1ASAS TN 19-21/04/04
Surveillance Data Processing, Networks Surveillance Data Processing, Networks and Validation Tools and Validation Tools
for ADS-B applicationsfor ADS-B applications
Christos RekkasADS Programme Manager
EUROCONTROL
2ASAS TN 19-21/04/04
ADS Programme PlanningADS Programme Planning
2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1
O p e r a t i o n s
P r e - I m p l & O p s V a l i d a t i o n
I m p l & O p s P l a n n i n gI m p l C o - o r d i n a t i o n
O p e r a t i o n s
P r e - I m p l & O p s V a l i d a t i o n
I m p l & O p s P l a n n i n gI m p l C o - o r d i n a t i o n
D e v e l o p m e n t
S t r e a m 1
S t r e a m 2
(Ground Surveillance applications)
(Airborne Surveillance applications)
3ASAS TN 19-21/04/04
Key deliverablesKey deliverables Internationally harmonised Requirements
Key for interoperability and efficiency Safety Case (including separation min considerations) Business Case
Consultation with manufacturers, ANSPs and Users Infrastructure Specs or prototypes
Ground infrastructure Surveillance Data Processing and Distribution (ARTAS) Surveillance Network equipment (RMCDE)
Airborne Surveillance Data Fusion (co-operation with AIRBUS, Boeing & avionics industry) Validation tools and Platforms
Surveillance and Communication Simulation and Analysis tools ADS-B Validation Testbed (AVT)
Validation activities at EEC or at various ECAC sites, proving the benefits CRISTAL
Implementation planning
4ASAS TN 19-21/04/04
Development of ARTAS Development of ARTAS for Mode S and ADS-Bfor Mode S and ADS-B
ARTAS V7 is capable of processing Surveillance data from classical radars, Mode S and ADS-B
Development phases ARTAS V7 Specifications (completed)
ARTAS V7 Development (ongoing) V7.0 development (July 2003 -> July 2004) V7.1 development (July 2004 -> May 2005)
Both Unix and Linux versions
May 2003
ContractSignature
July 2003
ARTAS V7Specifications
Dec 2003
ARTAS V7.0Beta
July 2004
ARTASV7.0U (FAT)
May 2005
ARTASV7.1U (FAT)V7.1L (FAT)
Phase 1 Phase 2 Phase 3
Oct 2004
V7.0L (Beta)
5ASAS TN 19-21/04/04
Surveillance Network Equipment Surveillance Network Equipment Upgrade of Surveillance network equipment (RMCDEs) to support
ADS-B functionality Operational purpose
Surveillance Front-End Processor for SDPD systems Access Node for Surveillance Networks
Benefits Flexibility of surveillance data formats Phased implementation of the ASTERIX format Optimal use of communications resources (networks)
Existing systems 39 Operational, 29 test, 40 sites
Prototype development Specs by June 2004 Development completed by end 2004
6ASAS TN 19-21/04/04
TIS-B ServerTIS-B ServerObjectivesObjectives
Support validation of TIS-B services for Package 1 as part of the ADS-B/TIS-B Validation Testbed (AVT)
Provide a prototype TIS-B Server offering the following capabilities uplink tracks and not radar plots support both gap filler and full picture uplink services handle multiple TIS-B link technologies handle multiple TIS-B Ground Stations and Service Volumes
Each SV is associated with a separate quality of service
be compatible with the services offered by ARTAS support various ASTERIX standards
Acquire source code and documentation enabling modifications and experimentation distributable to ADS Programme Stakeholders
Development to be completed in September 2004
7ASAS TN 19-21/04/04
Surveillance Coverage
Analysis Suite
Trajectory Reconstruction
& Evaluation suite
Multi-sourceAcquisition
Suite
SimulationSuite
Data SensorsDescription
Surveillance Data
Screening Files
Surveillance Analysis Tools (SASS-C)Surveillance Analysis Tools (SASS-C)
MAS
SMARTSCAS
TRES
Development work in the period 2003-2005
8ASAS TN 19-21/04/04
AVT is a validation platform for Package I surveillance applications and infrastructure provides the complete ATC system chain from pilot to
controller allows controller and pilot participation provides a realistic and controllable surveillance environment
to test Package I applications. handling both live and simulated aircraft including link error performance simulation
serves also as reference platform for surveillance components and tools
supporting standard surveillance interfaces, particularly ASTERIX tool for technical investigations on specific surveillance issues
for example tracking performance
AVT is funded by the EUROCONTROL ADS Programme but is also available for use by third parties.
