ABOUT COMPANY
A company d o o Zenicatermomatik . . . was established in 1987. as a privateenterprise with an unlimited liability. A company from its establishment is engagedin engineering, manufacturing and installation of industrail furnaces and industrialautomation. The initial placement of products and services mainly related to thecustomers within the BiH.
Develoment of market sales caused intensive investment in equipment andfacilities as well as human resources of the company.
Development of resources of the company enabled the carrying out engineeringwork and for the foreign market from which we can emphasize engineering ofindustrial furnaces and automation, software for programmable machines( 5 and 7, its own system based on microcontroller),Siemens SIMATIC S Sengineering in the field of refractory and refractory lining as well as thedevelopment and manufacture of electronic equipment and steel constructionaccording to the order for their own purposes.
Today company employs highly professional staff of different types specializedfor industrial furnaces, automation, measurement and control, and refractory andcollaborate with leading domestic and foreign companies.
A company is trying to adjust to current standards of quality and environmentmanagement to ensure preconditions for the further development of the marketsales.
Business alignment to the standards of quality and environment in the field ofdevelopment of manufacture and sales of technological equipment and machineryas well as continuosly training of human resources in the application of methodsof quality and environmental protection are guarantee for the successfulpositioning of the company in the future.
Products and markets
We have not had trouble with suppliers in the purpose of performing our services,and environment analysis indicates that this trend will continue in the comingyears in business. Good business relations with suppliers and their concerns forquality is certainly facilitate the realization of our vision, mission and strategic andbusiness objectives. The company currently works with 60 users who are loyal tothe founding company. In the market we are recognized for quality, experienceand good business cooperation.
3
4
MANAGEMENT PROCESSES
M A N A G E M E N T P R O C E S S E S
M A I N P R O C E S S E S
S U P P O R T E D P R O C E S S E S
INTERNAL
AUDIT
MAINTENANCE
CONTROL
MEASURING CUSTOMER
SATISFACTION
PROCUREME
NT
CORRECTIVE AND
PREVENTIVE MEASURES
PROVIDING RESOURCES
CONTINUOUS
IMPROVEMENT
PROIZVODNJA IUGRADNJA AL
STOLARIJE
MARKET
RESEARCH
TECHNOLOGY
DEVELOPMENT, MANUFACTURE AND SALES OF
INDUSTRIAL,TECHNOLOGICAL AND EQUIPMENT FOR
ENVIRONMENTAL PROTECTION, AS WELL AS ELEKTRICAL,
MECHANICAL AND REFRACTORY SERVICES
ASSEMBLY
5
QUALITY POLICY AND ENVIRONMENTAL MANAGEMENT
Quality policy and environmental management is defined, documented andimplemented in the company Zenica on the following principles:termomatik
- Our moto is: “A satisfied client is what we aspire to and we are recognizedby the quality“;
- Our customers are in the central point of overall relations and activities, we wantto meet their requirements and exceed expectations;
- We strive to ensure the rights and environmentally friendly product with the rightprice and that he finds the right time on the market;
- We establish partnerships with our suppliers based on a fair basis in the purposeof long-term business cooperation, mutually beneficial, including the requirementsof environmental management system;
- company undertakes to persue the fulfillment of all requirementstermomatik
of quality management and environment policy (policy which corresponds to thenature, extent and impacts on the environment), and be responsible for their ownactivities, products and services in all phases of the business process, therebypreventing pollution of the environment;
- We provide continuous control of the complement system, quality andenvironmental management, and training and employees motivation;
- We will take care of the conserve of natural resources and will reduce energyconsumption;
- We ensure the satisfaction of the interests of all stakeholders (customers,owners, employees, suppliers, communities) including complying of theobligation with applicable legal and other requirements that the organizationhas signed in relation to its environmental aspects;
- With preventive and remedial measure we prevent repetition of mistakes andthe formation of new faults;
- Constantly provide a favorable environment for establishing and reviewing setgoals of quality and environment in which environmental policy is framework forpermanent installation and monitoring of the operational framework andenvironmental goals;
- We provide passing, understanding and achievement of quality policy andenvironmental in entire company;
- Periodically (at least annully) reviewing the adequacy of the quality policy andenvironmental as well as effectiveness of applied measures, within questioningof the quality system and environmental management by the top managementto the board for the quality and the environment.
Quality policy and environment is defined on the basis of experience from theprevious period and suggestions of carrier of business functions and agreed onthe level of the top management in accordance with vision and strategy of thecompany.
All employees are familiar with the quality policy and the environment throughdirect supervisors, and the same is placed on the visible places in the company,website as well as on the advertising materials of the company, includingimmediate comunity.Constantly analyzing and redefining policies and goals of the qualiy andenvironmental management provide the conditions for the continuousimprovement of quality and environmental management, and preventionand reduction of environmental pollution.
