UNITEO STATES ATOMIC ENERGY COMMISSION REIMBURSEMENT AUTHORIZATION CONTRACT NO. DATE OF CONTRACT AT( 29 -i)- 1106 - January 18, 1951 The following revision or addition to the approved employment policies and wage and salary schedules of the contractor is approved as an allowable cost, eftectlve November 29, 1965 Appendix A, Part VI, Section A, Group Insurance, Paragraph 1 is revised as follows: 1. The Contractor maintains a contributory Group Insurance Plan for all employees who wish voluntarily to participate in the Plan. The terms and coñditio of the Plan are controlled by Group Insurance Policies 16740-0 and 16741-0 issued to the Contractor by the Metropolitan Lire Insurance Company on January 1, 1955. The group insurance policies, including Amendments 1 through 11 on Policy 1 84O -0 and Amendments 1 through 18 on Policy 16741 -0, are on file with and have ben approved by the Commission for application to this Contract and are incorporated herein by reference and made a part of this Appendix A. Such group insurance policies may, with prior approval of the Commssiôn be modified from time to time by agreements between the Contractor nd the insurer, Modifications to such policies shall be accomplished by arbendments which are made a part of this contract by reference in this paragraph. DATE: DECS DATE 11Manager, RFA( PROJECT Rocky rlats Plant CONTRACTOR The Dow Chemical Company LOCATION PAGE 1 or I,.,, Rocky flats, Colorado \PPRQVED4pRT9J crs,,TRACTOR BY: Title: General Manager L

Upload: vankhanh

Post on 03-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

UNITEO STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

CONTRACT NO. DATE OF CONTRACT

AT(29 -i)- 1106-

January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractoris approved as an allowable cost, eftectlve November 29, 1965

Appendix A, Part VI, Section A, Group Insurance, Paragraph 1is revised as follows:

1. The Contractor maintains a contributory Group InsurancePlan for all employees who wish voluntarily to participatein the Plan. The terms and coñditio of the Plan arecontrolled by Group Insurance Policies 16740-0 and 16741-0issued to the Contractor by the Metropolitan Lire InsuranceCompany on January 1, 1955. The group insurance policies,including Amendments 1 through 11 on Policy 1 84O -0 andAmendments 1 through 18 on Policy 16741 -0, are on file withand have ben approved by the Commission for applicationto this Contract and are incorporated herein by referenceand made a part of this Appendix A. Such group insurancepolicies may, with prior approval of the Commssiôn bemodified from time to time by agreements between theContractor nd the insurer, Modifications to such policiesshall be accomplished by arbendments which are made a partof this contract by reference in this paragraph.

DATE:DECS

DATE

11Manager, RFA(

PROJECT

Rocky rlats PlantCONTRACTOR

The Dow Chemical Company

LOCATIONPAGE 1 or I,.,,

Rocky flats, Colorado

\PPRQVED4pRT9J crs,,TRACTOR BY:

Title: General Manager

L

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

_______________________________

PAGELOCATION

Rocky Flats, Colorado

- Dow Chemical Companyr NO. DATE OF CONTRACT

AT(29l)1106 January 18, 1951The following revision or addition to the approved employment policies and wage and salary schedules of the contractor

Is approved as ah allowable cost, effective June 14, 1965.

Appendix A, Part LI, Section W - Overtime Meals, is added and readsas follows:

"The Contractor may furnish meals to employees requested to and whodo work in excess of 10 consecutive hours after the start of theirregularly scheduled work hours. Additional meals may be made availableevery four hours thereafter. The Contractor may furnish a breakfast today workers who are requested to and who do work more than two hoursbefore their normal starting time. When overtime work includes a mealperiod, such time will be counted as time worked in computing overtimepay. Meals will not be furnished to exempt employees when beingcompensated for time worked in excess of 8 consecutive hours."

— AGREEI5 TO FOR THE CONTRACTOR BY:

Named.Joshe1 Title: General Manager DateRN 19 55

APPROVED FOR THE AT MIC ENERGY COMMISSION y.... DATE

TIn.E Area Mgr RAc

)cIcy Flats Plant

NO. LA. No! 72to Mod. 92

1 OF 1 PAGES

AT(29-1)-1106

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

LOCATION

The following revision or addition to the approved employment policies and wage and salary schedules of the contracthrIs approved as an allowable cost, effective June 28, 1965

pPPendix A, Part II, Section J * Shift Premium, Paragraph 2 o read:

A non-eicempt employee who is assigned to work on a second, third or jumpshift will receive shift premium pay as hereinafter provided:

:y Flats Plant1/The Dow Chemiial Company

NO.

t(

PAGE 1 OP iRocky Flats, Colorado

DATE OF CONTRACT

January 18, 1951

1st Shift 7:45 a. m. to 3:45 p. rn. None2nd shift 3:45 p. m. to 11:45 p. in. $26. 003rdShfft ll:45p.m. to 7:45a.m. $35.O0per

per

Jump ShIft $40. 00

monthmonthmonth

I

?APPROVED FOR THE CONTRAC?jR BY:

9

DATE:

: General_Manager

U]

JUN 2 4 1965

DATE

I293

to Mod:

PAGE 1 OF 11 PAGESLOCATION

Rocky F1ats, Colorado

AT(29-1)-1106January18, 1951The following revision or addition to the approved employment policies and wage and salary schedules of the cotitracrIs approved as an allowable cost, effective on the dates indicated. Part V, Appendix A, is revisedto read in its entirety as follows:

(1) Effective December 5, 1961, for Section E, Part V, and Section A,Part V, as Section A applies to Section E (except that the require-rnent contained in the preamble to Section E for prior approval oftransfers by the General Manager shall not apply prior to July 1,1965, and Paragraph 3. of Section A shall not apply to Paragraph 8.of Section E prior to July 1, 1965);

(2) Effective July 1, 1965, for the balance of Part V, including Section A,as It applies to all Sections other than Section E.

PART V

TRAVEL AND SUBSISTENCE EXPENSES; RELOCATION EXPENSESA. General Provisions Applicable to Each Section of This Part V

1. Definitions for purposes of this Part V:

a. "Dependet" shall mean persons who regularly residewith the employee and are considered to be members ofhis immediate household.

b. "Travel expensest' shall mean expenses incurred for:transportation by common carrier; when approved bythe Contractor, rental of cars including payments madefor collision damage waivers; taxis; public transporta-tion; tolls; parking fees; and gratuities. When use ofthe employee's private car is approved or required, theterm shall mean: (1) an allowance of Seven cents permile, except when used for "local travel," i. e., travelwithin a radius of 100 miles of the Rocky Flats Plant inwhich case the allowance will be nine cents er mile;!ED fOR THE ATOMIC ENERGY COMMISSION BY—DATE

1ITLE I

UNITED STATES ATOMIC ENERGY COMMISSION

URSEMENT AUTHORIZATION

F1ats Plant

ITRACT NO.

Dow Chemical Company

FCONTRACF—-----

S

U. I. SOVfRNWIIS? !*INTINS OtPiC I6—67129—2

C.

United States Atomic £n.rg Commission

• AUTHORIZATION NO. 70 —ContinuatIon

and (ii) shall include expenses incurred for tolls andparking fees

Except as otherwise provided, "subsistence expenses"shall mean lodging, meals, gratuities, laundry, dry clean-ing and pressing, and charges for official telephone calls,telegrams and postage.

2. a. Costs allowable for expenses of transportation by airshall not exceed the costs of less-than-first-class airaccommodations except when less-than-first-classaccommodations are riot reasonably available to meetnecessary mission requirements, such as, where less-than...firsta-class accommodations would

(1) Require circuitous routing,

(2) Require travel during unreasonable hours,

(3) Greatly increase the duration of the flight,

(4) Result in additional costs which would offset thetransportation savings.

b. Costs allowable for expenses of transportation by railmay include first-class fare and expenses of Pullmanaccommodations.

c. The Contractor may furnish travel insurance to employ-ees traveling on official business at a cost not to exceed$1.00 per trip.

3. All allowable expenses of the types covered by this Part Vshall be supported by itemized accounts bf the expenses sub-mitted by the individuals who incurred them, documented byappropriate receipts such as stubs for transportation tickets,lodging and car rental receipts, etc. Full explanations willbe furnished relative to receipts which are lost or are notavailable.

Apov.d for Atomic Energy Commission by:

TITLE:

1—7464-1 OPO

flow Chemical Co.

Contract No. AT(29-l)-1106 Page 2_ of______

øIst•

DATE:

United States Atomic tnergy Commission

1JRSEMENT AUTHORIZATION NO. 70 —Contlnuatloh

4. All travel outside the limits of the continental United Statesin connection with the performance of work under the con-•tract shall have the prior approval of the AEC on a case-by-case basis.

S. Official Travel in Performance of the Contract Work

Reimbursement of reasonable travel and subsistence expensesincurred by employees regularly on the payroll of the Rocky FlatsDivision who are required to travel in connection with the perfor-mance of work under this contract shall be allowable costs.

C. Travel Performed in Connection with Employment Interviews

Reimbursement of reasonable travel and subsistence expensesincurred by individuals traveling at the request of the Contractorfor the purpose of pre-employment interviews shall be allowablecosts. The General Manager may authorize an individual per-forming such travel to be accompanied by his wife, in which casereimbursement of reasonable travel and subsistence expensesincurred by the individual for his wife also shall be allowablecosts; provided that authorization for the wife to accompany shallbe given only to those individuals being considered for exemptsalaried position vacancies. It is expected that except in unusualcircumstances the authorization for the wife to accompany theindividual will be given on a selective basis to those to be inter-viewed for important managerial or Important technical positionsat the Rocky Flats Plant,

Reasonable costs incurred by the Contractor in furnishing mealsto interviewees will be allowable.

