So Now You Have To Lead Your Team Through the Model for Improvement
Debbie Barnard, SHN PM, CPSI Dannie Currie, SIA Atlantic Node
October / November 2007
2Atlantic NodeAtlantic Node
Objectives
Each participant will be able to:
• Coach others on the Model for Improvement structure
• Evaluate and critique aim statements
• Evaluate and critique a team’s measurement strategy
• Coach teams on the use of the PDSA cycle
• Help teams design small scale PDSA cycles for initial tests of change
• Help teams design a series of PDSA cycles to implement a change idea
Source: Daniel, Donna, “Teaching the Model for Improvement” Collaborative Sponsor Training
3Atlantic NodeAtlantic Node
Introduction
Source: Daniel, Donna, “Teaching the Model for Improvement” Collaborative Sponsor Training
4Atlantic NodeAtlantic Node
Model for Improvement*
• A simple yet powerful tool for accelerating improvement
• The model has been used very successfully by hundreds of health care organizations in many countries to improve many different health care processes
and outcomes
*Langley GL, Nolan KM, Nolan TW, Norman CL, Provost LP
**The Plan-Do-Study-Act cycle was developed by W. E. Deming
5Atlantic NodeAtlantic Node
Model for Improvement*
• The model has two parts:
- Three fundamental questions, which can be addressed in any order.
- The Plan-Do-Study-Act (PDSA) cycle** to test and implement changes in real work settings. The PDSA cycle guides the test of a change to determine if the change is an improvement.
*Langley GL, Nolan KM, Nolan TW, Norman CL, Provost LP
**The Plan-Do-Study-Act cycle was developed by W. E. Deming
6Atlantic NodeAtlantic Node
Key Concepts
Three Basic Questions
Source: Daniel, Donna, “Teaching the Model for Improvement” Collaborative Sponsor Training
7Atlantic NodeAtlantic Node
• Does the aim statement include recommended elements?– What is expected to happen
– The system to be improved
– The setting or sub-population of patients
– Specific numerical goals
– Guidance for the activities such as strategies for the effort and limitations
• Is the aim specific enough to be accomplished in the Collaborative time frame?
• Does the team match the aim?
• Are the goals and population consistent with the mission for the Collaborative?
Evaluating Aim Statements
8Atlantic NodeAtlantic Node
The SHN campaign is about making changes to systems, not measurement. But measurement plays a key role role:
• Key measures are required to assess progress on team’s aim
• Specific measures can be used for learning during PDSA cycles
• Balancing measures are needed to assess that other parts of the system are not being negatively impacted.
How Do We Know That a Change Is an Improvement?
9Atlantic NodeAtlantic Node
An aim statement should include:
• What is expected to happen
• The system to be improved
• The setting or sub-population of patients
• Goals
• Guidance for the activities such as strategies for the effort and limitations
What Are We Trying to Accomplish?
10Atlantic NodeAtlantic Node
ConceptAn opportunity to create
a new connection
Thoughtprocess
Specificidea B
Specificidea A
What Changes Can We Make That Will Lead to Improvement?
Change Concept: a general notion or approach to change that has been found to be useful in developing specific ideas for changes that lead to improvement.
11Atlantic NodeAtlantic Node
Types of MeasuresType of measure Examples
Outcome measures
Process measures
Balancing measures
RatesFailuresRe-admitsMortality, LOS
% use order set, guideline, etc% treated in required time% receiving 100% of ‘bundle’Times, durationsEtc
CostsDelaysResources% detected by redundant processEtc
12Atlantic NodeAtlantic Node
• Clinical measures of patients health
• Documentation of behaviors
• Questionnaires
• Assessments
• Summary of databases
• Chart audits
• Observations
Methods of Measurement
13Atlantic NodeAtlantic Node
Measurement Guidelines
• The Vital Few: a few key measures that clarify a team’s aim and make it tangible
• Balanced set of measures
• Process, Outcome, Balancing
• Integrate measurement into the daily routine
How will we know that a change is an improvement?
14Atlantic NodeAtlantic Node
Outcome vs. Process Measures
Outcome = Represents the customer / patient: • How is the system performing?
• What is the result?
• How is the health of the patient affected?
What the CEO/Administrator/Director ultimately wants to know
Process = Represents the workings of the system: • Are the parts / steps in the system performing as planned?
• Are key changes being implemented in the system?