6
General
Manager
PRKAdvisor
Manager for electricaldepartment
Manager for mechanicaldepartment
department
Human ResourceManager
ProcurementEngineering
Manufacture
Engineering
Manufacture
Sales
PROTechnicalManager
Training
Administration andlegal
Finance andaccounting
Assembly /disassembly Assembly /
disassembly
MaintenanceMaintenance
FUNCTIONAL ORGANISATIONAL CHART
7
CONTACT PERSONS:
Faruk Babić [email protected](Manager)
Electrotechnical works:
Damir Hadžiđulbić [email protected]
Mechanical works:
Saud Beganović [email protected]
Measuring and regulation:
Laris Babić [email protected]
BASIC ACTIVITIES
ENGINEERING
- Industrial furnaces and automation- Defining project tasksof the- ing -technicalScreen of thermo characteristics- Optimization- Copyright monitoring
PROJECT ENGINEERING
- Heating technique- Steel constructions- Mechanical engineering- Hydraulics- Automation- Measurements and controls
PROGRAMMING SUPPORT FOR PROGRAMMABLE AUTOMATION
- Siemens SIMATIC S5, S7, PCS7 and WinCC
DEVELOPMENT AND PRODUCTION
- Development of electronic devices for own needs- Development of electronic devices on the basis of order- Low-serial production of advanced electronic devices- Low-serial production furnaces for heat treatment of plastic,heat treatment of metals and melting of non-ferrous metal
REALIZATION OF INVESTMENT PROJECTS IN THECOUNTRY AND ABROAD
- ,Industrial automation- Measurements and control,- Refractory lining
REPRESENTATIVE FOR FOREIGN COMPANIES
- Furnaces, industrial automation and devices for measuring and control(SIEMENS; KROMSCHRODER)
8
REFERENCE LIST - ELECTRICAL WORKS
Reconstruction and modernization of lime , 1997/1998shaft kilnInvestor: KALUN, Drniš, CroatiaSubcontractor to “Pomak” company, SplitValue: 25.000 €
E basic- laboration of the projectInstallation-
- Commissioning
F spark plugsurnace for , 1998Investor: ENKER, Tešanj, B&H
Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Proving guaranteed parameters
LV project of overheads ports and external lighting, 1998Investor: USAID for JP “VODOVOD” Zenica, B&H
- Partially engineering- Delivery of equipment- Installation- Commissioning
Measuring station Vitez with telemetry and visualisation, 1999in the dispatch centre in Zenica
Investor: USAID for JP “VODOVOD” Zenica, B&HValue: 56.000 BAM (approx. 28.632 €)
- Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters
9
Tunnel furnace No. 1, 1999Investor: ENKER Tešanj, B&HValue: 33.000 BAM (approx. 16.873 €)
- Modernisation of equipment for measuring and control- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters
Mud thickener, 1999Investor: USAID for JP “VODOVOD” Zenica, B&HSubcontractor to “Metalno” company, Zenica
- Delivery of equipmentnstallation- I
- Commissioning
Construction of furnace for galvanisation, 1999Investor: KALIM, Jelah, B&H
- Engineeringelivery of equipment- D
nstallation- I- Commissioning- Optimisation
Reconstruction , 1999of the Annealing Furnace 40tInvestor: Steel factory “ Š” Ilijaš, B&HILIJAValue: 64.000 BAM (approx. 32.723 €)
- Delivery of equipment- Installation- Commissioning- Detection parameters
Pump station Guča Gora, construction of water supplyInvestor: USAID for Municipality Travnik, B&H
- EngineeringDelivery of equipment-
- Work performance on construction of water supplies,pump station and water route
11
Reconstruction o furnacef control offor heat treatment of plates
VOEST-ALPINE Linz, AustriaInvestor: ,12
R oneconstruction of the heating and automation the furnace for enameling, 1999Investor: , B&HHELIOS, BanovićiValue: .000 BAM (approx. . €)18 9 203
Reconstruction and modernisation of the automaticcontrol of atomizer, 2000Investor: ENKER, Tešanj, B&H
- Designing- Delivery of equipment- Work performace
Equipment for construction of exhausted ladles,2000Reconstruction of the automatic control,
Investor: , , B&HVOLKSWAGEN VogošćaValue: .000 BAM (approx. . €)74 37 836
- Engineering- Delivery of equipment- Installation
F , 2000urnace for thermal treatment of “MACRALON” V=500lInvestor: TRZ HADŽIĆI, Hadžići, B&HValue: 8.000 BAM (approx. 4.090 €)
- Designing- Engineering- Construction
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001Investor: “ ” , B&HBH STEEL - Steel factory ZENICA ZenicaValue: 2 . BAM (approx. 1 . €)98 813 52 780
More then 90 % of furnace is completely new !
