10 - 1
Should we build thisplant?
Lecture TwelveCapital Budgeting
The Basics
![Page 2: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/2.jpg)
10 - 2
What is capital budgeting?
A process for planning and evaluating opportunities (projects/assets) that have an unexpected cash flow or will yield returns (have repercussions) for periods longer than one year
![Page 3: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/3.jpg)
10 - 3
Steps
1.A: Identify Projects
a. Types b. Categories
i. Environmental i. Independent
ii. New machine ii. Mutually exclusive
iii. Replacement iii. Compliments
1.B: Estimates CFs (inflows & outflows)
a. Normal b. Non-normal
2. Assess riskiness of CFs
a. High b. Average c. Low
![Page 4: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/4.jpg)
10 - 4
Steps (cont.)
3. Determine k = WACC (adj.).
4. Evaluate Cash Flows or Project
a. Payback d. IRR
b. Discounted Payback e. MIRR
c. NPV
5. Criteria for Accepting/Rejecting Projects
a. Example: accept if NPV > 0 and/or IRR > WACC.
6. Review Process after 1 or More years of Operation
![Page 5: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/5.jpg)
10 - 5
An Example of Mutually Exclusive Projects
BRIDGE vs. BOAT to get products across a river.
![Page 6: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/6.jpg)
10 - 6
Normal Cash Flow Project:
Cost (negative CF) followed by aseries of positive cash inflows. One change of signs.
Nonnormal Cash Flow Project:
Two or more changes of signs.Most common: Cost (negativeCF), then string of positive CFs,then cost to close project.Nuclear power plant, strip mine.
![Page 7: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/7.jpg)
10 - 7
Inflow (+) or Outflow (-) in Year
0 1 2 3 4 5 N NN
- + + + + + N
- + + + + - NN
- - - + + + N
+ + + - - - N
- + + - + - NN
![Page 8: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/8.jpg)
10 - 8
What is the payback period?
The number of years required to recover a project’s cost,
or how long does it take to get our money back?
![Page 9: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/9.jpg)
10 - 9
Payback for Project L(Long: Most CFs in out years)
10 8060
0 1 2 3
-100
=
CFt
Cumulative -100 -90 -30 50
PaybackL 2 + 30/80 = 2.375 years
0100
2.4
![Page 10: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/10.jpg)
10 - 10
Project S (Short: CFs come quickly)
70 2050
0 1 2 3
-100CFt
Cumulative -100 -30 20 40
PaybackL 1 + 30/50 = 1.6 years
100
0
1.6
=
![Page 11: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/11.jpg)
10 - 11
Strengths of Payback:
1. Provides an indication of a project’s risk and liquidity.
2. Easy to calculate and understand.
Weaknesses of Payback:
1. Ignores the TVM.
2. Ignores CFs occurring after the payback period.
![Page 12: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/12.jpg)
10 - 12
10 8060
0 1 2 3
CFt
Cumulative -100 -90.91 -41.32 18.79
Discountedpayback 2 + 41.32/60.11 = 2.7 yrs
Discounted Payback: Uses discountedrather than raw CFs.
PVCFt -100
-100
10%
9.09 49.59 60.11
=
Recover invest. + cap. costs in 2.7 yrs.
![Page 13: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/13.jpg)
10 - 13
NPV
CF
kt
nt
t 0 1
.
NPV: Sum of the PVs of inflows and outflows.
Cost often is CF0 and is negative.
NPVCF
kCF
t
nt
t
001.
![Page 14: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/14.jpg)
10 - 14
What’s Project L’s NPV?
10 8060
0 1 2 310%
Project L:
-100.00
9.09
49.59
60.1118.79 = NPVL NPVS = $19.98.
![Page 15: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/15.jpg)
10 - 15
Calculator Solution
Enter in CFLO for L:
-100
10
60
80
10
CF0
CF1
NPV
CF2
CF3
I = 18.78 = NPVL
![Page 16: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/16.jpg)
10 - 16
Rationale for the NPV Method
NPV = PV inflows - Cost= Net gain in wealth.
Accept project if NPV > 0.
