1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
NovAgenda Item 1.1.2 EuropeEMSA Study on DH Tanker Safety –
IACS follow up on Recommendations
Speaker: S. McIntyre, IACS GPG Chairman
![Page 2: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/2.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
NovEMSA High Level Panel of Experts• BIMCO• CESA• DG TREN• EMSA• IACS• ICS• IMO• INTERTANKO• OCIMF
![Page 3: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/3.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Terms of Reference• Further improve DH tanker safety• Analyse experience in design,
construction, operation, maintenance & survey
• Propose solutions for identified areas of concern
• Panel Meetings
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
Nov
30 April2004
9 July2004
1 Oct2004
30 Nov2004
1 Feb2005
31 Mar2005
Kickoff Conclusion
![Page 4: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/4.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
NovSummary of RecommendationsConcern Control
MeasureShip Comment
Ballast Tank Corrosion
1-Improve Coating Perf4-Maintain Coating
NewO/CAll O/C
1-DE developing4-Apply Rec.87
Cargo Tank Corrosion
2-Provide Coating3-Develop Standard
New Oil Tankers
2-Amend SOLAS3-IACS to develop
Cargo&Ballast Tank Fatigue
5-Develop procedures on maintenance
All Oil& Chem
Industry to use TSCF Manual
Fatigue Cracks
6-Repair to be based on fatigue analysis
All Oil& Chem
IACS to develop guidance
Construction Standards
7-Develop surveys -Mandate Rec.47
All Oil& Chem
IACS to develop requirements
Cargo seepage into adjacent Ballast Tanks
8a-Require Gas Detection/Monitoring
New Oil & Chem
IACS to develop technical req’ts
8b-Recommend Gas Detection/Monitoring
Exist Oil & Chem
Use industry best practice
![Page 5: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/5.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
Nov• Establish a mandatory performance
standard for cargo tank coating systems in new vessels
• Cargo tank deckhead& tank top structures
• IACS to developstandard withIndustry
• Present standardto IMO throughGovernment
Summary of Recommendation 3 to IACS
![Page 6: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/6.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
Nov• Develop surveyor guidance on
dealing with significant fatigue failures
• Address repairs andreinforcement methods
• Develop system toshare fatigue failureinformation
• Develop revisions toA.744(18) as needed
Summary of Recommendation 6 to IACS
![Page 7: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/7.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
Nov• Develop UR on surveys at new
construction• Harmonize
content andstandard ofsurveys
• Mandate IACSRec.47 as minimum standard for newconstructionand repairs
Summary of Recommendation 7 to IACS
![Page 8: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/8.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Tripartite DiscussionsBeijing 2005, 31st Oct – 1st
Nov
• Amend SOLAS to require fixed gas detection & monitoring system for double hull tanks
• Applies to new oil and chemicaltankers > 20,000 dwt
• IACS to developtechnicalrequirements
• Possiblythrough jointindustry workinggroup
Summary of Recommendation 8a to IACS
![Page 9: 1.1.2 - EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct 1 st Nov Agenda Item 1.1.2 Europe EMSA Study on DH Tanker Safety](https://reader033.vdocument.in/reader033/viewer/2022052710/5a4d1b797f8b9ab0599b8574/html5/thumbnails/9.jpg)
1.1.2 - EMSA Study on DH Tanker Safety
Status of Recommendations in IACS• Rec.3: Cargo tank coating performance
standard- IACS to initiate discussion with IACS/Industry Joint Working Group on Corrosion
• Rec.6: Fatigue guidance- Tasked to IACS Survey Panel
• Rec.7: New construction survey requirements - IACS UR being considered by IACS Council- IACS SARQS (Rec 47) being updated- IACS CSR to require SARQS or a recognized standard
• Rec.8a: Fixed hydrocarbon gas detection - Develop technical requirements subsequent to IMO decision to amend SOLAS