15Atlantic NodeAtlantic Node
• Conceptual, Vague, Strategic
• Specific Ideas, Actionable
• Improve
• Redesign process
• Move steps in the process closer together
• Move order receipt and warehouse closer together
• Move the fax that receives orders into the warehouse
• Write a work order to have the fax moved on Monday
Concepts to Ideas
16Atlantic NodeAtlantic Node
Compete List of Change Concepts
A. Eliminate Waste E. Enhance the Producer/Customer Relationship
1. Eliminate Things That Are Not Used 2. Eliminate Multiple Entry 3. Reduce or Eliminate Overkill 4. Reduce Controls on the System 5. Recycle or Reuse 6. Use Substitution 7. Reduce Classifications 8. Remove Intermediaries 9. Match the Amount to the Need 10. Use Sampling 11. Change Targets or Set Points
38. Listen to Customers 39. Coach Customers to Use Product/Service 40. Focus on the Outcome to a Customer 41. Use a Coordinator 42. Reach Agreement on Expectations 43. Outsource for “Free” 44. Optimize Level of Inspection 45 Work with Suppliers
F. Manage Time 46. Reduce Setup or Startup Time 47. Set up Timing to Use Discounts
B. Improve Work Flow 48. Optimize Maintenance 12. Synchronize 13. Schedule into Multiple Processes 14. Minimize Handoffs 15. Move Steps in the Process Close
Together 16. Find and Remove Bottlenecks 17. Use Automation 18. Smooth Work Flow 19. Do Tasks in Parallel 20. consider People as in the Same System 21. Use Multiple Processing Units 22. Adjust to Peak Demand
49. Extend Specialist’s Time 50. Reduce Wait Time
G. Manage Variation 51. Standardization (Create a Formal Process) 52. Stop Tampering 53. Develop Operational Definitions 54. Improve Predictions 55. Develop Contingency Plans 56. Sort Product into Grades 57. Desensitize 58. Exploit Variation
C. Optimize Inventory H. Design System to Avoid Mistakes 23. Match Inventory to Predicted Demand 24. Use Pull Systems 25. Reduce Choice of Features 26. Reduce Multiple Brands of Same Item
59. Use Reminders 60. Use Differentiation 61. Use Constraints 62. Use Affordances
D. Change the Work Environment I. Focus on the Product or Service 27. Give People Access to the Information 28. Use Proper Measurements 29. Take Care of Basics 30. Reduce Demotivating Aspects of Pay
System 31. Conduct Training 32. Implement Cross-Training 33. Invest More Resources in Improvement 34. Forcus on Core Processes and Purpose 35. Share Risks 36. Emphasize Natural and Logical
Consequences 37. Develop Alliance/Cooperative
Relationships
63. Mass Customize 64. Offer Product/Service Anytime 65. Offer Product/Service Anyplace 66. Emphasize Intangibles 67. Influence or Take Advantage of Fashion
Trends 68. Reduce the Number of Components 69. Disguise Defects or Problems 70. Differentiate Product Using Quality
Dimensions
Reference: The Improvement Guide, Langley, Nolan, Nolan, Norman, Provost, Jossey-Bass, San Francisco, CA, 1995, Appendix pages 293-359.
17Atlantic NodeAtlantic Node
Key Concepts
Plan, Do, Study, Act
Source: Daniel, Donna, “Teaching the Model for Improvement” Collaborative Sponsor Training
18Atlantic NodeAtlantic Node
What are we trying toWhat are we trying toaccomplish?accomplish?
How will we know that aHow will we know that achange is an improvement?change is an improvement?
What changes can we make that willWhat changes can we make that willresult in the improvements we seek ?result in the improvements we seek ?
Act Plan
Study Do
Model for improvement
Aims
Measurement
Thethree
fundamentalquestions forimprovement
The fourthquestion:
how to make changes
Langley, Nolan et al 1996
Ideas, evidence, hunches,Other people etc.
19Atlantic NodeAtlantic Node
Cycles for Testing
• Increase your belief that the change will result in improvement
• Document how much improvement can be expected from the change
• Learn how to adapt the change to conditions in the local environment
• Evaluate costs and side-effects of the change
• Minimize resistance upon implementation
20Atlantic NodeAtlantic Node
To Be Considered a PDSA Cycle:
The test or observation was planned (including a plan for collecting data)
The plan was attempted (do the plan)
Time was set aside to analyze the data and study the results
Action was rationally based on what was learned
21Atlantic NodeAtlantic Node
Attributes of Changes That Are Readily Adopted*
• The change has a clear advantage over the current system
• The change is compatible with current system and values
• The change is easy to try and reverse
• Understanding and adapting the change requires minimum complexity
• The change and its impact can be observed
*From Everett Rogers “Diffusion of Innovations”
22
What is the PDSA Cycle?
Act
• What changes are to be made?
• Next cycle?
