4 1 .*JOHNSTAFF
Affachmen7 H
Project OptionsThe Ultimo Presence Project
CRONE
MAAS Heritage Site, Ultimo Prepared for JohnstaffPreliminary feasibilites 14.09.17Sydney, NSW REV- E
TECTCLevel 2, 364 Kent Street Sydney NSW. Australia 2000E _________ [email protected] T + 61 2 8295 5300
FINAL DRAFT- CONFIDENTIAL
CRONEPreliminary Feasibility Study Key Design Principles
Whilst the work undertaken in this document represents high level feasibilitystudies for the Heritage Power Station, a number of design principleshave been developed in response to key project outcomes:
Arrival from Goods Line:It is envisaged that an extension to the Goods Line will form a revitalised entry point to the building
Flexibility:Any modification to the current building/s needs to build in a level of flexibility to be utlised for a range of different programs now and in the future. The various scenarios all employ similar spatial, operational and public domain strategies for this reason.
Streamlined Operational strategy:Look to overcome challenges associated with loading strategies and pedestrianflows both occuring from the Museum forecourt fronting the Goods Line.
Integrity of volumes against achieving more area within Heritage volumes: Intervention within the Heritage volumes has been approached as a balance between maintaining the full height reading of the heritage
power station against achieveing additional area in what may become a smaller Museum footprint.
Future Connection Opportunities:Consider connections and site linkages on and around the site
HeritageThe studies have been undertaken with an understanding that any significant building fabric including structure, gantries, remnant machinery would be retained and any new structure/interventions would work around and give prominence to these elements.
© 2017 Crone 2FINAL DRAFT- CONFIDENTIAL
3ANAL DRAFT - CONFIDENTIAL2017
Site AnalysisSite Boundary and
\
] Site
Dar
The total MAAS site area is comprised of the following
Lot 1 DP 770031Lot 1 DP 781732Lots 1 and 3 DP 631345Lot 3 DP 216854
Approximate total site area is 24,378
Site Analysis Study AreaThe total MAAS site area is
comprised of the following lots:
Lot 1 DP 770031Lot 1 DP 781732Lots 1 and 3 DP 631345Lot 3 DP 216854Lot 37 DP 822345The preliminary programmatic studies
in this document are confined to the
heritage study area identified (right)
— ] Study Area
© 2017 Crone 4
FINAL DRAFT - CONFIDENTIAL
Northern Boundary
Preliminary Feasibility Study Key Design Principles
In
Eastern Boundary
Western Boundary
Goods Line (Southern Boundary)
The adjacent photos show that access
is difficult from other approaches.
© 2017 Crone 5FINAL DRAFT - CONFIDENTIAL
Preliminary Feasibility Study Key Design Principles
The Experience Opportunity for a new arrival from the Goods Line, celebrating the Boiler Hou
Goods Line, celebrating the Boiler House facade as an entry The Volume Retaining significant, full height
spaces within the Boiler House and Engine RoomThe Program Introducing tiered flo
or
ding of the full building volumes to be retained whilst introducing more floor space
© 2017 Crone 6FINAL DRAFT- CONFIDENTIAL
Preliminary Feasibility Study Key Design Principles
Logistics Flexibility Logistics Stepped slabs provide visual and physical A flexible, permeable ground plane Identifying strategic servicing/core locationsconnections between programs within the building which can serve all areas.
© 2017 Crone 7
FINAL DRAFT-CONFIDENTIALPreliminary Feasibility Study
Key Design Principles
Connections Precinct Consider future through-site linkage to Pyrmont Consider future opportunities for reconsideredStreet connection (under pier street overpass) links/connections through the site/s
©2o17 Crone 8FINAL DRAFT - CONFIDENTIAL
01______________Stuc y Option 01, V ixec Use u 0
* 2017 Crone FINAL DRAFT- CONFIDENTIAL 9Feasibility Study
Existing Area 12,849 In. 86%
Existing Area 12,849 in. 100.0%Additional Area 2,132 14%
Adaptive re-use
Increased Area
More efficiency within the Heritage Building through introduced floor-plates
Existing Scheme Proposed Scheme
Tabl 1.2,849m' 100.0% Total14,981m' 100.0%
© 2017 Crone 10FINAL DRAFT- CONFIDENTIAL
Existing Area 12,849 In. 86%
Existing Area 12,849 in. 100.0%Additional Area 2,132 14%
Feasibility StudyAdaptive re-use, Mixed Use Hub
Ground/Public Domain 0 5 15 Scale1:1000 @ A3
Illustrative Ground Floor Plan indicating a revitalised arrival plaza, entry from the Goods Line and a flexible,
permeable, multi-use ground plane.
