIMOS”, Zenica

4.000.000,00 2.045.167,00Value: BAM (approx. €)

- ingDesign- Engineering- Installation- Electro equipment and automation- Commissioning

Friction press, 8200,Investor: , B&HPIROMETAL Brčko

Value: BAM (approx. €)400.000,00 204.517,00

- ingDesign- Engineering- Installation- Commissioning

Furnace for thermal treatment VPP, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)296.000,00 151.342,00

- Designing- Delivery of equipment- Engineering- Installation- Commissioning

Coke Oven Plant Plant forBattery -naphtalene and ammoniaInvestor: , , B&HARCELORMITTAL Zenica32

33

Furnace for testing fire-resistant material, 2008Investor: , B&HPROTUPOŽARNI INSTITUT Sarajevo,Value: BAM (approx. €)606.000,00 309.843,00

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Drying furnace 8, 200,Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&H

Value: €100.000,00 KM (approx. 51.129,00 )

- Designing- engineering- Installation- Commissioning

Steel Plant - Station for tundish heating 1,44 MW 8, 200Investor: , , B&HARCELORMITTAL ZenicaValue: BAM (approx. €)50 25.565.000,00 ,00

- Designing- Engineering- Installation- Commissioning

Coke Oven Plant-Plant for naphtalene and ammonia 200Battery 8,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. 1.0 €00.000,00

- Designing- Engineering- Installation- Automation- Commissioning

Coke Oven Battery Plant-Biological waste water treatment 2008,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. €750.000,00

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Automatic foundry for car partsInvestor: , B&H“CIMOS”, Zenica

34

35

Sugar factory 8, 200Investor: , B&H“STUDEN-AGRANA”, Brčko

2.430.000,00 1.242.439,00Value: BAM (approx. €)

- ingDesign- Installation- Electro equipment and automation- Commissioning- Parameters detection

Plant for the production of briquette, 2008“BRIGO-INVEST”, BanovićiInvestor: , B&H

40.000,00 20.00,00Value: BAM (approx. €)

- ingDesign- Engineering- Installation- Delivery of equipment- Commissioning

Furnaces for testing the resistance of materials, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)397.000,00 202.983,00

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Induction melter furnaces 8, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €59.840,00

- Designing- Engineering- Installation- Commissioning

Mobile stations for a heating of caldrons 8/2009, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €29 35. 0,00

- Designing- Engineering- Installation- Commissioning

Retrofit f milling machineo«WANDERER VC200»

36

37

Sugar factory, Boiler house 8/2009, 200Investor: , , B&HSTUDEN-AGRANA BrčkoValue: BAM (approx. €)175 89.476.000,00 ,00

- Designing- Engineering- Installation- Automation- Commissioning

Electro works in CIMOS - II phase 2009,Investor: , , B&HCIMOS ZenicaValue: BAM (approx. €)754 385.514,.000,00 00

- Designing- Engineering- Delivery of equipment- Automation- Installation- Commissioning

Protection of tanks from overloading 2009,Investor: , B&H“BIMAL”, Brčko

42.000,00 21.474,00Value: BAM (approx. €)

- ingDesign- Engineering- Installation- Electro equipment and automation- Commissioning- Parameters detection

CIMOS - substation, 9200,Investor: , B&HCIMOS Zenica

Value: BAM (approx. €)668.000,00 341.543,00

- ingDesign- Engineering- Installation- Commissioning

Cable factory, Extruders 4,5", 2009Investor: , B&HKAPIS TKT Tomislavgrad,Value: BAM (approx. €)210.000,00 107.371,00

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

General overhaul of machine forremoving slag, ArcelorMittal Zenica

38

39

Re-circulation system of technological water, 2009Investor: , B&HCement Plant Kakanj,Value: BAM (approx. €)78.300,00 40.034,00

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Machine for wire twisting „CIGARA” 2009,,Investor: , B&HKAPIS TKT Tomislavgrad

Value: €55.000,00 BAM (approx. 28.121,00 )

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

EMP drives and temp. measurements on 8 cells of silo, 2009/2010Investor: , B&H“BIMAL”, Brčko

78.375,00 40.073,00Value: BAM (approx. €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Dedusting of iron mixer on Steel Plant Department, 2010Investor: , B&H“ArcelorMittal”, Zenica

.000,00Value: approx. 60 €

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010Investor: , B&H“ArcelorMittal”, Zenica