- Project of measuring, regulation and electro motor drive- Delivery of equipment- nstallationI- Engineering- Delivery of application software for PLC and OP- Commissioning
Detection of parameters-- Copyright supervision- Delivery manuals for handling and maintenance
13
T gubular reactor for testin combustion-characteristics of bio mass and coal
Investor: Faculty of MechanicalSarajevoEngineering, , B&H14
Tunnel furnace No. , 12 200Investor: ENKER Tešanj, B&HValue: 33. 00 BAM (approx. 1 . €)6 7 179
- Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Optimisation- Proving of guaraneed parameters
Automation and reconstruction of Annealing furnaceŽ-25-B 10 /2002( 0 t), 2001Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)521 329 266 551
More then 90 % of furnace is completely new !
- Project of measuring, regulation and electro motor drive- Delivery of equipment- nstallationI- Engineering- Delivery of application software for PLC and OP- Copyrights- Commissioning- Proving of guaranteed parameters- Delivery manuals for handling and maintenance
Reconstruction of automation of Annealingfurnace Ž-30-B (100 t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)67 950 34 742
- Designing- Delivery of equipment- Engineering- Installation- Commissioning
Furnaces H-60 (60 t) and H-100(100t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: .3 BAM (approx. . €)99 30 50 786
Reconstruction of automatic controls on furnaces H-60 and H-100- Designing- Delivery of equipment- nstallationI- Engineering- Commissioning
15
Reconstruction of PLC equipment, sensors and hydraulic valvesof press SMS 25/31,5 MN and 5 MN manipulator of 250 kNDANGO&DIENNENTHALL in the Blacksmith department, 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)1.154.000 590 030
- Designing- Delivery of equipment- Engineering- Upgrade from SIMATIC S5-150 to S7-400- nstallationI- Commissioning- Parameters detection
R siloseconstruction and automation of transportedsystem in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)166.411,00 85.085,00
- Designing- Delivery of equipment- nstallationI- Engineering- Commissioning
Automation and reconstruction of steamgeneration facilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)83.182,00 42.530,00
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Automation and reconstruction of Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)435.492,00 222.664,00
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
17
Automation and reconstruction of oil supply plantfacilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)21.000,00 10.737,00
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Automation and reconstruction of filtering intoprocessvinterisatio facilities in Oil rafinery, 2003n
Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)22.402,00 11.454,00
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Clean water supply system, 2004Investor: , B&HBOSNALIJEK, SarajevoValue: 10.500,00 BAM (approx. 5.369,00 €)
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Cable factory –Testing device for breakdown voltage 4, 200KAPIS TKT, TomislavgradInvestor: , B&H
Value: BAM (approx. €)16.032,00 8.197,00
- Designing- Delivery of equipment- Installation- Engineering- Commissioning
Reconstruction o combustion, measurementf the equipment forand regulation in the furnace for normalisation of propane-butanebottles, 2004
,Investor: ,ĐURO ĐAKOVIĆ Slavonski brod CroatiaValue: €26.800,00
- Delivery of equipment- Engineering- Commissioning
19
21
Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
Refrigeration factory - filling machine for PUR-foam, 2004Investor: ” - refrigeration factory, Bihać, B&H“BIRA
- Delivery of equipment- Installation- Commissioning
, 200Reconstruction of automation on milling machine 4Investor: Steel factory Š” IlijašILIJA“ , B&H
- Designing- Delivery of equipment- Installation- Commissioning
Reconstruction on furnace for thermal treatmentof controlssheetof s 4, 200
VOEST-ALPINE Linz, AustriaInvestor: ,Value: €190.000,00
- Designing- Delivery of equipment- nstallationI- Commissioning- Parameters detection
Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H
Value: BAM (approx. €)25.500,00 13.038,00
- Designing- Delivery of equipment- Engineering- Installation- Parameters detection
23
Heating furnace BH STEEL, 2004UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
- Delivery of burner equipment- Installation- P of furnaceroject regulation and keeping the- Commissioning- Parameters detection
Maintenance of electro-resistant in annealing furnace 4, 200IGMAN, Konjic BInvestor: , &H
Value: €15.500,00 BAM (approx. 7.925,00 )
- Construction and delivery of heaters(made from KANTHAL A-1)
- Installation of the heaters
General r 5 in Maintenanceepair o electro-resistant furnaces nDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection2 ,2004/2005Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. €)53.750,00 27.481,00