- Assume new public domain, paving and landscaping to forecourt- new surface treatment (i.e. polished concrete to ground floor within heritage building)- strip back paint from heritage exhaust stacks to brick- restore portions of fenestration previously removed- More standard exhibition program finishes to new upper levels- New Arrival, glazed entry doors/air-lock system
© 2017 Crone 11FINAL DRAFT - CONFIDENTIAL
__11.
smir41 „ frammirminesiimaummis • ..p
Feasibility StudyAdaptive re-use, Mixed Use Hub
External Interface
ScaleNTS @ A3
1. Upgraded Rear Courtyard/Access to Pyrmont Street2. Access from Pyrmont Street. Possible access for deliveries, waste collection, BOH arrival3. Public Entry via revitalised Goods Line Arrival Plaza
©2o17 Crone 12FINAL DRAFT - CONFIDENTIAL
Feasibility StudyAdaptive re-use, Mixed Use program
Ground Level (Goods Line) 0 5 15 Scale1:500 @ A3
"
© 2017 Crone FINAL DRAFT - CONFIDENTIAL 13
Feasibility StudyAdaptive re-use, Mixed Use program
Level 1 0 5 15 Scale______i___________I 1:500 @ A3
2017 Crone FINAL DRAFT - CONFIDENTIAL 14
Level 2 0 5 15 Scale1:500 @ A3
Feasibility StudyAdaptive re-use, Mixed Use program
2017 Crone
15FINAL DRAFT - CONFIDENTIAL
Plantroo
Feasibility StudyAdaptive re-use, Mixed Use program
Level 3 0 5 15 Scale1:500 @ A3
© 2017 Crone
FINAL DRAFT - CONFIDENTIAL 16
Feasibility StudyAdaptive re-use, Mixed Use
Indicative Section Through Boiler 0 5 1 5 S c a l eQ
- -
.;111 11111 ;1111 III. III`IIIia
CULTURAL '
0 2017 Crone FINAL DRAFT- CONFIDENTIAL 17
LI
I
' 11:,[112,1 I
Feasibility StudyAdaptive re-use, Mixed Use program
—O
UT· •· we
Indicative Section Through Turbine Hall ®0i
5 15 Scale1:500 @ A3
t __I I
0 2017 Crone FINAL DRAFT - CONFIDENTIAL 18
Feasibility StudyAdaptive re-use, Mixed Use Program
Indicative Areas
p r o p o s e d
Mix use GFA 100%14,220 m2
TOTAL GFA 14,220 ma
H e r i t a g e
Tram Depot IRL Harwood Building Sitefloor to floor height
5
total height21.00
overallGBA2,012
museumGFA984
auditorium
GFA
flexible area
GFA
commercialGFA358
FOH
GFA
BOH/PlantArea',u.'4-11 2'.,% ,,r_li
totalmuseumf-auditillexi.comm+FOR+BOH
level 3 16
, 58level 2 11
516.00
3,9072,003
1.159
3,242level 1 6
511.00
4,9282,714
1,200
4,066Ground Mezz 0
6
6.00
7,022
364Ground 0
880704
3,263363592
6,262Basement 1
6,083
total17,869 6,581 704 3,263 3,080 592 1,062 15,282
total
GSA excl. basement GBA-GFA museum+auda+flexixcomm.F0H+130HEfficiency 79.58%
flexible area: education/commercialfincubatorGeneral Notes :-
1. GBA - Gross Building Area - Total Building Area2. GFA - Gross Floor Area - As per City of Sydney Council Definition3. All Areas are based off scanned PDF drawings and are approx. only4. All areas are based on concept drawings and are subject to final design and survey
© 2017 Crone FINAL DRAFT - CONFIDENTIAL 19
OP Stuc y Option 2, Refres -ec Vuseu T
© 2017 Crone FINAL DRAFT - CONFIDENTIAL 20
Feasibility StudyAdaptive re-use, Museum program
Ground Floor 0 5 15 Scale1:500 @ A3
....IIIII=NOW=EMIMM......RIM!,_________________________
27 Rent
Sto
0 2017 Crone 21FINAL DRAFT - CONFIDENTIAL
Level 1
0 5 15 Scale___________I 1:500 @
Feasibility StudyAdaptive re-use, Museum program
Staff Offlcas3400
II
M u s e u m
1 0 3 3 m .