46.323,00Value: €

- Designing- Delivery of equipment- Installation- Commissioning

Installation of hydraulic and pneumatic valves,fitting pipes and hoses, electric worksFAGOR, SPAIN40

41

Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010Investor: , FYR Macedonia“ArcelorMittal”, Skopje

109.667,00Value: €

- Designing- Delivery of equipment- Installation- Commissioning- Parameters detection

General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,

ZD Rudnici “Kreka” d.o.. TuzlaValue: 4.450.000,00 BAM (approx. 2.275.249,00 €)

- Electrical designing and engineering based on Siemens equipment,- Video surveillance,- Lighting,- Installation,- Delivery of equipment,- Commissioning- Parameters detection

Expansion of compressor station in BOF Steel Mill, 2011Investor: , B&H“ArcelorMittal”, Zenica

150.360,00Value: BAM (approx. 76.877,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011Investor: , B&H“NT FORGING”, Novi Travnik

82.720,00Value: BAM (approx. 42.294,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

Reconstruction and automation of AnnealingFurnace Ž-25B in ArcelorMittal Zenica

42

43

Reconstruction of furnace for thermal treatment, 2011Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

System for measuring temperature inside the flowingtunnel furnace BTU, 2011Investor: SELK, Kutina, CroatiaValue: approx. 20.000,00 €

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Delivery and commissioning of the communication and controlequipment in the HE Rama, 2011Subcontractor to “COMEL” SarajevoValue: 37.200,00 BAM (approx. 19.020,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

Electrical design –electrical installations and automation controlof Depo 1, TE Tuzla, 2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,

Power Plant TuzlaValue: 23.000 €

- Designing of automation, video surveillance, monitoringand control based on Siemens Simatic S7

44

General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac

45

Chamber furnace EUSKAL Sestao SPAIN, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €53 637

- Supply and delivery of equipment- Installation work- Software and Programming- Initial test run- Detection parameters and commissioning

Gas furnace Magdeburg Germany, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €16 970

- Installation work- Software and Programming- Initial test run- Detection parameters and commissioning

Delivery control cabinet, EGYPT, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €13 809

- Supply and delivery of equipment- Installation work

Cabinet of compensation 300 kVAr, JELAH-TEŠANJ BIH, 2012thI «Prevent FAD» d.d. Jelah-Tešanj, BiHnvestor:Value: ,00 €52.776 BAM (approx. 27.064,00 )

- Designing- Supply and delivery of equipment- Installation work

Training design and engineering for the establishment phase, SUDAN 2012th

Investor: University of Science and Technology SudanResearch Center for MaterialsContract value € 179,200.00

Delivery of laboratory furnaces, presses and manipulators, SUDAN 2013thInvestor: University of Science and Technology SudanResearch Center for MaterialsContract value € 420.000,00

- Designing- Supply and delivery of equipment- Installation work

General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac

46

47

Delivering cabinet of electrical furnace GERMANY 2013thInvestor: TST GermanyContract value € 74.130,00

- Design- Supply and delivery of equipment- Installation work

Hopper level trolley with screw dispenser ZENICA BIH 2013thSubcontractor: John M. Henderson & Co.. Ltd., United KingdomInvestor: ArcelorMittal Zenica d.o.o.Contract value € 146,519.00

- Design- Supply and delivery of equipment- Software and Programming- Installation work- Initial test run- Detection parameters and commissioning

Project of reconstruction and upgrade 35 MN presses,Helwan CAIRO-EGYPT 2013thInvestor: Helwan CO., LTD. FOR NON-ferrous INDUSTRIESContract value: € 1,168,127.00

- Design- Supply and delivery of equipment- Software and Programming- Installation work- Initial test run- Detection parameters and commissioning

F forurnace galvanizing sheetSkopje, Macedoniain ArcelorMittal

48

49

REFERENCE LIST - MECHANICAL WORKS

F spark plugsurnace for , 1998Investor: ENKER, Tešanj, B&H

Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Parameters detection

Mud thickener, 1999Investor: USAID for JP “VODOVOD” Zenica, B&HSubcontractor to “Metalno” company, Zenica

- Delivery of equipmentnstallation- I

- Commissioning

Construction of furnace for galvanisation, 1999Investor: KALIM, Jelah, B&H

- Engineeringelivery of equipment- D

nstallation- I- Commissioning- Optimisation

Reconstruction , 1999of the Annealing Furnace 40tInvestor: Steel factory “ Š” Ilijaš, B&HILIJA