ID. E.elocation Costs--All Individuals Recruited for Work Under ThisContract and All Employees Except Those Covered By SectionE

This Section applies to all individuals first becoming employeesof the Contractor as recruits for work under this contract and toall individuals who Were employees of the Contractor prior totheir transfer to the Rocky Flats Plant other than those coveredby Section E. Reimbursement to such employees of the followingexpenses incurred by the employees shall be allowable costs:

Atomic Energy Commission by:

tow hr4t1 Co Contract No. AT1Z)-fl--llO6 Psge3 of ll___

I

I

45rov.d for

TITLE: DATE:

1—74a64-1 SPO

United St.t.s Atomlo Energy Commission

IMBURSEMENT AUTHORIZATION NO. 70 —ContinuationThe Dow Chemical Co. Contract No.AT(29-l)—1106 Page..j.. of

Reasonable travel and subsistence expenses incurred by theemployee in moving himself and his dependents to withincommuting distance of the Rocky Flats Plant. Except wherespecial circumstances exist dictating that the move of theemployee and his dependents should be made by means ofcommon carler and the Manager of Industrial Relationsapproves travel by such means, the move of the employeeand his family shall be by way of his personal car. Themileage to be used in computing the amount to be paid theemployee for use of his car in making the move shall notexceed the number of miles as shown by the latest edition ofHousehold Goods Carriers Bureau Atlas, of the most direct,practical route of travel at the time of the move from theemployee' s previous location to his new location.

Reasonable expenses, Including packing and unpacking, ofshipping household goods and personal effects by commonor contract carrier to a location within commuting distanceof the Rocky Flats Plant; provided that no reimbursement ofexpenses incurred for handling and shipping boats, livestock,firewood or other items not normally considered "householdgoods and personal effects" shall be allowable. Should it benecessary for the employee to store his household goods andpersonal effects because the housing he will occupy as his"permanent" residence at a location within commuting distanceof the Rocky Flats Plant is not ready to receive the goods,reasonable expenses incurred by the employee for storagefor a period not in excess of thirty days may be reimbursed.

a. Premiums paid by the Contractor for blanket coverageinsuring household goods and personal effects of employ-ees against loss or damage in shipment or storage shallbe allowable; provided the insurance applied to the house-hold goods and personal effects of the individual employeeis reasonably commensurate with the value of that property.

Reasonable expenses incurred by the employee for himselfand his dependents for subsistence expenses for a maximumof thirty days while securing the housing he will occupy as his"permanent" residence within commuting distance of the RockyFlats Plant; provided that the General Manager authorizes

1.

2.

3.

rovd for Atomic Energy Commission by:

TITLE:

1O—7464-1 GPO

DATE

The Dow Chemical Co.

the reimbursement; and provided further that, should theemployee, through no fault of his own, be unable to securesuch housing within the thirty-day period, such reasonablesubsistence expenses may be reimbursed for such additionaltime as shall be authorized by the General Manager with theapproval of the Contracting Officer.

E. Relocation Costs- -Transferred Exempt Salaried Employees

This Section applies only to exempt salaried employees of theContractor selected with the prior approval of the GeneralManager for transfer to the Rocky Flats Plant to fill mana-gerial or technical positions.. Reimbutsement to such em-ployees of the following expenses incurred by the employeesshall be allowable costs:

1. Reasonable travel and subsistence expenses (except thosecovered by Paragraphs 8 e. and 8 j. of Section E) incurredby the employee for himself and his wife for one trip, notexceeding seven days in duration, to seek the housing hewill occupy as his "permanents' residence within commutingdistance of the Rocky Flats Plant; provided that such a tripis made prior to the move which is the subject of Para-graph 2 below.

2. Reasonable travel and subsistence expenses (except thosecovered by Paragraphs 8 e. and 8 j. of Section E) incurredby the employee in moving himself and his dependents towithin commuting distance of the Rocky Flats Plant. Ex-cept where special circumstances exist dictating that themove of the employee and his dependents should be madeby means of common carrier and the Manager of IndustrialRelations approves travel by such means, the move of theemployee and his family shall be by way of his personalcar. The mileage to be used in computing the amount tobe paid the employee for use of his car in making the moveshall not exceed the number of miles as shown by the latestedition of Household Goods Carriers Bureau Atlas, of themost direct, practical route of travel at the time of themove from the employee' s previous location to his newlocation.

11Q-1 GPO

UnIt*d Stat.. Atomic Energy Commission

tJRSEMENT AUTHORIZATION NO. 70 —ContinuatIonContract No.AT(29-l)—llO6 Page 5 of

I

.rOVOd for Atomic Energy Commission by:

TITLE:

UnIt.d States Atomic Energy Commission

URSEMENT AUTHORIZATION NO. 70-—---ContlnuatlonThe Dow Chemical Co

Reasonable subsistence expenses (except those covered by Para-graphs 8 e. and 8 j. of Section E) incurred by the employee for him-self and his dependents for a maximum of thirty days while occupyingtemporary living quarters within commuting distance of the RockyFlats Plant waiting to move into housing which he will occupy as his"permanent" residence within commuting distance of the Rocky FlatsPlant; providing the unavailability of the housing is due to circum-stances beyond the employee's control such as delay in delivery offurniture.

Reasonable expenses, including packing and unpacking, of shippinghousehold goods and personal effects by common or contract carrierto a location within commuting distance of the Rocky Flats Plant;provided that no reimbursement Of expenses incurred for handlingand shipping boats, livestock, firewood or other items not normallyconsidered "household goods and personal effects" shall be allowable.Should it be necessary for the employee to store his household goodsand personal effects because the housing he will occupy as his "per-manent" residence at a location within commuting distance of theRock\j Flats Plant is not ready to receive the goods, reasonable expenseincurred by the employee for storage for a period not in excess ofthirty days may be reimbursed.

a. Premiums paid by the Contractor for blanket coverage insuringhousehold goods and personal effects of employees against lossor damage in shipment or storage shall be allowable; providedthe insurance applied to the household goods and personal effectsof the individual employee is reasonably commensurate with thevalue of that property

Fee paid to a real estate broker in connection with the sale of theemployee's house at the location from which transferred; providedthat the cost allowable for the fee shall not exceed six per cent of thesales price of the house, or $3, 000, whichever is less; and providedfurther that the house was put up for sale following notification to theemployee that he was to be transferred to the Rocky Flats Division.a. In lieu of reimbursement of a fee to a real estate broker,

the Contractor may pay the employee two and one-halfper cent of the sales price of the employee's house atthe location from which transferred, or $1, 500, whichever

d for Atomic Energy Commission by:

Contract No. AT(29- 1_)! 1106 Page 6 I

4.

5.

TITLE: DATE:

United States Atomic Energy Commission

REIMBURSEMENT AUTHORIZATION NO. L—ContjnuatIon,.

The Dow C1emical Co. Contract No.T(291)_11O6 - Pag...L ofU.is 1ess, if the employee sells his houe himself Within ninety daysprior to, or thirty days after, the effective date of his transfer tothe Rocky Flats Division,

6. Expense incurred by the employee for cancellation of a lease for thehousing he occupied as a residence at the location from which trans-ferred; provided that the cost allowable shall not exceed that portionof the cancellation charge which Is attributable to the period beginningwith the date the employee occupies the housing (whether rented orpurchased) which will be his 'permanent" residence within commutingdistance of the Rocky Flats Plant.

• Reasonable expenses for utilities and fuel, nominal yard care, propertyinsurance, property taxes, mortgage interest and miscellaneous minormaintenance Incurred by the employee in maintaining the house heowned and occupied as a residence at the location from which trans-ferred, beginning with expenses Incurred on and after the 61st dayfrom the date he occupies (either as owner or renter) the housing whichwill be his "permanenttt residence within commuting distance of theRocky Flats Plant; provided that:

a. During the period commencing with the aforesaid 61st day andending with the 300th day from the date he occupies said housingwithin4 commuting distance of the Rocky Flats Plant, the employeeoffers his house at the location from which transferred for sale ata price not in excess of the average of two independent appraisals;

b. During the period commencing with the 3Olst day from the datehe occupies said housing within commuting distance of the RockyFlats Plant, and ending with the 425th day from the date he occupiessaid housing or the date sold, whichever is sooner, the employeeoffers his house at the location from which transferred for saleat a price not in excess of 95 per cent of the average of two inde-pendent appraisals;

c. In local situations where it has been demonstrated that appraisalvalues are consistently and substantially higher than marketsaleability, the Contractor appropriately reduces the time

S

- I for Atomic Energy Commission by:

TITLE:

16—74.64-1 ape

DATE:

Un$t.d States Atomic £nergy Commission

REIMBURSEMENT AUTHORIZATION NO. 70The Dow Chemical Co.

a'

Contract No. AT(2 9-. 1)- 1106 — Page !__ of 1

periods, and the prices at which the employee must offer hishouse for sale, specified in a. and b.;

The employee does not refuse during the respective periodsany offer equal to or greater than the price referred to in a.and b. as modified pursuant to C.; and

e. Any expenses reimbursed the employee pursuant to thisParagraph? shall have been incurred by the employeeduring the period commencing with the aforesaid 6lst dayand ending the 425th day from the date he occupies saidhousings

8. Reasonable and necessary miscellaneous legitimate expenses incurredby the employee as a direct result of the transfer, which either arenot specifically covered elsewhere in this Section E, or which ifof a type specifically covered, are incurred in amounts in excessof a limitation imposed by the paragraph dealing with the expenseincluding, but not limited to such items as:

a. Closing costs on sale of home (expense of abstract ortitle insurance, deed, prepayment penalties, documentarystamps, recording fees, notary costs, legal fees, discountpoints).

b. Preparation for shipment and installation of appliances.

c. Driver and auto licenses.

d. Shipping a car if move of employee and dependents ismade by common carrier; shipping a second car.

e. Telephone and telegraph charges (applies to all phasesof move).

f. Removal and installation of phones.

g. Removal and installation of carpeting and draperies.

TITLE:

1O—?464-1 GPO

DATE: ;1

B

I for Atomic Energy Commission by:

t' The

Unltd Stit.. Atomic n.rgy Commission

IIMBURSEMENT AUTHORIZATION NO. 70 —ContinuationDow

h.

1.

Chemical Co.