·
P lant R oam / BOB
211 so
Cato
library / Study rooms
err
© 2017 Crone
FINAL DRAFT- CONFIDENTIAL 22
2FINAL DRAFT - CONFIDENTIAL0 2017
Feasibility StudyAdaptive re-use, Museum
0 5 1 5 S c a l e___________1 1:500 @ A3
Level
Mu
iw ................................ 7
SafrOMa
Feasibility StudyAdaptive re-use, Museum program
Level 3 ® 0 5 15 ScaleI I _________1 1:500 @ A3
© 2017 Crone FINAL DRAFT- CONFIDENTIAL 24
Basement Plant/Loading/6,0
16511566
tot 13,917,3 14,3to
GBA excl, basement GBA - museum+BOH Use80.11Efficien
Tram DepotHarwood Building
level leveGrou
1160
3,64,77,0
floor to
5 21.00 2,0 1,32,
6,3, 3,8
6,2Museu
museum BOH/Plant total
Feasibility StudyAdaptive re-use, Museum Program
Indicative Areas
p r o p o s e d
Museum GFA
TOTAL GFA
100% 13,920 m2
13,920 m2
H e r i t a g e
General Notes :- 1. GBA - Gross Building Area - Total Building Area2. GFA - Gross Floor Area - As per City of Sydney Council Definition3. All Areas are based off scanned PDF drawings and are approx. only4. All areas are based on concept drawings and are subject to final design and survey
0 2017 Crone 25FINAL DRAFT- CONFIDENTIAL
Feasibility StudyAdaptive re-use, Museum program confined to Heritage building
Spatial Massing Study
Study massing vignette to describe
the spatial relationships between
the tiered floor-plates
®z017 Crone 26FINAL DRAFT - CONFIDENTIAL
03 Stuc y Option 3, Theatre Venue
0 2017 Crone FINAL DRAFT - CONFIDENTIAL 27
Spatial AnalysisAdaptive re-use to incorporate a theatre
image: Google Earth
This study investigates the potential for a performance theatre venue to be incorporated within the existing MAAS site at Ultimo. The precedent used for the preliminary volumetric studies is the Princess Theatre in Melbourne, Victoria. The Princess Theatre has been chosen as a precedent for a number of reasons: - It has a capacity of 1500 people- The programmatic volumes within the Princess Theatre housing stage areas, theatre seating, back of house, front of house and circulation are easily understood as separate volumes in the reading of the building and can more easily be used for high level test fits within the Ultimo building/s.- The main theatre stage and seating are housed within a clear span warehouse style building with volumes of similar style and proportion to the boiler house and turbine hall of the Ultimo power station building.For the purposes of high level siting analysis we have identified the scale and area required for each of these theatre functions. The following pages investigate the capacity of various locations to accommodate these programs.
© 2017 Crone 28FINAL DRAFT- CONFIDENTIAL
The adjacent plan, section and axonometric volumes represent the spatials required (based on the precedent) which is used to test the suitability of zones within the heritage power station to accommodate a theatre program of
BACK OF HOUSE
350 M
STAGE
9° M SEA
li
ii
1\‘0,
10)
,B a
FRONT OF HOUSEJAMENITIES/BARRRESTAU
I
Spatial AnalysisAdaptive re-use to incorporate a theatre
Plan: Programmatic/scale breakdown of the Princess Theatre, Melbourne.
Section: Programmatic/scale breakdownAxonometric Diagram: Programmatic/scale
of the Princess Theatre, Melbourne. breakdown of the Princess Theatre, Melbourne.