Reapir- Delivery of equipment- Installation- Commissioning- Detection parameters

Reconstruction of boiler room and hot water network, 1999Investor: USAID for Primary school “GOJEVIĆI”, Municipality Fojnica, B&H

- Engineeringivery of equipment- Del

- Works

Beaching area in ArcelorMittal ZenicaSpill transport system for ladle

50

51

Pump station Guča Gora, construction of water supply, 1999Investor: USAID for Municipality Travnik, B&H

- EngineeringDelivery of equipment-

- Work performance on construction of water supplies,pump station and water route

Reconstruction of the heating on the furnace for enameling, 1999Investor: , B&HHELIOS, Banovići

F , 2000urnace for thermal treatment of “MACRALON” V=500lInvestor: TRZ HADŽIĆI, Hadžići, B&H

Pump station „KOSTRČ“, Water supply, 2000Investor: Orašje Municipality, Orašje, B&H

Automation and reconstruction of Annealing furnace K-9 (60 t), 2001Investor: “ ” , B&HBH STEEL - Steel factory ZENICA ZenicaValue: 2 . BAM (approx. 1 . €)98 813 52 780

More then 90 % of furnace is completely new !

- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment

Automation and reconstruction of Annealing furnaceŽ-25-B 10 /2002( 0 t), 2001Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)521 329 266 551

More then 90 % of furnace is completely new !

- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment

Reconstruction of hydraulic valves of press SMS 25/31,5 MNand 5 MN manipulator of 250 kN DANGO&DIENNENTHALL inthe Blacksmith department, 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)1.154.000 590 030

- Delivery of equipment- Engineering- nstallationI- Commissioning

Upgrading of truck with mobile equipmentStation for testing of gas

52

53

Reconstruction of steam generation facilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)83.182,00 42.530,00

- Delivery of equipment- Installation- Engineering- Commissioning

Reconstruction of facilities in Oil rafinery, 2003oil supply plantInvestor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)21.000,00 10.737,00

- Delivery of equipment- Installation- Engineering- Commissioning

Reconstruction o combustion, measurementf the equipment forand regulation in the furnace for normalisation of propane-butanebottles, 2004

,Investor: ,ĐURO ĐAKOVIĆ Slavonski brod CroatiaValue: €26.800,00

- Delivery of equipment- Engineering- Welded vessels- Commissioning

Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

Refrigeration factory - filling machine for PUR-foam, 2004Investor: ” - refrigeration factory, Bihać, B&H“BIRA

- Delivery of equipment for filling machine- Installation- Commissioning

54

Administrative office and workshop

55

R , 200econstruction furnace for thermal treatment of s 4of sheetVOEST-ALPINE Linz, AustriaInvestor: ,

Value: €190.000,00

- Delivery of equipment- nstallationI- Commissioning- Parameters detection

Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H

Value: BAM (approx. €)25.500,00 13.038,00

- Designing- Delivery of equipment- Engineering- Installation- Parameters detection

Heating furnace BH STEEL, 2004UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

- Delivery of burner equipment- Installation- P of furnaceroject regulation and keeping the- Commissioning- Parameters detection

Maintenance of electro-resistant in annealing furnace 4, 200IGMAN, Konjic BInvestor: , &H

Value: €15.500,00 BAM (approx. 7.925,00 )

- Construction and delivery of heaters(made from KANTHAL A-1)

- Installation of the heaters

Press 10/2,5 MN and s 5respective manipulator , 200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

Reconstruction of hydraulic valves of press- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Steam drying plant for drying of sampledmaterial such as pellets, sand, dust, etc.

56

57

Heating furnace 1000kg/h, 5200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo

- ingDesign- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H

Value: BAM (approx. €)25.500,00 13.038,00

- Designing- Delivery of equipment- Engineering- Installation- Parameters detection

Automatically controlled tubular reactor for testing- 5combustion characteristics of bio mass and coal, 200

aculty of Mechanical Engineering,Investor: , B&HF SarajevoValue: BAM (approx. €)35.000,00 17.895,00

- Designing- fDelivery o equipment- Engineering- Installation- Commissioning- Parameters detection