- Construction and delivery (made KANTHAL A-1)of heaters from- Installation of material and equipment- Project of control of maintenance of atmosphere protection- Commissioning
Press 10/2,5 MN and s 5respective manipulator , 200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
Reconstruction of PLC equipment, sensors and hydraulic valves of press- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Heating furnace 1000kg/h, 5200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
- ingDesign- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
25
Remote control steam starting block 7for of “ ” in ThermalPower Plant Kakanj, 2005Investor: JP “ELKROPRIVREDA BIH”, Sarajevo, B&H
C P 5oncrete lant, 200,Investor: , B&HINGRUP Donji Vakuf
Value: BAM (approx. €)36.900,00 18.867,00
- Automation engineering- Delivery of equipment- Installation- Commissioning
Automatically controlled tubular reactor for testing- 5combustion characteristics of bio mass and coal, 200
aculty of Mechanical Engineering,Investor: , B&HF SarajevoValue: BAM (approx. €)35.000,00 17.895,00
- Designing- fDelivery o equipment- Engineering- Installation- Commissioning- Parameters detection
F 2005urnace for melting non-ferrous metals 25l/6.3kW,Investor: , B&HUNIVERZAL PROGRES, VisokoValue: BAM (approx. €)6.000,00 3.068,00
- Designing- Construction- Commissioning
Laboratory furnace 20l/8kW, 5200,Investor: , B&HTMD Gradačac
Value: BAM (approx. €)4.000,00 2.045,00
- ingDesign- Construction
A , 2005nnealing chamber furnaceInvestor: HES-HENNINGSDORF, GermanyHenningsdorf,
- Designing- WinCC SCADA system- Delivery of equipment- Installation- Commissioning
27
C P 5oncrete lant - Reconstruction, 200,Investor: , B&HINGRUP Donji Vakuf
- Engineering- Delivery of equipment- Installation- Commissioning
Recontruction and automation of level measuringin Oil factory 5, 200Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)15.486,00 7.917,00
- Designing- Delivery of ultrasonic sensors- Installation- Commissioning
F , 200urnace for melting non-ferrous metals 30,6l/6,3kW 6Investor: UNIVERZAL PROGRES, Visoko, B&H
- Designing- Construction- Engineering
F , 200urnace for melting non-ferrous metals 180l/14kW 6Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)11.000,00 5.625,00
- Designing- Construction- Engineering
R 200econstruction and automation of hydrogenation drives, 6ADIDA TunisInvestor: J ,
Value:51.680,00 €
- Designing- Delivery of equipment- Engineering- Installation- Commisioning
Chamber for baking varnish 6, 200S-PRETIS NIS ogo a-SarajevoInvestor: , B&HUNI , V šć
Value: BAM (approx. €)35.000,00 17.895,00
- Designing- Engineering- Installation- Commissioning
29
Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&HZenica
- ingDesign- Installation- Engineering- Commissioning
Peeling facility in Oil factory, 6200,Investor: , B&HBIMAL d.d Brčko
Value: BAM (approx. €)212.704,00 108.753,00
- ingDesign- Engineering- Installation- Commissioning- Parameters detection
Cable factory, Extruder 2,5", 2006Investor: , B&HKAPIS TKT Tomislavgrad,Value: BAM (approx. €)79.564,00 40.680,00
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Cable factory, Machine for rough drag-out of copper, 2007Investor: , B&HKAPIS-TKT Tomislavgrad,Value: BAM (approx. €)350.000,00 178.952
- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Press «Ivo Lola Ribar» 7, 200Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)75 38 347.000,00 . ,00
- Designing- Engineering- Installation- Commissioning
Mobile stations for a heating of caldronsMetalska industrija Varaždin-MIV,Investor:Varaždin, Croatia30
31
“ “ 200Emcotest machine for measuring hardness 7,Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)130 66 468.000,00 . ,00
- Designing- Engineering- Installation- Commissioning
Pellet dryer Machine 2007,Investor: , B&HFIS, VitezValue: BAM (approx. €)111.000,00 56.753,00
- Designing- Engineering- Installation- Commissioning
Automatic foundry for vehicles parts 8, 200Investor: , B&H“CIMOS”, Zenica
4.000.000,00 2.045.167,00Value: BAM (approx. €)
- ingDesign- Engineering- Installation- Electro equipment and automation- Commissioning
Friction press, 8200,Investor: , B&HPIROMETAL Brčko
Value: BAM (approx. €)400.000,00 204.517,00
- ingDesign- Engineering- Installation- Commissioning
Furnace for thermal treatment VPP, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)296.000,00 151.342,00
- Designing- Delivery of equipment- Engineering- Installation- Commissioning
33
Furnace for testing fire-resistant material, 2008Investor: , B&HPROTUPOŽARNI INSTITUT Sarajevo,Value: BAM (approx. €)606.000,00 309.843,00
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Drying furnace 8, 200,Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&H
Value: €100.000,00 KM (approx. 51.129,00 )
- Designing- engineering- Installation- Commissioning
Steel Plant - Station for tundish heating 1,44 MW 8, 200Investor: , , B&HARCELORMITTAL ZenicaValue: BAM (approx. €)50 25.565.000,00 ,00
