Door to Door Information for Air Passengers D6.1 Evaluation plan Editor: TUB (Technische Universität Berlin) Deliverable nature: Report Dissemination level: Public Date: planned | actual 29 February 2016 29 February 2016 Version | no. of pages 1.0 74 Keywords: Evaluation Plan / Impact Evaluation / Process Evaluation / Usability Evaluation

Upload: lydung

Post on 19-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Door to Door Information for Air Passengers

D6.1 Evaluation plan

Editor: TUB (Technische Universität Berlin)

Deliverable nature: Report

Dissemination level: Public

Date: planned | actual 29 February 2016 29 February 2016

Version | no. of pages 1.0 74

Keywords: Evaluation Plan / Impact Evaluation / Process Evaluation /

Usability Evaluation

DORA Deliverable D6.1

2 / 74 2 / 74

Disclaimer

This document contains material, which is the copyright of certain DORA consortium parties,

and may not be reproduced or copied without permission.

All DORA consortium parties have agreed to full publication of this document.

The commercial use of any information contained in this document may require a license

from the proprietor of that information.

Neither the project consortium as a whole nor a certain party of the consortium warrant that

the information contained in this document is capable of use, nor that use of the

information is free from risk, and accepts no liability for loss or damage suffered by any

person using this information.

Impressum

Project acronym/name DORA Door to Door Information for Air Passengers

Project number/type 643973 Research and Innovation Action

WP number/leader 6 TUB

Task(s) no.(s)/leader(s) 6.1 TUB

Copyright notice

2015/2016/2017/2018 Center for Technology and Society, Technische Universität Berlin

and members of the DORA consortium

DORA Deliverable D6.1

3 / 74 3 / 74

Executive Summary

This deliverable ‘6.1 Evaluation Plan’ starts with a general chapter on the background of

evaluation in DORA and its purpose. It shows the relation of the DORA project to Horizon

2020 as the biggest EU Research and Innovation programme of the European Union and to

the specific call ‘MG 1.3-2014: Seamless Air Mobility’.

It continues with describing the purpose of the deliverable which is to set the plan for all

evaluation activities that will be carried out within the DORA project. It, moreover, describes

the approach to the evaluation, presents a working plan for the evaluation activities and sets

the frame for the responsibilities of the partners involved. Besides this clearly structured

delineation of the evaluation framework, the evaluation plan also aims at providing

explanations on methods and indicators to be used, as well as presenting guidelines for the

application of specific methods by the partners involved in evaluation.

The following chapter summarises the aims of the project as they were described in the

‘Description of Work’ document. Aims are being understood as the realisation of single

components of the DORA service and their final integration. The component s being

described are: “Design and Implementation of a DORA Service Platform (PLA) and a Long

Term Door-to-Door Journey Planner (DJP)”, “Design and Implementation of End-User-

Applications for Seamless Mobility Information (APP / SWA / WEB)”, “Implementation of

Personal Information Services (FIS / ILR / SRS / TMS)”, “Implementation of an Incident and

Information Management for Airports (MIM)”, “Design and Implementation of a System for

Detection of Waiting Time in Airports (WTS)” and “Design and Implementation of an Indoor

Location and Routing at the Terminal (IP / IR)”.

The following chapter (1.5) identifies and describes all objectives that will be evaluated

within this project. The objectives being described are ordered along their corresponding

task in Work Package 6. Together with the indications of the following chapter, that describe

the frame conditions in the implementation sites in Berlin and Palma de Mallorca, the before

mentioned objectives provide the basis for the description of those methods that will be

applied to measure if – or to which extend - the objectives were reached.

Chapter 2 is dedicated to the description of the iterative DORA evaluation approach. It

describes the evaluation activities and their relations to each other, and presents methods

and information on how they can be applied. It contains detailed information on the four

evaluation activities that will be carried out in DORA:

The Technical evaluation chapter (2.3.1) demonstrates how the evaluation of the technical

features of DORA will be evaluated. The DORA developments are divided into three main

DORA Deliverable D6.1

4 / 74 4 / 74

categories: Services, Applications and Technology. Each category follows a different

development methodology that is being described by giving information on methods and

timelines for accomplishing them by orienting on the ‘Evaluation Roadmap’.

The chapter Usability evaluation (2.3.2) describes the main goal of the Usability Evaluation,

which is to assess usability criteria in order to identify possible problems with the design of

the interfaces at an early stage during the conceptual phase and during its integration phase.

It also provides a description on how to realize three usability evaluations at each of the

three development steps of the DORA system: Usability Evaluation of the Concept for the

Web and App GUI / Usability Evaluation of the DORA Prototype / Usability Evalua tion of the

Integrated Final Product (DORA system Alpha Version). The end of this chapter consists of an

overview on the operationalization of these evaluation activities, including information on

methods to be applied, partners who are involved, or times for their conducts.

The chapter Results evaluation (2.3.3) focuses on the description of the evaluation activities

related to the assessment of the results of the project. It comprises information related to

Impact Evaluation and Evaluation of User Satisfaction. It, moreover, includes information on

the application of impact evaluation, shows which indicators are being applied for the

assessment of the objectives, describes why a control site approach is planned to be applied

for two indicators, and shows which methods (user tests / surveys with questionnaire and

interviews) will be applied for the assessment of ‘User Satisfaction’. Methods and remarks

concerning the operationalization are summarized in tables.

The chapter Process evaluation (2.3.4) starts with an explanation of the intention of this

evaluation activity, which is to understand what influences the project process in an either

positive or negative way and how experiences gathered during the early phase of the project

have supported the further process of the project. It looks at the strengths and weaknesses

(drivers and barriers), thereby focusing on HOW an outcome or product is being realized

rather than on how the impact from the project performs. This chapter also summarizes

information concerning the operationalization of the three phases of this activity at the end

of the chapter.

A major ambition of the DORA project, is to develop a system that is easily transferable to

other cities and their airports in Europe. Thus, the following chapter 3, provides information

on the relevance of the results from all evaluation activities that are being carried out within

DORA for other cities that are considering to implement the system in their cities.

Being aware of the fact that every development or implementation process is constantly

subject of changes and also risks, chapter 4 describes ‘Issues that can jeopardise the

evaluation’. Since these risks are mainly related to the technical development of the

components or to the integration of them (e.g.: incompatibilities of systems or a lack of

DORA Deliverable D6.1

5 / 74 5 / 74

information that is necessary for the development of the system) , this chapter tries to

foresee a range of possible risks in order to prepare for the case of their occurrence. Thus,

also mechanisms to avoid or minimise the risks are being described.

The Evaluation Plan ends with chapter 5 “Operationalization / Roles and Responsibilities”. It

provides a quick overview on the DORA objectives and the related Work Packages, shows

the involvement of the partners in the tasks of Works Package 6 and the timeline for the

deliverables of the single tasks as described in the DOW. It presents a table with an overview

on all evaluation tasks and sub-tasks, the related methods for assessment and time frames

for their accomplishment.

DORA Deliverable D6.1

6 / 74 6 / 74

List of Authors

Organisation Authors Main organisations’ contributions

TUB Michael Abraham

TUB Norman Döge

CSE Konstantinos KoutsopoulosChapter 2.3.1 Technical Evaluation;

Review

TUB Mandy Töppel Consultation for Usability Evaluation

VMZ Jan-Niklas Willing Review

VMZ Tom Schilling Review

DORA Deliverable D6.1

7 / 74 7 / 74

Table of contents

1 INTRODUCTION ............................................................................................... 10

1.1 Horizon 2020 ................................................................................................... 10

1.2 MG 1.3-2014: Seamless Air Mobility................................................................. 10

1.3 Purpose of the deliverable ............................................................................... 11

1.4 Aims of the Project .......................................................................................... 12

1.5 Objectives........................................................................................................ 15

1.5.1 Objectives related to Task 6.2 Technical Evaluation and Assessment ................... 15

1.5.2 Objectives related to Task 6.3 Usability Assessment............................................. 16

1.5.3 Objectives related to Task 6.4 Evaluation of Impact and Process.......................... 17

1.6 City and Airport Description Berlin ................................................................... 21

1.7 City and Airport Description Palma de Mallorca ............................................... 23

2 EVALUATION APPROACH AND METHODOLOGY................................................ 25

2.1 Introduction .................................................................................................... 25

2.2 DORA Evaluation Approach.............................................................................. 25

2.3 Methods and Operationalization...................................................................... 30

2.3.1 Technical Evaluation ............................................................................................ 30

2.3.2 Usability Evaluation.............................................................................................. 40

2.3.3 Results Evaluation ................................................................................................ 47

2.3.4 Process Evaluation ............................................................................................... 57

3 TRANSFERABILITY ............................................................................................ 63

4 ISSUES THAT CAN JEOPARDIZE THE EVALUATION ............................................. 65

5 OPERATIONALIZATION / ROLES AND RESPONSIBILITIES.................................... 67

6 REFERENCES .................................................................................................... 72

7 ANNEX............................................................................................................. 73

DORA Deliverable D6.1

8 / 74 8 / 74

List of Figures

Figure 1 Interlinkage of DORA Objectives .............................................................................17

Figure 2 Dora Airports ..........................................................................................................21

Figure 3 DORA Evaluation Approach .....................................................................................26

Figure 4 Evaluation tasks and their relations.........................................................................27

Figure 5 Web Content Accessibility Guidelines 2.0 - success criteria examples for DORA......41

Figure 6: Baseline and Business-As-Usual Scenario [4] ..........................................................48

Figure 7 Control Site Evaluation in DORA ..............................................................................52

Figure 8 Categories of process barriers and drivers and examples [4] ...................................59

Figure 9 WP 6 Effort per partner...........................................................................................69

List of Tables

Table 1: Development Methodologies ..................................................................................31

Table 2: Evaluation Roadmap for Services ............................................................................33

Table 3: DJP Development Roadmap ....................................................................................34

Table 4: IR Development Roadmap.......................................................................................35

Table 5: ILR Development Roadmap .....................................................................................35

Table 6: FS Development Roadmap ......................................................................................36

Table 7: TMS Development Roadmap ...................................................................................37

Table 8: SRS Development Roadmap ....................................................................................37

Table 9: Operationalisation - usability test of conceptual variants ........................................43

Table 10: Operationalisation - usability test of first prototype ..............................................44

Table 11: Operationalisation - last usability test before trial phase .......................................45

Table 12 DORA objectives and their indicators .....................................................................49

Table 13 DORA Indicators and field test data gathering methods (control site approach) .....53

Table 14 DORA Indicators and field test data gathering methods (survey) ............................55

Table 15 DORA objectives and the related Work Packages ...................................................67

Table 16 DORA deliverables and the related Work Packages ................................................69

Table 17 Overview of DORA Evaluation Tasks .......................................................................70

DORA Deliverable D6.1

9 / 74 9 / 74

AbbreviationsAbbreviation Explanation

APP DORA App

BER Berlin Brandenburg Airport Willy Brandt

D#.# Deliverable number #.# (D7.1 deliverable 1 of work package 7)

DJP Door-2-Door Journey Planner

DoA Description of Action of the project

DORA Door to Door Information for Airports and Airlines

EC European Commission

EU European Union

FIS Flight Information Service

H2020 Horizon 2020 Programme for Research and Innovation

ILR Intermodal Landside Router

IP Indoor Positioning

IR Indoor Routing

M# #th month of the project (M1=June 2015)

MIM Mobility and Incident Management Panel

PLA DORA Platform

SRS Strategic Routing Service

SWA DORA Smart Watch App

SXF Berlin-Schönefeld Airport

TMS Trip Monitoring Service

TXL Berlin-Tegel Airport

PMI Palma de Mallorca airport

WEB DORA Web GUI

WMS Web Map Service

WP Work Package

WTS Waiting Time Service

DORA Deliverable D6.1

10 / 74 10 / 74

1 INTRODUCTION

The purpose of this deliverable is to give an overview of all evaluation activities that will be

carried out within the DORA project. In this chapter there will be given information on the

frame conditions and goals of the deliverable. The respective call as well as funding scheme,

the purpose of the deliverable as well as its structure will be described.

1.1 Horizon 2020

Horizon 2020 is the biggest EU Research and Innovation programme of the European Union

ever with nearly €80 billion of funding available over 7 years (2014 to 2020). It is the

financial instrument implementing the Innovation Union, a Europe 2020 flagship initiative

aimed at securing Europe's global competitiveness. It is being regarded as an investment in

the future of Europeans and seeks to boost smart, sustainable and inclusive growth and

jobs.[1]

1.2 MG 1.3-2014: Seamless Air Mobility

With this call the European Commission addresses the specific challenge to “… create links

between people and exchanges for business, leisure and culture within Europe and

worldwide.” by improving flight connections between European cities. The specific approach

to shorten travel times is to focus on door to door travelling comprising the entire travel

chain that consists of several single segments. Those can be enhanced concerning time

efficiency, seamlessness, robustness and accessibility of the European air transport system.

Further, and more concretely, the call is looking for research and innovation projects that

could target products and services which can enhance customer experience, minimize the

duration of the travel of air passengers and provide them with integrated and

comprehensive information to plan their travel. Also they could seek to directly improve the

accessibility to airport and planes.

Another specific focus lies on the provision of mobility information for passengers with

reduced mobility.

In conclusion, the call is clearly addressing intermodality that links all kinds of transportation

modes, be it landside or aircraft transportation. This way, transportation should become

smarter, greener and more integrated.

DORA Deliverable D6.1

11 / 74 11 / 74

The expected impacts are being formulated in the call as follows:

- 90% of the travels involving air transport within Europe can be completed in 4 hours

door to door.

- Passengers can make informed decisions.

- Air transport is well connected to other modes.

1.3 Purpose of the deliverable

This deliverable sets the plan for all evaluation activities that will be carried out within the

DORA project. It will describe the approach to the evaluation, it will present a working and

time plan for the evaluation activities and sets responsibilities of the partners involved.

Moreover it will include explanations on methods and indicators to be used, as well as

guidelines for the application of specific methods.

DORA is a project composed of a high number of partners across Europe. The technical

development of the DORA services will be developed conjointly between these partners. The

high number of partners and the complexity of factors that are influencing the development

of the various technical components make the development process a comprehensive task.

It can be assumed that a range of unforeseen events might occur. This has an effect on the

evaluation activities. Thus, this evaluation plan does not present a final, rigid plan that has to

be implemented by all means. It rather can only be regarded as a flexible, developing plan

that takes into consideration actual occurrences. It sets the frame for the evaluation

activities, describes methods that should be applied, but also seeks to present alternative

methods for the case that it will turn out that the initially planned method cannot be carried

out.