Installations exist at Brétigny and Arlanda, and more are foreseen for 2004
ADS-B Validation Testbed (AVT)ADS-B Validation Testbed (AVT)
9ASAS TN 19-21/04/04
• Phase I :Baseline air to ground functionality• Separate ADS-B and SSR tracking • Platform operational: November 2002• Demonstrated in Malmo, Sweden (Jan 03)
• Phase II: Support for En-route and TMA ground surveillance applications• Full ADS-B and SSR data fusion • Platform operational: October 2003• Demonstrated in Arlanda, Sweden (Nov 03)
• Phase III : AVT for ATSAW and multilateration• Support for Airborne Situational Awareness• Use of wide area multilateration, TIS-B, and ADS-C• Platform operational: End 2004
• Phase IV : AVT for full set of Package I applications• Support for Spacing application and airport surface operations• Use of airborne SDPD and airport tracker • Platform operational: End 2005
AVT Phased ImplementationAVT Phased Implementation
10ASAS TN 19-21/04/04
AVT OverviewAVT Overview
eCockpit
A-SDPD
EAT/EDEP
MCS/eCockpit
Allows reliable and efficient validation
11ASAS TN 19-21/04/04
CRISTAL CRISTAL – – CCo-opeo-opeRRative Validatative ValidatIIon of on of SSurveillance urveillance TTechniques and echniques and
AAppppLLications of Package Iications of Package I
Validation exercises in partnership with individual ANSPs, industry and other stakeholders, in various ECAC sites “Crystallisation effect”
Targeting local situations of interest – Driven by the stakeholder operational needs
Wide range of activities (operational, technical, safety, cost-benefit, separation mimima etc.), as appropriate
Evolution to pre-operational level depends on the stakeholder plans and the trial progress
Cover both Stream 1 (Ground Surveillance applications) and also Stream 2 (Airborne Surveillance applications)
12ASAS TN 19-21/04/04
Currently under discussion
CRISTAL sites
Trial/Study sites & areasFI
GE
AMAZ
EE
UA
MD
TR
CY
FR
LV
LT
NL
DE
GB
IE BY
RO
AL
MK
BG
GR
CH
IT
ATHU
YU
ES
PT
DK
NO SE
PL
CZ
MT
BA
MA DZ TN
SY IQ
IR
KZ
RU
LU SK
SI HR
BE
FI
GE
AMAZ
EE
UA
MD
TR
FR
LV
LT
DE
GB
IE BY
RO
AL
MK
GR
IT
ATHU
YU
ESPT
DK
NO SE
PL
CZ
BA
MA DZ TN
SY IQ
IR
KZ
RU
LU SK
SI CRCH
CRISTAL countries
BENL
Discussions planned
13ASAS TN 19-21/04/04
ConclusionsConclusions The EUROCONTROL ADS Programme provides important deliverables
related with the Package I Surveillance applications and enablers The Programme deliverables include Specifications and prototyping of important
system infrastructure components and validation tools Infrastructure components
Ground Infrastructure Surveillance Data Processing and Distribution (ARTAS Version 7) Surveillance Network Nodes (RMCDE)
Airborne functionality Validation tools
Surveillance and Communication Simulation and Analysis tools ADS-B Validation Testbed (AVT)
These systems are the necessary basis for the validation trials, leading towards implementation in a cost efficient way CRISTAL projects in partnership with local ANSPs, industry and other
stakeholders