- Designing- Engineering- Installation- Commissioning
Coke Oven Plant-Plant for naphtalene and ammonia 200Battery 8,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. 1.0 €00.000,00
- Designing- Engineering- Installation- Automation- Commissioning
Coke Oven Battery Plant-Biological waste water treatment 2008,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. €750.000,00
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
35
Sugar factory 8, 200Investor: , B&H“STUDEN-AGRANA”, Brčko
2.430.000,00 1.242.439,00Value: BAM (approx. €)
- ingDesign- Installation- Electro equipment and automation- Commissioning- Parameters detection
Plant for the production of briquette, 2008“BRIGO-INVEST”, BanovićiInvestor: , B&H
40.000,00 20.00,00Value: BAM (approx. €)
- ingDesign- Engineering- Installation- Delivery of equipment- Commissioning
Furnaces for testing the resistance of materials, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)397.000,00 202.983,00
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Induction melter furnaces 8, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €59.840,00
- Designing- Engineering- Installation- Commissioning
Mobile stations for a heating of caldrons 8/2009, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €29 35. 0,00
- Designing- Engineering- Installation- Commissioning
37
Sugar factory, Boiler house 8/2009, 200Investor: , , B&HSTUDEN-AGRANA BrčkoValue: BAM (approx. €)175 89.476.000,00 ,00
- Designing- Engineering- Installation- Automation- Commissioning
Electro works in CIMOS - II phase 2009,Investor: , , B&HCIMOS ZenicaValue: BAM (approx. €)754 385.514,.000,00 00
- Designing- Engineering- Delivery of equipment- Automation- Installation- Commissioning
Protection of tanks from overloading 2009,Investor: , B&H“BIMAL”, Brčko
42.000,00 21.474,00Value: BAM (approx. €)
- ingDesign- Engineering- Installation- Electro equipment and automation- Commissioning- Parameters detection
CIMOS - substation, 9200,Investor: , B&HCIMOS Zenica
Value: BAM (approx. €)668.000,00 341.543,00
- ingDesign- Engineering- Installation- Commissioning
Cable factory, Extruders 4,5", 2009Investor: , B&HKAPIS TKT Tomislavgrad,Value: BAM (approx. €)210.000,00 107.371,00
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
39
Re-circulation system of technological water, 2009Investor: , B&HCement Plant Kakanj,Value: BAM (approx. €)78.300,00 40.034,00
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Machine for wire twisting „CIGARA” 2009,,Investor: , B&HKAPIS TKT Tomislavgrad
Value: €55.000,00 BAM (approx. 28.121,00 )
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
EMP drives and temp. measurements on 8 cells of silo, 2009/2010Investor: , B&H“BIMAL”, Brčko
78.375,00 40.073,00Value: BAM (approx. €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Dedusting of iron mixer on Steel Plant Department, 2010Investor: , B&H“ArcelorMittal”, Zenica
.000,00Value: approx. 60 €
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010Investor: , B&H“ArcelorMittal”, Zenica
46.323,00Value: €
- Designing- Delivery of equipment- Installation- Commissioning
Installation of hydraulic and pneumatic valves,fitting pipes and hoses, electric worksFAGOR, SPAIN40
41
Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010Investor: , FYR Macedonia“ArcelorMittal”, Skopje
109.667,00Value: €
- Designing- Delivery of equipment- Installation- Commissioning- Parameters detection
General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
ZD Rudnici “Kreka” d.o.. TuzlaValue: 4.450.000,00 BAM (approx. 2.275.249,00 €)
- Electrical designing and engineering based on Siemens equipment,- Video surveillance,- Lighting,- Installation,- Delivery of equipment,- Commissioning- Parameters detection
Expansion of compressor station in BOF Steel Mill, 2011Investor: , B&H“ArcelorMittal”, Zenica
150.360,00Value: BAM (approx. 76.877,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011Investor: , B&H“NT FORGING”, Novi Travnik
82.720,00Value: BAM (approx. 42.294,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
43
Reconstruction of furnace for thermal treatment, 2011Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
System for measuring temperature inside the flowingtunnel furnace BTU, 2011Investor: SELK, Kutina, CroatiaValue: approx. 20.000,00 €
- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection
Delivery and commissioning of the communication and controlequipment in the HE Rama, 2011Subcontractor to “COMEL” SarajevoValue: 37.200,00 BAM (approx. 19.020,00 €)
- Designing- Delivery of equipment- Installation- Commissioning
Electrical design –electrical installations and automation controlof Depo 1, TE Tuzla, 2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
Power Plant TuzlaValue: 23.000 €
- Designing of automation, video surveillance, monitoringand control based on Siemens Simatic S7
45
Chamber furnace EUSKAL Sestao SPAIN, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €53 637