Baby - sitting fees (applies to all phase s of the move),

Transportation and handling of household pets.

j. Laundry, dry cleaning, and pressing (applies to allphases of the move).

k. Appraisals required pursuant to Paragraph 7 above.

1. Expenses of the type covered by Paragraph 7 aboveincurred during the period commencing with the dateemployee occupies (either as owner or renter) thehousing which will be his Ipermannlt residence

within commuting distance of the Rocky Flats Plantand ending with the 60th day thereafter.

For an employee who owned the premises he occupied asa residence at the location from which transferred at thetime selected for transfer, the costs allowable for expensesreimbursed under this Paragraph 8 shall not exceed onemonthts salary, or $1,500, whichever is less. For allothers, the costs' allowable for reimbursement of suchexpenses shall not exceed one-third of a month's salaryor $500, whichever is less.

F. Temporary Assignment

If it becomes necessary in connection with the performance ofwork under the contract to make temporary assignments, theContractor shall obtain the prior approval of the ContractingOfficer for each assignment and for the arrangements proposedfor reimbursing the employee for expenses incurred incident tothe assignment. The Contractor will submit a written justifica-tionto the Contracting Officer in advance fo the assignment andthe proposed reimbursement arrangements.

The term "temporary assignment" means assignment of an em-ployee for a period of not less than one month nor in excess oftwelve months to perform work under the contract at a locationother than the Rocky Flats Plant and not within reasonable com-muting distance of the employee's usual residence. The term

rov.d for Atomic Energy Commission by:

-I

4

Contract No. AT(291)l106 Page9 of 11

I

p

p

T1TLE

15—74164-1 0.0

United States Atomic Energy Commission

1MBURSEMENT AUTHORIZATION NO. —?-°-------ContinuatjonContract No. 7T(29 1)-i 106 Page jQ

"employee" as used in this Section F means a person regularlyon the payroll of the Rocky Flats Division.

Relocation Costs - - Terminated mployees1. The following expenses, If incurred within ninety days (orsuch longer period as may be approved in writing by theContracting Officer) subsequent to the date of terminationby The Dow Chemical Company of the employment at theRocky Flats Plant of an individual because of lack of work,may be reimbursed by the Contractor; provided that suchitems of cost shall not be allowable if (I) the individual wasnot employed at the Rocky Flats Plant prior to October 15,1965; (ii) an express oral or written understanding that theemployee would be reimbursed for such expenses was notmade a condition of employment; or (iii) the Contractortransfers the employee to another facility, subsidiary oraffiliate of the Contractor.

a. Reasonable travel, food and lodging expenses incurredby the employee in moving himself and his dependentsback to the location from which he was recruited ortransferred for work in the performance of this contractor to a location of lesser distance. If the move wasmade by way of car, the mileage to be used incomputingthe amounts to be paid the individual for use of his carshall not exceed the number of miles, as shown by thelatest edition of Household Goods Carriers Bureau Atlas,of the most direct, practical route at the time of themove between the individual's place of residence withincommuting distance of the Rocky Flats Plant and thelocation from which he was recruited or transferred.If the individual moves to some location which is a greaterdistance from his place of residence within commutingdistance of the Rocky Flats Plant than is the place fromwhich recruited or transferred, the aforesaid expensesmay be reimbursed up to an amount which is in the sameratio as the distance of the most direct route, •as shown bythe latest edition of the Household Goods Carriers BureauAtlas, between his place of residence within commuting

ov.d for Atomic Energy Commission by:

TITLE:DATE: L

The Dow Chemical Co.

G.

United States Atomic Energy Commission

REIMBURSEMENT AUTHORIZATION NO. _i_-c

distance of the Rocky Flats Plant and the location fromwhich recruited or transferred bears to the distanceactually traveled in the move

b. Reasonable expenses, including packing and unpacking,of shipping the household goods and personal effects ofthe individual by common or contract carrier to a loca'-tion from which he was recruited or transferred forwork in the performance of this contract or to a locationof lesser distance; provided that no reimbursement ofexpenses incurred in handling and shipping boats, live-stock, firewood, automobile or other items not normallyconsidered "household goods and personal effects" shallbe allowable; and provided further that should the movebe made to some location which is a greater distancefrom his place of residence within commuting distanceof the Rocky Flats Plant than is the place from whichrecruited or transferred, the aforesaid expenses maybe reimbursed up to an amount which is in the same ratioas the distance of the most direct route, as shown by thelatest edition of the Household Goods Carriers BureauAtlas, between his place of residence within commutingdistance of the Rocky Flats Plant and the location fromwhich recruited or transferred bears to the distance thehousehold goods and personal effects were actually moved.

2. Before making reimbursement of expenses covered by thisSection, the Contractor shall:

a. Obtain from the individual evidence establishing withreasonable certainty that the individual has completedthe move; and

b. Secure from the individual a certification that (i) he hasnot and to the best of his knowledge will not receive re-imbursement for expenses of the move from any othersource; and (ii) agreement that, should the individualreceive reimbursement for expenses of the move fromsome other source, he will return to the Contractoramounts paid him by the Contractor on account of ex-pses of the move.

-Energy Commission by: Agreed, for the' lloyd M. Joshel

11STf, Jr. TITLE: General Man(èif (gi.,—1LFAO 16—74364-1 GPO

cractor The Dow (hwi,'1 Co. Contract No. 4T(291).1l06 Page.jj ot...

.

The following revision or addition to the approved employment polIcies aId wage and• salary schedules of the contractor

is approved as an allowable cost, effective November 22, 1965 *

Appendix A, Part VI, Section A - Group Insurance, Paragraph 1revised as follows

1. The Contractor maintains a contributory Group InsurancePlan for all employees who wish voluntarily to participatein the Plan. The terms and cOnditions of the Plan arecontrolled by group insurance policies 16740-0 and l674lGisSued to the Contractor by the Metropolitan Life InsuranceCompany on January 1, 1955. The group insurance policies,including amendments 1 through 11 on Policy 16740-0 andamendments 1 through 16 on Policy 16741-0, are on filewith and have been approved by the Commission for. applica-tion t.o this Contract and are incorporated herein byreference and made a .part of this Appendix A. Such groupinsurance policies may, with the prior approval of theCommission, be môdif led from time to time by agreementsbetween the Contractor and the insurer. ModificatIons tosuch policies shall be accomplished by. amendments whichare made a part of this contract by reference in thisparagraph.

APPROVED FOR THE CONTRACTOR BY:

*ovluu.Nç$T PSINTN OUICI 1G-—5fl20—2

NOV 19 i9

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATIONto Mod

LOCATION

ocky Flats Plant. ... ..

The Dow Chemical Company

tRAcT NO.

AT (29—1) —1106

PAGE 1 OF 1 PA4ES

Rocky Flats, Colorado

DAlE OF CONTRACT

January 18, l51

DATE:

PAGE 1 or 2 PXGESPROJECT

Rocky Flats PlantLOCATION

Rocky Flats, ColoradoCONTRACTOR

The Dow Chemical Company

.CONTRACT NO. DATE OF CONTRACT

AT(29—l)—l106• January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractoris approved as an allowable cost, effective November 15, 1965.

O Appendic A, Part VI, Section A, Group Insurance, Paragraph 1is revised as follows:

1. The Contractor maintains a contributory Group InsuraticePlan for all employees who wish voluntarily to partioipatein the Plan. The terms and conditions of the Plan arecontrolled by Group Insurance Policies 16740-.G and 16741—0issued to the Contractor by the Metropolitan Life InsuranceCompany on January 1, 1955. The group insurance policies,including Amendments 1 through 10 on Policy 16740—0 andAmendments 1 through 16. on Policy 16741—6, are on fIle withand have been approved by the Commission for applicationto this Contract and are incorporated herein by referenceand made a part of this Appendix A. Such group insurancepolicies may, with prior approval of the Commission, bemodified from time to time by agreements. between theContractor and the insurer. Modifications to such policiesshall be accomplished by amendments which are made a partof this contract by reference in this paragraph.

Appendix A, Part VI, Section B, Pension and Profit Sharing Plan,Paragraph 1, Subparagraph a, is revised to change Schedule V toSchedule IV as follows:

a. The Contractor maintains a Pension and Profit SharingProgram as set forth in the pamphlets entitled "Pensionand Profit Sharing Plan" and "Supplemental Retirement

, / Plan" which are included under Schedule IV and hereby madea part of the Appendix A for all eligible transferredemployees.

TLE

DATE

U. S. QVI*NNSNT P*t$YINGOr,e( IC,—)QI)—

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

I NC

FOR THE ATOMIC ENERGY COMMISSION By—

L

Unit.d Stat•s Atomic En.rgy Comml.sksn

REIMBURSEMENT AUTHORIZATION NO -----—Continuation

àontractor The Dow Chemical Compa1ntract No. AT(29-1) —1106 Page 2

Appendix A, SCHEDULES:

Schedule IV — Group Insurance is hereby deleted, andSchedule V — Pension and Profit Sharing Plan is changed to read:

Schedule I

Schedule II

Schedule III

Schedule [V

SCHEDULE IV

PENS ION AND PROFIT SHARING PLAN

1

10

11

14

APPROVED FOR THE CONTRACTOR BY: DATE: ,

Name: 'd M. osliel Title: General Manager NOV 17 1965

4rnionY:TITLE: Manager. RPAO

16—74a64-1 .P*

1Appendix A, Table of Contents, Page iv, is changed to read:

SCHEDULES

Wage and Salary Schedule

Labor Agreement

Overtime Chart

Pension and Profit Sharing Plan

- )provd for ' - —

XfLJ /4 ,qr-DATE: 1

I

UNITED stATES ATOMIC tNRGY COMMISSION

REIMBURSEMENT AUTHORIZATION

PNOJEcT

Rocky Flats PlantLOCATION

flocky Flats, Colorado

coa*cmsThe bow Chemical Company

CONTRACt Nb.

