Presented by:
Robert L. Ibell: Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd
Partnerships, Collaborative Working &Integrated Teamwork
09:45 – 10:45Thursday 26th March 2015Warwick University
![Page 2: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/2.jpg)
Today’s Agenda
Introduction and terminology
History & Development
The Benefits of working in a partnership
Key factors for success
Desired approach for working in an integrated team
Project case studies – the successes and failures of
working in an integrated team
![Page 3: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/3.jpg)
1. Partnering – The development of a win/win relationship, based on trust and teamwork; partnerships involve the splitting of project liabilities and the sharing of rewards. Partnerships are a means of achieving best practice and TQM.
2. Integrated Teams – A combination of client representatives and suppliers selected to manage the design and construction stages of a project, and to plan for building maintenance. The theory is centred around the valued input from all members of the integrated team.
3. Collaborative Working – Similarly to partnering, the development of collaborative working environments involves the establishment of clear strategies, values and structures between organisations in order to achieve long term goals.
4. Strategic Alliances – A formal relationship between two or more parties with a common goal; it differs from partnering in that organisations remain separate throughout the process.
5. Supply Chain Partnerships – The development of a full chain of organisations responsible for the delivery of a project. Over time, organisations on the chain develop an aligned set of values and goals as their relationships develop (forming an Integrated Supply Chain).
Introduction - Forms of Partnership
![Page 4: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/4.jpg)
Terminology Project (Tactical) Partnering – “a method of applying project
specific management in the planning, design and construction profession without the need for…third party involvement.”
R. J. Stephenson (1996)
Strategic Partnering – “a formal partnering relationship that is designed to enhance the success of multi-project experiences on a long term basis”
R. J. Stephenson (1996)
Facilitator – A neutral individual designed to assist with the organisation and running of initial project workshops and to provide advise on partnering where necessary. The facilitator has no executive function within the contract.
![Page 5: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/5.jpg)
“The great revolution takes place in the mental attitude of the two parties…. is that both sides take their eyes off of the division of the surplus…. And together, turn their attention towards increasing the size of the surplus until it is so large it becomes unnecessary to quarrel over how it is divided. They come to see that when they stop pulling against one another and instead push in the same direction, the size of the surplus created by their joint efforts is truly outstanding.”
Frederick Winslow Taylor 1912
What is partnering?
![Page 6: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/6.jpg)
What is Partnering –History of Partnerships and Teamwork
Partnering theory first developed in 1980s/ 1990s in North America, following lessons learnt from Japanese manufacturing industry.
Adopted in the UK construction industry in the 1990s following pressure from Clients who had learnt lessons from their own business developments – the concept was seen to provide greater levels of efficiency and resource than any single organisation could provide.
The Latham Report (1994) – Identified a series of inefficiencies within the UK construction industry and outlined the need for a greater level of partnering/ collaboration in order to improve.
Trusting the Team (1995) – The first report on how partnering could be applied to construction projects.
The Egan Report: Re-Thinking Construction (1998) – Provided a series of targets and steps to improve process in the construction industry.
The Latham and Egan Reports have been vastly more influential than others as they were written as advisory documents for the UK government.
The CIOB and other institutions have now written codes of practice relating to the use of integrated teams and partnerships in construction projects.
![Page 7: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/7.jpg)
What is Partnering –History of Partnerships and Teamwork
• Then we started to call it collaboration and alliancing and we saw these type of arrangements beginning in the UK
• Now we have BS11000 and a gradual (not sure the DFT are yet convinced) move towards working together to reduce costs.
![Page 8: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/8.jpg)
Potential Benefits to the Project
1. Increased project efficiency through a more harmonious and less confrontational work ethic.
2. Reduced chances of claims and litigation upon project completion
3. Allow better control of Project cost and programme via an open cost and cost predictability regime
4. Increased probability of delivery to time and budget
5. Allows better management of risk
![Page 9: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/9.jpg)
Stakeholder Specific Benefits
CLIENT
•Reduced exposure to litigation•Lower risk of overrun•Better quality of product•Potential for time and cost reduction•Efficient resolution of problems•Lower administrative costs•Better opportunity for innovation•Greater opportunity for financial success.•Better management of all risks•Able to provide stakeholders with greater confidence in out come
CONTRACTOR
• Reduced exposure to litigation• Increased productivity• Expedited client decisions• Improved control over time and cost factors• Lower risk of overrun• Lower overhead costs•Better cash flow on most forms• Greater profit potential• Greater opportunities for future business.•More satisfied Client
CONSULTING ENGINEERS
•Reduced exposure to litigation• Reduced exposure to document inefficiencies through early identification of problems and their resolution.• Enhanced role in decision making• Reduced administrative costs• Greater profit potential•Enhanced communication and efficiency during design•Others take some greater responsibility for design and design information even if only moral responsibility•More satisfied Client
![Page 10: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/10.jpg)
Influence of Procurement method.