This deliverable is crucial for all other work packages since it describes how to evaluate

whether the objectives of each work package, as they were described in the ‘Description of

Work’ document, have been reached after the finalization of the project. Evaluation will

focus specifically on the work packages 3 ‘Concept Specification’, 4 ‘Software development

and integration’ and 5 ‘Pilot Execution’, since all steps during the development and testing

phase of the technical features will be evaluated. Thus an iterative approach is being

pursued that constantly evaluates the different steps of the service and that feeds back its

results into the further development. The results from evaluating the test during the pilot

execution will finally deliver evidence proving the success or failure of the project.

DORA Deliverable D6.1

12 / 74 12 / 74

Further, this evaluation plan will be the basis for the following other deliverables that will be

produced within work package 6:

- D6.2 Technical Evaluation and Assessment Report [M30] as a summary of the results

from the technical pretests

- D6.3 Usability Assessment Report [M24] – as a summary of the results from the

Usability pre-tests

- D6.4 Final Evaluation Report [M36] – as a summary of the findings resulting from the

impact, usability and process evaluation.

In this sense the deliverable at hand is also relevant for work package 7 ‘Di ssemination and

Exploitation’ – it contributes to the creation of sound results that can be disseminated on

European level in order to enable other cities and airports to learn from the findings of the

DORA project.

1.4 Aims of the Project

This Chapter summarises the aims of the project as they were described in the ‘Description

of Work’ document. Aims are being understood here as high level objectives that descr ibe

the overall service that will be the result of the project and the single technical features of it.

The objectives, that will be subject of the following chapter, will be the measureable goals of

the project that will accomplish the aims of the project and that will be evaluated within the

scope of Work Package 6 of the DORA project. Single components of each project aim, that

were defined in the scope of the DORA project requirements specifications (Task 2.4.

Technical Requirement Analysis and Specification), are added with acronyms in brackets

after each headline. Their full names are mentioned in the descriptions.

Design and Implementation of a DORA Service Platform (PLA) and a Long Term Door-to-

Door Journey Planner (DJP)

As the basic DORA component a seamless and integrated Door-to-Door Journey Planner

(DJP) will be realized to integrate existing transport mode specific real time information

services in one overall intermodal traffic information platform – the DORA Service Platform

(PLA) for land and air transport. The intermodal platform will gather and analyse the

required traffic information in real time, which is necessary to provide needed information

to the air passenger on his journey to the airport, with a seamless information covering all

transport modes and all stages of the journey, and suggest optimal routes for travels to and

from airports. The platform will also be designed for usage by further interested third

parties, such as travel agencies, airlines, airports, etc. By open interfaces which will be

established, they can embed the DORA functionalities in already existing or new

DORA Deliverable D6.1

13 / 74 13 / 74

applications. The concrete target of the objective is to make the Intermodal platform for Air

and Land transport available in its full functionality. Furthermore, the Journey Planer will

enable the end user applications for routing optimization and will integrate technology

solutions for recognition of waiting queues and indoor location services in airports.

Design and Implementation of End-User-Applications for Seamless Mobility Information

(APP /SWA /WEB)

Based on the concept of the Door to Door Journey Planner (DJP), described above, the DORA

project will design and implement applications (APP) for smartphones and the internet.

These applications are enabling the end users to receive seamless mobility information

covering all transport modes and the entire mobility chain from the origin to the airports

and planes, including the final destination. The route, the mode change nodes and the

indoor path in the terminal is shown on maps to support the orientation of the passenger.

Detailed information on expected disruptions like road works and un-predictable events are

given. The smartphone application will be realised as an intermodal routing Planner that

integrates and processes the available real time information on land transport means,

terminal procedures, and air transport. A trip monitoring function of the smartphone

applications will register disturbances on the selected route and provides alternative routes

when necessary. Beside the smartphone applications, the project will also create a

corresponding web application (WEB) and web interfaces for the end users with the same

functionality, to be integrated to web-portals or existing and new mobile applications of

airlines, airports, and further interested stakeholders to allow a broader usage.

Following components are being realized in the scope of this goal:

DORA App (APP) for iOS and Android

DORA WEB GUI (WEB)

Possibly: Smart Watch App (SWA)

Implementation of Personal Information Services (FIS / ILR / SRS / TMS)

The DORA mobility information platform and the smartphone application will be also

designed to ensure personalized services, in order to meet requirements of individual

passengers and specific end users’ groups, such as people with reduced mobility, families

with children, frequent travellers, etc. Thus, the target is that the end users individually can

configure the smartphone application so that the provided routing information is calculated

in accordance with individual mobility preferences and constraints. The personal information

services, being targeting at least three different travellers groups, will be evaluated by the

end users during the planned project trials. Following components can be subsumed under

these goals:

DORA Deliverable D6.1

14 / 74 14 / 74

Flight Information Service (FIS)

Intermodal Landside Router (ILR) for Berlin and Palma

Strategic Routing Service (SRS)

Trip Monitoring Service (TMS)

Implementation of an Incident and Information Management for Airports (MIM)

The Incident and Information Management for Airports system (AIRVIS – Sec. 1.3) is based

on a cooperation of all operation centers involved in control and information of airport-

bound transport and ensures that in case of disruption the airport remains accessible and air

passengers are informed consistently. The DORA information portal (Mobility & Incident

Management Panel – MIM) will also be linked with this incident and information

management system for land and air transport, which is already in place in Berlin. The AIRVIS

system will be extended by terminal strategies including security gates terminal incidents.

The system will be transferred to Palma de Mallorca in the scope of the project.

Design and Implementation of a System for Detection of Waiting Time in Airports (WTS)

It is the traveller’s responsibility to arrive at the airport with enough time to complete all

ticketing, baggage check, and security clearance procedures, but the waiting times at check -

in and security control are not predictable. To handle this, the DORA project will design and

implement a waiting time detection system (Waiting Time Service – WTS) in the airports

based on image recognition. The information gathered in this way will be processed by the

DORA information platform and corresponding end user applications for route optimisation.

To ensure privacy of the passengers and employees in the airports, the planned video

observation procedures will be fully anonymised without possibility to recognise individuals

on the images. Additionally, users can also contribute into detection of delays and queues by

verifying and uploading events into the system. These notifications can be triggered by

detection of any changes in the regular or current moving pattern of the user in combination

with the current location.

Design and Implementation of an Indoor Location and Routing at the Terminal (IP / IR)

The DORA project will explore innovative technologies, e.g. on the WLAN or BLE or beacon

technologies, for indoor location in the airports to be used by the DORA system to suggest

optimal routes to the passengers through terminals, security gates, etc. The passengers will

be located in the airport buildings by analysis of the data available in the WLAN base stations

installed in the airports, so that optimal routes through the buildings can be estimated based

on the passengers locations. Beside usage of the WLAN based stations, the project will also

elaborate further opportunities for the location service such as the development of Indoor

DORA Deliverable D6.1

15 / 74 15 / 74

Location beacons using WiFi and/or BLE radio systems. . After selection of appropriate

approach, the location1 Wireless Local Area Networks service will be implemented and

linked to the overall DORA platform, including its functional testing. The location service will

also be a part of the planned field trials. Components of this goal are:

Indoor Positioning (IP)

Indoor Router (IR)

1.5 Objectives

In this chapter the objectives of the DORA project will be described. This is a first step to

identify appropriate methods on how to measure if they were achieved. The goal of this

chapter is to identify and describe all of the objectives that will be evaluated within this

project. In the next chapter it will be described which methods will be made use of to

measure them. The objectives will be described ordered along their task in Work Package 6,

whereas Task 6.1 will not be regarded since it is the drafting of this deliverable ‘Evaluation

Plan’.

1.5.1 Objectives related to Task 6.2 Technical Evaluation and Assessment

These objectives are addressing the existence, functionality and availability of the technical

components of the DORA service. The results from this evaluation will be summarized in

D6.2 ‘Technical Evaluation and Assessment report’. This is an intermediate report which will

summarize the results from the technical pre-tests (Validation of functionality / Performance

assessment / Troubleshooting tests / Platform test). The following DORA objectives will be

evaluated in this task:

Objective 6.2.1 Development of Intermodal Platform for Air and Land Transport

Main result: The platform is available in its full functionality, enables the Smartphone

application for routing optimization, and integrates technology so lutions for recognition of

waiting queues and indoor location service.

Verification: Successful technical testing of the integrated DORA solution

Objective 6.2.2: Availability of Mobile Smartphone Application for Seamless Mobility

Information

Main result: The smartphone application is available in all project areas with wireless

Internet access and is able to show the best possible routes to/from and in the airports in

the areas involved in the trials.

Verification: Successful technical testing of the smartphone application

DORA Deliverable D6.1

16 / 74 16 / 74

Objective 6.2.3: Functionality of Personal Information ServicesMain result: It is technically possible for the end users to configure the smartphone

application according to the individual mobility preferences and personal constraints.

Verification: The personal information service validated by real end users

Objective 6.2.4 Integration of Mobility and Incident Management Panel into Operation Centers for AirportsMain result: The Intermodal platform for Air and Land transport is available and connected

to different operation centres.

Verification The information management system, is integrated into different operation

centres in Berlin and Palma de Mallorca

Objective 6.2.5: Functionality of System Component for Detection of Waiting Time in AirportsMain result: The DORA system can recognize the queues at designated points in the airports(queue detection system).

Verification: The queue detection and related calculation of the waiting time in airports is integrated with the DORA system.

Objective 6.2.6: Functionality of Indoor Location and Navigation Service componentMain result: The fully functional location service is implemented and linked to the overall DORA platform

Verification: The indoor location and navigation service is integrated with the DORA system.

1.5.2 Objectives related to Task 6.3 Usability Assessment

This objective focuses on the usability of the overall DORA service including all of its components. It addresses only prototype variants of the system and seeks to identify problems in its usability in order to eliminate them during the development phase. In contrast to the previous group of objectives that are dealing with the technical readiness of the components, the objectives in this group are dealing with the usability of the components by users. Results from this evaluation will be summarized in D6.3 ‘Usability Assessment report’ which will summarize the results from the Usability pre-tests (test ofconceptual variants / first prototype test / pre-test before trial phase). The main objective of this task can be formulated as follows:

Objective 6.3. Identification of usability problems of prototypes of the DORA serviceMain result: Prototypes of the DORA service were tested in trials and pre-tests with involvement of real end users. Usability problems were identified summarized and reported back to the developers. The prototype tests comprise all components of the service including the platform as well as the application. It consists of the identification of usability problems concerning three steps during the development process:

DORA Deliverable D6.1

17 / 74 17 / 74

Figure 1 Interlinkage of DORA Objectives

- GUI Concept of DORA application and website

- First Prototype test

- Final pre-test before trial phase

1.5.3 Objectives related to Task 6.4 Evaluation of Impact and Process

The objectives subsumed under this category, are in so far crucial ones for the DORA project as they describe the quality of the result of the project. In contrast to the previous groups of objectives that focus on the possible improvements of the technical and usability features during the development phase, the objectives described in this chapter are dealing with the description of the final product of DORA project. The results of the impact and process evaluation will be summarized in D6.4 ‘Final evaluation report’.

These objectives and their interlinked effects and impacts are shown in the following graph. Later on they will be described in detail and with a focus on their measureable impacts.

DORA Deliverable D6.1

18 / 74 18 / 74

Objective 6.4.1: Reduction of travel timeMain Result: By making use of the DORA integrated information system including the application, the overall time needed for a typical European air travel including the necessary time needed for transport to and from the airports will be reduced by up to 20 %. Thereby DORA can have a significant impact for reaching the high level objective of the EU for 2050 that 90 % of the travels involving air transport within Europe can be completed in 4 hours door to door. DORA comprises three features that will contribute to achieve this objective:

- real time based intermodal routing services for landside transport

- waiting time reduction in terminal based on better information provided by thedetection system

- personalized indoor routing

Objective 6.4.2: Passengers can make informed decisions: Also this goal contributes to make travel times shorter: With DORA passengers will have information that enables them to organize their trips in a time-efficiently and adjusted to personal needs (this is important for mobility-impaired people). To reach the goal that 90 % of DORA App users consider the information provided as useful, the DORA App will provide information on:

- expected and real time travel time for various modes and multimodal travel chains

- delays in air and landside transport

- alternative routes in case of disruptions or technical breakdowns in transport system

- personalized information reflecting the user´s preferences

Objective 6.4.3: Air Transport is well connected to other modes – Accessibility of Airport This objective contributes to travel time reduction as well. But by ensuring the accessibility of the airport through providing information on different modes of transportation with DORA, it will also make the journey to/from the airport less stressful for passengers. Thus the goal is that 90 % of DORA App users consider information on how to travel to and from the airports as helpful. More specifically two features will provide information:

- the DORA App will provide multimodal route recommendations covering landside and air transport information

- the Operation Centre Application ensures accessibility of airports even in case of

disruptions

Objective 6.4.4: Improved Service Quality in Airport terminalThis objective is addressing the reduction of waiting and walking times at the airports. DORA will provide information to reduce waiting and walking times in the terminal by up to 20 %. Two features will be implemented within DORA to achieve this goal:

- the DORA waiting time detection system that helps passengers to complete clearance procedures in terminal

- the personalized DORA Indoor routing system that helps passengers to find the most comfortable way to the plane in the terminal

DORA Deliverable D6.1

19 / 74 19 / 74

Objective 6.4.5: Shift to greener landside transport modes Travelers often consider public transport to the airports too uncomfortable for the transport of bulky luggage or too unreliable to arrive in time at the terminal. Also schedules , tariffs or even the existence of alternative travelling services are not known so that passengers frequently choose to travel by taxi or car. In order to overcome these barriers DORA will implement a time-reliable and comprehensive mobility information system that shows the up-to-the minute transport options, indicates related costs and travel times and personalized needed transport infrastructure. This way, DORA will contribute to reach a share of 50 % of public transport trips to the airports in Berlin and Palma de Mallorca and the corresponding trips from the airports to the final destinations. To reach this goal the DORA App will provide an intermodal route planner with information on travel time, costs and CO2 which might show the attractiveness of public transport.