© 2017 Crone FINAL DRAFT- CONFIDENTIAL29
Spatial AnalysisAdaptive re-use to incorporate a theatre
- Location A: Turbine Hall, Ultimo Powerhouse
The turbine hall shows high level potential for a performance venue to be incorporated. The required volumes as identified in the precedent are similar to those of the turbine hall with the exception of the height of the above stage and fly system. The design would require localised amendments to roof and structure to accommodate more height in this zone. There is an ability to service the stage and back of house areas directly from the Goods Line plaza. The turbine hall also provides more width than the boiler house.
© 2017 Crone FINAL DRAFT - CONFIDENTIAL30
CIPILIUMAI Eil lit 1
Spatial AnalysisAdaptive re-use to incorporate a theatre
O- Location A: Turbine Hall, Ultimo Powerhouse It1
The section above indicates a theatre venue incorporated into the turbine house volume. Spatial Limitations:
1.The fly system structure would be resticted by the underside of the roof truss and would need to extend 5m higher as a rectilinear volume to be in line with the Princess Theatre precedent and general fly structure requirements. This would impact approximately 400sqm of existing roof area. Subject to more detailed design/services/acoustic/heritage studies and specialist theatre design input.
2. Indicative current location of the gantry crane. The gantry crane in the Turbine Hall would need to be considered in design for detailed seating layouts and assessment of sight lines to the stage. Whilst the gantry is currently fixed at the Northern end of the Turbine Hall, it could slide along the length of its perimeter rails further South (out of critical sight lines to the stage) or be relocated.
© 2017 Crone FINAL DRAFT - CONFIDENTIAL 31
Ground Level (Goods Line) s 0 5 15 Scale1____i___________I 1:500 @ A3
Feasibility StudyAdaptive re-use, Incorporate a theatre
© 2017 Crone32
FINAL DRAFT - CONFIDENTIAL
Feasibility StudyAdaptive re-use, Incorporate a theatre
Level 1 0 5 15 Scale1:500 @ A3
Mus
aim
SVetoes
L
Comme
PlaM
L
TerrI 1
®2017 Crone 33FINAL DRAFT - CONFIDENTIAL
Level 2 s 0 5 15 ScaleI_____i___________i 1:500 @ A3
Feasibility StudyAdaptive re-use, Incorporate a theatre
0 2017 Crone 34
FINAL DRAFT - CONFIDENTIAL
Level
[ M i c a s
I■ Plant roam
m1111111111
Feasibility StudyAdaptive re-use, Incorporate a theatre
0 5 1 5 S c a l e_____i ______________1:500 @ A3
Museum4 8 5 m .
(seating area below)
S t a g eb e l o w
© 2017 Crone 35FINAL DRAFT- CONFIDENTIAL
© 2017 Crone FINAL DRAFT- CONFIDENTIAL 36
BOH Plant totalmuseum-Faudit+flexi+comm*FOH*BOH
3,0736
2,913
6,211
8 4
GBA excl. basement GBA - museum+audit.flext. . u •• • .4; • .tota l
Feasibility StudyAdaptive re-use, Incorporate a theatre
Indicative Areas
proposedTheatre GFA lop% 12,637 m2
TOTAL GFA 12,637 m2
Heritage
Tram DepotHarwood Building Site
IRL floor to Ifloor height total height
overall GBA
museum flexible area* commercial theatreGFA GFA GFA GFA
level 3 16 5 21.00 1,446 467 358level 2 11 5 16.00 3,528 1,003 1,159 671level 1 6 5 11.00 3,843 804 1,286 926Ground Mezz 0 6 6.00 7,022Ground 0 987 1,165 363 3,448Basement 1 6,083total 15,839 3,261 1,165 3,166 5,045 765 13,402
Efficiency 79.78%
" flexible area: education/commercialfincubatorGeneral Notes :- 1. GBA - Gross Building Area - Total Building Area2. GFA - Gross Floor Area - As per City of Sydney Council Definition3. All Areas are based off scanned PDF drawings and are approx. only4. All areas are based on concept drawings and are subject to final design and survey5. building efficiencies are indicative only and based on projects of similar scale6. BOH/Plant are not part of the final GFA proposed above
Spatial AnalysisAdaptive re-use to incorporate a theatre
- Location B: Boiler House, Ultimo Powerhouse
0 2017 Crone FINAL DRAFT- CONFIDENTIAL 37
- AREA-
Spatial AnalysisAdaptive re-use to incorporate a
- Location C: Harwood Site, Ultimo
The Harwood building site provides more spatial flexibility to incorporate a theatre venue. The site is deep enough and provides more than enough length to accommodate the required front of house and back of house theatre programs. The site also has the ability to be serviced via Macarthur or Mary Arm Street offering 2 ideal site locations. These locations are represented in
®z017 Crone 38
AREA - A: Indicative Theatre Venue = 2500sqm footprint AREA - B: Residual rectangular footprint =
L_J
—Front of
ARS
FITROT - 117f
n
Diagram: Theatre venue on the Harwood site (serviced from
r _J
1t 1
1 P SP.O. I Pl. I
, 1 -I .