- Supply and delivery of equipment- Installation work- Software and Programming- Initial test run- Detection parameters and commissioning
Gas furnace Magdeburg Germany, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €16 970
- Installation work- Software and Programming- Initial test run- Detection parameters and commissioning
Delivery control cabinet, EGYPT, 2012thI «Industrie Ofen Bau» Weinheim, Njemačkanvestor:Value: . ,00 €13 809
- Supply and delivery of equipment- Installation work
Cabinet of compensation 300 kVAr, JELAH-TEŠANJ BIH, 2012thI «Prevent FAD» d.d. Jelah-Tešanj, BiHnvestor:Value: ,00 €52.776 BAM (approx. 27.064,00 )
- Designing- Supply and delivery of equipment- Installation work
Training design and engineering for the establishment phase, SUDAN 2012th
Investor: University of Science and Technology SudanResearch Center for MaterialsContract value € 179,200.00
Delivery of laboratory furnaces, presses and manipulators, SUDAN 2013thInvestor: University of Science and Technology SudanResearch Center for MaterialsContract value € 420.000,00
- Designing- Supply and delivery of equipment- Installation work
47
Delivering cabinet of electrical furnace GERMANY 2013thInvestor: TST GermanyContract value € 74.130,00
- Design- Supply and delivery of equipment- Installation work
Hopper level trolley with screw dispenser ZENICA BIH 2013thSubcontractor: John M. Henderson & Co.. Ltd., United KingdomInvestor: ArcelorMittal Zenica d.o.o.Contract value € 146,519.00
- Design- Supply and delivery of equipment- Software and Programming- Installation work- Initial test run- Detection parameters and commissioning
Project of reconstruction and upgrade 35 MN presses,Helwan CAIRO-EGYPT 2013thInvestor: Helwan CO., LTD. FOR NON-ferrous INDUSTRIESContract value: € 1,168,127.00
- Design- Supply and delivery of equipment- Software and Programming- Installation work- Initial test run- Detection parameters and commissioning
49
REFERENCE LIST - MECHANICAL WORKS
F spark plugsurnace for , 1998Investor: ENKER, Tešanj, B&H
Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Parameters detection
Mud thickener, 1999Investor: USAID for JP “VODOVOD” Zenica, B&HSubcontractor to “Metalno” company, Zenica
- Delivery of equipmentnstallation- I
- Commissioning
Construction of furnace for galvanisation, 1999Investor: KALIM, Jelah, B&H
- Engineeringelivery of equipment- D
nstallation- I- Commissioning- Optimisation
Reconstruction , 1999of the Annealing Furnace 40tInvestor: Steel factory “ Š” Ilijaš, B&HILIJA
Reapir- Delivery of equipment- Installation- Commissioning- Detection parameters
Reconstruction of boiler room and hot water network, 1999Investor: USAID for Primary school “GOJEVIĆI”, Municipality Fojnica, B&H
- Engineeringivery of equipment- Del
- Works
51
Pump station Guča Gora, construction of water supply, 1999Investor: USAID for Municipality Travnik, B&H
- EngineeringDelivery of equipment-
- Work performance on construction of water supplies,pump station and water route
Reconstruction of the heating on the furnace for enameling, 1999Investor: , B&HHELIOS, Banovići
F , 2000urnace for thermal treatment of “MACRALON” V=500lInvestor: TRZ HADŽIĆI, Hadžići, B&H
Pump station „KOSTRČ“, Water supply, 2000Investor: Orašje Municipality, Orašje, B&H
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001Investor: “ ” , B&HBH STEEL - Steel factory ZENICA ZenicaValue: 2 . BAM (approx. 1 . €)98 813 52 780
More then 90 % of furnace is completely new !
- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment
Automation and reconstruction of Annealing furnaceŽ-25-B 10 /2002( 0 t), 2001Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)521 329 266 551
More then 90 % of furnace is completely new !
- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment
Reconstruction of hydraulic valves of press SMS 25/31,5 MNand 5 MN manipulator of 250 kN DANGO&DIENNENTHALL inthe Blacksmith department, 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)1.154.000 590 030
- Delivery of equipment- Engineering- nstallationI- Commissioning
53
Reconstruction of steam generation facilities in Oil rafinery, 2003Investor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)83.182,00 42.530,00
- Delivery of equipment- Installation- Engineering- Commissioning
Reconstruction of facilities in Oil rafinery, 2003oil supply plantInvestor: BIMAL d.d. Br , B&Hčko, BrčkoValue: BAM (approx. €)21.000,00 10.737,00
- Delivery of equipment- Installation- Engineering- Commissioning
Reconstruction o combustion, measurementf the equipment forand regulation in the furnace for normalisation of propane-butanebottles, 2004
,Investor: ,ĐURO ĐAKOVIĆ Slavonski brod CroatiaValue: €26.800,00
- Delivery of equipment- Engineering- Welded vessels- Commissioning
Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H
- Delivery of equipment- Installation- Commissioning
Refrigeration factory - filling machine for PUR-foam, 2004Investor: ” - refrigeration factory, Bihać, B&H“BIRA