Objective 6.4.6: Inclusive transport services responding to special needs of travelersTo make air transport accessible and user-friendly to everyone, travel opportunities need to be equitable for all groups of travelers including those with any type of disabilities. The personalized indoor routing services provided by DORA will assist these user groups and help to provide a seamless, barrier-free access of the plane and access to special assistance services at the airports. Thus the DORA App provides personalized travel informationincluding indoor routing for special user groups such as handicapped or elderly persons and families. This way the goal can be reached that 10 % of DORA App users including users with and without special mobility needs use indoor routing services.

Objective 6.4.7: Robustness in case of disruptionsAirports are critical infrastructure and may easily be affected by man -made and natural threats. The potential threats are manifold and range from unattended luggage in the terminal, to accidents and break downs in the transport infrastructure etc. The DORA Operation Centre Application will respond to the occurrence of these threats by providing predefined substitution processes for managing air and landside traffic and consistent passenger information in stations, streets and terminals. It will also provide passenger with alternative transport options. Thus the objective is to develop and implement a No. of predefined substitution processes and information strategies.

Objective 6.4.8: Results from Process Evaluation are availableWithin the DORA project a process evaluation will be carried out. It will assess the main drivers and barriers that occurred during the main phases of the project, including the development and testing phase. It will also assess how the partners reacted on these barriers and drivers: How did the overcome barriers and how did they make use of the unexpected drivers to the project process? This information is essential for the analysis whether the project will have been implemented in a successful way. Thus, and together with the results from impact and result evaluation, these findings from process evaluation can give valuable hints for the transferability of the DORA service to other airports in Europe. DORA will prepare a Process Evaluation Report that summarizes the drivers, barriers, solutions and their relevance for the transferability to other airports that were identified

DORA Deliverable D6.1

20 / 74 20 / 74

during the project lifetime.

Objective: Field TrialsThis task comprises field trials to proof the DORA concept in Berlin and Palma de Mallorca. 500 real end users will be involved in the tests and feedback on usability. This objective is verifiable by the fact that 500 people validated the successful conducting of the field trial with the fully operational and implemented DORA system at both airports.

The following objectives are listed in the DoW as such. But in fact they will be assessed or verified within the deliverables of other Work Packages than WP 6.

Objective 6.4.9: New Cooperation and Business Framework (Deliverable 3.5)Main results of this objective is that appropriate cooperation and business frameworks for DORA have been analyzed and that the most suitable and sustainable solution(s) were selected to develop a cooperation and business framework. The outcome will be a report including the definition of a business framework for various identified stakeholders interested to use the DORA system.

Objective 6.4.10: Wide Public AwarenessThis objective seeks to showcases the pilot of the DORA solution at Berlin Airport and PMI to an extend that it will be widely reported and attract public interest. The outcomes, the Scientific and technological advancements, will be published in leading academic and industry journals. Also the Establishment of an Advisory Group is part of this objective. The visible results of this objective are that the pilot showcases are covered in traditional and social media and in 2-6 scientific or industry journal publications produced annually. The Advisory group meetings will be held regularly. The results of the meetings will be documented.

DORA Deliverable D6.1

21 / 74 21 / 74

Figure 2 Dora Airports

1.6 City and Airport Description Berlin

The proof of the DORA concept and the test of the system will be executed in the field trials

at the airports of Palma de Mallorca and Berlin (Figure 2 Dora Airports), including respective

transportation regions.

The two airports reach more than 40 million of air passengers per year which corresponds to

almost 5 % of all intra-European flights. Germanys 2nd largest airline Air Berlin holds a major

hub at Berlin-Tegel airport and serves connection to Palma de Mallorca up to six times a day,

which together with other airlines amounts to a total of 690,000 passengers travelling

between these two destinations in 2013.

DORA Deliverable D6.1

22 / 74 22 / 74

In addition, the trial sites cover a range of typical travelers that are highly relevant for intra-

European air transport in general:

- Significant number of tourists, in particular from Germany, starting a journey from Berlin.

- Air Commuters: residents of Palma de Mallorca migrated from Germany, which number is increasing, but still work in Germany.

The DORA system will be realized as a technical solution that is easily to be transferred to

other airports. For Berlin in the long-term it is envisaged to realize the DORA system for the

new Berlin airport BER. At present, it is planned to open the BER in 2017 which is in line with

the DORA time schedule. However, to avoid risks for the DORA project and to ensure that

the DORA system can be evaluated in an operating Berlin airport, the technical requirements

for a DORA application in Berlin will be analysed for the existing airport ( SXF) and the future

airport (BER). The implementation of the system and necessary hardware components will

be done in the airport actually in operation at the time of the system testing.

At the Berlin airport 85 % of all departing passengers to destinations in Europa have flight

times less than 2 hours. This indicates that DORA can have a significant impact for reaching

the 4 hour travel time goal of the EU.

The Flughafen Berlin Brandenburg GmbH (FBB) ensures the air traffic infrastructure for the

German capital region of Berlin-Brandenburg by operating the regions two airports,

Schoenefeld (SXF) and Tegel (TXL). The FBB has around 1,500 employees and cooperates

with more than 300 companies to fulfil the requirements of FBB’s stakeholders such as

airlines, ground handling or air traffic control. All together more than 19,000 jobs are directly

linked to the airports. 2013 a total of 26.319.144 passengers flew to or from FBB’s airports.

This represents an increase of 4,2 % in comparison to 2012. With respect to the passenger

numbers, the metropolitan region of Berlin-Brandenburg ranks #3 in Germany and #13

within Europe. The regions positive development of the past years builds a demand for a

new infrastructure. Berlin Brandenburg Airport (BER) will fit this demand as the new single

airport location in south-east of Berlin close to the existing Schoenefeld Airport. BERs

ongoing construction will integrates more state-of-the-art Information and Communication

Technology (ICT) than many other European infrastructure projects. In DORA the FBB will

work on the technical concept, set up a test environment and work on reasonable business

models. FBB expects a continuing growth of passenger figures for the next years and sees a

significant increase of customer experience and satisfaction within DORA.

Berlin Brandenburg Airport will have the best possible connections. Having the six-lane A113

motorway and the six-lane B96a or else the four-lane B96 Berlin provides many alternative

DORA Deliverable D6.1

23 / 74 23 / 74

routes connecting the inner city and the airport. A high-tech traffic management system

called AIRVIS, observing the routes, offers a maximum of traffic information and guidance

before and on the trip. Including the Berlin-Brandenburg public transportation AIRVIS

ensures a 24 hours accessibility of Berlin’s inner city.

All air traffic in the region will be operated from the Schoenefeld site in southeast Berlin. BER

will be a new-generation airport: functional and cosmopolitan distinguished by its modern

architecture. A starting capacity of up to 27 million passengers is expected for 2012.

Depending on passenger development, the airport can be expanded to accommodate up to

45 million passengers.

1.7 City and Airport Description Palma de Mallorca

Palma de Mallorca is a municipality and a Spanish city, capital of the Mallorca Island and the

autonomous community of the Balearic Islands. It is located in the western Mediterranean

Sea and southwest of the Mallorca Island, about 250 km east of the Iberian Peninsula. The

municipality covers an area of 208,63 Km2. The city is located in the centre of the bay of

Palma, about 13 meters above the sea level. With more than 400.000 inhabitants (2011),

Palma de Mallorca is the eighth largest city in Spain by population and the first of the

Balearic Islands. In addition, its metropolitan area includes nine localities reaching 560.2 40

inhabitants in an area of 1015,88 km2, being the 14th of Spain. More than 50 % of the

population lives in the Palma metropolitan area. Mallorca is a major holiday destination with

over 9 million tourists a year, all of them pass through the City of Palm a at arrival and many

of them return to visit the attractive historic city centre. The island has a high car ownership

rate with 900 vehicles per 1000 inhabitants. Mobility culture is still very much based on the

private car, with a modal share of 58 % of trips on the island. The main means of public

transport in Palma is the urban bus and in recent years several improvements to increase

the use of public transport have already been made, including intermodality measures to

connect public transport to cycling and car use. Most of the non-motorised trips in Palma are

made on foot. The city has created pedestrian areas on routes towards the historic city

centre and within the historic centre itself. The cycling lane network has a length of 43.5 km.

In 2011, a new public bicycle system called Bicipalma was launched. To improve accessibility,

attractiveness, environment and health, the different levels of government have designed a

favourable legislative and political framework for the promotion of sustainable mobility. This

is shown by the recent adherence of the municipality of Palma de Mallorca to the CIVITAS

Forum Network, by signing the CIVITAS Forum Network Declaration.

Aeropuerto Palma de Mallorca is the world's leading airport operator. It manages 46 airports

and 2 heliports in Spain and participates directly and indirectly in the management of

DORA Deliverable D6.1

24 / 74 24 / 74

another 15 airports worldwide. Palma de Mallorca International Airport is located eight

kilometres south-east of the city of Palma on the Balearic Island of Majorca, Spain. The

airport is operated by AENA (Spanish Airports and Air Navigation Authority). More

commonly known as Son Sant Joan Airport or Aeroport de Son Sant Joan, it is the third

largest airport in Spain after Madrid's Barajas Airport and Barcelona Airpor t. The airport

serves 22 million passengers and records 180,000 aircraft movements annually. It handles

15,000t of cargo. During the summer months it is one of the busiest airports in Europe, and

was used by 22.7 million passengers in 2012. The airport is the main base for the Spanish

carrier Air Europa and also a focus airport for German carrier Air Berlin. The airport was

awarded the Airport Service Quality (ASQ) Award in February 2012 by the Airport Council

International (ACI). AENA – Palma de Mallorca Airport will mainly participate in the

deployment of the field trials in Palma.

DORA Deliverable D6.1

25 / 74 25 / 74

2 EVALUATION APPROACH AND METHODOLOGY

2.1 Introduction

The evaluation of the DORA service including its single components and as an integrated

system is a complex tasks. Since the service will be developed from the very beginning it is

very important to carry out several intermediate assessments. Thus DORA wil l pursue an

iterative approach that will be described in the following chapter.

2.2 DORA Evaluation Approach

Evaluation activities in DORA will pursue an approach based on the three pillars:

Iterative evaluation,

Impact evaluation and

Process evaluation.

During the development phase of the system: To identify adaption to user needs in an early

stage, an iterative evaluation procedure will accompany all phases of the development. Test

persons will be involved in the concept phase and during the pilot test. The usability of the

service will be tested in pilot activities at the test sites with up to 500 real end users. Another

focus of this iterative evaluation will be to evaluate the technical functionality throughout

the development process. The technical evaluation is accomplished by measurements and

pre-tests for the partial components and systems. It is aiming at resolving and validating

interoperability issues as well as producing performance indicators.

Amongst others, an emphasis is set thereby on indoor navigation in airport buildings up to

the gate. The results of these tests will be analyzed and incorporated in the development

process of the system. This way this iterative evaluation will support the development of a

highly user-friendly and technically well-functioning system.

Evaluation of the impacts (impacts and outputs) of the project will be conducted during and

after the pilot test of the system. By asking the question “Were the objectives of the project

achieved?” this pillar of the DORA evaluation approach represents the core of the evaluation

activities. By evaluating the expected impacts with the corresponding indicators and by

applying suitable measurements and methods for data gathering (qualitative methods with

questionnaires, interviews, focus groups, if applicable control site), the successes of the

project can be demonstrated. Since the success of the system strongly depends on the user

satisfaction, this indicator will be assessed in depth. Surveys addressing the task groups (end

users) and experts will be conducted to find out to which degree the user is satisfied with

DORA Deliverable D6.1

26 / 74 26 / 74

Figure 3 DORA Evaluation Approach

the newly developed service.

Evaluation of the process that leads to the project’s implementation. By conducting surveys

with project partners and other relevant stakeholders, it will assess which barriers hindering

the development and implementation processes, which drivers that had a positive influence

on these processes occurred and which were the lessons learnt from these experiences. The

surveys will be carried out three times during the project lifetime. Together with the result

from the impact evaluation the results from process evaluation will deliver a comprehensive

picture of the expectable benefits from implementing the system, as well as on the process

of the process of its implementation. This is important information for other cities/airports

that are planning to transfer the system to their cities. Moreover process evaluation will

deliver insights on possible improvements of the ongoing implementation process of DORA.

The DORA evaluation approach is visualized in the following figure:

Due to the complex structure of the DORA service with its various components and different

development and testing phases, the evaluation approach seeks to be simple and sound.

Thus wherever possible, evaluation activities should be combined between the sin gle tasks

of evaluation and their corresponding partners, that will carry out the evaluation activities.

In the following figure a simplified time and task structure will be shown that illustrate s the

relation between the evaluation activities and the month in which it will be carried out. It

will focus on the tasks of WP 6 ‘technical evaluation’, ‘usability evaluation’ and ‘impact

evaluation’.

DORA Deliverable D6.1

27 / 74 27 / 74

Figure 4 Evaluation tasks and their relations

Deadlines Technical Evaluation Objectives

6.2.1 - 6.2.6

DORA

Development Steps

Usability Evaluation

Objective 6.3

Impact Evaluation Objectives 6.4.1 –

6.4.7Proj.

MReal

MYear

1 Jun 2015

24 May 2017 Deadline WP 6.3

30 Nov 2017 Deadline WP 6.2

36 May 2018 Deadline WP 6.4

Version I

Component X

Version II

Component X

Concept for Web – App-

GUI

Tech. Eva. Component X

Tech. Concept Eva.

Usability Concept Eva.

Integrated Prototype

Usability Prototype

Eva. Tech.

Prototype Eva. Integrated

Final Product (Alpha

Version)

Tech. Final Product Eva.

Usability Final Product

and Final Report

Final Report Tech.

Assessment

Impact Eva.

Field Tests

and Final

Report

Field Test

DORA Deliverable D6.1

28 / 74 28 / 74

This graph gives a rough overview on the times at which the single evaluation steps will be

carried out. Since it is not definite at what times the single steps of the development of the

components and their integration into the final DORA service will take place, times indicated

in the table are showing the deadlines of the deliverables of the Work package 6 only.

Besides deliverable 6.1 ‘Evaluation Plan’, these are:

D6.2 in month 30: Technical Evaluation and Assessment report. It will summarize the

results from the technical pre-tests and describe alternative and/or backup

approaches for proper and uninterrupted service provisioning.

D6.3 in month 24: Usability Assessment report. It will summarize the results from the

Usability pre-tests and represent a summary of the three intermediate short reports

containing information on the identified usability problems and recommendations

for improvements that will be provided to the developers of the system during the

development phase.