AT(29-1)ll6DAlE OF CONTRACT

January 18, 1951

The following revision Or addition to the approved employment policies and wage aiid. salary schedttles of the contractorIs approved as an allowable cost1 eftect!ve June 28, 1965

SAppeitdix A, Part VI, Section A - rotip Insurance, Paragraph 1revised as kllowst

1. The Contractor maintains a contributory Group InsurancePlan foi& all employees who wish voluntarily to participatein the .1lan. The terms and conditionsaf the Plan are asclesoribed in the attached Schedule IV, and are controlledby groui insurance policies 18740-G and 16741-G issued tothe Contractor by the Metropolitan Life Insurance Companyon January 1, 1955. The group insurance policies,including amendments 1 through 10 on Policy 16740-0 andamendments 1 through 14 and 16. on o1icy l6741i.G, are onfile with and have been approved by the Commission forapplication to this Contract and are incorporated hereinby reference and made a part of this Appendix A. Suchgroup insurance policies may, with the prior approval ofthe Commission, be modified from time to time by agreementsbetween the Contractor and the insurer. Modifications tosuch policies shall be accomplished by ReimbursementAuthorization.

APPROVED FOR THE CONTRACTOR BY:

General Manager

DATE:

SEP 30 1965

to

PAGE1 'PAGEsOF

Appendix A, Part VI, Section B, Pension and Profit SharingPlan, Paragraph 2a is revised as fol1ows

2. Rocky Flats Plan

a. The Contractor maintains a Pension Program for allemployees as defined in subparagraph ii of Article Iof Grotip Annuity Contract Number 437, issued to theContractor by the Metropolitan Life Insurance Company,dated June 27, 1956, and effective July 1, i54. ThePension Program, which is controlled by said GroupAnnuity Contract Number 437 and ametidments 1 through14 thereto, is on file with and has been approved bythe Commission for application to this Contract andIs incorporated herein by reference and made a partof this Appendix A. Such Group Annuity Contract may,with the prior approval of the Commission, be modifiedfrom time to time by agreements between the Contractorand the insurer. Modifications to such Contract shallbe accompanied by Reimbursement Authorization.

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

PROJECT

Rocky Flats Plant

LOCATIONPASt 1

Rocky Flats, Colorado

OF .,

CONTRACTOR

The Dow Chethical Company

CONTRACT NO.

AT(294)4106DATE OF CONTRACT

January 18 1951

The following revision or addition to the approved employmeiit policies and wage atd salary schedules of the contractorIs approved as an allowabl cost, effective July 1, 1965

OVE14l'OR 'I'9 CONTRACTOR BY:

.Title: General MancitION

DATE:DECO 65

Manager, RFAO

DATE

LL.

UNITED STATES ATOMIC ENERGY (OMMISSiON

REIMBURSEMENT AUTHORIZATION

Flats Plant

Chemical Company

The following revision or addition to the approved employment policies and wage and salary schedules of the contractorIs approved as an allowable cost, effective November 1, 1965

1. Appendix A, Schedule I, Part A, Ser1e R, Salary Ranges is revised as

0 follows:

Salary Ranges for the above classifications will be based on the followingformula:

Where (currently):

Range Median a ,i bx

a $250.00b: 3.90x ' Evaluation Points

The values of ttatt and"b" may be changedfrom time to time inaccordance with Section0 of Part II.

Range Maximum Median plus 20%Range Minimum Median minus 20%

2. Appendix A, Part II, Exempt and Nonexempt Salaried Employees, Se.ctionsID and 0 are amended as follows:

a. During the period November 1, 1965, through December 31, 1966, allreferences to Sections ID and 0 to "twelve months" and to "twelve-monthperiod" shall be deemed to be to fourteen months and to fourteen-monthperiod. Thereafter, beginning January 1, 1967, these references shallbe to twelve months and to twelve-month period.

b. Also during the period November 1, 1965, thiough December 31, 1966, theterm "salary budget year" In Sections ID and 0 shall cover such fourteen-month period. Thereafter, beginning January 1, 1967, this term shallrefer to a twelve..rnonth period.

QC 17 1965

to Mod. 9

LOCATION

PAGE 1

T(29 1). 1106

Rocky Flats, Colorado

OF 1 PAGES

DATE OF CONTRACT

January 18, 1951

GREED TO FOR THE CONTRACTOR BY: DATE:

General Manager

SunderlandActing Manag

tITLERocky Flats

DATErea

AT(29-1)-.1106

The following revision or addition th the approved employment policies and wage and salary schedules of the tontractorIa approved as an allowable cost, cective Deeembe' 6, 165

Part XX, Section N - Vacation Leave, Paragraph 1, to read:

1. Regular Vacation

a. After one year of continuous employment, salaried employees willbecome eligible for a paid vacation of fourteen working days. Thisfirst vacation must be completed during the remaining part of thecalendar year after the employee first becomes eligible, exceptas outlined in subparagraphs c and d below, or where the eligibilitydate of an employee falls during the month of December, in whichcase vacation for which such employee would otherwise becomeeligible on that date, may be taken at such time during that monthas his supervisor may approve.

b. After the first anniversary of his hire, each salaried employeebecomes entitled to fourteen days of vacation on or after eachsucceeding January let that the employee is on the payroll. Thisvacation must be taken during the calendar year in which theemployee becomes entitled to the vacation or lost without paymenttherefor, except as outlined in subparagraphsc and d below.

c. An employee may carry over up to five days of vacation from onecalendar year to the next succeeding calendar year. (Note: forcalendar year 1965 any employee may carry over up to six daysof regular vacation into calendar year 1966.)

-UNITED STATES ATOMIC tNERGY COMMISSION

1JRSEMENT AUTHORIZATION

- - ky Plate PlantLOCATION

CONTRACT NO.

The Dow Chemical Company

Rocky Flats, Colorado

DATE OF CONTRAcT

January 18, 1951

.

APPEVEO FOR THE ATOMIC ENERGY COMMISSION BY—DATE

________________

-

TITLE

e. If an employee is laid off for lack of work, Is a'etired under theCompany retirement prqgram, is granted a military leave ofabsence1 or quits with five day's notice, he will be paid for anyunused vacation and in addition will be paid for vacation earnedduring the year in which he terminates, on a prorated basis ofone day per each full month worked since his last vacationeligibility date. However, if an employee is discharged forcause or quits without giving five day's notice, no vacation paywill be allowed.

f. Effective January 1 of the year in which the employee completestwenty years of continuous service and each year thereafter,he is entitled to a total of seventeen days of regular vacation.

DEC

1O) Unlt.d *tat.s Atosni. I

REIMBURSEMENT AUTHORIZATION NO.

cohtraotor The Dow Chemical Co Controt No. AT(29 1)-i 1

d. By arrangement with his supervisor, an employee Lup to five days of regular vacation from the followingemployment is terthinated for any reason whatsoevertthe date the employee would normally have become eligible ,said vacations the Contractor shall take reasonable steps torecover salary paid to such employee for the borrowed vacation,H

LI

1

I

I;APPROVED 'OR THE CONTRACTOR BY:

..Jhel Title: General Manager

DATE:

Acting Manager

CONTRACT NO. DATE OF CONTRACT

AT(29-l)—1106 January 18, 1951The following revision or addition to the approved employment policies and wage and salary schedules of the contractor

is approved as an allowable cost, effective September 6, 1965.

Appendix A, Schedule I, Part B, Series RFN, is revised as follows:

SCHEDULE IPART B - SERIES N

THE DOW CHEMICAL COMPANYROCKY FLATS PLANT

CONTRACT NO. AT(29-1)-.l106

SCHEDULE OF MONTHLY SALARY RANGES FORNONEXEMPT SALARIED CLASSIFICATIONS

JOB CODE CLASSIFICATION

Clerk I101 File Clerk102 Mail Clerk

SALARY RANGEMINIMUM MAXIMUM

$289 $404

N-lb Operator I111 Ozalid Operator I

289 404

Administrative ClerkClassified Material ClerkReservations Clerk

Operator II211 Key Punch Operator212 Switchboard Operator

315 441

315 441

315

UNITED ATOMIC tNERGY COMMISSiON

PROJECT,

Rocky Flats Plant

NTRACT0R

The Dow Chemical Company

Rocky Flats, Colorado

N-bOO

N-200 Clerk II201202204

N-210

Stenographer

I THE ATOMIC ENERGY COMMISSION BY—

441

TITLE

DATE

United States Atomic energy Commission

The flow Chemical_Compa1r t No.AT(29-l) —1106

REIMBURSEMENT AUTHORIZATION NO —Cont.

Page

Operator III -

Senior Key Punch OperatorTeletype OperatorTabulating Machine Operator III

Junior Secretary

Clerk IV401 Operations Clerk402 Payroll Clerk

Operator IV411 Reproduction Equipment Operator412 Senior Teletype Operator

Secretary

Technician IV431 Technician IV

SALARY RMINIMUM

$ 341

N-500

Operator V511 Tabulating Machine Operator V

N-520

N-540

Senior Secretary

Technician V531 Medical Technician

Clerk V

Administrative Secretary

JOB CODE CLASS IF ICAT ION

N—300 Clerk III301 Accounting Clerk303 Purchasing Clerk

N—3l0311312313

$ 478

IN-320

N-400

341 478

N—4l0

341 478

370

N-420

N-.430

517

370 517

N-510

Draftsman

370

370

517

517

N-530

400

400

560

560

N—600

400

400

560

560

400 560

435

. Atomic Enorgy Commission by:

609

TITLE: DATE:

______

641642643644645646

Page! of._

SALARY RANGEMINIMUM MAXIMUM.