Laboratory furnace 20l/8kW, 5200,Investor: , B&HTMD Gradačac

Value: BAM (approx. €)4.000,00 2.045,00

- Engineering- Installation- Commissioning

F , 200urnace for melting non-ferrous metals 30,6l/6,3kW 6Investor: UNIVERZAL PROGRES, Visoko, B&H

- Engineering- Construction- Commissioning

58

Deduster in foundry for car partsInvestor: , B&H“CIMOS”, Zenica

59

F , 200urnace for melting non-ferrous metals 180l/14kW 6Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)11.000,00 5.625,00

- Engineering- Installation- Commissioning

Chamber for baking varnish 6, 200S-PRETIS NIS ogo a-SarajevoInvestor: , B&HUNI , V šć

Value: BAM (approx. €)35.000,00 17.895,00

- Engineering- Installation- Commissioning

Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&HZenica

- Installation- Engineering- Commissioning

Press «Ivo Lola Ribar» 7, 200Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)75 38 347.000,00 . ,00

- Engineering- Installation- Commissioning

“ “ 200Emcotest machine for measuring hardness 7,Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)130 66 468.000,00 . ,00

- Engineering- Installation- Commissioning

Pellet dryer Machine 2007,Investor: , B&HFIS, VitezValue: BAM (approx. €)111.000,00 56.753,00

- Engineering- Installation- Commissioning

Lubrication DC motor driveCustomer: NESMA Co. Saudi Arabia,for porpose of ARAMCO Co.60

61

Friction press, 8200,Investor: , B&HPIROMETAL Brčko

Value: BAM (approx. €)400.000,00 204.517,00

- Engineering- Installation- Commissioning

Furnace for thermal treatment VPP, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)296.000,00 151.342,00

- Engineering- Installation- Commissioning

Furnace for testing fire-resistant material, 2008Investor: , B&HPROTUPOŽARNI INSTITUT Sarajevo,Value: BAM (approx. €)606.000,00 309.843,00

- Engineering- Installation- Commissioning

Drying furnace 8, 200,Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&H

Value: €100.000,00 KM (approx. 51.129,00 )

- engineering- Installation- Commissioning

Steel Plant - Station for tundish heating 1,44 MW 8, 200Investor: , , B&HARCELORMITTAL ZenicaValue: BAM (approx. €)50 25.565.000,00 ,00

- Engineering- Installation- Commissioning

Coke Oven Battery Plant-Biological waste water treatment 2008,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. €750.000,00

- EngineeringInstallation-

- Commissioning

Bag filters for dedusting of exhaust gas insugary rafinary «STUDEN-AGRANA» Brčko, B&H

62

63

Furnaces for testing the resistance of materials, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)397.000,00 202.983,00

- Engineering- Delivery of equipment- Installation- Commissioning

Induction melter furnaces 8, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €59.840,00

- Engineering- Installation- Commissioning

Mobile stations for a heating of caldrons 8/2009, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €29 35. 0,00

- Engineering- Installation- Commissioning

Equipment for preserving of temperature of liquid metal inmixer in Steel Mill Department – “ArcelorMittal Zenica”, 2009Investor: ARCELORMITTAL Zenica, , B&HValue: approx. €70.636,00

- Dismantling of existing equipment- Delivery- Installation and supervision- Trial work and parameterisation- Commissioning

Mechanical works in CIMOS - II phase 2009,Investor: , , B&HCIMOS ZenicaValue: BAM (approx. €)754 385.514,.000,00 00

- Engineering- Delivery of equipment

Installation-- Commissioning

Remount of rotary furnace, «IGMAN» Konjic

64

65

Re-circulation system of technological water, 2009Investor: , B&HCement Plant Kakanj,Value: BAM (approx. €)78.300,00 40.034,00

- Engineering- Delivery of equipment- Installation- Commissioning

Machine for wire twisting „CIGARA” 2009,,Investor: , B&HKAPIS TKT Tomislavgrad

Value: €55.000,00 BAM (approx. 28.121,00 )

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010Investor: , B&H“ArcelorMittal”, Zenica

46.323,00Value: €

- Designing- Delivery of equipment- Installation- Supervision- Commissioning

Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010Investor: , FYR Macedonia“ArcelorMittal”, Skopje

109.667,00Value: €

- Designing- Delivery of equipment- Installation- Supervision- Commissioning- Parameters detection

Upgrading of truck with mobile equipment,Station for testing of gas, 2010Investor: IVEX , B&H, Usora

71.000,00Value: BAM (approx. 36.300,00 €)