D6.4 in month 36: Final evaluation report that will summarize the findings resulting

from the impact, usability and process evaluation. It will be the central document to

demonstrate to which degree the objectives of the project were achieved and how

they were achieved (process evaluation) and contain recommendations for

transferability to other cities.

The Graph further lists the DORA development steps. They can be described according to the

‘Description of Work’ with the following tasks and delivery dates:

‘Version I Component X’: The architecture of the components are being developed

with task ‘3.2.1 Waiting Time Detection (= Waiting Time Service: WTS) ’, ‘3.2.2

Indoor-Location and Indoor Routing (IP / IR)’, ‘3.2.3 Intermodal Landside Router (ILR)

and Flight Routing Service (= Flight Information Service: FIS)’, ‘3.2.4 Trip Monitoring

Service (TMS)’, ‘3.2.5 Door-to-Door Journey Planner (DJP) and Strategic Routing

Service (SRS)’. First versions are being developed in the scope of work package ‘4.1

and 4.2 which is due end of year 2016 (M18/M19).

Version II Component X: Here the same components as in version I are dealt with.

They now were improved or developed further according to the results of the

technical evaluation carried out after the first development step.

Concept for Web-App-GUI: This concept demonstrates the first draft of the task ‘3.3

Specification of DORA Applications’ that includes tasks ‘3.3.1 Operation Centre

Application’ and ‘3.3.2 End User Applications’. It is being developed in the scope of

work package 3. These subtasks are due in month 14.

DORA Deliverable D6.1

29 / 74 29 / 74

Integrated Prototype: It is the first draft for the integration of the system in which all

single components are technically integrated. It is being developed in the scope of

work package 4 Software Development and Integration. It will be developed between

months 10 to 24.

Integrated Final Product (Alpha Version): It contains the components of the first

integrated prototype that were improved or further developed according to the

findings of technical and usability evaluation. It is being developed in the scope of

work package 4 Software Development and Integration. The integrated final product

will be due in month 24.

‘Field Test’ describes the final product of DORA service. It will be tested by involving a

number of end users to demonstrate if the DORA objectives were achieved. It will

focus on the evaluation of impacts and user satisfaction. The field test will be carried

out within the scope of work package ‘5 Pilot Execution’ and be finalized in month 36

with delivering the final evaluation report.

DORA Deliverable D6.1

30 / 74 30 / 74

2.3 Methods and Operationalization

2.3.1 Technical Evaluation

DORA developments are divided into three main categories: Services, Applications and

Technology

Each category follows a different development methodology (Table 1).

DORA Deliverable D6.1

31 / 74 31 / 74

Table 1: Development Methodologies

Development Category Methodology Details

Services:

D2D Journey Planner (DJP)

Indoor Router (IR)

Intermodal Landside Router

(ILR)

Flight Information Service (FIS)

Trip Monitoring Service (TMS)

Strategic Routing Service (SRS)

Waterfall It is expected that a clear view of

the final outcome is defined and

remains stable until the

completion of the project. The

different components are

progressing in parallel.

Applications:

Operation Center (MIM)

Web (WEB)

App (APP)

Agile The aspects of the applications

are expected to evolve

throughout the project’s lifetime.

The final outcome will be subject

to gradual inclusion and update of

ergonomic requirements.

Technology:

Waiting Time Detection (WTS)

Indoor Location (IP)

Prototyping The final outcome involves

hardware components. A limited

number of prototypes revisions is

possible to be produced and the

process can last for a few

iterations in order to produce

mature and efficient products.

Evaluation Plan Approach for Waterfall Methodology Related Developments

The evaluation/validation plan to be followed for the Services is aligned with the related

phases of the waterfall methodology (Requirements Analysis, Design, Development, Testing)

and therefore broken down to sub-plans to be followed for the proper completion of each

phase. The forward evolution of the waterfall methodology necessitates that each phase

should be evaluated positively since it defines the starting point for the next one (evaluation

of the Requirements Analysis was performed during the preparation of D6.1.)

i. The output of the Requirements Analysis was subject to verification that the Use Cases

wish list is properly addressed and there is not any part of system behavior that has not

DORA Deliverable D6.1

32 / 74 32 / 74

been mapped to any adequately described requirement. The Technical Requirements

and Specification Task (T2.4) took place from M4 (September 2015) to M9 (February

2016) while the Use Cases were produced by the end of M7 (December 2015). During

M8 (January 2016) the existing set of requirements that had been produced up to that

point was analyzed against the Use Cases so as to be consolidated as well as to be

completed in case of identification of any non-addressed aspect. The outcome of this

process was provided as feedback to Task 2.4.

ii. The design phase as far the services are concerned is expected to have reached a

mature state by the end of the first year (M12). The aspects addressed by the

requirements will have been taken into account in the reference architecture as well as

in the design of the services. The work produced by Tasks 3.1 & 3.2 will be analyzed on

the basis of the consolidated requirements during M11 and M12 and feedback will be

provided to the design teams.

iii. The services design teams will identify the development roadmap of all the architecture

components to be produced during M10 and M11. A preliminary high-level roadmap is

provided in the next paragraphs to indicate the various correlations among the services.

Times of different development steps could change and the evaluation phases will adapt

accordingly, but deadlines of deliverable will be kept. For each version/release of the

development systems the set of requirements satisfied will be identified. For each of the

requirements relating to a specific version release a set of tests and benchmarking

indicators mainly relating to performance will be detailed. The combination of release

dates and test and benchmarking indicators will be used to plan the activities that will

be performed in the context of the actual evaluation task (Task 6.2).

iv. The execution and output of the evaluation activities planned in the context of Task 6.2

will realize the testing phase of the developments and will be carried out in the staging

environment. The findings will be analyzed and feedback will be provided to the

development teams for improvements or resolution of bugs.

v. The context of the evaluation process relating the overall integration will be addressing

the maintenance phase of the services development methodology. The

evaluation/validation actions performed in the context of the operation of the overall

platform will be resulting (if any) in feedback to be taken into account by the

responsible development team.

Evaluation Plan Details

The following matrix summarizes the integration roadmap among the various components

as well as the roadmap regarding interface definition and setup among these. In the

indicated projects months a number of aspects will evaluated as indicated in the next

paragraphs. The full integration phase is expected to take place between M19 and M22. Any

DORA Deliverable D6.1

33 / 74 33 / 74

changes in the roadmaps presented will be reflected on the Evaluation Plan and the

scheduling of the corresponding activities.

Table 2: Evaluation Roadmap for Services

PS ILR SR FS TM IR DJP Open API

B2B API

PS M14-M15

ILR M18-M19

M14-M15

SR M14-M15

M13-M14

M14-M15

M14-M15

FS M18-M19

M14-M15

M19-M20

M13-M14

TM M14-M15

M15-M16

M14-M16

IR M18-M19

M14-M15

DJP M18-M19

M16-M17

M18-M19

M16-M17

M18-M19

M16-M17

- M21-M22

M14-M15

Integration/Basic Transactions – I/F Setup

D2D Journey Planner (DJP), Intermodal Landside Router (ILR), Strategic Routing (SR S), Flight Information

Service (FIS), Trip Monitoring Service (TM), Indoor Router (IR)

D2D Journey Planner

The specification of the DJP (D2D Journey Planner) service started in M7 and completes in

M14 whereas the development of the service lasts from M12 to M21.

DJP interfaces with the following services:

Intermodal Landside Router (ILR)

Strategic Routing Service (SRS)

Flight Information Service (FIS)

Trip Monitoring (TMS)

Indoor Router (IR)

The following table summarizes the development roadmap along with the

features/requirements to be evaluated per release. The evaluation of the final release will

ensure that all the UC related functionality is available and thus Objectives 6.2.1, 6.2.3, 6.2.4,

6.2.5 and 6.2.6 have been achieved.

DORA Deliverable D6.1

34 / 74 34 / 74

Table 3: DJP Development Roadmap

Month M14-M15 M16-M17 M18-M19 M19-M22

Details Data structures and REST functionalities verifiedOpen B2B API

DJP_003Basic Transactions

DJP_004Basic Transactions

DORA Open APIFull Integration

PS I/F setup Integration Support of UCs

ILR I/F setup Integration Support of UCs

SR I/F setup Integration Support of UCs

FS I/F setup Integration Support of UCs

TM I/F setup Integration Support of UCs

IR I/F setup Integration Support of UCs

Indoor Router

The specification of the IR (Indoor Router) service started in M5 and completes in M12

whereas the development of the service lasts from M10 to M21. IR interfaces with the

following services:

D2D Journey Planner (DJP)

Strategic Routing (SR)

And also with the following prototypes:

Queue Detection System (QD)

Indoor Location System (IL)

The following table summarizes the development roadmap along with the aspects to be

evaluated per release. The evaluation of the final release will ensure that all the UC related

functionality is available and thus Objective 6.2.6 has been achieved.

DORA Deliverable D6.1

35 / 74 35 / 74

Table 4: IR Development Roadmap

Month M12-M13 M14-M15 M16-M17 M18-M19 M19-M22

Details Basic Transactions

Data structures and REST functionalities verified

Basic Transactions

Basic Transactions Full Integration

DJP I/F setup Integration Support of UCs

SR I/F setup Integration Support of UCs

IL Integration Support of UCs

QD Integration Support of UCs

Intermodal Landside Router

The specification of the Intermodal Landside Router (ILR) service started in M7 and

completes in M12 whereas the development of the service lasts from M10 to M21.

ILR interfaces with the following services:

Strategic Routing Service (SRS)

D2D Journey Planner (DJP)

The following table summarizes the development roadmap along with the aspects to be

evaluated per release. The evaluation of the final release will ensure that all the UC related

functionality is available and thus Objectives 6.2.1, 6.2.4, 6.2.5 and 6.2.6 have been

achieved.

Table 5: ILR Development Roadmap

Month M14-M15 M16-M17 M18-M19 M19-M22

Details Data structures and REST functionalities verifiedOpen B2B API

Basic Transactions

Basic Transactions

DORA Open APIFull Integration

DJP I/F setup Integration Support of UCs

SR I/F setup Integration Support of UCs

DORA Deliverable D6.1

36 / 74 36 / 74

Flight Service

The specification of the Flight Search (FS) service started in M7 and completes in M12

whereas the development of the service lasts from M8 to M19.

FS interfaces with the following services:

Strategic Routing (SR)

D2D Journey Planner (DJP)

The following table summarizes the development roadmap along with the aspects to be

evaluated per release. The evaluation of the final release will ensure that all the UC related

functionality is available and thus Objective 6.2.1 has been achieved.

Table 6: FS Development Roadmap

Month M14 M16 M18 M19

Details Data structures and REST functionalities verifiedOpen B2B API

Basic Transactions

Basic Transactions

DORA Open API

DJP I/F setup Integration Support of UCs

SR I/F setup Integration Support of UCs

Trip Monitoring

The specification of the Trip Monitoring (TM) service started in M7 and completes in M12

whereas the development of the service lasts from M10 to M19. TM interfaces with the

following services:

Door2Door Journey Planner Service (DJP)

The following table summarizes the development roadmap along with the aspects to be

evaluated per release. The evaluation of the final release will ensure that all the UC related

functionality is available and thus Objective 6.2.4 has been achieved.

DORA Deliverable D6.1

37 / 74 37 / 74

Table 7: TMS Development Roadmap

Month M14-M15 M15-M16 M18-M19 M19-M22

Details Data structures and REST functionalities verifiedOpen B2B API

DORA Open API

Basic Transactions

Full Integration

DJP I/F setup Integration Support of UCs

Strategic Routing Service

The specification of the Strategic Routing (SR) service started in M7 and completes in M14

whereas the development of the service lasts from M10 to M19.

SR interfaces with the following services:

Intermodal Landside Router (ILR)

Door2Door Journey Planner Service (DJP)

Flight Search (FS)

Indoor Router (IR)

The following table summarizes the development roadmap along with the aspects to be

evaluated per release. The evaluation of the final release will ensure that all the UC related

functionality is available and thus Objectives 6.2.1, 6.2.3, 6.2.4, 6.2.5 and 6.2.6 have been

achieved.

Table 8: SRS Development Roadmap

Month M13-M14 M14-M15 M18-M19 M19-M22

Details Data structures and REST functionalities verified

Data structures and REST functionalities verified Basic

Transactions

Full Integration

ILR I/F setup Integration Support of UCs

DJP I/F setup Integration Support of UCs

FS I/F setup Integration Support of UCs

IR I/F setup Integration Support of UCs

DORA Deliverable D6.1

38 / 74 38 / 74

Evaluation Plan Approach for Agile Methodology Related Developments

Agile development methodology is expected to be applied for web and app based

applications. The applications will be using the services infrastructure but they also focus on

other aspects relating to ergonomic features, responsiveness and performance. All the

qualitative aspects will be evaluated in the context of Task 6.3 while functional aspects will

be evaluated in Task 6.2.

Although the agile developments are expected to be highly dynamic with ev aluation phases

being an integral part of each design-development-test iteration, the evaluation plan from

the project perspective covering the main requirements that have been collected in the

context of T2.4 is presented in the sequel to be followed without hindering the actual

methodology (e.g. Scrum).

The analysis of the requirements performed during M8 included also to requirements

addressing applications.

The final versions of the applications will be validated against the UC envisaged functionality

thus Objectives 6.2.2, 6.2.3, 6.2.4, 6.2.5 and 6.2.6 have been achieved.

Operation Centre Application

The specification of the Operation Centre Application starts in M9 and completes in M14

whereas the development lasts from M10 to M24. Since the Operation Centre will be

developed in a number of design-develop-test iterations according to the agile methodology

principles, three evaluation phases will be scheduled for M18, M21 and M24.

Web & APP

The specification of the WEB application and Mobile App starts in M9 and completes in M14

whereas the development lasts from M10 to M24. Similar with the Operation Center the

applications will be evaluated during the same phases in M18, M21 and M24.

Evaluation Plan Approach for Prototypes

The prototypes that will be produced in the project (Queue Detection, Indoor Location) are

enabling technologies that are utilized by both applications and services. They ar e expected

to produce information which other components use to perform more complex calculations

and associations, sometimes transparently to the end user, for the provision of added value

services.

The process for evaluating the prototypes is quite similar to the waterfall methodology

related developments. The starting point for the composition of the requirements is the

wish list of features relating to the system components utilizing the prototypes. The

requirements for the prototypes were produced in M7 (December 2015). Similar to the

DORA Deliverable D6.1

39 / 74 39 / 74

waterfall methodology case the prototype requirements were evaluated against the wish list

so as to identify any missing aspects or non-addressed functionality.