Diagram: Theatre venue on the Harwood site (serviced from Mary
I
7r40 — pITY — —
04 Stuc y Option 4, Warm Shell
0 2017 Crone FINAL DRAFT- CONFIDENTIAL 39
Preliminary Feasibility Study
Warm Shell Study Option
The preliminary assessment has identified structures, objects and joinery items to be removed or relocated that are seen as non-critical for a warm shell to be retained. Structures that appear to have services or critical circulation tied to them have been shown as retained.
See Plans on following pages
This approach is subject to specialist consultant input
© 2017 Crone 40FINAL DRA
FT - CONFIDENTIAL
Existing Conditions
MOM NI.
· r m n
·
F
·
•
r•
· F. N ·
eon. PPa
O W * . M 7 . 0
· • • • *erne
l11•10
West
Building
K e
IBM Items to be removed, relocated or outside of heritage building study area
Non-Heritage items
Basement
® 0 5 15 Scalei____________________________________I_______________I 1:500 @ A3
· · •· • ••••10.1
ZLotTrift•
Engine House
14. II .••• •••••••••••••. . . . • • • • • • •
; - a — a -
0 2017 Crone 41FINAL DRAFT - CONFIDENTIAL
Existing Conditions
Ground (Goods ® 0 5 1 5 S c a l e I i_______________________1 : 5 0 0 @ A 3
ONACE•01011
·
r ·
TUROONE
tra•MilI•
•
•
Vd*All
I— —L K
Non-Heritage items
MN Items to be removed, relocated or outside of heritage building study area
0 2017 Crone 42FINAL DRAFT-CONFIDENTIAL
Existing Conditions
Level S 0 5 15 Scale
1 1 1 1 1 1 1 1 1 1
K
Non-Heritage items
NOM Items to be removed, relocated or outside of heritage building study area
®2017 Crone 43ANAL DRAFT- CONFIDENTIAL
Existing Conditions
0 5 1 5 S c a l eLevel
· ,vat
s4 LOugGE 1·
r... mai alias
·
4. .11. 46 4. ail ALL 41•10"PiXr•ri-,19.V:177s
1
K
ENTRY
Non-Heritage items
MI= Items to be removed, relocated or outside of heritage building study area
© 2017 Crone 44
FINAL DRAFT — CONFIDENTIALExisting Conditions
·
Non-Heritage items
Level 3
WRAN BUILINNO
• . .
