R X-Ⅱ-Z-SWSDEN 2012-11WLJ Please read the manual book and maintenance book before operation, Changes are periodically added to the information, and sunward may change the products or services described in this book at any time without announcement. All rights of this manual book reserve to sunward. Add: Sunward Intelligent lndustrial Park, Xingsha, Changsha, 410100, China. T e l : (0086-731) 8357 2828 Fax: (0086-731) 8357 2661 W e b : http://www.sunward.cn E-mail: [email protected] P . C : 410100 Double Rotary Head Strength Multifunctional Drilling Rig

Upload: lamngoc

Post on 06-May-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

R

X-Ⅱ-Z-SWSD③EN 2012-11WLJ

Please read the manual book and maintenance book before operation, Changes are periodically added to the information, and sunward may change the products or services described in this book at any time without announcement. All rights of this manual book reserve to sunward.

Add: Sunward Intelligent lndustrial Park, Xingsha, Changsha, 410100, China.

T e l : (0086-731) 8357 2828

F a x : (0086-731) 8357 2661

W e b : http://www.sunward.cn

E-mail: [email protected]

P . C : 410100

Double Rotary Head Strength Multifunctional Drilling Rig

SUNWARD SWSD Double Rotary Head Strength Multifunctional Drill is one

kind of new product with independent intellectual property rights. It is a new

update of international advanced technology whose core technology has been

granted the national invention patent license.

SUNWARD SWSD Double Rotary Head Strength Multifunctional Drill is

composed by double rotary heads, pile driver with high-stability, advanced

hydraulic electrical control system and tools set including casing tube, drilling

auger and DTH hammer. SUNWARD rig is designed for multi-functional

construction, especially for high efficient drilling in complex stratum condition

with gravel and hard rock. The drilling rig provide high pile quality, high vertical

precision and less mud contamination. SUNWARD rig solved the technical

problems in large diameter pile foundation drilling in rock, overcame the

environmental pollution of the bentonite. It is one kind of environment-friendly

piling machinery with new technology, which not only complies with the national

policy for the energy saving and emission reduction, but also has good

economic, social benefits and international market promotion prospects.

Applicable Piles: bored pile, occlusive pile, steel-pipe pile, steel pipe composite

pile, pumping bored pile, CFG pile, CFA drilling, internal drill pressing pipe pile,

treatment for discarded pile foundation etc.

Applicable stratum: All kinds of soil layers,sand seam, gravel layer, boulder

layer and all rock layers etc.

Bore Diameter: φ500 mm ~ φ1500 mm

Patent for SWSD Double Rotary Head Strength Multifunctional Drill

Authorized Patent No:

ZL 200410070744.7

ZL 200420087779.7

ZL 200620158137.0

ZL 200910311281.1

ZL 200920317217.X

Authorizing Patent No:

200610138353.3

201110305831.6

201110101540.5

201110169360.0

DRM Drilling Rig

SWSDIntroduction

Full hydraulic drives double rotary heads; Constant power variable; Large torque output.

Rotary head driven by full hydraulic has the power function of constant power variable. Rev can

be adjusted automatically under different load. Large torque, high overload capacity. The

measurement is smaller and weight is lighter than electric rotary head, better work stability.

Base on the construction process, inner and outer rotary head can separate upward and

downward respectively, relative motion, anti-clockwise rotation to drive inner auger, DTH

hammer and outer casing tube. It can be suit for many construction methods.

Chassis with high stabilityHigh stability and independent innovation crawler chassis ensures pile driver's reliable stability

in structure, which is much better than crane chassis.

Two sides crawler can extend and retract freely controlled by hydraulic cylinder. Under

transportation width≤ 3300mm, crawler can be extended to 5000mm in work, which has the

highest stability in the market.

Large diameter high strength mast, hinged three- points supporting.

φ920mm large diameter high strength mast and Hinged 3-point supporting combined with lower

cross axle and upper double-bevel sustainer can helps to tilt mast back-and-forward direction,

left-and-right direction according to job site condition and construction application requirement ,

therefore make sure its stability and flexibility when works with heavy-duty attachment.

Max. Lifting force is 80tons which is the highest level in the worldwide market.

Cylinders in the bottom of mast and and double-bevel sustainer can provide easy direction

control,verticality for simplified operation and high vertically precision.

SWSD

Main Technical Characteristic:

DRM Drilling Rig

Advanced hydraulic system, high precision work and reliable technology.Apply advanced hydraulic technique, independent innovation hydraulic system. Use high reliability import hydraulic parts, work

stably and correctly, which ensures machine high precision work.