Once the requirements were consolidated (M9) a plan for the production of prototypes was

composed and is appended in the next paragraphs. Since the number of prototype revisions

is restricted, the main factors that may impose the need for a revision have been clearly

identified and correlated with the actual testing and evaluation results that have to be

collected. The progress of the overall system components has been taken into account so

that the evaluation plan for the prototypes aligns with the availability of those components

(or mockups) that need to be present for validating the prototypes as close to real

conditions as possible.

Proper functionality of the prototypes is closely related with the achievement of Objectives

6.2.5 and 6.2.6.

Waiting Time Detection

The Waiting Time Detection prototypes are will be developed from M8 to M19. A first

evaluation of the initial versions will be performed by Eureva in its premises during M12 -

M14. whereas later and more mature versions will be evaluated on site (airports) during

certain experimentation phases that will be scheduled in advance in coordination with the

airport administration. It is expected that the on site evaluation will be performed from

M16-M19.

Indoor Location

The design of the Indoor Location prototypes (DORA WiFi Beacons) started in M5 and will

evolve until M12 while related software and integration tasks start in M8 and last until M18.

The first prototype were provided in M8. The prototype will be evaluated both by UPVLC and

CSE in their premises during M9 and M10. CSE will focus on laboratory testing (CSE setup)

for battery and power management issues prior to delivering a number of Beacons to

UPVLC. UPVLC will focus then on usage of the Beacons for accurate position resolution.

Evaluation of the prototypes also under close to real conditions will be attempted, therefore

the beacons will be installed in public places (UPVLC setup) where ambient conditions,

crowd and building peculiarities can be affecting the performance of the system.

The first phase of the evaluation therefore is expected to produce feedback regarding:

Tx power adjustment

SSID management

Fingerprinting

Ambient conditions impact

Beacon transmission intervals

DORA Deliverable D6.1

40 / 74 40 / 74

Battery life in relation to the above aspects

The collected results will be analyzed and potential design changes will be identified during

M10. In view of the actual power consumption details the BLE implementation feature on

the same or separate boards will be analyzed in M10. A next run of prototypes addressing all

the collected feedback as well as the necessity for BLE will provided in M12. In the second

prototype attention will be paid so that further customization will not need hardware

redesign. The second prototype will address several other aspects such as casing, mounting

and battery recharging. The evaluation of the second prototypes will be performed inside

airports between M16 and M18.

2.3.2 Usability Evaluation

In this chapter it will be described why and how Usability Evaluation will be carried out.

The main goal of the Usability Evaluation is to assess usability criteria in order to identify

possible problems with the design of the interfaces at an early stage during the conceptual

phase and during its integration phase. Also the usability evaluation in DORA will follow an

iterative approach. It will be carried out at three steps during the development phase of the

DORA system (cp. blue boxes in Figure 4 Evaluation tasks and their relations). The subjects of

usability evaluation during these development steps will be:

- Usability Evaluation of the Concept for the Web and App GUI

- Usability Evaluation of the DORA Prototype

- Usability Evaluation of the Integrated Final Product (DORA system Alpha Version)

When it comes to usability evaluation of websites or Apps, there is a wide range of possible

criteria that can be assessed. Those criteria are described in various norms such as with the

norm of the International Organization for Standardization ISO/IEC TR 25060:2010. It

contains “… formats (CIF), that document the specification and evaluation of the usability of

interactive systems. It provides a general overview of the CIF framework and contents,

definitions, and the relationship of the framework elements. The i ntended users of the

framework are identified, as well as the situations in which the framework may be applied. ”

Moreover standards for systems and software engineering, systems and software products,

quality requirements and evaluation (SQuaRE), a common industry format (CIF) for usability

as well as a general framework for usability-related information are included. [7]

Other Standards that include criteria for usability evaluation are the DIN EN ISO 9241

‘Ergonomics of the interaction between humans and systems’, released from the German

national standardization institute. It seeks to set the frame for the evaluation of dialogue

systems and presents standards for keyboards, dialogue menus, user guidance,

DORA Deliverable D6.1

41 / 74 41 / 74

terminologies, display of information, requirements for optical electronical displays, etc.. or

‘DIN EN ISO 14915’ for the software ergonomics for multimedia user interfaces, that

includes requirements for design, navigation and combination of media.[6]

There are also plenty of guidelines and standards that have to be taken under consideration

when designing and developing websites or apps that can meet the special requirement for

people with disabilities. Since these groups are relevant for the development of the DORA

system, accessibility standards will be in the focus of the usability evaluation. The ‘World

Wide Web Consortium (W3C)’ has developed Web Content Accessibility Guidelines (WCAG)

which can be found for example at the website of the Web Accessibility Initiative. The WCAG

were developed “… through the W3C process in cooperation with individuals and

organizations around the world, with a goal of proving a single shared standard for web

content accessibility that meets the needs of individuals, organizations, and governments

that presents criteria that will serve as an example for the criteria that will be assessed

within the usability evaluation of the DORA service:

Figure 5 Web Content Accessibility Guidelines 2.0 - success criteria examples for DORA

Text Alternatives: Provide text alternatives for any non-text content so that it can

be changed into other forms people need, such as large print, braille, speech,

symbols or simpler language.

Time-based Media: Provide alternatives for time-based media

Adaptable: Create content that can be presented in different ways (for example

simpler layout) without losing information or structure

Distinguishable: Make it easier for users to see and hear content including

separating foreground from background

Keyboard Accessible: Make all functionality available from a keyboard

Enough Time: Provide users enough time to read and use content

Seizures: Do not design content in a way that is known to cause seizures.

Navigable: Provide ways to help users navigate, find content, and determine where

they are.

Readable: Make text content readable and understandable.

Predictable: Make Web pages appear and operate in predictable ways.

Input Assistance: Help users avoid and correct mistakes.

Compatible: Maximize compatibility with current

and future user agents, including assistive

technologies.

The iterative usability approach pursued by DORAA

foresees three assessment during the design process. This

Formative evaluation is a type of

usability evaluation that helps to

"form" the design for a product

or service. Formative evaluations

involve evaluating a product or

service during development,

often iteratively, with the goal of

detecting and eliminating

usability problems.[10]

DORA Deliverable D6.1

42 / 74 42 / 74

formative approach seeks to save financial and working time resources linked to the

technical development of the system. Thus formative usability evaluation methods will be

taken under consideration for the application in DORA (selection)[12]:

Focus groups: a small group of potential end users or developers (5-8) will discuss

the requirements of a system

User diaries: the users document their behavior and experiences after interacting

with the system

Field observation: users will be observed and interviewed in their natural

environment

Retrospective interview: after the interaction with a system, the user are

interviewed, face to face, via telephone or video connection

Questionnaires: users will be asked to reply to questions in a questionnaire after

they were interacting with the system

‘User Experience Questionnaire (UEQ)’. It is structured to “… allow a quick

assessment of the user experience of interactive products. The format of the

questionnaire supports users to immediately express feelings, impressions,

and attitudes that arise when they use a product.”[11]

Heuristic evaluation: usability experts review the interface and compare it against

accepted usability principles

Thinking out loud: users say aloud what they are doing during the use of a system,

why they do it and what they are thinking, what feelings they have.

Participatory Workshop: People are brought together to seek and discuss their

opinions concerning usability issues, and to elaborate solutions for identified

problems. It happens in a friendly and creative atmosphere

The most appropriate methods for the assessment of each DORA usability evaluation step

will be selected in the scope of the project. At places a combination of several methods can

be appropriate. Also, due to time, financial or personnel limitations, some methods might

have to be carried out in a reduced or simplified way. In order to carry the respective

method out in a sound manner, close attention will be paid to the preparation of the

usability tests.

The U.S. Department for Health and Human Services has released a guideline planning a

usability test.[8] It gives information concerning all features of the test including its scope,

purpose, schedule and location, required equipment, the participants and their roles, etc.

These guidelines (cp ANNEX) will be taken under consideration for the preparations of the

usability evaluation in DORA.

In the following, the features of the three user tests that will be carried out in DORA will be

DORA Deliverable D6.1

43 / 74 43 / 74

described. Details for the implementation of the tests, are still subject of specification. Times

for carrying them out (In the DoW all usability evaluation activities are scheduled from

month 16 = Sept. 2016, to 24 = May2017), DORA partners to be involved or resources to be

allocated, will be defined during the further development process of the DORA system:

Table 9: Operationalisation - usability test of conceptual variants

1) Assessment of different conceptual variants of the system

Short

description

The different conceptual drafts of the Web and App GUI will be assessed by

target group persons evaluation will result in identifying which variant of the

system is the most preferred one.

Method(s) Participatory Workshop: Up to 5 members of the DORA Advisory Board and +

up to 5 usability experts will be brought together in a workshop. The

conceptual drafts will be presented and discussed along usability criteria and

qualitative questions. The same review workshop will be carried with

representatives of the predefined DORA User Groups. The results will be

analyzed, and reported in words and graphs to the developers of the system.

Time Preparation: Months 11 - 12

Conduct: Month 13

Reporting: Month 14

Partners

involved

Partners involved in development of the front end (App, Web GUI), VMZ,

ETRA, TUB

Specifics The dates for conducting this evaluation were changed compared to the

times indicated in the DoW. This is because the first draft of the conceptual

Web and App GUI will be finalized in month 14 (July 2016) already.

Tasks - Identification of reviewers

- Planning of Workshops

- Preparation of usability criteria

- Analysis of results and reporting

DORA Deliverable D6.1

44 / 74 44 / 74

Table 10: Operationalisation - usability test of first prototype

2) Testing first prototype

Short

description

Testing first prototype of the system in order to identify usability problems.

This prototype includes first functioning components. The test persons will

have to accomplish several tasks and report their experiences made while

using it in a simple questionnaire. This way, occurring problems and

corresponding improvements with handling the system will be identified.

Method(s) To complete this assessment the test users will report their experiences with

using the system in a questionnaire that ask in a structured way according to

predefined usability criteria. There are standardized questionnaires available

that will be used for it: The ‘User Experience Questionnaire (UEQ)’ contains

26 bipolar items on a scale of 7 steps. Scales are ordered along criteria such

as Attractiveness, perspicuity, efficiency, stimulation, novelty or

dependability.

Ideally these test users will be chosen according to the user groups as

defined in WP 2.2. The number of test persons should be at least 5.

Additionally up to 5 usability experts will be asked to accomplish the tests.

The analysis will be accomplished by applying the same method as for the

assessment of different conceptual variants.

Time Preparation: One month before the development of the first prototype will

be finished (Task 4.4 Integration and Initial Testing (M16-

M24))

Conduct: During first month of existence of first prototype (M16-M24)

Reporting: One month after conduct of tests (M16-M24)

Partners

involved

Partners involved in development of the front end (App, Web GUI), VMZ,

ETRA, TUB

Specifics The tests should be carried out towards the beginning of the time period of

Task 4.4 Integration and Initial Testing (M16-M24). Towards the end of this

period the last system pre-test before trial phase should be conducted. Each

set of usability evaluation takes 3 month, accordingly the first prototype test

could be conducted in the month 16 – 18, and the last pretest in the month

DORA Deliverable D6.1

45 / 74 45 / 74

22 – 24.

This test cannot be carried out under real time conditions. For example it will

not be possible to plan and travel the whole trip between Berlin and Palma

in reality. Thus, 2-3 test scenarios have to be simulated (programmed) for

the test users.

Tasks- Identification of test persons

- Identification of interviewees

- Preparation of guidelines and selection of usability criteria (by experts) for

the interviews

- Analysis of results and reporting

- Creation of trip simulations (test scenarios) for test users

Table 11: Operationalisation - last usability test before trial phase

3) Last system pre-test before trial phase

Short

description

This test will evaluate the entire system with regard to the main usability-

objectives of the project (objective 6.3. Identification of usability problems of

prototypes of the DORA service).

Method(s) This test should be conducted under ‘real’ conditions: Up to 5 experts should

test the Web and App service throughout the entire trip between Berlin and

Palma. This can be accomplished by mobilizing members of the DORA

consortium when they travel between these cities for DORA project

meetings.

These test persons should report their behavior and experiences after

interacting with the system in user diaries. The user diary will be structured

along the User Experience Questionnaire (UEQ). Afterwards they should

present their experiences in a focus group meeting during i.e. a DORA

consortium meeting, in which further necessary usability adjustments of the

system will be discussed.

Time Preparation: One month before the development of the Integrated Final

Product (Alpha Version) will be finished (Task 4.4 Integration

and Initial Testing (M16-M24))

Conduct: During the first month of existence of the integrated final

DORA Deliverable D6.1

46 / 74 46 / 74

product (M16-M24)

Reporting: One month after conduct of tests (M16-M24)

Partners

involved

Partners involved in development of the front end (App, Web GUI), VMZ,

ETRA, TUB

Specifics These tests should be carried out towards the end of the time period of Task

4.4 Integration and Initial Testing (M16-M24), for example during month 22

– 24 (cp 2, Testing first prototype)

Tasks- Identification of test persons

- Identification of interviewees

- Preparation of a template for the user diaries

- Preparation of a focus group meeting in Berlin or Palma de Mallorca

- Analysis of results and reporting

Note: The usability evaluation has many overlaps with the technical evaluation. Criteria such

as functionality, robustness or responsiveness and performance of the system that will be

evaluated in task 6.2 Technical Evaluation do also influence the usability of the system. Thus;

both of these evaluation activities will have to be accomplished in close coordination . This

refers to the planning, conduct, analysis and reporting.

The results of each step of usability evaluation carried out within this work package will be

(three) short intermediate reports about the identified usability problems and with

recommendations for improvements. They will be disseminated within the project

consortium. These short reports will be summarized in the deliverable “D6.3 Usability

Assessment report” to be delivered in month 24.”

DORA Deliverable D6.1

47 / 74 47 / 74

2.3.3 Results Evaluation

This chapter is describing the evaluation approach and methods to be used for the

evaluation of the results of the DORA project. According to the description of work that was

granted by the commission, this section comprises:

- Impact Evaluation

- Evaluation of User Satisfaction

- Process evaluation

It should be mentioned from the beginning of this chapter, that actually only the first both

elements, impact evaluation and evaluation of user satisfaction, are purely referring to the

assessment of the results of DORA. Process Evaluation however describes the results of the

assessment of the project process but it does not focus on the results of the project alone. It,

moreover, also looks at the processes of the entire time span of the project. Thus it can be

regarded as an evaluation task that is ongoing throughout the project but that will be finally

accomplished by compiling a final report at the end of the project.