.1==1•1•11110.,
•
Key
MI Items to be removed, relocated or outside of heritage building study area
®2017 Crone 45FINAL DRAFT - CONFIDENTIAL
Existing Conditions
Non-Heritage items
Level 4
I I
mem
•Key
11111.1 Items to be removed, relocated or outside of heritage building study area
©2o17 Crone 46FINAL DRAFT- CONFIDENTIAL
05 A D oenc ix A - Existinc Dravvincs anc Areas
© 2017 Crone FINAL DRAFT- CONFIDENTIAL 47Feasibility Study
Adaptive re-use
Existing Areas
Heritage GFA t00% 22,974 m2
TOTAL GFA 22,974 m2
Heritage
Tram DepotHarwood Building Site level 5
extension GFA
total GFA Use
6 3 8 1 , 2 8 2 1 , 7 9 6 5 , 0 5 3 7 , 0 0 37,202
Museum
Plant/Loading/Storage10,089 22,974
Ilevel 4
level 3
level 2
level 1
Ground
8 39 1 , 73 6 2 , 92 0 4 , 5
extensionGBA
745
heritage GFA
904 517831 1,127
3,186 2,1114,403 3,4012,305 5,729
12,8816,84 12,37tota l
FINAL DRAFT -
' floor to heritagefloor height total height GBA
6,8006,083
249
totalGSA excl. basement GBA excl. basement GBA - GFA GFAUse
Efficiency 78.63%
General Notes :- 1.GBA - Gross Building Area - Total Building Area2.GFA - Gross Floor Area - As per City of Sydney Council Definition3.All Areas are based off scanned PDF drawings and are approx. only4.All areas are based on concept drawings and are subject to final design and survey5.building efficiencies are indicative only and based on projects of similar scale6.BOH/Plant are not part of the final GFA proposed above
© 2017 Crone 48
Feasibility Study
Adaptive re-useGFA Heritage: 5645m2
Existing Building GFA Area - Ground (goods line) GFA Extension: 1473m2
Z 10 s,eu '.071
. 200 3Ia 320 33a 34a
VUt
U
Tt
S
It
01
OP2
P
Al
© 2017 Crone 49FINAL DRAFT- CONFIDENTIAL
U
It
T
0 1
Feasibility Study
Adaptive re-use
Existing Building GFA Area - Level 1GFA Horan!: 3401m2
'GFA Extbnsidn: 3t02rii2
2 4 8 8 10 12 13 10 15 16 17 16 18 20 216 22 .23 74 25
It
T
0 1
© 2017 Crone 50FINAL DRAFT - CONFIDENTIAL
Feasibility Study
Adaptive re-use GFA Heritage: 2111m2
'GFA Extensitin: 2942M2 Existing Building GFA Area - Level 2
V
Ul
71
R01
0
P2
P
N
1.1
H
0
/
1.13
MS
H
0 F1E2 El
0
C
2 234 8 8 10 12 13 15 18 1? 13 19 20 21. 22 23 24 243 25
CD 2017 Crone 51
FINAL DRAFT - CONFIDENTIALFeasibility Study
Adaptive re-use
Existing Building GFA Area - Level 3GFA Heritage: 1127m2
GFA Extenstbn: 6t9ni2
4 SO q 13 14 19 17 111 19 20 214 22 23 24 25
0 2017 Crone 52
FINAL DRAFT - CONFIDENTIAL
Feasibility Study
GFA Heritage: 517m2 GFA Existing Building GFA Area - Level
0 12 13 14 112 a 21 2
7 7 2 1 2 0 3 0 3 1 3 2 3 3 3 4 3 5 3 0
Vtit
U
0 1'
2 7 2 & Z . 3 0 3 1 3 2 3 3 3 4 3 5 3 6
MS112
V
U1
0
0
Adaptive re-use
0 2017 Crone 53FINAL DRAFT - CONFIDENTIAL
UI
71.7
S
R
01
0P2
N
Soler House
V
U 1
01
0 P 1
27 26 20 30 31 32 33 34 35 36
AWN Nouse
&Mich Howe
1 1 3 u t i
L2
Feasibility Study
Adaptive re-use GFA Heritage: 0m2 GFA Extension: 638mZ 16 17
Existing Building GFA Area - Level 5
;•!-I-r - f-ri-r-r-T - T1 _____ i , -1-7-rr7"1.--f Tft - r - ti "TTr - 1 , . - r 1 r 'it'll - 77 - r I r .1 1 2 6 2 7 2 0 2 0 3 0 3 1 3 2 5 3 3 1 3 5 3 6
, .1110011.•••
13 . .1 0E 2
E 1
0 0
C
2 6 10 12 13 14 is 16 17 19 20 210 22 23 24 25
© 2017 Crone 54FINAL DRAFT - CONFIDENTIAL
•••.••IWMZV••••WVIWIV•WVW ••••••••••v.v",VV••••••=Wl•••W•VVad••••1lFWVVvrIVVln•EW•••••••IVVVVMILVVVI••VMIE•V••MS•ViVniV•rliNV.Ve•aV•
· MV41,11, +......4.VMSOMIOMMV•MIVVV .. 'WV . "VMMIPIDAIWSMANVIIIIM*MWVMM”.WWVIIVO, a
' 1 1 . - •a VV... IVIRVIVIVVV•VVVIVIVI• VIC VI V I' V%
anVIVIV11/11a1•11.10,01...........•VIV4,11.110100.1110,11111%
01••••ALIRJPEROINVVIPILINVR••••••••11061•111•M ItI•
Ana ....WV," "100..• IVVVIVIVVVVIRS. • • a...a • 110011,,,,v.