- Delivery of equipment for filling machine- Installation- Commissioning
55
R , 200econstruction furnace for thermal treatment of s 4of sheetVOEST-ALPINE Linz, AustriaInvestor: ,
Value: €190.000,00
- Delivery of equipment- nstallationI- Commissioning- Parameters detection
Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H
Value: BAM (approx. €)25.500,00 13.038,00
- Designing- Delivery of equipment- Engineering- Installation- Parameters detection
Heating furnace BH STEEL, 2004UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
- Delivery of burner equipment- Installation- P of furnaceroject regulation and keeping the- Commissioning- Parameters detection
Maintenance of electro-resistant in annealing furnace 4, 200IGMAN, Konjic BInvestor: , &H
Value: €15.500,00 BAM (approx. 7.925,00 )
- Construction and delivery of heaters(made from KANTHAL A-1)
- Installation of the heaters
Press 10/2,5 MN and s 5respective manipulator , 200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
Reconstruction of hydraulic valves of press- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
57
Heating furnace 1000kg/h, 5200UNIS-PRETIS NIS, VogoInvestor: , B&Hšća-Sarajevo
- ingDesign- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection
Heating furnace 10 kg/h 40 , 200FORESTER, SarajevoInvestor: , B&H
Value: BAM (approx. €)25.500,00 13.038,00
- Designing- Delivery of equipment- Engineering- Installation- Parameters detection
Automatically controlled tubular reactor for testing- 5combustion characteristics of bio mass and coal, 200
aculty of Mechanical Engineering,Investor: , B&HF SarajevoValue: BAM (approx. €)35.000,00 17.895,00
- Designing- fDelivery o equipment- Engineering- Installation- Commissioning- Parameters detection
Laboratory furnace 20l/8kW, 5200,Investor: , B&HTMD Gradačac
Value: BAM (approx. €)4.000,00 2.045,00
- Engineering- Installation- Commissioning
F , 200urnace for melting non-ferrous metals 30,6l/6,3kW 6Investor: UNIVERZAL PROGRES, Visoko, B&H
- Engineering- Construction- Commissioning
59
F , 200urnace for melting non-ferrous metals 180l/14kW 6Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)11.000,00 5.625,00
- Engineering- Installation- Commissioning
Chamber for baking varnish 6, 200S-PRETIS NIS ogo a-SarajevoInvestor: , B&HUNI , V šć
Value: BAM (approx. €)35.000,00 17.895,00
- Engineering- Installation- Commissioning
Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&HZenica
- Installation- Engineering- Commissioning
Press «Ivo Lola Ribar» 7, 200Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)75 38 347.000,00 . ,00
- Engineering- Installation- Commissioning
“ “ 200Emcotest machine for measuring hardness 7,Investor: , V , B&HPRETIS NIS ogošća-SarajevoValue: BAM (approx. €)130 66 468.000,00 . ,00
- Engineering- Installation- Commissioning
Pellet dryer Machine 2007,Investor: , B&HFIS, VitezValue: BAM (approx. €)111.000,00 56.753,00
- Engineering- Installation- Commissioning
61
Friction press, 8200,Investor: , B&HPIROMETAL Brčko
Value: BAM (approx. €)400.000,00 204.517,00
- Engineering- Installation- Commissioning
Furnace for thermal treatment VPP, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)296.000,00 151.342,00
- Engineering- Installation- Commissioning
Furnace for testing fire-resistant material, 2008Investor: , B&HPROTUPOŽARNI INSTITUT Sarajevo,Value: BAM (approx. €)606.000,00 309.843,00
- Engineering- Installation- Commissioning
Drying furnace 8, 200,Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&H
Value: €100.000,00 KM (approx. 51.129,00 )
- engineering- Installation- Commissioning
Steel Plant - Station for tundish heating 1,44 MW 8, 200Investor: , , B&HARCELORMITTAL ZenicaValue: BAM (approx. €)50 25.565.000,00 ,00
- Engineering- Installation- Commissioning
Coke Oven Battery Plant-Biological waste water treatment 2008,Investor: , , B&HARCELORMITTAL ZenicaValue: approx. €750.000,00
- EngineeringInstallation-
- Commissioning
63
Furnaces for testing the resistance of materials, 2008Investor: , B&HNT FORGING Novi Travnik,Value: BAM (approx. €)397.000,00 202.983,00
- Engineering- Delivery of equipment- Installation- Commissioning
Induction melter furnaces 8, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €59.840,00
- Engineering- Installation- Commissioning
Mobile stations for a heating of caldrons 8/2009, 200Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: €29 35. 0,00
- Engineering- Installation- Commissioning
Equipment for preserving of temperature of liquid metal inmixer in Steel Mill Department – “ArcelorMittal Zenica”, 2009Investor: ARCELORMITTAL Zenica, , B&HValue: approx. €70.636,00
- Dismantling of existing equipment- Delivery- Installation and supervision- Trial work and parameterisation- Commissioning
Mechanical works in CIMOS - II phase 2009,Investor: , , B&HCIMOS ZenicaValue: BAM (approx. €)754 385.514,.000,00 00
- Engineering- Delivery of equipment
Installation-- Commissioning
