primis.phmsa.dot.gov...FINAL ORDER CPF No. 4-2016-3002 From June 24, 2016, to August 17, 2016, pursuant to 49 U.S.C. 60117, a representative of the Pipeline and Hazardous Materials
Download
Transcript
Page 1
Page 2
Page 3
Page 4
Page 5
LOAD MORE
Top Related
primis.phmsa.dot.gov · · 2015-10-29In addition, Marathon's ECDA procedures did not follow the requirement of NACE Section 6.1.1 of Marathon's ECDA SP0502 Section 6 Direct Examination
primis.phmsa.dot.gov inspector or ultrasonic thickness testing ... nonconductive impermeable liners per API 651 7.2.3 ... in an aboveground breakout tank built to API Spec
primis.phmsa.dot.gov please find the Final Order issued in the above-referenced case. It makes findings of violation and withdraws the compliance order issued to Plains Pipeline, L.P
60169 - Lego · 60144 60147 60148 60149 60146 60145 60152 60119 60150 60117 LEGO and the LEGO logo are trademarks of the LEGO Group. ©2017 The LEGO Group. 6203823
primis.phmsa.dot.gov...U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 901 Locust Street, suite 462 Kansas City, Missouri 64106-2641 NOTICE
primis.phmsa.dot.gov · Individual means a person who, ... Qualified individual means an individual has been evaluated and can: ... Some covered tasks do not have a Span-of-Control
primis.phmsa.dot.gov · reference, see §195.3). However, you don't need to comply with ANSI/API RP 651 when installing any tank for which you note in the corrosion control procedures
1x - Lego35 60144 60147 60148 60149 60146 60145 60152 60119 60150 60117