Plan• Objective• Questions and predictions (why)• Plan to carry out the cycle (who, what, where, when)
Study• Complete the analysis of the data
•Compare data to predictions
•Summarize what was learned
Do• Carry out the plan• Document problems and unexpected observations• Begin analysis of the data
23Atlantic NodeAtlantic Node
Tasks at Each Station
Act PlanPlan a test (change, theory, prediction)
Record plan on planning sheet
Study DoModify your plane to Incorporate your changes; fly 3 times; record data, unusual events
Plot data, interpret results. Compare data to predictions
Keep changes, modify, abandon?
24Atlantic NodeAtlantic Node
Testing on a Small Scale• Have others that have some knowledge
about the change review and comment on its feasibility
• Test the new product or the new process on the members of the team that developed the change before introducing it to others
• Incorporate redundancy in the test by making the change side-by-side with the existing process or product
25
What is the PDSA Cycle?
Act
• What changes are to be made?
• Next cycle?
Plan• Objective• Questions and predictions (why)• Plan to carry out the cycle (who, what, where, when)
Study• Complete the analysis of the data
•Compare data to predictions
•Summarize what was learned
Do• Carry out the plan• Document problems and unexpected observations• Begin analysis of the data
26Atlantic NodeAtlantic Node
Tasks at Each Station
Act PlanPlan a test (change, theory, prediction)
Record plan on planning sheet
Study DoModify your plane to Incorporate your changes; fly 3 times; record data, unusual events
Plot data, interpret results. Compare data to predictions
Keep changes, modify, abandon?
27Atlantic NodeAtlantic Node
Repeated Use of the PDSA Cycle
Hunches Theories
Ideas
Changes That Result in
Improvement
A P
S D
APS
D
A P
S D
D SP A
DATA
Very Small Scale Test
Follow-up Tests
Wide-Scale Tests of Change
Implementation of Change
28Atlantic NodeAtlantic Node
Repeated Use of the PDSA Cycle to Improve
LOS for ED patients with X-rays
Theories Ideas
Changes That Result
in Improvement
A P
S D
APS
D
A P
S DD S
P A
DATA
Cycle 1a: Pilot quick-look for extremity x-rays on one shift. Monitor LOS for patients with x-rays and error rate. Review results with Radiology
Cycle 1b: Revise documentation process and try quick-look for two days
Cycle 1c: Redesign viewing area and continue quick-look for two weeks
Cycle 1d: Make quick-look standard practice and monitor
EXAMPLE
29Atlantic NodeAtlantic Node
Decrease the Time Frame for a PDSA Test Cycle
• Years
• Quarters
• Months
• Weeks
• Days
• Hours
• Minutes
Drop down next “two levels” to plan test cycle!
30Atlantic NodeAtlantic Node
Successful Cycles to Test Changes
• Plan multiple cycles for a test of a change
• Think a couple of cycles ahead
• Scale down size of test (# of patients, location)
• Test with volunteers
• Do not try to get buy-in, consensus, etc.
• Be innovative to make test feasible
• Collect useful data during each test
• Test over a wide range of conditions
31Atlantic NodeAtlantic Node
Testing on a Small Scale Cont.
• Conduct the test in one facility or office in the organization, or with one customer
• Conduct the test over a short time period
• Test the change on a small group of volunteers
• Develop a plan to simulate the change in some way
32Atlantic NodeAtlantic Node
Reasons for Failed Tests
1. Change not executed well
2. Support processes inadequate
3. Hypothesis / hunch wrong:• Successful change did not result in local
improvement
• Local improvement did not impact global measure
Collect data during the “Do” phase of the cycle to help differentiate these situations.
33Atlantic NodeAtlantic Node
Cycles for Implementation
• The change is permanent - need to develop all support processes to maintain change
• High expectation to see improvement (no failures)
• Increased scope will lead to increased resistance
• Generally takes more time than tests
34Atlantic NodeAtlantic Node
EXERCISE
Building Planes and Flying in the
Alaska Bush
Original Work Developed by IHI.org
35
Key Activities
• Review baseline data
• Study change ideas
• Learn about Model for Improvement
36Atlantic NodeAtlantic Node
What the Experts Know “Change Package”
Problem• Short flight
distances
• Nose dives
• Wanders off-target
Changes• Use heavier paper• Change launch
angle
• Add tape weight to rear
• Reinforce plane body with clips
37Atlantic NodeAtlantic Node
Debbie Barnard, MS, CPHQProject Manager Safer Healthcare Now!
Canadian Patient Safety Institute
Suite 1414, 10235 101 Street
Edmonton, Alberta T5J3G1
Phone: 780-498-7259 or 1-866-421-6933
Fax: 780-409-8098
Email: [email protected]
Website: www.patientsafetyinstitute.ca
Questions/Comments
The Canadian Patient Safety Institute would like to acknowledge funding support from Health Canada. The views expressed here do not necessarily represent the views of Health Canada