Impact Evaluation (Task 6.4.1). It can be defined as the following:

“Impact evaluation illustrates changes which are attributed to an intervention such as a

project, measure or policy which was planned and implemented to reach a formulated goal.

In contrast to outcome monitoring which examines whether targets have been achieved,

impact evaluation is structured to answer the question: How would outcomes (…) have

changed if the intervention had not been undertaken?”[4]

Thus, and in order to carry out a sound impact evaluation the following steps have to be

taken under consideration:

- Before data collection.

This is the basis to be able to compare the data with the after data collection. This

comparison will show the effect of the measure. Thus, the first step is to establish a

baseline (before data) of data collections, possibly in different points of time. This

way long term developments can be identified.

- Establishing a Business as Usual scenario.

This step is necessary to identify what would have happened if the measure was not

introduced. There are plenty factors that possibly can influence the subject under

evaluation. An example for DORA could be that even without using the DORA App

travel times of travelers are being reduced because new, shorter connections

between sites were built during the time of data assessment. These effects have to

be excluded from the ‘After Measurements’ to know the exact effect that can be

attributed to a measure.

DORA Deliverable D6.1

48 / 74 48 / 74

Figure 6: Baseline and Business-As-Usual Scenario [4]

- Collection of After- Data (ex-post) after the measure was implemented.

This is to compare the situations before and after the implementation and to analyze

the results from this comparison. As mentioned, effects of other factors that had an

influence on the after data have to be excluded.

In

DORA, Impact Evaluation will focus on the expected impacts to be evaluated during pilot

execution at Berlin and Mallorca airports (described in chapter 1.6 under the heading

‘Objectives related to Task 6.4 Evaluation of Impact and Process’). The goal of the evaluation

activities is to prove if the objectives of the DORA project were achieved and to which

extend this happened.

An important difference to the impact evaluation methodology, described in Figure 6, is

however that in DORA the impacts of the project cannot be measured over time, before and

after the implementation of the new service. There will be only one central pilot execution

of the service at the airports in Berlin and Palma de Mallorca. These field test will take place

at one day. Long term effects or impacts resulting from applying DORA at airport can thus

not be measured within the lifetime of DORA since this project ends with the pilot test.

Consequently Impact Evaluation in DORA will focus on the measurements that can be carried

out during the pilot test of the final product. The results of these analyses will be

DORA Deliverable D6.1

49 / 74 49 / 74

documented in the final evaluation report. This will also include recommendations for future

implementations that resulted from the assessments carried out within DORA .

Since the results of this assessment should show to what extend the project’s outcome

meets the formulated objectives, the step of choosing adequate methods and indicators is of

outmost importance.

The indicators should be chosen in a way that they are clearly matching the objectives. A

pragmatic criterion for their selection is also that they are reliably an d feasibly measurable.

Possibilities of ‘bundling’ should be proven (one indicator can be taken to measure the

effects of several components or features of a project).

As mentioned above the objectives 6.4.1 to 6.4.7 are subject of the Impact Evaluation

carried out within the DORA project. They are precisely described and include descriptions of

indicators already. The following table gives an overview on these objectives and their

corresponding indicators.

Table 12 DORA objectives and their indicators

Objective Nr.

Objective description Indicator Indicator description

6.4.1 The necessary time needed for

transport to and from the

airports will be reduced by up

to 20%

Travel Time Time needed for trips to and from

the airport (destinations:

Accommodation or home)

6.4.2 90 % of DORA App users

consider the information

provided as useful

Informed

decision

making

Number of passengers that

consider the information provided

as useful (real time travel info /

delays / alternative routes /

personalized information

provision)

6.4.3 90 % of DORA App users

consider information on how to

travel to airport by different

modes of transportation as

helpful

Multimodal

Accessibility

Percentage of users that perceives

information on accessibility of

airports by different transportation

modes as helpful

6.4.4 Service Quality: waiting times in

the terminal will be reduces by

up to 20 %

Service

quality

waiting time

Percentage of time reduction for

waiting at queues at airports

DORA Deliverable D6.1

50 / 74 50 / 74

6.4.5 DORA will contribute to the

goal that 50% of all trips to

/from the airports in Berlin and

Palma de Mallorca will be done

by public transport

Modal Split Percentage of travelers that reach

(or leave) the airports in Berlin and

Palma de Mallorca by Public

Transportation

6.4.6 10 % of DORA App users use

indoor routing services

Accessibility Percentage of DORA App users that

are making use of the indoor

routing services

6.4.7 Implementation of a number of

predefined substitution

processes and information

strategies for disruption cases.

(number = tbd)

Robustness

of service

Number of predefined substitution

processes and information

strategies for disruption cases

developed and implemented in the

DORA service.

After the objectives have been clearly defined and after the indicators to measure them

have been identified the next step in drafting the evaluation plan is to find appropriate

methods for conducting the measurements and data assessments. H ere method of ‘Control

Site Evaluation’ offers a number of advantages especially in evaluating the time -depending

impacts of 6.4.1 and 6.4.4. They should be assessed with a control site approach since it

allows to have a direct comparison between users having been exposed or not having been

exposed to the measure:

Control Site Evaluation:

The comparison of a group or area that was exposed to the effect of a specific intervention,

to a group or area that was not exposed to it, is being regarded as the ‘str ongest and thus

preferable evaluation design’ [4]. These groups have equivalent characteristics e.g. regarding

their size, composition (age / gender / social status) – the only difference is the exposition

toward the measure. Both groups – the one with and the one without exposition to the

measure will be tested before and after measure implementation at the same times and

with the same data collection methods. The reasons why this method is the most preferable

one are:

The comparison will show in a simple and sound way, which effect the measure will have.

Depending on the method used to assess the groups, specific effects can be easily compared

and analyzed Applying this evaluation design allows to clearly allocate the information

inquired to the single objectives of the measure.

DORA Deliverable D6.1

51 / 74 51 / 74

The most important advantage is that external factors can be excluded: The results from

comparing the groups will show the real effect from this measure, because external effects

coming from other factors, are excluded. This exclusion is caused by the fact that external

effects (such as cheaper fuel prizes, that have not relation to the measure, but that would

possibly lead to an increased usage of private cars) are effecting both sites or both groups.

This way, impacts of the measure can be clearly separated from other factors that is

influencing the group concerning the indicator assessed.

Reflecting the indicators presented in Table 12, it can be stated that only for the objectives

6.4.1 and 6.4.4 a direct comparison between users and non-users is necessary to evaluate

the impact of the measure. Since both indicators are not related to each other, it is from the

methodological point of view also possible to measure them separately.

All other indicators (6.4.2; 6.4.3; 6.4.5; 6.4.6; 6.4.7) can be assessed ex -post by users of the

DORA service using by answering a certain amount of questions addressing the before

mentioned objectives.

Operationalization

As described in the DOW, it is planned to have one central pilot execution of the service at

the airports in Berlin and Palma de Mallorca at one day. It is, moreover, envisaged to

conduct this field test with 500 test users at both airports.

This will be the best possibility to apply the control site evaluation and the evaluation of the

other criteria at the same time.

Application of a control site evaluation in DORA for the indicators 6.4.1 and 6.4.4

Compared to the Evaluation design as illustrated in the graph above ‘Baseline and Business-

As-Usual Scenario’, the DORA approach, proving the planned effects by the application of a

control site evaluation can be illustrated as follows:

DORA Deliverable D6.1

52 / 74 52 / 74

Figure 7 Control Site Evaluation in DORA

However, in regard to the operationalization there are several requirements that have to be

taken under consideration when conducting a control site evaluation:

- Orienting on the formal definition of the “Control Site Evaluation”, this kind of

evaluation would be possible as long as 50% of the test users at each airport would

use the DORA app and 50% are accomplishing the same tasks without using the app.

- The method and practical implementation of the measurement process should

safeguard the comparability of times and perceived quality (assessing persons should

have same starting and ending points at the same time).

- The people to carry out the tests should be chosen randomly but their travel

behavior should orient on the average traveler on this route.

This means that the results from the tests (e.g. finding routes) accomplished by the control

group that is not using the DORA app would represent the ‘before’ data. The results from

the tests accomplished by the control group that is using the DORA app would represent the

‘after’ data collection. Since the indicators 6.4.1 and 6.4.4 are addressing forerun and follow-

up movement to or from both airports as well as the waiting times at both airports, it is

necessary to have altogether 6 groups of DORA users and non-users. As already mentioned,

both indicators are independent from each other. This means that time comparisons within

the groups at all 6 locations of the travel chain can be conducted independently.

On the example of the forerun to the new Berlin airport BER, this would mean that two

persons, randomly chosen, have to start from the same location and travel towards the

airport. One should have the access to usually available travel information and one should

use the DORA service and has been briefed before. By receiving the location at the target

DORA Deliverable D6.1

53 / 74 53 / 74

airport (e.g. terminal entrance) at the same time it is safeguarded that all framing conditions

are homogenous except the information provided by the DORA service. Measuring the

amount of time between having the destination and arrival at the destination and arrival at

the airport and comparing the DORA user and non-user with each other enables the

evaluator to analyze a potential travel time reduction. In order to provide reliable results this

procedure has to be performed with an appropriate number of user and non-user tandems

representing the different kinds of travelers for every of the six parts of the travel chain. The

more tandems can be motivated by the project to participate on the field test the more

reliable the final results are. After the tests the participants of both groups have to complete

a questionnaire with questions addressing all indicators explicitly. Technical functionalities

(Important: ‘technical evaluation can be assessed with the same questionnaire)

The technical part of the operationalization and also the concrete realizable sample size for

the control site evaluation as well as the concrete technique to do the measurements are

strongly depending on the final product and the related technical options for measuring the

required information. This has to be decided during the course of the research project. A

preliminary overview of possible options is shown in Table 13.

Table 13 DORA Indicators and field test data gathering methods (control site approach)

Objective

Nr.

Indicator Indicator

description

Field test data gathering method

6.4.1 Travel

Time

Time needed for

trips to and from

the airport

(destinations:

Accommodation or

home)

Groups using the service and control groups

not using the service, have to reach starting at

the same time from the same origin the same

location;

Measurements are taken separately for the

forerun / follow-up movement in Berlin and in

Palma;

Documentation of travel times and mode

choices during the test in a travel protocol by

all participants of the field test

6.4.4 Service

quality

waiting

time

Percentage of time

reduction for

waiting at queues

at airports

Groups using the service and control groups

not using the service, have to process queues

at the airport entering the airport at the same

time;

Measurements are taken separately for the

start and end in Berlin and in Palma airports;

DORA Deliverable D6.1

54 / 74 54 / 74

Measuring the Indicators of the objectives 6.4.2; 6.4.3; 6.4.5; 6.4.6

The evaluation of the indicators of the objectives 6.4.2; 6.4.3; 6.4.5; 6.4.6 is vital to assess

whether the developed DORA service has fulfilled its task to make the whole journey for the

travelling individual more seamless and easier. This part of the evaluation also contains the

Evaluation of User Satisfaction (Task 6.4.2) which assesses specifically whether the majority

of DORA testers consider the information provided by Dora as useful. Additionally, user

satisfaction seen as the general perception of the service is a key indicator to the further

success or failure of the DORA service. Thus this indicator will be evaluated in depth. The

single components of the service will be evaluated by conducting surveys end users during

the trial phase. The surveys addressing users will be carried out during test s ite

implementation at Berlin and Mallorca pilot sites for those parts of the travel chain that

include forerun / follow-up movement and the movement at the airport at both pilot sides.

The survey will consist of a predefined set of closed questions in a s tandardized

questionnaire to measure the indicators in form of variables on nominal or ordinal scale.

Since it is not sure whether the test users will be real travelers or supernumeraries the

number and complexity of the questions will be reduced to a minimum. Moreover, it

depends on the way the field test will be realized, whether the indicators will be measured

separately for each part of the travel chain, for the parts from origin / destination to the gate

or for the whole travel chain.

In regard to the users it is planned to address, if possible, the in D 2.2 described user groups

by equal shares in order to take measurements for all, for the user -groups typical travel

chain. The way the measurement are being technically performed, depends firstly on the

way the field test is being carried out and secondly on the technical possibility to provide an

online questionnaire in the DORA App or as an external online questionnaire. If both options

are not possible to be realized within the project the interviews will have to be performed as

face to face interviews. In each case the interview will be of a retrospective nature after the

test user has successfully finished his trip.

Due to this uncertainty Table 14 below illustrates objectives, indicators and an overview of

potential measurement methods that have to be determined closer throughout the project

runtime.

DORA Deliverable D6.1

55 / 74 55 / 74

Table 14 DORA Indicators and field test data gathering methods (survey)

Objective Nr.

Objective description Indicator Field test data gathering method

6.4.2 90 % of DORA App

users consider the

information provided as

useful

Informed

decision

making

Can be assessed separately for each

part of the travel chain, for the parts

from origin / destination to the gate or

for the whole travel chain

The test user has to be questioned

after having successfully finished the

trip

Questions can be formulated online as

a part of the DORA App, as an external

online questionnaire or face to face by

interviewers

Answer categories should be on ordinal

scale (1 worst 5 best) or nominal scale

6.4.3 90 % of DORA App

users consider

information on how to

travel to airport by

different modes of

transportation as

helpful

Multimodal

Accessibility

6.4.5 DORA will contribute to

the goal that 50% of all

trips to and from the

airports in Berlin and

Palma de Mallorca will

be done by public

transport

Modal Split Can be assessed separately for forerun

and follow-up movement at both pilot

sites, for test users using the DORA

service for the parts from origin /

destination to the gate or for the whole

travel chain

The test user has to be questioned

after having successfully finished the

trip

Questions can be formulated online as

a part of the DORA App, as an external

online questionnaire or face to face by

interviewers

Answer categories should be on ordinal

or nominal scale

6.4.6 10 % of DORA App

users use indoor

routing services

Accessibility Can be assessed separately at both

pilot sites, for test users using the

DORA service for the parts from origin /

destination to the gate or for the whole

travel chain

The test user has to be questioned

after having arrived at the gate

DORA Deliverable D6.1

56 / 74 56 / 74

Questions can be formulated online as

a part of the DORA App, as an external

online questionnaire or face to face by

interviewers

Answer categories should be on ordinal or

nominal scale

Specifications concerning objective 6.4.5 (example):

The questions for measuring the variables related to this indicator could look as follows:

Did the DORA App inform well in regard to your public transport travel options? YES/NO

Did you choose the Public Transport for the part of this part of the travel chain? YES/NO

Was DORA the reason why you chose the public transport? YES/NO

Do you think the information on travel alternatives provided by DORA will motivate you to use more

often the public transport for reaching / leaving the airports? (no, rather no, rather yes, yes)

Consequently, the assessment of these objectives in the scope of Impact Evaluation delivers

results regarding the satisfaction of the users concerning the DORA service. However, the

perception of the quality of the service that leads to a high user’s satis faction, is composed

by a number of additional factors such as reliability, safety, privacy issues, comparison to

other apps, availability and accessibility of service, etc. In order to assess this range of

factors, DORA will add specific questions in to the questionnaire that will also be handed out

to the participants of the test execution after the trial. These questions will address the

mentioned additional factors directly.