Apply low speed micro-setting devices to control main and auxiliary winch speed, accurate micro-setting for drilling speed by

simple knob operation. It can complete rock drilling and high precision work in special construction method.

Pre-set the infinitive speed adjusting device for work device rev setting, use knob for adjusting easily.

Main operation joysticks set in cab seat two sides, other handles are all in the control panel, and there are compact layout and

convenient control.

Double engines, two pump groups, full hydraulic drives whole machine.

Global initiate developing of double engines drive two pump groups and supply high power to make double rotary heads work,

which can suit the on-side work under no industry power supply.

Two sets engines drive two sets hydraulic pump groups, two sets independent power system are standby each other, which can

advance whole machine reliability and emergency ability. The design can confluent and output power, meanwhile it also can

work separately according to real load, high efficiency and save energy.

Engine is using international famous brand product, electric control, turbo-charge, intercooled, lower emission, save energy,

low noise, and environment protection. Engine and hydraulic is constant power match to maximize whole machine work

efficiency.

Single engine pump set is available on request.

Auger + casing tube + DTH hammer : New type combined drill tool.

Auger and outer casing tube works simultaneously in drilling. The casing protect drill hole all the way during drilling and the auger

discharge soil continuously while drilling rigidly, fast and precisely. It is suitable for construction in all kinds of complicated

geologic condition by many construction methods.

Excepting above mentioned combined drill tool, it can also drill with DTH hammer and air compressor to drill the complicated hard

rock condition with high efficiency.

SWSD SWSD

Advanced electric control systemComplete functionAdvance and reliability Convenient control and operation

Apply advanced in te l l igent contro l techn ique,

CANBUS and virtual meter technology, high reliability

embedded type mechanical controller and LCD

display. Independent innovation electric control

system with high integrated level, stable control, fast

and correct ly .S impl i f ied contro l joyst icks and

operation, man-machine friendly interface, easy

control and reliable use.

Automatic mast verticality and manual control for

mast lifting figure guide.

Drill depth monitor and record in time display.

Lifting force of main and auxiliary winches monitor and

record in time display, winch position limit, error

operation protect.

Interlocking for machine adjustment and drill.

Easy operationComfortable and safety cab

Integrated design for electric control and hydraulic system

joysticks, buttons and switches, fine layout. Air-condition

is set in cab. Cab is light and quiet, wide-field for operator

convenient control and comfortable& safety drive space.

Optional electric double speed rotary head, electric conversion infinitive speed change rotary head.

Electric double speed rotary head or electric conversion infinitive speed change rotary head is available on request.

Electric double speed rotary head is using special double speed motor, speed change conveniently. Rotary head has the same

power under different rev, large output torque, and high overload capacity. Max torque force multiple and blocking torque force

multiple are both over 3 times than rated value.

Electric conversion infinitive speed change rotary head can adjust rotary head rev at any time according to detail geology

condition, work easily and flexibly.

Main technical characteristics:

SWSD2512/SWSD3618 Double Rotary Head (Full Hydraulic)

SWSD2512E Double Rotary Head (Electric)

SWSD3618E Double Rotary Head (Electric)

DRM Drilling Rig DRM Drilling Rig

SWSD3612E Double Rotary Head (Electric)

In the construction of precast pipe pile, excepting hammering and

pressing methods, internal drill and embedded pile construction

are more and more popular. It adopts the technical function of

SWSD double rotary head, equipped with comparable drill tools, to

complete vibration-free and efficient precast pipe pile construction

by using internal drill and embedded pile methods.

Precast Pipe Pile – Internal Drill

and Embedded Pile Construction

Steel-pipe pile construction

Thanks to the technical features for SWSD CAP

Drilling Rig ,with special attachments, the rig can

construct steel-pipe pile with concrete without

vibration at high efficiency by means of full driving

casing and drilling through pipe.

Driven cast-in-place pile construction-2

——Long auger, auger drill bit + Outer casing, casing shoes

Construction Method 1:

Drill hole, casing followed for protection——Auger lifting, casing is remained

underground——insert steel reinforcing cage, filling concrete——pull out

casing tube and finished.

SWSD series CAP Drilling

Rig with its special drill ways

and combined dr i l l too ls

supplies a high efficiency,

precision and high quality

secan t p i l e cons t ruc t i on

m e t h o d s i n c o m p l i c a t e d

geologic condition.