N-700 Clerk VII701 Eead Clerk702 Scheduler-Expediter

473 661

N-710 Engineer-Draftsman

,N-720 head Nurse

N-750 Junior Programmer

N-760 Shipment Officer

N—770 Operator VII771 Head Key Punch Operator

N-ISO Confidential Secretary

N-790 Tabulating Machine Operator VII

N-800 Design Draftsman801 Tool Designer802 Planner

473 661

473 661

473 661

473 661

473 661

473 661

•473 661

514 720

United State* Atomic Energy Commission

REIMBURSEMENT AUTHORIZATION NO. --ContInr--Contractor The Dow Chemical

No AT(291) 4106

JOB CODE

N-6l0

CLASSIFICATION

611612613614

$ 435

N—620

N-630

IN-640

$ 609Clerk VIAccountant VIMaterial Control Accountant VISchedulerSenior Clerk

Nurse

Operator VI

Technician VIEquipment and Armory TechnicianLock and Key TechnicianTechnician VIIndustrial IllustratorIndustrial PhotographerDispatching Officer

435

435

435

609

609

609

Atomic £n.rgy Commission by:

DATE:

United States Atomic tn.rgy Commission

Technician VIII811 Technician VIII812 Associate Chemist, Physicist,

Metallurgist, Cost Accountant., etc.813 Senior Industrial Illustrator814 Senior Industrial Photographer815 Master Locksmith816 Associate Programmer

APPROVED FOR THE CONTRACTOR BY:

-- Energy Commission by:

DATE:

.iL_JMBURSEMENT AUTHORIZATION NO. —--Contlnuatlontor The Dow Chemical_Compa1iJntract No AT(29—1)-l106

Page

JOB CODE

11-810

CLASS IFI CAT IONSALARY RANGE

MINIMUM MAXIMUM

$ 514 $ 720

I,

I,

:1oyMhe Title: General Manager

LJAIl

SEP 8 1965

-UNITED StATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

Flats Plant

'The Dow Chemical Company

PAGE I

NNO. - DATEOPCONTRACT

AT(29-1)llQ6 Jaary,g51The following retiiIon or addition to the approved einploynietit pol1eIe and wage and salary schedules of the cOnttactoria approved as an allowable costs effectIve September 1, 1965.

Schedule I, Part A, Series RF, revised as follows:

of Classifications, Titles and/or Points:

Accountability 1epresentatjveAccountability Representative

Superintendent, MaintenanóeSuperintendent, Maintenance

Machine Shop SuperintendentMachine Shop Superintendent

LOCATION

Rocky Flats. Colorado

•.,. Appendix A,

, •;. 1•. Changes

Code

I..

•.. Old

NewRF-2RF-2

Old RI6New RF6

Classification Eval, Points

: OldNew'Old

• New

,• Qi'sew

R1?23RF 23

RF-29RF-29

RF-50RF-5O

Budget SupervisorBudget Supervisor

Senior AuditorSenior.. Auditor

Engineering Staff SpecialistPrincipal Engineer

O1d RF-5lNew RF4151

Old RF..52New RF-52

• OldNew

Electric Shop SuperintendentElectric Shop Superintendent

Instrument Shop SuperintendentInstrument Shop Superintendent

229201

215238

149186

205215

350377

222215

222238

222215

222215

134153

RF-53RF-53

Old RF54:1 New RF-54.

RP6o&ew RF-60

Pipe Shop SuperintendentCraft SupervisorArea Maintenance SupervisorArea Maintenance Supervisor

.JGY COMMISSION BY— -

TITLE

11—17*9,-,

DATE

-L

Old RF99. New RP'99

Old RP*.lflNew RF'll1

Old RP-1l9New RPubll9

Old RF-130New IP43O

v Old RPml3lNew R'-l3l

Old RI?a..l42

New Fl42

Old R?-1)49, New RP-l49

Old fi"l55New RP-l55

Old RFl56New RFl56

Contrict No, AT(29i) "liO6 PI____

Cia ssificati on

Chief Construction InspectorFacil. Inspection Superintendent

Superintendent, Mfg. AssemblySuperintendent, Mfg. Assembly

Supervisor, Chemical OperationsSupervisor, Chemical Operations

Plant Services SuperintendentPlant Services Superintendent

Production Control SuperintendentProduction Control Superintendent

sen. Supt,Qity ntl. & Accep,Gen. Supt., lty Cntl & Accep.

Security DirectorSecurity Director

Director of esearch and DevelopmentDirector of Research and Development

Metallurgical Research DirectorMetallurgical Research DIrector

Technical Information OfficerTechnical Information Officer

Health Physics SupervisorHealth Physics Supervisor

Medical Services SupervisorMedical Services Supervisor

UnIt.d St*t•s Alemlo tn.rgy

REIMBURSEMENT AUTHORIZATION NO. 62The Dow Chemical Co.

C ode

Old RF-64New flP164

Old RF.'73New RF73

Old RFdII79

• New RF.'79

' Old RF89New RF89

Eval4 PointsI

I

225255

354328

205i88

23922229255

375362

285276

571557

354390

238224

222264

350362

246315

285264

PhysicianPhysician

Assistant Laboratory DirectorAssistant Laboratory Director

Old RFl58' New R?l58

:tornEn.rm Commiss$on by:

Contract No. AT(29.]j11o6

ClassifIcationChemical Research DirectorChemical Research Director

Administrative Services- ManagerAdministrative Services Manager

Quality Control SuperintendentQuality Control Superintendent

Mfg. Technical SuperintendentSuperintendent, Mfg. Technical

Prod. Line Services SuperintendentProd. Line Services Superintendent

Supervisor, Quality EngineeringQuality Control Supervisor

Superintendent, Quality AcceptanceSuperintendent, Quality Acceptance

2. Addition of Classification Titles:

C ode

RF- 101RF-147RFl94RF-217RF-2l8RF-22lRF-223

Classification

Senior Quality Control EngineerNon-Destructive Testing SuperintendentFacil., tjtil,, & Planning SuperintendentArea Maintenance SuperintendentArea Maintenance SupervisorLabor Relations CoordinatorSenior Budget Analyst

Eval Points

1582614

239265215158153

APPiDVED FO THE CONTRACTOR BY:

,IfName: Lloyd M. J el Title: General Manager

contraotor The Diemi cal C 0.

United States Atomic Eh.rgy Commission

REIMBURSEMENT AUTHORIZATION NO. 6a —'

Code

Old RF-159New RF-'159

Old RF-169New RF-169

Old RF-174New RF-i74

Old RF'-175New RF-175

Old RF-l76New RF-176

Old RF-186New RF-186

Old RF-20)4New RF-204

Eval Points339377

4771447

325274

30414

326

264315

222200

325285

'3Energy Commission by:a4-f7

DATE

iJ; ;7 65

LA t

DATE OF CONTRACT

January 18, 19513 following revision or addition to the approved employment policies and wage and salary schedules of the contractorroved as an allowable cost, effective June 28, 1965

Appendix A, Part II, Section R, paration Py, Paragraph 2, isrevised to read:

2. Nonexempt employees whose employment at the Rocky Flats Plantis terminated by the Contractor for lack of work may be givenseparation pay as follows, provided that the individual is nottransferred to another facility, subsidiary or affiliate of theContractor:

Length of employment with the Contractorprior to effective date of termination

One month or more, but less than one year

One year or more, but less than two years

Two years or more, but less than three yearsThree years or more, but less than four years

Four years or more, but less than five years

Five years or more, but less than six yearsSix years or more

TO FOR THE CONTRACTOR BY:

Manager

_____

ThE4MION7

tJWN4 OicI J.I57135-$

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

tocky Flats Plant

The Dow, Chemical Company

NO. ri A £'IUito Mod. 9

PAGE 1 1 PALOCATION

AT(29-l)-llo6

Rocky Flats, Colorado

Amount of SeparationPay, to be computedat basic salary rate

One week

Two weeks

Three weeks

Four weeks

Five weeks

Six weeks

Seven weeks

tEED

Date: SEP 30 1965

DATE

Area Manager I /TITLE RF.AO

UNITED STATES ATOMIC ENERGY COMMISSION

JIMBURSEMENT AUTHORIZATION

NO.

R.A. il0:

Flats PlantLOCATION

Rocky Flats, Colorado

Dow Chemical Company

(29-1)-l1O6

revision or addition to the approvedaa an allowable Cost, effective January

employment policies and wage and salary schedules of the contractor1, 1965

Appendix A, Part IV, Section D - Medical xathinatlon, Is revisedto read as follo*s:

Medical Examination

1. Routine industrial pr e - employment, mandatory periodic,voluntary periodic and termination medical examinationsprovided by the Contractor are allowable costs. The RockyFlats Plant medical facilities will be utilized to the fullestextent possible to conduct such examinations.

2. Periodic examination of key employees at off site medicalfacilities in accordance with the Contractor's establishedExecutive Health Examination Program described in theContractor's letter dated May 16, 1962, is an allowablecost.

General1THE

DATE OF CONTRACT

.January 18, 1951

ED TO FOR THE CONTRACTOR BY:

Manager Date:

DATEArea Manager j,

TITLE RFAO.._IMfl*GOcflct G—57I2g-3

DATE OF CONTRACT

R.A, Noto Mod, 92

1 OF 1

foltowlhg revielcth or additioti to the approved employment policlea atid Wage and ealary chedulee of the onttactor

Ia approved em fth aIio*able cost, effecthe Jux 28, 1965

1. The title to ectlon A of Appendix A Part III is revised to readI4ottx'ly' Paid Production and Ma1ntexnce np1oyees."

2. AppehdI A, Part Ill, Section A, Paragraph l is revised toread aa Lollows:

'1. Rates of Pay arid Fringe Benefits

4ottr1ya Paid Production and Maintenatice mp1oyees shall becovered by this Part III. PaymentS of wages not in excessof those provided for in the agreement dated June 28, 1965,

between the Dow Chemical Company, Rocky F1at Division,and the United Mine Workers of America District 50,Local 15440 will be allowable. Such agreement is attachedas Shedtile II and by this reference Is hereby made a part

of this Appendix. In accordance with the "Settlement

Agreement" reached in connection with the foregoing agreementof Sttne 28 196 payment to employees of the bargaining unit

of 8 centS per hour in addition to that aniount paid them perhour during the period February 1, 1965, through June 28,l96, will also be allowable. All other costs, such asgrievance processing, arbitration, dues deductions, leaveprovisions and other fringe benefits, incurred pursuant tothe provisions of said agreement of Jun&28, 1965, will beallowable.