65
Re-circulation system of technological water, 2009Investor: , B&HCement Plant Kakanj,Value: BAM (approx. €)78.300,00 40.034,00
- Engineering- Delivery of equipment- Installation- Commissioning
Machine for wire twisting „CIGARA” 2009,,Investor: , B&HKAPIS TKT Tomislavgrad
Value: €55.000,00 BAM (approx. 28.121,00 )
- Designing- Engineering- Delivery of equipment- Installation- Commissioning
Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010Investor: , B&H“ArcelorMittal”, Zenica
46.323,00Value: €
- Designing- Delivery of equipment- Installation- Supervision- Commissioning
Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010Investor: , FYR Macedonia“ArcelorMittal”, Skopje
109.667,00Value: €
- Designing- Delivery of equipment- Installation- Supervision- Commissioning- Parameters detection
Upgrading of truck with mobile equipment,Station for testing of gas, 2010Investor: IVEX , B&H, Usora
71.000,00Value: BAM (approx. 36.300,00 €)
- Engineering and attest technical documentation- Procurement and delivery of equipment- Installation- Trial work- Parameter detection
67
Construction of the system for emergency oil evacuationTurbo unit of blocks 5. and 6. TE “KAKANJ” KAKANJ, 2010Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Kakanj, , B&HValue: 94 BAM (approx. 48 €).716,00 .427,00
-Procurement and delivery of equipment-Installation and Supervision- Commissioning
General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
ZD Rudnici “Kreka” d.o.. TuzlaValue: 4.450.000,00 BAM (approx. 2.275.249,00 €)
- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- CommissioningParameters detection and
Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011Investor: , B&H“NT FORGING”, Novi Travnik
82.720,00Value: BAM (approx. 42.294,00 €)
- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Commissioning
Expansion of compressor station in BOF Steel Mill, 2011Investor: , B&H“ArcelorMittal”, Zenica
150.360,00Value: BAM (approx. 76.877,00 €)
- Mechanical engineering- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning- Revision of project documentation
Reconstruction of furnace for thermal treatment, 2011Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)
- Engineering, control and running furnace- Procurement and delivery of equipment- Installation and Supervision- Trial work- Parameters detection and Commissioning
69
Replacing the hydraulic system shutter Mostar BiH 2012thinitial discharge HE "Salakovac"Investor: JP "Elektroprivreda BiH" dd SarajevoContract value: 186,100.00 BAM 9 435(approx. 5. ,00 €)
- Dismantling of existing equipment- Supply and delivery of equipment- Installation and supervision of works- Initial test run
Supply, delivery and installation of the crusher in ArcelorMittal ZenicaZENICA BH 2012thSubcontractor: "Teikom BH" Ltd. SarajevoInvestor: "ArcelorMittal" ZenicaContract value 120.000,00 BAM 61 538(approx. . ,00 €)
- Mechanical Design- Supply and delivery of equipment- Installation work- Commissioning and test run parameter
Reconstruction of telescopic and rotary platforms in ArcelorMittal ZenicaZENICA BH 2012thInvestor: "ArcelorMittal" ZenicaContract value: 135,452.00 BAM 69 462(approx. . ,00 €)
- Mechanical Design- Supply and delivery of equipment- Installation work- Commissioning and test run parameter
Reconstruction of pipeline hydraulics in ArcelorMittal ZenicaZENICA BH 2012/2013.Investor: "ArcelorMittal" ZenicaContract value: 260,377.00 BAM 133 526(approx. . ,00 €)
- Dismantling of existing equipment- Supply and delivery of equipment- Installation and supervision of works- Initial test run
The inspection and repair of machines for displacement slag potswith transport ZENICA BH 2012/2013.Investor: "ArcelorMittal" ZenicaContract value: 23,776.00 BAM 12 192(approx. . ,00 €)
- Dismantling of existing equipment- Supply and delivery of equipment- Installation work- Initial test run
71
Delivery of laboratory furnaces, presses and manipulators, SUDAN 2013thInvestor: University of Science and Technology SudanResearch Center for MaterialsContract value € 420.000,00
- Designing- Supply and delivery of equipment- Installation work
Hopper level trolley with screw dispenser ZENICA BIH 2013thSubcontractor: John M. Henderson & Co.. Ltd., United KingdomInvestor: ArcelorMittal Zenica d.o.o.Contract value € 146,519.00
- Supply and delivery of equipment of hydraulics- Installation work- Initial test run- Detection parameters and commissioning
Project of reconstruction and upgrade 35 MN presses,Helwan CAIRO-EGYPT 2013thInvestor: Helwan CO., LTD. FOR NON-ferrous INDUSTRIESContract value: € 1,168,127.00
- Design- Supply and delivery of equipment- Installation work- Initial test run- Detection parameters and commissioning
© Copyright by termomatik
LOCATION OF COMPANY
Ltd Zenica
42, Juraja Neidharta Street
72000 Zenica, B&H
phone: +387 32 44 88 10 web site: www.termomatik.com
fax: +387 32 32 44 88 27 e-mail: [email protected]
termomatiktermomatik