Transbay Transit CenterCAC Presentation
Early Below Grade Package14 February 2012
![Page 2: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/2.jpg)
EARLY BELOW GRADE PROCESS
• Currently executing the Buttress and Shoring Package
• Objectives
o To include the substantial majority of below grade structural concrete
work
o Provide waterproofing for the mat slab and foundation walls
o Incorporate cast‐in elements for pipes, electrical and structural items
o Incorporate a major seismic joint
o Accommodate bracing and construction equipment platform (trestle)
o Accommodate dewatering
o Accommodate utility penetrations
![Page 3: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/3.jpg)
Shoring, Foundation & Train Box
Mat Foundation
Shoring Wall
Tie-downs
Water table
B12
![Page 4: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/4.jpg)
Slide 3
B12 animate this slide to sequentially show:1. shoring walls2. Mat slab (& shoring)3. Lower concourse and columnsTHEN ON A NEW SLIDE:4. Steel frame & concrete ground floor slab5. Steel superstructure
SHOW SHORING WALLS IN SAY BLUE, CONCRETE IN GREY; STEELWORK IN RED PRIMERBGibbons, 9/15/2011
![Page 5: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/5.jpg)
• Once the shoring wall is installed, excavation begins.
• 2250 Micropile tie‐downs are installed and site dewatering commences.
• Then the Below Grade Package gets underway : which includes a 5ft thick Mat slab and 3ft thick Foundation walls running the full length of the site
Currently executing the Buttress and Shoring Package
![Page 6: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/6.jpg)
To Include The Substantial Majority Of Below Grade Structural Concrete Work
![Page 7: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/7.jpg)
Provide Waterproofing For The Mat Slab And Foundation Walls
![Page 8: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/8.jpg)
Incorporate Cast‐in Elements For Pipes, Electrical And Structural Items
![Page 9: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/9.jpg)
Incorporate a Major Seismic Joint
![Page 10: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/10.jpg)
Accommodate Bracing And Construction Equipment Platform (Trestle)
![Page 11: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/11.jpg)
Accommodate Dewatering
![Page 12: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/12.jpg)
Accommodate Utility Penetrations
![Page 13: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/13.jpg)
EARLY BELOW GRADE DRAWINGS
• Approximately 450 drawings in the package
• Consultant drawings and specifications
o Structural
o Architectural
o Mechanical
o Electrical
o Plumbing
![Page 14: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/14.jpg)
Scope of Early Below Grade Package
![Page 15: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/15.jpg)
STRUCTURAL
• Concrete Mat slab
• Foundation walls
• Concrete structural columns
• Water storage tanks
• Vehicle and Bike Ramps
• Tiedowns
![Page 16: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/16.jpg)
Water Storage Tanks
![Page 17: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/17.jpg)
Vehicle and Bike Ramps
![Page 18: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/18.jpg)
2300 Tiedowns
• Installed in BSE package
• Top of micropiles cast in to Mat slab to hold down building
• Building expected to rise due buoyancy 1 1/2"
• Returns to rest after building is fully loaded
![Page 19: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/19.jpg)
ARCHITECTURAL
• Slab edge drawings
o Locations of slab opening for stairs, escalators and elevators
o Opening locations for drains, sumps, pipes and major conduits
• Room layouts
o Provide location of reinforcing for future rooms
• Waterproofing
• Seismic joint
• Cast in channels
o Support of future MEP items
o Support of ceilings
o Support of future overhead catenary power system for trains
![Page 20: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/20.jpg)
Seismic Joint
![Page 21: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/21.jpg)
MECHANICAL
• Geothermal loop system
ELECTRICAL
• Cast in boxes and conduits
• Grounding system
PLUMBING
• Cast in pipes and sleeves for future pipes
• Sump pits and drains
![Page 22: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/22.jpg)
Geothermal Loop System
![Page 23: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/23.jpg)
Sump Pits and Drains
![Page 24: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/24.jpg)
t3
![Page 25: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP](https://reader034.vdocument.in/reader034/viewer/2022051509/5ad525e37f8b9a5c638cb293/html5/thumbnails/25.jpg)
Slide 28
t3 Do not animatettuser, 9/21/2011