VIVIVelbflna.... wan n 411011,100,VVV0VIVOIVSIVIVIVVVII•OVVVVVVIVill, a•VVIVOVIVO • .• YVV.V.V VT
VONVON•0•1.1•1111110•X•••••••••1
VVIVVIVIVVVVNVIASVIIIVtIVPIIMM,104,1111
•••
••
:
•· 1,10VIV I 1,1"01.1,11.101-.V.VVVIV V.VV-0,201, ••••• 0 1..V.V.1•1•109"
...................... x1717.7..••••VI
41•11•• . ..... • • 11101•VV010114000. eV11.01,110•1•1•••••••••••••••MVIVIVUIVVAVONI.,011 IVIVIIAWSVI •01•11.010{1.V. VIVV.L•V̀ ..........
•
......
•VOVV•••••••••••11VVVIVOVIV
OfficesContact +61 2 8295 5300Sydney (HQ)-Melbourne +61 3 8621 8000
Brisbane +61 7 3666 0401
Trlfneve.....wwz vsf, 10k rIV.V.E.0000. V VIal•1010010, 10010 US, V', VI0 V 1••••.•h•• n7... IV VVV040.V.V•b•• i
1010,1•VM111/0111
· g"
4r..3VIRRVIVVVIVIV060tVANVAIVVINIVIVIVII.1113041110.PEIVIVIRVIVI0110•0101100•410.1(30,011SKVVVILDV VVVVVIVIVJEVIVVVVIVIVVIMLVEMVIVIV61•11.1VVVIRTV10.0.1,,P0.1.10491000.1"2901M110101•1.91,101,•11,1011,,
41041116411.000101.V0.1414110•1141•101 a. Yvvv•VVIROMIVIROMIVIVIVRIIVIMIVIMIIIVIIMAVIVINIMINVERIVIIIIRMS•VONVOMII*WW•1.1•0102AVSVINVICANI•
work . "' __________• __ . _____________________ TV••%1IIVO0110140•01VINISIV101111111.10110• ••••Pt911,V.FIVVVINI • 00040•••
India an, = 7:7 - .1.=====.1-==========trz=lt-t== 7E—
0110 000.0Z•01.%...1k2VIVVICV,VVVOVVVVIVVVVVIVEMS100010.•••VVIRIVW1‘90016 VVRIV.V111011 • •• 0"'
n . • • • • = 1 . : • • • • • • MANI•111•11•1•0 •••••••••••VOMVSEIINAMOMINVE•••••01.11VVVIVNIMOVIVIVOIIIIMMIV0VV4.1.11
VAX VIV.000,1•10-11•1001410/10VVVOIMPRIVIEV•IFVNVIWIR-VVVVKIBt 0,11•1,1el•IFIVVOVVIVIrterl FE EIDSVVVVVV.11.10,110.018M Wwww•ww IN: • 00.VVIVInv • in VIn11.01.1,
a v • v g v a • v v • •
IVELAVVVM1110011011,1•20•01011.1 OVPIPMNIVOIV”.1111 ••••••••••• AVIVEVIVAIL, • V. v ...WwwWwlawawamawa
0114010•01V0.10.•••••••••1111010.101.000.1PVE4101•••••WPVIV
13752,.. T.IV31001011,14,1.71-1LWVIL•2011VVIVCVWLVIMVVIVVVAIP•1101••••11•11.1, -111.1.10VV........."MeV/ Ii00.1211./VII•VISMIVAISMTVIRVIR•VIVIAIMIOVINV0411,1
· a a •••••41.0.0.11.115SVIIIMINVIVV.VOlVitIVV•E•VCIIVAVVV••••1141.109•1•••••
MK. 1,1.1000003.1111.•••...,••••••101V111./.1.00.0VVIMIVVVVINARIVVVVVVIVIIMMIVIVVVILV 4111.0.VVV,••••• • TV 1.41
· 1.01•111IVIVIMVAILL110111.1110003.. V•It..........................411 se/VMVSOVVVIVVRIMVAIOVVSKIILIFIRIATMIVIMIV•VV-
•