• Behaviours and attitude
• Messages given out
• Selection of contractors
• Types of contractual arrangement Design and Build(D & B) Optimised Contractor Involvement(OCI) Incentivised Contractor Involvement(ICE) Early contractor involvement(ECI)
• Good vibes—Bad vibes
![Page 11: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/11.jpg)
Influence of Procurement method.
Essentials for sound collaboration and minimisation of cost on a project
Shared and common objectives
Returns for all if things go well
Risk management Incentives(not bonuses)
No incentive to drive cost up
Every incentive to reduce cost
Trust and belief in the relationship and the team
Performance
![Page 12: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/12.jpg)
Key Factors for Success at the Outset
Belief from all parties; all project stakeholders should be involved in the process, not just main contractors
Belief and commitment at all levels of the project team
Clear understanding of the benefits and the pitfalls
Commitment to being open, honest and truthful
An understanding by all parties of others key interests
A clear alignment of objectives at all levels
![Page 13: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/13.jpg)
Approach to Partnerships/ Collaborative Working
All define their objectives and their interests Feasibility of success is agreed by all (note that this will
depend on a realistic budget) All parties must recognise the risks that may impact the
project as a whole, not just their own works Identify and require the behaviours that are required - be
prepared to change staff!!! Focus on best practice improvement targets and
performance to deliver these. Establish a forum to monitor the relationship Establish a right of referral to the forum from parties,
individuals, suppliers and sub contractors
![Page 14: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/14.jpg)
London Bridge Station 1996 (£200m)
Not set up as a ‘partnering’ arrangement
Hard Contract but experienced staff
Good personnel relationship from outset
Delays due to Heathrow Express collapse
Worked together to get back on track
Applied for a Partnering award
Very satisfied Client
![Page 15: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/15.jpg)
Jubilee Line Extension - C104
![Page 16: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/16.jpg)
![Page 17: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/17.jpg)
Ramsgate 1999 (£32m)
Early Partnering type contract using NEC
Client very open as to what he could afford
Very close integrated team working from outset
Staff integration, roles integration, open
administration
Full of VE, delivered to time and budget
Very satisfied Client
![Page 18: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/18.jpg)
B
![Page 19: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/19.jpg)
![Page 20: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/20.jpg)
CTRL 240 – T200 Alliance 2004 (120m)
Target cost contract – quite benevolent
Establishment of a realistic target cost and a collaborative
working culture from the outset.
Shortly after commencement of works Team 200 alliance
(T2A) established. Four JVs in single alliance (£600m)
One cost, one target, shared rewards
Delivery ahead of time, on budget
Good safety record, record breaking performance
![Page 21: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/21.jpg)
M25 Holmesdale (£70m)
Intelligent Client -Highways Agency under ECI contract—Quality Bid only
Design and construct, ostensibly all risk with contractor Some time spent in agreeing the budget( target cost)
because of poor estimating. Excellent relationships and complete openness from the
outset Client very clear on objectives and performance indicators Contract full of innovation and improvements
Delivery on time and to budget—follow on contract won
![Page 22: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/22.jpg)
M25 Holmesdale Tunnel Refurbishment
![Page 23: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/23.jpg)
Kings Cross Eastern Range (£65m)
Critical situation where contract heading for major overrun and delay to main project
Relationships were in trouble—designer was not performing, contractor waiting for information
Target cost incentive mechanism established and an integrated team set up
Contractor took over more and more management of the designer
Situation turned round—delivery to accelerated programme and beneath target cost.
Client delighted –project back on track
![Page 24: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/24.jpg)
![Page 25: Presented by: Robert L. Ibell:Past Chairman, British Tunnelling Society Chairman; London Bridge Associates Ltd Partnerships, Collaborative Working](https://reader036.vdocument.in/reader036/viewer/2022062805/5697bfc71a28abf838ca789a/html5/thumbnails/25.jpg)