16 /1.ETiThE Area M r., R A

DATE

UNITED STATES ATOMIC ENERSY tOMMISSION

REIMBURSEMENT AUTHORI2ATI0N

1...

Flat a Plant

LOCATION

PAGE

iNO

The Aw Chetnica1 Company

Rocky hats, Colorado

AT(29Mll106 Januaryl8, 1951

AGREED TO FOR T CONTRACTOR BYt

Tit1e General Manager Date:A 12

APPROVED FOR THE ATOMIC NERO COM ION BY—

NAME Seth R. Woodruff, Jr.U. I. SOYtUNMENT PItSNtINSO#?ICI 16—iI29—2

UNIIIb STA1tS AtOMIC NERG COMMISSION

REIMBURSEMENT AUTI-ORiZATION

revision or addition to the approved employment policiei and wage and salary schedules of the contractorved a an allowable cost, effectIve June 14, 1965

Paragraphs 1 and 3 of Appendix A, Part II, Section 0 Sick Leave,

are revised to read 1t their entirety as follows:

1. No salary deductions are made If salaried employees are absentfor reasonable periods due to illness or Injury If the absence is

approved as follows:

Absene Period

8 hours o legs in a ay

period

40 houxe or less, but more

than 8 hours, in a pay

period

More than 40 hours in a pay

period, or moie than 40hours for one illness or

injury

salary to an individual onscheduled work hours per

Officer approval.

Level of Approval

Authorized Supervisor

Supervisor reporting to

eneral Manager

Manager of Indtstr1al1eiati ons

sIck leave for more than acalendar year shall require

1ty Flats Plant

LOCATION

I PAGE

The Dow Chemical Company

1p4OF 1

Rocky Flats, Colorado

AT(29-1)il06

DATE OF CONTRACT

January 18, 1951

3. Payment oftotal of 600Contracting

TO FOR THE CONTRACTOR B?:

ti r'tel Title: Oeneral Manager IDate: /?''DATE

Aiea Manager

TITLE RFAOI VIINNtM? PIIN?IN ,,Ici ts—*?129—2

/3 /1i.i—I

1 cc 2 p..

Rocky Flats Plant

LOAT3ON

Rocky Plats, ColoradocONTRACTOR

•The Dow Chemical Company

CONTRACT NO.

AT(29-i)4106DATE OF CONTRACT

January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractorIs approved as an allowable cost, effectIve June 28, 1965:

Appendix A, Schedule I, Part A, Series RP, revised as follows:

Code

1W—i 5RP-41RF.-76HF-i 15RF-.18lRF-l89RF—209RF-209RP-210RF-212RF—216

2. Changes of Classifications, Titles and/or Points

Eval. Points

117153264150215127104123351351186

S Code -

Old RF-4New RF-.4

Old RF-32New RF-32

Old RF-48New RF-48

Old RF-74New EP-74

Old RF-205New RF-.205

Classification

Computing Operat ions SupervisorData Processing Supervisor

Design EngineerEngineer

Maintenance AideAdministrative Aide

Misc. Fabrication SuperintendentFabrication Superintendent

Technical Writing SupervisorTechnical Writing Supervisor

Eval. Points

215215

130130

9292

264264

131181

•. $. IOYUNNgNT P*INTSNS OfliCi IS—57129-2

UNITED STATE ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

•Mod. 92

PAGE

S 1. Deletion of Classification Titles:

Classification

Industrial EngineerWomen's Employment SupervisorPu Fabrication SuperintendentSpecial Projects EngineerSupervisor, U ChemistryProduction Control SupervisorSpecial Services AssistantRecords Service LeaderFacilities ConsultantManufacturing ConsultantTechnical Employment Supervisor

AID FOR THE ATOMIC ENERGY COMMISSION DATE

L_—T-:.. NAME TITLE

1

FO? AEO4M United States Atomic £norgy Commission

REIMBURSEMENT AUTHORIZATION NO --—Continuation

contraeri! Dow Chemical Co Contract No AT(294)1106 Page 2 of 2

Code

'Rr-88

RF-.102RF—109

•i RP—113RP-118

,RFl 45.EP—224\flp225

RF—227Rp.228RP—239

' RP-240,RF-241

RF-242RF—244

Classification

Gage SpecialistSr. Quality Control EngineerAssistant Quality Control EngineerGage Control LeaderTechnical Writer-EditorSr. Technical WriterTechnical EditorProduction Control LeaderProgram Planning EngineerRecords Management CoordinatorProduct Definition SupervisorSpecial Services SupervisorIndustrial EngineerSr. Industrial EngineerFire InspectorAssistant PaymasterSecurity Inspector

Eval. Points

130158117170130117172117158131187181149172119130110

APPROVED FOR THE CONTRACTOR BY:'.4JStName: lo d . oshe1 Title: General Manager

DATE:

.

July , 196Approved I r Atomic nergy Co miss on by:

NAMEZ hUE: Manager, RPAO

.

1I—74164-1 •o

3. Addition of Classification Titles:

(

(I)

January 18, 1951

The following revisiozi or addition to the approved employment policies and wage and salary schedules of the contractorIs approved as an allowable cost effectIve July 1, 1965

P Appendix A, Pait VI, Section A, Group Insurance,' Paragraph 1revised.as follows

1. The Contractor maintains a contributory Group Insurance Planfor all employees Who Wish voluntarily to participate in thePlan. The terms and conditions of the Plan are as describedin the attached Schedule IV, and are Controlled by GroupInsurance Policies 16740—G and 16741-0 issued to the Contractorby the Metropolitan Life Insurance Company on January 1, 1955.The group insurance policies, including Amendments 1 through 9on Policy 16740..G and Amendments 1 through 14 on Policy l6741-G,are on file with and have been approved by the Commission forapplication to this Contract and are incorporated herein byreference and made a part of this Appendix A. Such groupinsurance policies may, with the prior approval of theCommission, be modified from time to time by agreements betweenthe Contractor and the insurer. Modifications to such policiesshall be accomplished by Reimbursement Authorization.

APPROVED FOR TIlE CONTRACTOR BY:

Name: Lb ci M. oshel Title: General Manager

Date:

JUL 2 11965

APffiOVED.PoR THE ATOMIC ENERGY COMMISSION BY—

,4J �/ 1'(i't. jL/.NAME R. Wo6cf.ruffj/4r. TITLE Manager, RFAC

DATE

:,

SrATES ATOMIC ENERGY COMMISSION

JJRSEMENT AUTHORIZATION

NO.

7'Flats 'Plant

R.to

A. No. 56,Mod.

LOCATION

i Dow CheMical Company

PAGE

c..... tNO..AT(29-'l)-1106

1 o 1Rocky Flats, Colorado

PAGES

DATE OF CONTRACT

S

UNITED STATES ATOMIC ENERGY COMMissioN

1JRSEMENT AUTHORIZATION

LOCATION

Appendix A, Part VI, Section A, Group Insurance, Paragraph 1revised as follows:

The Contractor maintains a contributory Group Insurance Plan for allemployees who wish voluntarily to participate in the Plan. The termsand conditions of the Plan are as described in the attached Schedule IV,and are controlled by Group Insurance Policies 16740-G and 16741—Gissued to the Contractor by the Metropolitan Life Insurance Companyon January 1, 1955. The group insurance policies, includingAmend-ments 1 through 9 on Policy 16740-G and Amendments 1 through 13on Policy 1674l-G, are on file with and have been approved by the

Commission for application to this Contract and are incorporatedherein by reference and made a part of this Appendix A. Such groupinsurance policies may, with the prior approval of the Commission,be modified from time to time by agreements between the Contractorand the insurer. Modifications to such policies shall be accomplishedby Reimbursement Authorization.

Date:

flats Plant

The t)ow Chemical Company

PAGE 1

coNTRAct NO.

IOP

Rocky Flats, Colorado

. AT(291)11o6 January 18, 1951

DATE OF CONTRACT

The following relalon or addition to the approved employment policies and wage and salary schedules of the contractor1. approved as an allowable cost, effective June 28, 1965

S

APPROVED FOR THE CONTRACTOR BY:

TloydelI THE ATOMIC ENE

14-

Title: General Manager

JUN 2 5 1965

I,

DATE7//c4

— .

NO.

Schedule I, Part A, Series RF revised as follows:

Classification Title

Budget Analyst

Eval.Points

130

APPROVED Fol THE ATOMIC ENERGY COMMISSION BY—

U. S. GOVfffiMT PRINTt OfPIC P. •..

DATE

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

v. Flats Plant

R.A.Mod.

No. 54to92

i Dow ChemicalNO.

LOCATION

Rocky

Company

PAGE 1 OF 1 PAGES

(29—l) —1106

Flats, Colorado

approved as all alloWaJ)lC cost, effective l1—264

Appendix A,

DATE OF CONTRACT

January 18, 1951The following revision or addition to the approved employment policies and wage and salary schedules of the contractor

1. Addition of Classification Title:

Code Number

RF-222

)

APPROVED FOR THE CONTRACTOR BY: DATE:

Name: Lloyd M. Joshel - Title: General Manager JUL 3 0 1965

IITED STATES ATOMIC ENERGY COMMISsiON

LURSEMENT AUTHORIZATION

AT(29-l)- 1106The following revision or addition to the

Is approved as an allowable cost, effectiveapproved employmentJune 14, 1965 wage and salary of the contractor

Appendix A, Part IV is amended as follows:

Delete the Section designated "I - Special Holiday Allowance."

