dos rios wrc re-rati ph ii ting phase ii: primary settling

17
Dos Rios WRC R ti Ph II Dos Rios WRC R ti Ph II R e-rating Phase II: Primary Settling Tank R e-rating Phase II: Primary Settling Tank P b itt l C f Improvements Improvements April 25, 2012 April 25, 2012 April 25, 2012 April 25, 2012 Pre-submittal Conf erence Alissa R Lockett P E PMP Alissa R. Lockett, P .E., PMP Project Engineer – Treatment & Recycle Engineering

Upload: others

Post on 19-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Dos Rios WRC R ti Ph II Dos Rios WRC R ti Ph II Re-rating Phase II: Primary Settling Tank Re-rating Phase II: Primary Settling Tank

P b itt l C f

ImprovementsImprovementsApril 25, 2012April 25, 2012April 25, 2012April 25, 2012

Pre-submittal Conference

Alissa R Lockett P E PMPAlissa R. Lockett, P.E., PMPProject Engineer – Treatment & Recycle Engineering

Page 2: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 2

Re-rating Phase II RFQ Schedule

Questions Due

May 1, 2012

Proposals Due

May 14, 2012

Notification

June 19, 2012

Answers Posted

May 4, 2012

Interviews (if necessary)

June 2012

SAWS Board Award

August 2012

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 3: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 3

Point of Contact for Questions

Maria FrancoContract Administration

mfranco@saws [email protected]

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 4: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 4

Scoring CriteriaP j t A h 35 P i t

• Work plan

Project Approach – 35 Points

– Tasks / Durations– Resources– Special considerations

• Project schedule– 360 days, inclusive of SAWS review time

• Discuss measures for schedule and budget (design and construction) adherence

• QA / QC procedures (project specific)April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 5: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 5

Scoring CriteriaP j t T d R 30 i t

• Organizational Chart

Project Team and Resumes – 30 points

• Project Manager’s record of experience• ResumesResumes

– Not more than 1 page per team member– Not more than ½ page per sub-consultant teamNot more than ½ page per sub consultant team

member• Sub-consultants• Availability to perform the work and meet the

scheduleApril 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 6: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 6

Scoring CriteriaT E i 20 i t

• List at least four (4) similar projects in the

Team Experience – 20 points

past five (5) years over $10 million• Specify respondent’s / team member’s roles p y p

on each project• Include current references

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 7: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 7

Scoring CriteriaSMWB P ti i ti 15 i t

• Design may be TWDB funded

SMWB Participation – 15 points

• Adhere to requirements listed in Addendum 1• For assistance or clarifications, contact Mr.For assistance or clarifications, contact Mr.

Rene Gonzalez, DBE & Policy Coordinator with TWDB at (512) 463-2634( )

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 8: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 8

BackgroundCh Si 2005 R ti M t Pl

Reduction in Change in Influent F t Effl t

Changes Since 2005 Re-rating Master Plan

Reduction in Projected

Wastewater Flows

• Slow down in

Change in Influent Wastewater

Quality

• Conservation

Future Effluent Nutrient Criteria

• Next permit• Slow down in population growth

• Maintain Leon Creek WRC at 46

• Conservation (higher strength)

• Ferrous sulfate (collection

• Next permit renewal in 2015

• TP limits may be imposed

mgd AADF• Conservation

(system odor control)

p• TN limits on the

horizon

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 9: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 9

Flow Projections SummaryP i P d Previous vs. Proposed

Previous 2027 Proposed 2030 Flows (mgd) 1 Flows (mgd) 2

Annual Average Daily Flow (AADF) 217 137Flow (AADF)

Maximum Month Flow (MMF) 240 165

1 Re rating Report (CDM 2005)

Peak 2-hour Flow (P2HF) 439 343

1 Re-rating Report (CDM, 2005)2 Capacity Evaluation of Dos Rios WRC Secondary Treatment

Facilities (SAWS, 2012); peaking factor increased from 2.0 to 2.5 to include diverted flows from Leon Creek WRC and SBSP (MRSO)

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 10: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 10

Proposed FacilitiesO i

• Primary Settling Tank(s)

Overview

Tank(s)• Primary Sludge and

S P St tiScum Pump Station• Distribution Box(es)

Distribution Box #1

Primary Sludge & S P

Distribution Box #2

& Scum Pump Station

st but o o #

SCHEMATIC OF PROPOSED FACILITIES

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

FACILITIES

Page 11: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 11

Proposed FacilitiesC id tiConsiderations

• Determine optimal method for flow splitting• Size primary settling tank(s) for future flow• Evaluate optimal location for primaryEvaluate optimal location for primary

settling tank(s)• Conduct technology evaluation for primary• Conduct technology evaluation for primary

sludge and skimmings pumpsN l t i l b ildi f i ti i• New electrical buildings for existing primary settling tank electrical equipment / controls

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 12: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 12

Existing Facilities RehabilitationO i

• Primary Settling

Overview

y gTanks

• Primary Sludge andPrimary Sludge and Skimmings Pump StationsStations

• Primary Effluent Channel BlowerChannel Blower Station

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 13: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 13

Existing FacilitiesP i S ttli T kPrimary Settling Tanks

Number of Tanks 8fTank Diameter 140.0 ft

Side Water Depth 12.0 ftSurface Overflow Rate at Rated Flow (125 mgd) 1,015 gpd/sfSurface Overflow Rate at Peak 2-hr Flow (250 mgd) 2,030 gpd/sfDetention Time At Rated Flow (125 mgd) 127 min

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 14: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 14

Existing FacilitiesP i Sl d d Ski i P St ti

Number of Stations 4

Primary Sludge and Skimmings Pump Stations

Type of Primary Sludge Pumps Plunger (triplex)Number of Primary Sludge Pumps per Station 3Capacity / TDH of Primary Sludge Pumps 220 gpm / 125 ftp y y g p gpType of Primary Skimmings Pumps Progressive CavityNumber of Primary Skimmings Pumps per Station 2Capacity / TDH of Primary Skimmings Pumps 150 gpm / 90 ftCapacity / TDH of Primary Skimmings Pumps 150 gpm / 90 ft

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 15: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 15

Existing FacilitiesS It• Replace clarifier drives, scraper arm,

skimmings arm skimmings box etc

Scope Items

skimmings arm, skimmings box, etc.• Addition of sludge withdrawal ring and other

l ifi ti i ti k f tclarifier optimization package features• Rehabilitate primary sludge and skimmings

pump stations (including mixers, valves, piping, etc.)

• Rehabilitate Primary Effluent Channel Blower Station and Diffuser System

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

y

Page 16: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Page 16

Questions

April 25, 2012

Dos Rios WRC Re-rating Phase II Pre-submittal ConferenceDos Rios WRC Re-rating Phase II Pre-submittal Conference

Page 17: Dos Rios WRC Re-rati Ph II ting Phase II: Primary Settling

Dos Rios WRC R ti Ph II Dos Rios WRC R ti Ph II Re-rating Phase II: Primary Settling Tank Re-rating Phase II: Primary Settling Tank

P b itt l C fMarch 20, 2012March 20, 2012March 20, 2012March 20, 2012

ImprovementsImprovementsPre-submittal Conference

Alissa Lockett, P.E., PMPProject Engineer – Treatment & Recycle EngineeringProject Engineer Treatment & Recycle Engineering