Choose between mutually exclusive projects on basis ofhigher NPV. Adds most value.
![Page 17: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/17.jpg)
10 - 17
Using NPV method, which project(s) should be accepted?
If Projects S and L are mutually exclusive, accept S because NPVs > NPVL .
If S & L are independent, accept both; NPV > 0.
![Page 18: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/18.jpg)
10 - 18
Internal Rate of Return: IRR
0 1 2 3
CF0 CF1 CF2 CF3
Cost Inflows
IRR is the discount rate that forcesPV inflows = cost. This is the sameas forcing NPV = 0.
![Page 19: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/19.jpg)
10 - 19
t
nt
t
CF
kNPV
0 1.
t
nt
t
CF
IRR
0 10.
NPV: Enter k, solve for NPV.
IRR: Enter NPV = 0, solve for IRR.
![Page 20: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/20.jpg)
10 - 20
What’s Project L’s IRR?
10 8060
0 1 2 3IRR = ?
-100.00
PV3
PV2
PV1
0 = NPV
Enter CFs in CFLO, then press IRR:IRRL = 18.13%. IRRS = 23.56%.
![Page 21: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/21.jpg)
10 - 21
40 40 40
0 1 2 3IRR = ?
Find IRR if CFs are constant:
-100
Or, with CFLO, enter CFs and press IRR = 9.70%.
3 -100 40 0
9.70%N I/YR PV PMT FV
INPUTS
OUTPUT
![Page 22: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/22.jpg)
10 - 22
90 109090
0 1 2 10IRR = ?
Q. How is a project’s IRRrelated to a bond’s YTM?
A. They are the same thing.A bond’s YTM is the IRRif you invest in the bond.
-1134.2
IRR = 7.08% (use TVM or CFLO).
...
![Page 23: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/23.jpg)
10 - 23
Rationale for the IRR Method
If IRR > WACC, then the project’s rate of return is greater than its cost-- some return is left over to boost stockholders’ returns.
Example: WACC = 10%, IRR = 15%. Profitable.
![Page 24: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/24.jpg)
10 - 24
IRR Acceptance Criteria
If IRR > k, accept project.
If IRR < k, reject project.
![Page 25: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/25.jpg)
10 - 25
Decisions on Projects S and L per IRR
If S and L are independent, accept both. IRRs > k = 10%.
If S and L are mutually exclusive, accept S because IRRS > IRRL .
![Page 26: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/26.jpg)
10 - 26
Construct NPV Profiles
Enter CFs in CFLO and find NPVL andNPVS at different discount rates:
k
0
5
10
15
20
NPVL
50
33
19
7
NPVS
40
29
20
12
5 (4)
![Page 27: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/27.jpg)
10 - 27
-10
0
10
20
30
40
50
0 5 10 15 20 23.6
NPV ($)
Discount Rate (%)
IRRL = 18.1%
IRRS = 23.6%
Crossover Point = 8.7%
k
0
5
10
15
20
NPVL
50
33
19
7
(4)
NPVS
40
29
20
12
5
S
L
![Page 28: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/28.jpg)
10 - 28
NPV and IRR always lead to the same accept/reject decision for independent projects:
k > IRRand NPV < 0.
Reject.
NPV ($)
k (%)IRR
IRR > kand NPV > 0
Accept.
![Page 29: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/29.jpg)
10 - 29
Mutually Exclusive Projects
k 8.7 k
NPV
%
IRRS
IRRL
L
S
k < 8.7: NPVL> NPVS , IRRS > IRRL
CONFLICT k > 8.7: NPVS> NPVL , IRRS > IRRL
NO CONFLICT
![Page 30: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/30.jpg)
10 - 30
To Find the Crossover Rate
1. Find cash flow differences between the projects. See data at beginning of the case.
2. Enter these differences in CFLO register, then press IRR. Crossover rate = 8.68%, rounded to 8.7%.
3. Can subtract S from L or vice versa, but better to have first CF negative.
4. If profiles don’t cross, one project dominates the other.
![Page 31: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/31.jpg)
10 - 31
Two Reasons NPV Profiles Cross
1. Size (scale) differences. Smaller project frees up funds at t = 0 for investment. The higher the opportunity cost, the more valuable these funds, so high k favors small projects.