Secant pile construction

Construction Technique

SWSDSWSD

Driven cast-in-place pile construction-1

——Auger+ Casing + DTH hammer for rock drilling

Auger, casing + DTH hammer

drilling , casing followed for

protection——Auger and DTH

hammer lifting, casing is

remained underground——insert

steel reinforcing cage, filling

concrete——pull out casing tube

and finished.

Hole forming diameter and hole

wall shape is regular, high quality

pile body and high precision

verticality. (The process needs

to set air compressor.)

Construction Method 2:

D r i l l h o l e — — a u g e r a n d c a s i n g l i f t i n g

simultaneously ——pumping concrete through

s tem auger dur ing l i f t i ng——inser t s tee l

reinforcing cage——finished

This method is also known as Pressure Filling

Pile Construction.

A 桩 B 桩

DRM Drilling Rig DRM Drilling Rig

Multifunctional, Multipurpose Construction

Full Hydraulic DRM Drilling Rig SWSD2512/SWSD3618- Main Technical Data

“app. represents approximately”

SWSDSWSD

Dimension Drawing

3300~5000

DRM Drilling Rig DRM Drilling Rig

Remark

with casing

2 sets

/transition rope

/transition rope

Without lifting hook arm

Without stud etc.

In work device loading

Main Parameter

mm

——

kw/rpm

N•m/rpm

kN-m

rpm

t

kN-m

rpm

t

kN

mm

m

kN

mm

m

kN

mm

m

kN

mm

m

kN

mm

m

mm

m

mm

mm

°

°

kN (t)

mm

mm

mm

km/h

r/min

°

m

m

t

t

t

m2

Mpa

Unit

Model

Rated Power

Max. Torque

Torque

Rev.

Weight

Torque

Rev.

Weight

Pull force in single rope

Steel rope diameter

Needed rope length

Pull force in single rope

Steel rope diameter

Needed rope length

Pull force in single rope

Steel rope diameter

Needed rope length

Pull force in single rope

Steel rope diameter

Needed rope length

Pull force in single rope

Steel rope diameter

Needed rope length

Stud diameter

Stud length

Main rack dimension

Service rack dimension

Tilt angle (forward and backward)

Tilt angle (leftward and rightward)

Max. lifting force

Crawler extend width

Crawler retract width

Track shoe width

Travel speed

Upper-carriage swing speed

Upper-carriage swing angle

Work Mode

Shipping Mode

Item

Engine

Outer Rotary Head

Inner Rotary Head

Main winch

(outer rotary head)

Service winch

(inner rotary head)

Vertical frame winch

Lifting hook winch

Pile frame stud

Crawler chassis

Machine dimension

(L×W×H)

Counterweight weight

Machine Weight

Allowable max. travel weight

Ground area

Ground pressure

Max. Drill Diameter

Manned winch

app.

app.

app. app.

app.app.

app.

app.

SWSD

Secant Pile Construction

CFG Pile Construction

CONSTRUCTION CASE---- Multifunctional, Multipurpose Construction

Rock Drilling With Integral DTH Hammer

Rock Drilling With Combined DTH Hammer

DRM Drilling Rig

How to enjoy the services we provide:

1、 Please contact our customer service center, and we provide service with

comprehensive, positive, active, high-quality and efficient;

2、Please visit our website - customer service - online service and enter the information

about your service required;

3、 Please call our service hotline: 400-887-8230(hotline for customer impairment

report service).

400-887-6230(Customer Complaint hotline).

After-Sales ServiceCreating the customers' value and completely relieving

the customers.

·Assisting customer to make the construction scheme at the first time.

·Equipment installation and debugging;

·On-site training of operators;

·Regular inspection of equipment;

·Maintenance within 24 hours after receiving trouble report;

·Home delivery of warranted accessories;

·Special service for key projects;

·Actively identifying the reasons for the customers' dissatisfaction and solve in a timely

manner;

·Providing technical exchange opportunities;

·Offer major repair and maintenance services;

·Establish complete product archive

CONSTRUCTION PROCESS FLOW(CASE)

SWSD

Research geology report, decide construction scheme; Test and confirm pile location; Auger drilling

Auger drilling to due positionDriving casingDTH hammer test

DTH hammer drilling DTH hammer drilling to due position Test hole depth

Insert steel reinforcement cageInsert concrete tubeFilling concrete

Pulling out casing Use vibrator to pull out casing Pile finished

DRM Drilling Rig