Renumb e rAwards."

the Section designated "J" to "I - Length of Service

OR BY:

- P*INTfl OFpi 16-—57129--3

Name:General Manager Date:

LOCATION

Rocky Flats, Colorado

DATE OF CONTRACT

January 18, 1951

The following revision or additioti to the approved employment policies atid wage and salary schedules of the contradtorapproved as an allowable cost, effective May 1, 1964:

Appendix A, Part VI, Section A - Group Insurance, Paragraph 1revised as follows:

1. The Contractor maintains a contributory Group InsurancePlan for all employees who wish voluntarily to participatein the Plan. The terms and conditions of the Plan are asdescribed in the attached Schedule IV, and are controlledby group insurance policies 16740-G and 16741-G issued tothe Contractor by the Metropolitan Life Insurance Companyon January 1, 1955. The group insurance policies,including amendments 1 through 9 on Policy 16740—G andamendments 1 through 12 on Policy 1614l—G, are on filewith and have been approved by the Commission for appli-cation to this Contract and are incorporated herein byreference and made a part of this Appendix A. Such groupinsurance policies may, with the prior approval of theCommission, be modified from time to time by agreementsbetween the Contractor and the insurer. Modifications tosuch policies shall be accomplished by ReimbursementAuthorization.

APPROVED FOR THE CONTRACTOR BY:

Name: L oyd . J el Title: General Manager

DATE:

JuN

APPROVED FOR THE ATOMIC NERGY COMMISSION BY—

NAME odruf. TIThEManaer IRFAO

DATE

V. S. SOVIUWSENT PUINTINS OfVICC 16—57129—2

7 4

- .., --NO. R.A. No. 52

UNIIED STATES ATOMIC ENERGY COMMISSION to Mod. 92REIMBURSEMENT AUTHORIZATION

__________________

PAGE 1 OF 1 PAGES

:y Flats Plant

Dow Chemical Company

IN:AT(29l) -1106

0

NO.

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

PAGE 1 OF 1 PAGES

CONTRACT NO. DATE OF. CONTRACT

AT(29—1) —1106 January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractorIa approved as an allowable cost, effective February 1, 1965

Appendix A, Schedule I, Part C, is revised as follows:

I Add to Hourly Wage Rate Schedule for Plant Protection Personnel:

CLASSIFICATION Effective February 1, 1965

Security DispatcherMaster SergeantSenior SergeantPatrolman

Security. DispatcherMaster SergeantSenior SergeantPatrolman

Effective June 27, 1966

Effective June 26, 1967

(Figures in parenthesis indicate number of months to beserved at each rate before advancing to the next ratewithin a classification.)

VU. L SOVIUIMINT PRtNTIN%) OPflCI 16—-5712U--2

-'—-——— ———-— "—— —.-.-* —

y. Flats Plant

R.A. No. 51to Mod. 92

The Dow Chemical Company

LOCATION •.

Rocky Flats, Colorado

HOURLY RATE

$2 . 76(3)$2 . 62(2)

$2 . 84(3)$2 . 70 (2)

$3.16(3)$3.Ol(3)$2 . 86 (3)$272(3)

$3 . 24 (3)$3 .09 (3)

$2 . 94 (3)$2 . 80 (3)

$3. 32 (3)$3. 17(3)$3 . 02 (3)$2 . 88 (3)

Security DispatcherMaster SergeantSenior SergeantPatrolman

$3.26$3.11$2.96$2.82

$3.34$3.19$3.04$2.90

$3.42$3.27$3. 12$2.98

$2 . 92 (3)$2 . 78 (2)

APPROVED FOR THE CONTRACTOR BY:

Name:dM.Joshel - Title: General Manager

DATE:

June 1965COMMISSION BY—APPROVED FOR THE

NAME__Seth_R._Woodrufj 4k" TITLEManager,RFAO

DATE

L

NO.

R. A. No. 50to Mod. 92

Colorado

Appendix A, Part II, Section Q - Military Service and Military Training(Title changed and new paragraph 3 addecD to read:

An employee accepted for service in the Peace Corps may begranted a leave of absence without pay up to a maximum oftwo years while so serving. If within 30 days followingtermination of such leave of absence, the indivi1ual makesapplication for re-employment and is re-employed by theContractor within six months of the date of the application,the individual shall be entitled to be recredited with thatlength of service or longevity of service to which he wasentitled to be credited on the effective date of the leave of

APPROVED FOR THE CONTRACTOR BY:

ManagerLoyd

___

V u. s. SOVUNNINT PUINTINS C?ICI i6—5712g—2

' Flats Plant

UNITED STATES ATOMIC ENERGY COMMISSION

.URSEMENT AUTHORIZATION

LOCATION

DATE OF CONTRACT

January 18, 1951

The Dow Chemical Company

PAGE 1 OF 1 PAGES

Rocky Flats,

AT(29- 1)- 1106

- following revision or addition to the approved employment policies and wage and salary schedules of the contractor'1 as an allowable cost, effective June 1, 1965

Q. Military Service, Military Training and Peace Corps Service

3. Peace Corps Service

absence.

) FOR THE AT,CENERGOMIO,

Date:

JUN 1 6 ?IR

DATE

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

LOCATION

Flats Plant Rocky Flats, Colorado

The DoW Chemical CompanyCONTRACT NO.

AT(29-1)1106DATE OF CONTRACT

January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractoris approved as an allowable cost, effective September 1, 1965

Appendi A, Part I, Section C, Paragraph 2 is amended by:

a. Revising the introductory sentence to read in its entirety as follows:

"Enip1oyees may be refunded 90 per cent of tuition costs for coursesstat'ted on or subsequent to September 1, 1965, subject to the followingconditions:"

b. Revising subparagraph b. to read in its entirety as follows:

"b. The courses are:

(1) Directly related to the individual employee's current positionor to a position to which he can reasonably aspire; or

(2) Required for attainment of a high school diploma; or

(3) Required for completion of the approved curriculum developedfor the parti cular employee leading to a degree directly relatedto the employee's current position or to aposition to which hecan reasonably aspire. Courses not directly related to theemployee's current position or to a position to which he canreasonably aspire may be authorized and qualify for the refundif they are certified by the assigned faculty advisor as requiredor qualifying electives in the curriculum developed for theparticular employee leading to a degree so directly related.

APIOVED FOR THE ATOMIC ENERGY COMMISS$ON BY—

NAME

U I. SOVUNNIN? PSINTINS OPPICt

TITLE

1*—alias—3

DATE

L

NOR A No. 49to Mod. 92

PAGE 1 OF 2PAGES

I

United States Atomic Energy Commissloit

REIMBURSEMENT AUTHORIZATION NO. —Continuation

__________________________

Contract No. AT(29—1)—1106

c. Revising subparagraph f. to read in its entirety as follows:

"f. Total of refunds paid to any employee will not exceed $250 in anyfiscal year."

d. Revising subparagraph i. to read in its entirety as follows:

"i. The refund shall be paid to the employee after the completion ofthe particular semester, session or term, as appropriate, providedthat the employee shall have submitted a certification from theinstitution that a grade of "B" or better was received by him in theparticular course or courses taken."

Approved for Atomic Energy Commission by:

NAME:

so

Contractor The Dow Chemical Co. Page.2 of 2

APPROVED FOR THE CONTRACTOR BY: DATE:

TTmp. Lloyd M, General ManagerMAY 19 1965

TITLE:eP4-

IDATE:

NO: LA... No. 48UNITED STATES ATOMIC ENERGY COMMISSION to Mod. 92

REIMBURSEMENT AUTHORIZATION

PAGE'

-

LOCATIoN

cky Flats Plant Rocky Flats, Colorado

( ACTOR

'The Dow Chemical Company

CONTRACT NO.DATE OF CONTRACT

AT(29-1)-1106 January 18, 1951

The following revi8ion or addition to the approved emp1ornent policies and wage and salary schedules of the contractor

Is approved as an allowable cost, effective March 1, 1965

Appendix A, Part IV, Is amended by the addition of a new section,designated "J", as follows:I

_____

J. Length of Service Awards

The contractor has a length of service award program pursuant to which(i) pins are given to male employees after 10 years of service and foreach additional 5 years of service thereafter, (ii) a pin, brooch orbracelet, at the option of the employee, is given to female employeesafter 10 years of service and for each additional 5 years of servicethereafter, and (iii) watches are given to employees after 35 years ofservice. Costs incurred by the contractor for such awards shall beallowable subject to the following limitations:

1. Costs to be allowed for pins, brooches and bracelets, including anyengraving, shall not exceed the costs for these items shown in the

p contractor's description of its program dated May 4, 1965.

2. Costs to be allowed for . watch, including any engraving, shall notexceed that portion of the cost of the watch, as set forth in thecontractor's description of the program referred to above, whichis in the same ratio as the employee's years of service under thecontract bear to 35.

3. Awards are to individuals who at the time he or she becameeligible for the award was a regularly assigned employee of theRocky Flats Division.

APROV) FOR THE ATOMIC ENERGY COMMISSION BY— - DATE

NAME TITLE

S. I. SQYUNNEJSt pt,.tt.. orrit 1e—57129-3

2 PAGE

Unitad Stat.. Atomic £n.rgy Commisgksn

REIMBURSEMENT AUTHORIZATION NO. --ContInuatkhcontractorThe Dow Chemical Companycontract No ATC29 1) 1106.

____

of 2

Should there be revisions in the contractor's program which result inincreases in the cost of awards, the Contracting Officer may establish,effective on the date of the revision in the program, new limitations onallowability under 1. and 2. above reflecting the increases.

AGREED TO FOR T}IE CONTRACTOR BY:

Name: by M. shel Title: General Manager Date: 19LJApproved f2r Atomic £nsrgy Coepmission b•; Area Manager / /q'J:Z_.a

4 S th R. Woodruif, Sr rrni Rocky Flats Area Ofc. DATE.

1, -

t6—748641 •Q L

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

PROJECT

Rocky Flats PlantLOCATION

Rocky Flats,

OF

ColoradoCONTRACTOR

The Dow Chemical CompanyCONTRACT NO. DATE OF CONTRACT

AT(29-'l)..1106. January 18, 1951

The following revision or addition to the approved employmetit policies and wage and salary schedules of the contractoris approved as an allowable cost, effective May 1, 1 9b5

Appendix A, Part V, is amended by the addition of a new section,designated "E", as follows:

E. Temporary Assignment

If it becomes necessary in connection with the performance of workunder the contract to make temporary assignments, the contractorshall obtain the prior approval of the Contracting Officer for eachassignment and for the arrangements proposed for reimbursing theemployee for costs incurred incident to the assignment. Thecontractor will submit a written justification for the assignment andthe proposed reimbursement arrangements.