- Engineering and attest technical documentation- Procurement and delivery of equipment- Installation- Trial work- Parameter detection

Coiling machine for cablesInvestor: KAPIS TKT, Tomislavgrad

66

67

Construction of the system for emergency oil evacuationTurbo unit of blocks 5. and 6. TE “KAKANJ” KAKANJ, 2010Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,

Power Plant Kakanj, , B&HValue: 94 BAM (approx. 48 €).716,00 .427,00

-Procurement and delivery of equipment-Installation and Supervision- Commissioning

General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,

ZD Rudnici “Kreka” d.o.. TuzlaValue: 4.450.000,00 BAM (approx. 2.275.249,00 €)

- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- CommissioningParameters detection and

Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011Investor: , B&H“NT FORGING”, Novi Travnik

82.720,00Value: BAM (approx. 42.294,00 €)

- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Commissioning

Expansion of compressor station in BOF Steel Mill, 2011Investor: , B&H“ArcelorMittal”, Zenica

150.360,00Value: BAM (approx. 76.877,00 €)

- Mechanical engineering- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning- Revision of project documentation

Reconstruction of furnace for thermal treatment, 2011Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)

- Engineering, control and running furnace- Procurement and delivery of equipment- Installation and Supervision- Trial work- Parameters detection and Commissioning

Hydraulic power unit of platform for converterlining in ArcelorMittal Zenica

68

69

Replacing the hydraulic system shutter Mostar BiH 2012thinitial discharge HE "Salakovac"Investor: JP "Elektroprivreda BiH" dd SarajevoContract value: 186,100.00 BAM 9 435(approx. 5. ,00 €)

- Dismantling of existing equipment- Supply and delivery of equipment- Installation and supervision of works- Initial test run

Supply, delivery and installation of the crusher in ArcelorMittal ZenicaZENICA BH 2012thSubcontractor: "Teikom BH" Ltd. SarajevoInvestor: "ArcelorMittal" ZenicaContract value 120.000,00 BAM 61 538(approx. . ,00 €)

- Mechanical Design- Supply and delivery of equipment- Installation work- Commissioning and test run parameter

Reconstruction of telescopic and rotary platforms in ArcelorMittal ZenicaZENICA BH 2012thInvestor: "ArcelorMittal" ZenicaContract value: 135,452.00 BAM 69 462(approx. . ,00 €)

- Mechanical Design- Supply and delivery of equipment- Installation work- Commissioning and test run parameter

Reconstruction of pipeline hydraulics in ArcelorMittal ZenicaZENICA BH 2012/2013.Investor: "ArcelorMittal" ZenicaContract value: 260,377.00 BAM 133 526(approx. . ,00 €)

- Dismantling of existing equipment- Supply and delivery of equipment- Installation and supervision of works- Initial test run

The inspection and repair of machines for displacement slag potswith transport ZENICA BH 2012/2013.Investor: "ArcelorMittal" ZenicaContract value: 23,776.00 BAM 12 192(approx. . ,00 €)

- Dismantling of existing equipment- Supply and delivery of equipment- Installation work- Initial test run

Furnace for thermal treatment VPPInvestor: NT FORGING, Novi Travnik

70

71

Delivery of laboratory furnaces, presses and manipulators, SUDAN 2013thInvestor: University of Science and Technology SudanResearch Center for MaterialsContract value € 420.000,00

- Designing- Supply and delivery of equipment- Installation work

Hopper level trolley with screw dispenser ZENICA BIH 2013thSubcontractor: John M. Henderson & Co.. Ltd., United KingdomInvestor: ArcelorMittal Zenica d.o.o.Contract value € 146,519.00

- Supply and delivery of equipment of hydraulics- Installation work- Initial test run- Detection parameters and commissioning

Project of reconstruction and upgrade 35 MN presses,Helwan CAIRO-EGYPT 2013thInvestor: Helwan CO., LTD. FOR NON-ferrous INDUSTRIESContract value: € 1,168,127.00

- Design- Supply and delivery of equipment- Installation work- Initial test run- Detection parameters and commissioning

© Copyright by termomatik

LOCATION OF COMPANY

Ltd Zenica

42, Juraja Neidharta Street

72000 Zenica, B&H

phone: +387 32 44 88 10 web site: www.termomatik.com

fax: +387 32 32 44 88 27 e-mail: [email protected]

termomatiktermomatik