2. Timing differences. Project with faster payback provides more CF in early years for reinvestment. If k is high, early CF especially good, NPVS > NPVL.
![Page 32: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/32.jpg)
10 - 32
Reinvestment Rate Assumptions
NPV assumes reinvest at k (opportunity cost of capital).
IRR assumes reinvest at IRR.
Reinvest at opportunity cost, k, is more realistic, so NPV method is best. NPV should be used to choose between mutually exclusive projects.
![Page 33: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/33.jpg)
10 - 33
Managers like rates--prefer IRR to NPV comparisons. Can we give them a
better IRR?
Yes, MIRR is the discount rate whichcauses the PV of a project’s terminalvalue (TV) to equal the PV of costs.TV is found by compounding inflowsat WACC.
Thus, MIRR assumes cash inflows are reinvested at WACC.
![Page 34: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/34.jpg)
10 - 34
MIRR = 16.5%
10.0 80.060.0
0 1 2 310%
66.0 12.1
158.1
MIRR for Project L (k = 10%)
-100.010%
10%
TV inflows-100.0
PV outflowsMIRRL = 16.5%
$100 = $158.1
(1+MIRRL)3
![Page 35: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/35.jpg)
10 - 35
To find TV with 10B, enter in CFLO:
I = 10
NPV = 118.78 = PV of inflows.
Enter PV = -118.78, N = 3, I = 10, PMT = 0.Press FV = 158.10 = FV of inflows.
Enter FV = 158.10, PV = -100, PMT = 0, N = 3.Press I = 16.50% = MIRR.
CF0 = 0, CF1 = 10, CF2 = 60, CF3 = 80
![Page 36: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/36.jpg)
10 - 36
Why use MIRR versus IRR?
MIRR correctly assumes reinvestment at opportunity cost = WACC. MIRR also avoids the problem of multiple IRRS.
Managers like rate of return comparisons, and MIRR is better for this than IRR.
![Page 37: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/37.jpg)
10 - 37
Pavilion Project: NPV and IRR?
5,000 -5,000
0 1 2k = 10%
-800
Enter CFs in CFLO, enter I = 10.
NPV = -386.78
IRR = ERROR. Why?
![Page 38: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/38.jpg)
10 - 38
We got IRR = ERROR because there are 2 IRRs. Nonnormal CFs--two signchanges. Here’s a picture:
NPV Profile
450
-800
0400100
IRR2 = 400%
IRR1 = 25%
k
NPV
![Page 39: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/39.jpg)
10 - 39
Logic of Multiple IRRs
1. At very low discount rates, the PV of CF2 is large & negative, so NPV < 0.
2. At very high discount rates, the PV of both CF1 and CF2 are low, so CF0 dominates and again NPV < 0.
3. In between, the discount rate hits CF2 harder than CF1, so NPV > 0.
4. Result: 2 IRRs.
![Page 40: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/40.jpg)
10 - 40
Could find IRR with calculator:
1. Enter CFs as before.
2. Enter a “guess” as to IRR by storing the guess. Try 10%:
10 STO
IRR = 25% = lower IRR
Now guess large IRR, say, 200:
200 STO
IRR = 400% = upper IRR
![Page 41: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/41.jpg)
10 - 41
When there are nonnormal CFs and more than one IRR, use MIRR:
0 1 2
-800,000 5,000,000 -5,000,000
PV outflows @ 10% = -4,932,231.40.
TV inflows @ 10% = 5,500,000.00.
MIRR = 5.6%
![Page 42: 10 - 1 Should we build this plant? Lecture Twelve Capital Budgeting The Basics](https://reader035.vdocument.in/reader035/viewer/2022062515/56649c995503460f949563a1/html5/thumbnails/42.jpg)
10 - 42
Accept Project P?
NO. Reject because MIRR = 5.6% < k = 10%.
Also, if MIRR < k, NPV will be negative: NPV = -$386,777.