The partners who will support the conduct of these evaluation activities will have to be

clarified in the scope of the detailed planning of these evaluations. Partners who committed

themselves for supporting WP 6 are listed in chapter ‘4 OPERATIONALIZATION / ROLES AND

RESPONSIBILITIES’. The results from the evaluation activities carried out within the

evaluation of impacts and user satisfaction will be analyzed and documented.

Recommendation for future implementations will be formulated. These findings will be

summarized in “D6.4 Final evaluation report” in month M36.

---

Basing on the aim that the system resulting from DORA should be easily transferable to

other airports throughout Europe; DORA will carry out a Process Evaluation (task 6.4.3). It

will deliver a comprehensive picture of the modalities required for its successful

implementation and important results for the improvement of the ongoing implementation

process of the DORA project. The assessment will be carried out by conducting three surveys

with the most important stakeholders of the project. Questionnaires will be developed to

DORA Deliverable D6.1

57 / 74 57 / 74

contain tables giving an overview of fields in which such barriers or drivers could occur. In

order to facilitate a learning process during the project lifetime, short, internal reports of

each reporting period will be distributed within the project.

Since the concept of process evaluation remains a rather new way of evaluation projects

comprehensively, and since the implementation of the method requires thorough

preparation, the following chapter, will describe the purpose, approach and method in

depth.

2.3.4 Process Evaluation

Purpose: The method of process evaluation is grounded on the experience that most

measures differ from the originally intended plan – what was planned in the very beginning

mostly is different from the final product. This is caused by a range of factors that are

influencing the processes of planning, developing, testing, implementing and operating a

product or project and moreover, this is a natural process of adaptation that every project is

going through to a certain extend. Process evaluation seeks to assess these dynamics of a

measure in order to understand what has influenced the measure process in an either

positive or negative way. Thus it looks at the strength and weaknesses or in other words

drivers and barriers that are effecting these processes. It is looking on HOW an outcome or

product is being realized rather than on its impact.[4]

This helps to understand which failures, changes, or delays have occurred during the

planning and implementation process, but it also tries to find explanations why processes

have worked well or what influenced them in a way that they worked even better than

expected. For our DORA project this means that these results from this evaluation thus can

deliver very useful information for:

- Transferability: Other cities or airports to learn from the experiences Berlin and

Palma de Mallorca and their airports were making in developing and implementing

the DORA services. Failures occurred can be avoided and events that had a positive

effect in DORA can be repeated.

- Improvements of the ongoing development and implementation processes in DORA.

It will detect barriers to the process that can be avoided in the further process and

detects positive events which can be maximized in their effect for the further project

processes.

- Documentation of positive and negative events that occurred during the project

process. This can be very helpful for example to justify eventually occurring delays to

the management level.

DORA Deliverable D6.1

58 / 74 58 / 74

Approach: With process evaluation these results can be achieved, because it asks in a

systematic way for the events a project was opposed to. Moreover it asks different people

that were participating in the project process. The opinions of developers, transportation

planners, public transportation operators, administrations, municipal bodies, managers or

scientists will be assessed. Together, the different viewpoints can provide valuable insights

into the measure process. This demonstrates the approach behind process evaluation: It

listens to stories that different kinds of people are telling about one project. These ‘stories

behind the figures’ are the basis for learning from the experiences made.

Barriers and Drivers: Process evaluation is assessing which barriers and drivers had an effect

on a project process. It especially refers to unforeseen events that were shaping the project

process. For the DORA project, barriers and drivers can be described as follows:

- Barriers are the events or conditions that have a negative effect in reaching the

working tasks of developing, testing and implementing the DORA service on the

airports in Berlin and Palma de Mallorca as initially planned.

- Drivers are the events or conditions that have a positive or stimulating effect in

reaching the objectives during developing, testing and implementing the DORA

service in both cities and airports.

There are several categories in which barriers and drivers can be grouped. They are shown in

Figure 8. For the practice in DORA a (fictive) ‘planning’ barrier could be that in the financial

planning the costs for a certain necessary technical device for measuring waiting times was

much more expensive than initially estimated. The negative effect on the measure process is

that now additional funding has to be looked for until the development process can be

continued. A ‘financial’ driver could be that another airport is interested in implementing

DORA and therefore contributes with additional funding to hire more developers to speed

up the implementation process. Other categories of drives and barriers, including some

abstracted examples are shown in the following figure:

DORA Deliverable D6.1

59 / 74 59 / 74

Figure 8 Categories of process barriers and drivers and examples [4]

Field Examples of barriers Examples of drivers

Political /strategic Opposition of key actors based on

political and/or strategic motives, lack

of sustainable development agenda or

vision, impacts of a local election,

conflict between key (policy)

stakeholders due to diverging believes

in directions of solution

Commitment of key actors based on

political and/or strategic motives,

presence of sustainable development

agenda or vision, positive impacts of a

local election, coalition between key

(policy) stakeholders due to converging

(shared) believes in directions of

solution

Institutional Impeding administrative structures,

procedures and routines, impeding

laws, rules, regulations and their

application, hierarchical structure of

organisations and programs

Facilitating administrative structures,

procedures and routines, facilitating

laws, rules, regulations and their

application, facilitating structure of

organisations and programs

Cultural Impeding cultural circumstances and

life style patterns

Facilitating cultural circumstances and

life style patterns

Involvement,

communication

Insufficient involvement or awareness

of key (policy) stakeholders,

insufficient consultation, involvement

or awareness of citizens or users

Constructive and open involvement of

key (policy) stakeholders, constructive

and open consultation and involvement

of citizens or users

Planning Insufficient technical planning and

analysis to determine requirements of

measure implementation, insufficient

economic planning and market

analysis to determine requirements for

measure implementation, lack of user

needs analysis: limited understandings

of user requirements

Accurate technical planning and analysis

to determine requirements of measure

implementation, accurate economic

planning and market analysis to

determine requirements for measure

implementation, thorough user needs

analysis and good understandings of

user requirements

Organisational Failed or insufficient partnership

arrangements , lack of leadership, lack

of individual motivation or know-how

of key measure persons

Constructive partnership arrangements ,

strong and clear leadership, highly

motivated key measure persons, key

measure persons as „local champions“

Financial Too much dependency on public funds

and subsidies, unwillingness of the

business community to contribute

financially

Availability of public funds and subsidies,

willingness of the business community

to contribute financially.

Technological Additional technological requirements,

technology not available yet,

technological problems

New potentials offered by technology,

new technology available

DORA Deliverable D6.1

60 / 74 60 / 74

Activities related to barriers and drivers: In practice, what people do if a negative or positive effect to a project occurs, is that they want to find out what exactly happened. In the case of a methodological process evaluation this step is the assessment of barriers or drivers. But what happens next is that people think of what follows from this cognition. A positive example in DORA could be that in case another city or airport unexpectedly is interested in implementing DORA, the managers of the project could decide to contact even more cities and airports to boost the development of the service even more. In the method of process evaluation, this step is called assessment of activities related to barriers and drivers. This is a necessary step to fully assess the process of a measure and to find out what really happened and why. This assessment of activities is also essential for the reporting and documenting the measure process. The reader will be very interested in how problems have been solved and how positive events have been utilized to carry out the measure more efficiently.

Method for DORA: There are several methods that are suitable to assess the processes of a

project or measure. They are mainly differing in the degree of detail in how they are

observing the processes. For the DORA project, a project with many partners spread over

various countries in Europe, a rather practical and easy-to-conduct method that bases on

using standardized forms seems to be the appropriate choice.

Using Standardized forms to collect the data relevant for process evaluation has advantages

that make it the appropriate method for process evaluation in DORA: only one or a few

persons are required to complete the forms, it is an easy standardized form that can be done

by everyone even without special knowledge, finally the evaluation of the forms can be

achieved in a simple way because the filled in forms are easily comparable. This makes the

result also easily comparable with the result from other project sites which is an important

asset for assessing the transferability of the DORA service to other airports in Europe.

The following simplified structure of a template has been proven to be practicable:

1) General Information

- It should firstly contain a part with general information such as the name of the task

in DORA it refers to,

- then the time period the assessment refers to should be indicated

- also the target group of your working task should be named as well as the partners

that were involved in realizing your working task.

- It is also important to show which person has completed the form and who is the

person that can be contacted by the evaluator

DORA Deliverable D6.1

61 / 74 61 / 74

2) Barriers

- Should be described in a brief and clear way. Only the 1-3 most important barriers

should be named.

- Each barrier should be described by answering the questions: What happened and

how did it actually occur? Which negative impact did it have on the process of DORA?

3) Drivers

- Should be described in the same clear and brief way for the 1-3 most important

drivers as the barriers.

- Also for the drivers questions should be answered asking for what really happened?

How did it exactly occur and which positive impact on DORA did it have?

4) Activities

- Should be described in a brief and clear way by using simple words

- They should answer the question: What did you undertake to make use of the drivers

and what did you do to overcome the barriers mentioned in the previous part of the

completed template

5) Any other comment

- This is a very important part of the form because here you have the chance to

describe any other relevant information to explain the measure process. This can be

extraordinary conditions or your estimation of the risks to reaching the objectives of

DORA or your task in DORA. Also, you can add here pictures, illustrations or methods

you think that could be useful for others. With regard to the time needed for

completing and processing the form, also this information should be described briefly

and clearly.

Operationalization - Process Evaluation

First Phase:

Month 10: Finalization of Process Evaluation Questionnaire and guideline for completion

Month 11: First Process Evaluation: Questionnaires will be sent to DORA Partners for

completion within 2 weeks

Month 12: Evaluation and analyses of questionnaire results and summary in a short report.

The short report will be distributed to the partners.

Second Phase:

Month 22: Second Process Evaluation: Questionnaires will be sent to DORA Partners for

completion within 2 weeks

Month 23: Evaluation and analyses of questionnaire results and summary in a short repor t.

The short report will be distributed to the partners.

DORA Deliverable D6.1

62 / 74 62 / 74

Final Phase:

Month 33: Final Process Evaluation: Questionnaires will be sent to DORA Partners for

completion within 2 weeks

Month 34: Evaluation and analyses of questionnaire results and summary in a short report.

The short report will be distributed to the partners.

Month 35 and 36: Analysis of all three process evaluation results and reporting in the final

evaluation report

DORA Deliverable D6.1

63 / 74 63 / 74

3 TRANSFERABILITY

A major ambition of the DORA project, is that the system developed is easily transferable to

other cities and their airports in Europe. Thus the DORA system for seamless air mobility will

be comprehensively evaluated and tested in Berlin and Palma de Mallorca.

The results from the evaluation activities that are described in this evaluation plan are a

central point of reference for other cities to prove if the DORA system could be implemented

in their cities. They will provide insights in the expectable results from implementing DORA;

in its technical functionalities and requirements of each component as well as in the

integrated service, and it will provide information on the necessary requirements to manage

the process of implementation in a successful way. To ensure that cities can learn from the

positive and negative experiences made within DORA, the results of the evaluation activities

will be analysed carefully and recommendations that have to be taken under consideration

for other cities that wish to implement the system in their cities will be formulated. The

deliverable “D6.4 Final evaluation report” will summarize these findings resulting from the

impact, usability and process evaluation and describe the resulting recommendations.

The development of the DORA system is designed to be easily transferable to ot her cities

from the beginning of the development phase. Features to ensure transferability include:

DORA is based on a modular structure that combines service locally available

components with new technologies. The overall integrated system concept aims to

be easily technically transferable to other European airports and regions. This way,

the service components and products developed within DORA can be used as a

toolbox and can be integrated in further (existing or new) service applications such as

in operation centres of landside and air transport, airlines or travel agencies

addressing the overall mobility needs of different user groups.

DORA puts special emphasis on research, development and transferability of

innovative systems to optimize the procedures in the terminal based on new

technologies such as indoor location and waiting time detection and their integration

in user specific indoor-routing services. Especially the included development of new

cooperation and business models support the transferability to other cities.

DORA puts emphasis on the reproducibility or transferability of both the technology

and the business framework, i.e. the innovation as a whole. Hence the business and

cooperation framework will be easily adaptable to other contexts and configurations

beyond the DORA project to allow market expansion of the product to further areas

which in return will provide for incentives to continued innovation.

DORA Deliverable D6.1

64 / 74 64 / 74

DORA established an Advisory Board Group that is composed of representatives of

various stakeholder groups. This group is included in the evaluation activities (i.e. for

expert interviews). This also assures that they are functioning as supported for the

dissemination of DORA, to promote it and to create an interest in adopting and

further developing DORA beyond project lifetime. Some of this communication will

utilize organizational level targeting and some will utilize the personal and business

contacts of the consortium partners to allow for highly targeted contacts. Another

key element in this layer will be the ability to invite professionals for workshops and

on-site showcase demonstrations at PMI and TXL.

The findings from results-, usability- and process evaluation are essential for all

dissemination activities. They provide proved and valid facts and reasons as well as the

necessary preconditions to communicate and promote the DORA system. Together with the

structural drivers for transferring DORA to other cities the results from evaluation will build a

strong base for transferring DORA to other cities.

DORA Deliverable D6.1

65 / 74 65 / 74

4 ISSUES THAT CAN JEOPARDIZE THE EVALUATION

It is hard to foresee what will happen in the upcoming process of the DORA project, but it is

certainly helpful to think about issues that could have a negative effect on the planned and

necessary evaluation activities. This is the basis to be prepared and to avoid these problems

from the beginning or to prepare a set of possible solutions for overcoming these problems.

