Transcript
Page 1: 2. Installation and Set Up · Table of contents ECO# 6786 SOP05-5049F Effective Date: 01/28/14 Rev. 03 Page 7 of 79 2. Installation and Set Up 2.1 Unpacking the PROLYTE analyzer The

Table of contents

ECO# 6786 SOP05-5049F Effective Date: 01/28/14 Rev. 03 Page 7 of 79

2. Installation and Set Up

2.1 Unpacking the PROLYTE analyzer

The PROLYTE analyzer is shipped with all necessary components for proper set up and operation.This section will cover installation and replacement of all consumable components. When replacingany consumables refer to this chapter of the manual.

After receiving the analyzer, carefully remove all components from their protective packing and inspectto make sure all components are present and have not sustained damage during shipping. If missingor damaged parts are discovered immediately notify Diamond Diagnostics service professionals oryour authorized dealer.

Below is the list of all the components that should have been sent with your PROLYTE:

Part Number Product DescriptionCN-3109 Power Cord, 120VACCN-3110 Power Cord, 250VACCN-3104 Serial Communication CableME-2108D Solutions ValveIL-2121D Fluid Pack Na/K/Cl/LiME-2257D Sample DetectorME-2107D Sample ProbeCN-A3021 Start-Up Kit (includes Below)ME-2541D Printer PaperME-2101D K+ ElectrodeME-2102D Na+ ElectrodeME-2113D Cl- ElectrodeME-2106D Li+ ElectrodeME-2103D Reference ElectrodeME-2572D Troubleshooting KitME-2118D Daily Cleaner/ Rinse KitME-2095D Maintenance KitCN-4146 Fuse, 1.6A, 250VDD-0206 Mini-KeyboardDD-0202 Barcode Scanner (Optional)SOP05-5048F Quick Start GuideSOP05-5049F Operator’s ManualSOP05-5050F Upload Application Kit

Top Related