l.V.0.1•••••VVVS06`...00.1000006140.1009AVVVVVAIR.011.0111.0000•10.4.10010V1 1.VAP.VAYM111.SAVAVIVIMONA11.1040100100100100100000MIVOSIA• VA*404.00000111.9.0..tii...10,9.49.0.1.14041•84•10/.01.4011•001•VVMS.11•00.411.04 •
VIV VII V 11,10•40‘.0‘11,011110 11.101,1•1,442•10100 .... . • .••"14.1.0310.V.,101,1"00 V.0-11110Y-VISAVV,ZOVNAVSA ..... ...... 160••••VMv. VAIVIV1- ....V/M11•1-101,01.0,V,VI•0111VIIS08 .111 I V•VIVIPIVVIVI V.. V V.V.11‘,VIFIV10.1.1,10. vIVIIIVVVVLIVIVVVITIVIIVI110.010{,-VII1VS..........WV"..................41111,1011911111.11N, la· • •
f•11•VVIEWS•10110•110.104,00,0•11401141.001•101•000.001.4010111.1.101.01/6100V1.1011 ..... 1•1010,10t MOWVOWSSWRIMPIIMMALUSWWWW ... w . WIIAWWWWWWWW 111.V•WeRifW WWWWW119.114WMOWICW.WWWWW1RierWW.WW. ..11/1VVVIIIIIVVIIMMV0111.9.1614•1100•11.0110INVVIMPIVIVIMMV.41.6.11401•4•1•110101, 10.0,1•1
.• V.:VOVVVIVIIVINVII0•000•VVIVeSIV.S.VOSAVIVVVAIVIVOLVV•WSWIMOLIMMVIVDMHAVVIVINIAMAIMOVVAS- JMIN/0100/10101110.1t •WIIIILVVIONIV• msvo .0001,Meximxtamlearnmanswwwwyenvas __________________________________________________________________________________________________________________________________________FIVVIV•041IFIVVVEMONINIVVIMMONIV3' VIVIIIM10•10•••••a•V•rftWillICAVVVVVIVID•RJVIIMINVIRMS0VAVVVVIIIVIP•VVEIM.110MAILSWIP110•VV• WV
,M V V,VIPW'SOMIVVVV.n•WWW.,11.0VVIVMM.,10.0V.V.M.WIAM1001.,,OVVOMANMIVPIVV V· Vere1110101•04,” "V.V1001f.10016V • VVV/V̀ 101•T•01.001111.11,161• 01.00002,40.0 V • •010,1'9"
liV0V1016•11•0114•110•11•00110•Vit
' . . .
· wa gnmrennmps...r.v.ranfr.r.,,•nn.. nr ,a /my"-, MIEVIMATIFIIMITX•VTIIIIMVM11,7IRtRIONIIMMIPSIMAnr.01,1,91.V•MMIVIIIECTVITIVIRIMINIVWV.1091,112.1tOrIMOTIMIC.SAMPIPTIPM./.
1.1.010VVVMVS611VIVIVVVVVIMIVIIIMVIVIVIVAVIMVV0VMV•6•1011•1•VERNMVIVNIRIMMEINIVVIVTATIvRIVIVIAVVVVVVISXSPVIAVYVVV 1•••••MVIIMIN 001•202110,1•010B1P.1100MIIIVVVVIVVAMMVVVVVVVVVMVOLMOVERMIXVVIVISINOTIVII 01,1000IVIMMVIIHRIPININ0•1101 lir VIM IVIVOTV 061109101401VVI010111VPVIMPTIP I. •4 . *
V•1•010,1V11.•90•1.31•2•3010.11.010 VVIVIVIVIVVInaln1LVVIVVIVrn/VICIVIV01•91 •••111000V1VVV0.1110,400Hr•VVRAVIRVIVI a 13111•IFIVVVIVIVI010.0.0414rni•IVIVI0110•110111•06110V1VNIALV
ILIV•110.0VVOMVIVIV1V091111111111101V.V.MV•110VIVIVVIFIMINIRVVIVVIVIVIF 110101181%.”1101119(01•••••-1 SVVVEAV.V0111011,001,17•ILIVV0V,V, VMS
iD 2017 Crone FINAL DRAFT - CONFIDENTIAL 55