The success of the DORA project mainly depends on the technical d evelopment of the

components and the integrated services that will be the final project result. Thus, technical

problems would have a crucial effect on the evaluation: They can be caused by changes in

the global technical development, or by unexpectedly occurring technical problems, such as

problems with incompatibilities of systems or a lack of information that is necessary for the

development of the system although these problems are minimized by the specification of

requirements in T2.4. These problems could lead to delays and make it impossible to keep

the timeline to finalise the evaluation of the DORA System still in the lifetime of the project.

In addition to technical problems, other issues that could have a negative effect on the

evaluation activities could happen. These can be partners related risks, planning problems,

collaboration issues or any other external risks that are described in the DOW in chapter

“Critical Implementation risks and mitigation actions”.

A specifically risky issue is linked to the usability evaluation. The success of the three

usability evaluation steps is strongly linked to identifying appropriate tests persons, who

should ideally represent the pre-defined user groups. They should be familiar with technical

details and terms to be able to assess which usability problems are existing in the different

stages of the system. There are however only limited means to incentivise these experts to

participate in the evaluation which could make it necessary to pursue an alternative usability

evaluation method that is less valid. However, the DORA project is large and well connected

to various partners that can be motivated and mobilised to join the evaluation activities.

Another issue refers to the evaluation of impacts that is described in chapter “2.3.3 Results

Evaluation”. The validity of this evaluation increases a lot if it can be carried out by applying

a control site evaluation. This is however depending on a sufficiently high number of test

users in both cities at both airports. If this high number of test users cannot be reached,

other methods (described) will have to be made use of. This could lead to an increased effort

to re-schedule and re-plan this evaluation activity and might lead to less satisfactory

evaluation results.

To avoid unexpected evaluation risks from the very beginning, the project seeks to assess

delays at an early stage in the project by carrying out a ‘process evaluation’. This evaluation

DORA Deliverable D6.1

66 / 74 66 / 74

activity helps to identify and gather occurring barriers of the development process in a

systematic way. The assessment within process evaluation also includes the elaboration of

solutions to overcome these barriers.

This compilation of possible issues that could jeopardize the evaluation within DORA does

not claim to be complete. It is not possible to know what will happen in future. But it is

supposed to sensitise all partners involved in evaluation in order to ensure high quality

results from evaluation.

DORA Deliverable D6.1

67 / 74 67 / 74

5 OPERATIONALIZATION / ROLES AND

RESPONSIBILITIES

This chapter gives a quick overview on the DORA objectives and the related Work Packages ,

it shows also the involvement of the partners in the tasks of Works Package 6 and the

timeline for the deliverables of the single tasks as described in the DOW. Further details of

the distributions of work between the partners, the description of the tasks as well as times

for delivery are included in the chapter ‘2.3 Methods and Operationalization’ (see headlines

‘Operationalization at the ends of each subchapter).

Table 15 DORA objectives and the related Work Packages

Objective Related Work packages

6.2.1: Intermodal Platform for Air and Land

Transport

WP4, based on requirements and concept

from WP2 and WP3

6.2.2: Mobile Smartphone Application for

Seamless Mobility Information and SDK

WP4, based on requirements and concept

from WP2 and WP3

6.2.3: Personal Information Service WP4 – service development, WP6 – service

validation

6.2.4: Integration with Incident and

Information Management for Airports

WP5

6.2.5: System for Detection of Waiting Time

in Airports

WP4, based on requirements and concepts

from WP2 and WP3

6.2.6: Indoor Location and Navigation

Service

WP4, based on requirements and concept

from WP2 and WP3

7: New Cooperation and Business

Framework

WP3 – general DORA framework, WP7 –

exploitation of the framework towards the

stakeholders

8: Preparation of a usable platform for

planning trips

WP5 and WP6

9: Wide Public Awareness WP7

DORA Deliverable D6.1

68 / 74 68 / 74

Roles and Responsibilities of WP6

TUB is WP leader and leads the Tasks 6.1, 6.3, 6.4. The contributions will be reports

that either will deliver information on the improvement of the system during the

development phase, or on the quality and impacts of the system.

VMZ and UPVLC will contribute to the definition of the evaluation plan and the technical evaluation related to routing and platform together with indoor routing and navigation and usability assessments.

ETRA will contribute to the impact evaluation and the user satisfaction assessment within Palma de Mallorca´s Pilot.

ETRA will support the preparation and conduction of surveys.

FBB will provide a feedback of the test results to the evaluation team.

AENA and Eureva will participate in the impact evaluation by contributing to the definition of relevant indicators for the measurement and providing feedback to the preparation of surveys.

CSE will lead Task 6.2 and perform technical validation and performance evaluation of the overall platform but also of the separate components by the provision of testing mechanisms that will verify the operation of the platform against the defined requirements.

LUT supports creating the evaluation plan and conducting impact and process evaluation while ensuring interaction with the Advisory Group.

EMT will provide relevant indicators for the measurement of the PMI pilot.

VBB will contribute to Task 6.2 Technical Evaluation and Task 6.4 Evaluation based on project results, focusing on alternative and/or backup approaches/paths for proper and uninterrupted service provisioning as well as barriers, drivers and lessons learnt under the aspect of a continuous operation of DORA services.

The following figure gives an overview of the planned resources (man-month) of the each

partner involved in Work Package 6.

DORA Deliverable D6.1

69 / 74 69 / 74

Figure 9 WP 6 Effort per partner

Reporting

The following deliverables have to be prepared within work package six

Table 16 DORA deliverables and the related Work Packages

Deliverable Time

D6.1 Evaluation plan M9- Feb. 2016

D6.2 Technical Evaluation and Assessment report M30 – Nov. 2017

D6.3 Usability Assessment report M24 – May 2017

D6.4 Final evaluation report M36 – May 2018

These deliverables are split up in several sub-tasks or working steps. The following overview

compiles these sub-tasks, describes briefly their corresponding methods, the time frames of

these activities, the outcomes and the respective deliverable and the deadline for

finalisation.

Note: Boxes marked in yellow are describing deliverables and their deadlines for the

submission to the EC. The other deadlines are referring to working steps necessary to

complete the deliverables. These might be subject of changes depending on the progress of

the respective developments.

Eurescom: 2.00

VMZ: 4.00

ETR: 4.50

FBB: 2.00

Eureva: 0.50

UPVLC: 5.00

CSE: 6.00

TUB: 29.00

LUT: 3.00

EMT: 0.50

VBB: 1.00

DORA Deliverable D6.1

70 / 74 70 / 74

Table 17 Overview of DORA Evaluation Tasks

Technical Evaluation and Assessment: Work package 6 Task 2Sub-task Method Timeframe Outcome /Deliverable Deadline Validation of Interfaces

Verification of information flows across all interfaces. Simulation of Use Case scenarios.

Months 13-15 Intermediate Report to be included in the final D.6.2

Month 16

Open API Evaluation

Test data and stimuli executed against DORA Open API I/Fs

Months 15-21 Intermediate Report to be included in the final D.6.2

Month 22

B2B API Evaluation Test data and stimuli executed against DORA B2B API I/Fs

Months 15-19 Intermediate Report to be included in the final D.6.2

Month 20

Basic Transactions Evaluation among DORA components

Unit, Integration and performance Tests

Months 16-21 Intermediate Report to be included in the final D.6.2

Month 22

Initial App Evaluation

Testing of Apps with service interfaces and functionality mockups

Months 18-22 Intermediate Report to be included in the final D.6.2

Month 23

App Evaluation with real data

Evaluation of Apps with integrated services

Month 24 Intermediate Report to be included in the final D.6.2

Month 25

Prototype Evaluation

Laboratory and custom testbed experiments

Months 10-16 Intermediate Report to be included in the final D.6.2

Month 17

Prototype Evaluation

On site evaluation and performance measurements

Months 16-19 Intermediate Report to be included in the final D.6.2

Month 20

Overall Initial Integration Testing

Integration tests in staging environment with emulated input

Months 20-23 Intermediate Report to be included in the final D.6.2

Month 24

Final Integration Testing

On site testing with equipment

Months 24-29 Final D.6.2 integrating all previous intermediate reports

Month 30

Usability Evaluation: Work package 6 Task 3Sub-task Method Timeframe Outcome /Deliverable Deadline

Usability test of conceptual variants

Participatory Workshop Months 11 - 14 Short intermediate report (internal)

Month 14

Month 24 D6.3 Usability Assessment report

Month 24

Usability test of first prototype

Survey with standardized questionnaires

Month 16 -24 Short intermediate report (internal)

tbd

D6.3 Usability Assessment report

Month 24

Last usability test before trial phase

Tests: reporting in user diaries, discussion in focus group workshop

Month 16 -24 Short intermediate report (internal)

tbd

D6.3 Usability Assessment report

Month 24

DORA Deliverable D6.1

71 / 74 71 / 74

Results evaluation: Work package 6 Task 4Tasks Method Timeframe Outcome /Deliverable Deadline Impact evaluation (task 6.4.1)Evaluation of user satisfaction (task 6.4.2)

Control site assessment / time measurements / user tests / surveys with questionnaire and interviews

Month 19 - 36 D6.4 Final evaluation report

Month 36

Process evaluation: Work package 6 Task 4Sub - tasks Method Timeframe Outcome /Deliverable Deadline

Preparation and conduct of first phase

Survey with standardized questionnaire (to project partners)

Months 10 - 12 Short intermediate report (internal)

Month 12

Conduct of second phase

Survey with standardized questionnaire (to project partners)

Months 22 - 23 Short intermediate report (internal)

Month 23

Conduct of final phase and reporting

Survey with standardized questionnaire (to project partners)

Months 33 - 34 Short intermediate report (internal)

Month 34

Analysis of all results / reporting in “Final evaluation report”

Months 35 - 36 D6.4 Final evaluation report

Month 36

DORA Deliverable D6.1

72 / 74 72 / 74

6 REFERENCES

[1] http://ec.europa.eu/programmes/horizon2020/what-horizon-2020, seen: November

2015

[2] Chesbrough, H. (2003) Open Innovation: The New Imperative for Creating and Profiting

from Technology. Boston, MA: Harvard Business Press. 227 p. ISBN 1-57851-837-7.

[3] Adner, R. and Kapoor, R. (2010) ‘Value creation in innovation ecosystems: how the

structure of technological interdependence affects firm performance in new

technology generations’, Strategic Management Journal, vol. 31, iss. 3, pp. 306-333.

[4] Dziekan K., Riedel V., Müller S., Abraham M., …, (2013) Evaluation Matters – a

practitioners‘ guide to sound evaluation für urban mobility measures : Waxmann

Münster / New York / München / Berlin. ISBN 978-3-8309-2881-2

[5] Atteslander P. (2010) Methoden der empirischen Sozialforschung: Erich Schmidt Verlag

GmbH & Co.KG, Berlin. ISBN 978 3 503 126187

[6] Sarodnick F., Brau H., (2011) Methoden der Usability Evaluation – Wissenschaftliche

Grundlagen und praktische Anwendung: Verlag Hans Huber, Hofgreve AG Bern. ISBN

978-3-456-84883-9

[7] http://www.iso.org/iso/catalogue_detail.htm?csnumber=35786, seen: February 2016

[8] http://www.usability.gov/how-to-and-tools/methods/planning-usability-testing.html,

seen: February 2016

[9] https://www.w3.org/WAI/intro/wcag, seen: February 2016

[10] http://www.usabilitybok.org/formative-evaluation, seen: February 2016

[11] http://www.ueq-online.org/, seen February 2016

[12] http://www.usetree.de/wp-content/uploads/2015/07/Uebersicht-Usability-

Methoden.pdf, seen: February 2016

DORA Deliverable D6.1

73 / 74 73 / 74

7 ANNEX

GUIDELINES FOR PLANNING A USABILITY TEST

(According to U.S. Department of Health & Human Services)

“Planning a Usability Test

One of the first steps in each round of usability testing is to develop a plan for the test. The

purpose of the plan is to document what you are going to do, how you are going to conduct

the test, what metrics you are going to capture, number of participants you are going to test,

and what scenarios you will use.

Typically, the usability specialist meets with the site or product owner and members of the

development team to decide on the major elements of the plan. Often, the usability specialist

then drafts the plan, which circulates to management and the rest of the team. Once

everyone has commented and a final plan agreed upon, the usability specialist revises the

written plan to reflect the final decisions.

Elements of a Test Plan

Scope: Indicate what you are testing: Give the name of the Web site, Web application,

or other product. Specify how much of the product the test will cover (e.g. the

prototype as of a specific date; the navigation; navigation and content).

Purpose: Identify the concerns, questions, and goals for this test. These can be quite

broad; for example, "Can users navigate to important information from the

prototype's home page?" They can be quite specific; for example, "Will users

easily find the search box in its present location?" In each round of testing, you

will probably have several general and several specific concerns to focus on.

Your concerns should drive the scenarios you choose for the usability test.

Schedule & Location: Indicate when and where you will do the test. If you have the schedule

set, you may want to be specific about how many sessions you will hold in a day

and exactly what times the sessions will be.

Sessions: You will want to describe the length of the sessions and schedule the meetings

with the participants. If test will be carried out individually, remember to leave

time, usually 30 minutes, between sessions to reset the environment.

Equipment: Indicate the type of equipment you will be using in the test; desktop, laptop,

DORA Deliverable D6.1

74 / 74 74 / 74

mobile/Smartphone. If pertinent, include information about the monitor size

and resolution, operating system, browser etc. Also indicate if you are planning

on recording or audio taping the test sessions or using any special usability

testing and/or accessibility tools.

Participants: Indicate the number and types of participants to be tested you will be

recruiting. Describe how these participants were or will be recruited and

consider including the screener as part of the appendix.

Scenarios: Indicate the number and types of tasks included in testing. Typically, for a 60

min. test, you should end up with approximately 10 (+/-2) scenarios for desktop

or laptop testing and 8 (+/- 2) scenarios for a mobile/smartphone test. You may

want to include more in the test plan so the team can choose the appropriate

tasks.

Metrics: Subjective metrics: Include the questions you are going to ask the participants

prior to the sessions (e.g., background questionnaire), after each task scenario

is completed (ease and satisfaction questions about the task), and overall ease,

satisfaction and likelihood to use/recommend questions when the sessions is

completed.

Quantitative metrics: Indicate the quantitative data you will be measuring in your test (e.g.,

successful completion rates, error rates, time on task).

Roles: Include a list of the staff who will participate in the usability testing and what

role each will play. The usability specialist should be the facilitator of the

sessions. The usability team may also provide the primary note-taker. Other

team members should be expected to participate as observers and, perhaps, as

note-takers.””[8]