The term "temporary assignment" means assignment of anemployee for a period of not less than one month nor in excess oftwelve months to perform work under the contract at a locationother than the Rocky Flats Plant and not within reasonable com-muting distance of the ernployeets usual residence. Notwithstandingany other provision of Part V. the term "employee" as used in thisSection E. means a person regularly on the payroll of the RockyFlats Division.

AGREED TO FOR THE CONTRACTOR BY:

U.S. GQVCSNM!NT PNINTIN OflC5 1- t292

to

PAGE 1 1PAGES

-CONTRACT NO. - bATE OF CONTRACT

AT(29-1)-.1106 January 18, 1951

The following revision or addition to the appro%ed employment ollc1e and wage and a3Ary schedule8 of the contractoris approved as an allowable cost, effective March 1, 1965:

Code

RF—230RF231RP-236RP-232RF-237RP-233RP-238RF.-234RF-.235

Eval.Points

130158187198239241285304376

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

Rocky Flats PlantCONTRACTOR

The Dow Chemical Company

LOCATION1PAaPACK 1.. .o

Rocky Flats, Colorado

Appendix A, Schedule I, Part A, Seriea RP revised, as follows:

1. Deletion of Classification Titles

Code ClassificationRP-208 Metallurgical Research SupervisorRP-203 Research & Development Supervisor

2. Addition of Classification Titles

Classificatioü

Eval.Points

296241

ftChemist, Physicist, Engineer, etc.Senior (Chemist, Physicist, Engineer, etc.)Research Leader.Research (Chemist, Physicist, Engineer, etc.)Research SupervisorSr. Research (Chemist, Physicist, Engineer, etc.)Sr. Research SupervisorAssociate ScientistResearch Scientist

APPROVED FOR THE CONTRACTOR BY: DATE:

Name: Title:APPROVED FOR ATOMIC ENERGY Co:MISSI:N By.... . General

TManager

aaer PAQ

Feb)'/ 1965DATE

2..

V 1. SOYIIMENT P*INIINS OcVtCL 15—57329—2

CONTRACTOR

The Dow Chemigal ipanyCONTRACT NO. DATE OF CONTRACT

AT(29l)41O6 Jry i,The following revision or addition to the pproved employment policies and wage and salary schedules of

is approved as an allowable cost, effective . ebruary 1, 19b5 the contractor

Appendix A, Part III, is revised to add the following new Section E:

E. When the Contractor schedules a reduction in the work forcein any hourly classification, any employee in that classificationwho volunteers to take layoff from the plant out of seniorityorder may be paid severance pay as though he had beeninvoluntarily laid off. The Contractor may make the fullpayment in a lump sum, Such employee shall lose all recallrights. No employee who retires from active work underany retirement program of the Contractor shall be affordedan opportunity to volunteer to accept layoff. For all otherpurposes and in all other respects, including any entitlementpursuant to Paragraph 3., Section D., Part V of Appendix Ato reimbursement of expenses of returning the individual,his dependents and household goods to his former home or• to a location of equivalent distance, said employee shall bedeemed to have voluntarily resigned.

.

.

0

APPROVED FOR THE CONTRACTOR BY:

Name: Lloy M. oshel Title: General Manager

DATE:

February 25, 1965APPROVED FOR THE ATOMIC ENERGY COMMISSION BY— DATE

TITLE7'. L

V. I. VWMtV? PV VtNS V•UtI i.—,*-*

S

UNITED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

Rocky Flats Plant

to Mod. 92

LOCATION

Rocky Flats,

PAGE ' OF PAGES

Colorado

LOCATION

Rocky Flats, Colorado

1. Changes

Code

Old RF-173New RF-l73

Old RF-69New RF-69

Old RF-144New RF-144

Old RF-169New RF-169

of Classifications, Titles.and/Or Points:

Class if icat ion

Manufacturing ManagerManufacturing Manager

General Services ManagerGeneral Services Manager

Technical Services ManagerTechnical Services Manager

Product ManagerAdministrative Services Manager

APPROVED FOR THE CONTRACTOR BY:

lydM. Johel-. . ATOMI ENER Y MISSION BY—

NAME Seth R. Woodruff,

639669

531557

494477

494477

ATOMIC ENERGY COMMISSION

.YIENT AUTHORIZATIONto

Flats Plant

Mod. _.

PAGE

Dow Chemical Company

1 ocl PAGES

DATE OF CONTRACT

AT(29—1)-l106 January 18, 1951

-jç following revision or addition to the approved employment policies and wage and salary schedules of the contractor

is approved as an allowable cost, effective January 4, 1965

Appendix A, Schedule I, Part A, Series RF, revised as follows:

Eva1uaton Points

DATE:

.TanJ.

a. .ovIJI4IsT PUINTINS OPFICC 1S—57119—2

Title: General Manager

1Manager ,RFAO

1

DATE

.1) —1106

Range Median = a + bxWhere (currently): a = $240.00

b 3.80x Evaluation Points

Range Maximum = Median plus 20%Range Minimum Median minus 20%

The values of "a" and"b" may be changed fromtime to time in accor-dance with Section G ofPart II

SFORTHEcENERGYcOMMIO BY—

pth R. Wood f , Jr.

Oct.30, 1964 -

DATE

;1;P4/,, ifdf -

r COMMISSIONJATOMIC

- - JRSEMENT AUTHORIZATION

?jats Plant

LOCATION

PAGE 1 OF 1 PAGES

Chemical CompanY

Rocky Flats. Colorado

- DATE OF CONTRACT

January 18. 1951..jfollowing revision or addition to the approved employment policies and wage and salary schedules of the contractor

japproved as an allowable cost, cffectivc 11—1—64

Appendix A, Schedule I, Part A, Series RF Salary Ranges isrevised as follows:

Salary Ranges for the above classificationsthe following formula:

will be based on

APPROVED FOR THE CONTRACTOR BY: DATE:

Name: Title: General Manager

V. V. GOVUNMINT PUIIITING OFFIcI 16-- 5729—2

TITLE Manager , RFAO

Chemical Company

LOCATION

to Moci

The following revision or addition to the approved employment policies and wage and salary schedules of the contractorapproved as an allowable cost, effective December 7, 1964

Appendix A, Schedule I, Part C, is revised as follows

Hourly Wage Rate Schedule for Plant Prötectioñ Personnel

Security DispatcherMaster SergeantSenior SergantPatrolman

$2 . 75(3)$2.61(2)

(Figures in parenthesis indicate number of monthsserved at eaøh rate before advancing to the nextwithin a classification.)

APPROVED FOR 'THE CoN!rRACTOR BY:

FOR THE ATOMIc ENERGY COM ION BYTitle: General Manager

TITLE Manager IRPAO

DATE

o#YIc$ 16—31I—*

COMMIS..ON

AUTHORIZATION

'lats Plant

PAGE 1 OF 1

Rocky Flats, Colorado

..'(.29-.l) -1106

PAGES

DATE OF CONTRACT

January 18, 1951

$3 . 15(3)$3 .00(3)$2 . 85(3)$2 . 71 (3)

$3.25$3.10$2.95$2.81

to berate

I

i: M. Lóoshel

DATE:

Dec.Ii . 1964

(Figures in parenthesis indicate number of months to beat each rate before advancing to the next rate within aclassification).

S

served

APPROVED R THE CONTRACTOR BY

I -: lo M oshe Title: General Manager

ORTHE.i

'1

Date:

October 3O, 1964

DATE

1 t ! A

, UNITED STATES ATOL.. ENERGY C,.

REIMBURSEMENT AUTHORIZATION

I PAGE OF

Flats Plant

LOCATION

Dow Chemical Company

NO.

Rocky Flats, Colorado

—1106DATE OF CONTRACT

January 18, 1951

j. following revision or addition to the approved employment policies and wage and salary schedules of the contractor'9s approved as an allowable cost, effective October 12, 1964

Appendix A, Schedule I, Part C, is revised as followsHourly Wage Rate Schedule for Plant Protection Personnel

C

I Security DispatcherMaster SergeantSenior SergeantPatrolman

$2. 68(3)$2. 54(2)

$3 . 08(3)$293(3)$2 . 78(3)$2. 64(3)

$3. 18$3.03$2.88$2.74

yFlats Plant Rocky Flats, Colorado

Dow Chemical Comanv

___________________________________

DATE OF CONTRACT

Appendix A, Schedule I, Part A, Series RF, revised as follows:

1. Deletion of Classification Titles:

Code

RF-9RF—l 0

.4 RP-l2RF-l4RP—56

RF-.58tRF,59RF—6l

• RF-67'RF-684RF-.80

RF—93RF—94EF- 101RF-. 102

RF—104"RF-l 13'RP-.l 18RF—l29RF-l45'.RF-l 54RF-l84RP—l85

Classification

Lead Industrial EngineerSenior StatisticianStatistical QC ChemistStatisticianMiscellaneous Maintenance

Shop SuperintendentMaintenance ForemanMaintenance ForemanEstimator CheckerService ForemanService ForemanProduction DepartmentAssistant Superintendent

Area Utilities ForemanProduction Services ForemanMaterial Control ForemanProduction Development LeaderPlant EngineerHead InspectorInspection CoordinatorShipment CoordinatorSupervisor, Quality EvaluationRadiation EngineerAm SupervisorMachining Supervisor

Evaluation Points

131145135123

158134116114116100

175104100100158130134116110255158187187

FOR THE ATOMIC ENERGY COMMISSION BY—

TITLE

U. L QVE*NUNT PRtNT*NS CUVICI iO—5713*-3

DATE

WILTED STATES ATOMIC ENERGY COMMISSION

REIMBURSEMENT AUTHORIZATION

tA ;7 -.

to Mod. 92

LOCATION

NO.

.AT(29-l)-1l06

PAGE 1 OF 3 PAGES

January 18, 1951

The following revision or addition to the approved employment policies and wage and salary schedules of the contractorIs approved as an allowable cost, effective October 13, 1964

NAME