![Page 1: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/1.jpg)
2016 International Petroleum Environmental Conference
MINE TAILINGS DRAINAGE – A BOTTOMS UP APPROACH USING HDD
DRILLING AND INSTALLATION METHODS
![Page 2: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/2.jpg)
Tailings Dams • Impoundments used to retain tailings
– Effluents, ground rock, dry stacked or pumped as slurry
• Many times constructed from local materials or tailings themselves
•• Guidelines exist for design, construction Guidelines exist for design, construction and closure
• Some dams raised over time – Conditions may change
– Supervision may change
• Estimated 3,500 worldwide
![Page 3: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/3.jpg)
Why Do They Fail? • Poor construction
• Overtopping
• Foundation failure
• Piping – erosion
•• Poor maintenance
![Page 4: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/4.jpg)
Callahan Mine - Maine • Open pit zinc/copper mine
– Deposit discovered at low tide in 1880
– Commercial mining started in 1887
– Mining/milling ended in 1972
• Added to National Priorities List – Superfund in 2002
• State of Maine entered into Administrative Order to Complete RI/FS in 2005
• Tailings impoundment designated as OU3
![Page 5: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/5.jpg)
![Page 6: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/6.jpg)
![Page 7: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/7.jpg)
OU 3 Tailing Impoundment • 17 acres
• Over 700,000 cubic yards of material – Fine sand, silt and clay
– Saturated material
• Three sided dam – 60’ height
– 1.3H to 1V
– Constructed of cobble and boulder sized waste rock material
![Page 8: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/8.jpg)
OU 3 Tailing Impoundment
• Impoundment “marginally unstable” under long term static conditions
• May fail under long term design magnitude earthquake g q
• Tailing material and seepage result in sediment and surface water contamination – Pb, Zn, Cd, As, Mg
![Page 9: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/9.jpg)
OU 3 Remediation Goals
• Reduce contaminant load to surface and ground water
– Dewatering of tailings impoundment • Water sent to anaerobic wetland bioreactor
– Excavation, regrading and capping
• Reduce surface water recharge infiltration and seepage
![Page 10: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/10.jpg)
Dewatering Options • Vertical wells
– Based on modeling 20 required • Would preclude excavation, regrading and
capping
• No power on site
– Deepp trench • Either excavated or installed “one pass”
• Cost estimate over $1,000,000
– Directionally drilled horizontal well • No surface access needed during construction or
dewatering
• Bit/well could be steered and placed precisely
• Gravity flow – no power needed
![Page 11: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/11.jpg)
Continuous Well Installation
![Page 12: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/12.jpg)
Site Constraints - Continuous • Well screen needed to be at the base of the
tailings
• No rig up area to drill from East to West
• Limited rig up area to the North
• No room to work or lay out well materials on the South side of the pond
![Page 13: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/13.jpg)
Rig Up
Area
![Page 14: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/14.jpg)
Blind Well Open Hole
![Page 15: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/15.jpg)
Site Constraints – Open Hole Blind Completion
• Would borehole stay open in tailings consisting of silts, sands and clays?
– 50’ of saturated thickness above the borehole
• Could PVC be pushed 900’ into an open borehole?
• Would the material flow uncontrollably back to the rig?
![Page 16: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/16.jpg)
Blind Well Knock Off
![Page 17: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/17.jpg)
Knock Off Blind Well Method
![Page 18: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/18.jpg)
Knock Off Installation
• The method would solve the problems of borehole stability and compressive forces on the PVC screen and casing
• EVERYONE still concerned about uncontrolled flow of tailings back to the rig
![Page 19: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/19.jpg)
Solution • Drill pad construction prior to equipment
mobilization
• Install and cement 40’ of 16” steel casing at the exit point
– Crude horizontal “blow out” preventer
• Installed using auger boring methods
• Surface casing installation proved challenging
• Screen installed as a slope of 6° above horizontal
![Page 20: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/20.jpg)
Drill Pad Construction
![Page 21: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/21.jpg)
![Page 22: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/22.jpg)
![Page 23: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/23.jpg)
Drilling and Installation
• Entered surface casing with 12 ¼ tricone bit to drill through grout plug and under dam into tailings
• Pulled tricone and re-entered borehole with knock off bit
• Drilled to 995’ MD
• End of well – 24’ above entry point
– 40’ below top of tailings
![Page 24: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/24.jpg)
Drilling and Installation
• Installed 4” dia., sch. 80 PVC screen and casing inside of drill pipe – 740’ screen
– 251’ casing
– 991’ t t l l th – 991’ total length
• Engaged knock off bit and removed drill pipe
• Cement-bentonite grout to 140’ MD
![Page 25: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/25.jpg)
![Page 26: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/26.jpg)
Well Development
• Flush with fresh water
• Flush with enzyme additive to break biopolymer drilling fluid
•• Jet screenscreen with freshfresh water Jet with water
![Page 27: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/27.jpg)
Finally • Flow rate after development – 5 gpm
• Monitor drain flow rates – Siltation
– Screen plugging
– Periodic maintenance
![Page 28: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/28.jpg)
In Summary • HDD blind well drilling is a viable solution to
tailings dewatering
• Worst case scenario must be included in project planning
• Communication between regulators, t k h ld d t t i tstakeholders and contractors is paramount
• Review and preplanning required – Project scope
– Site visit
– Preconstruction meeting
![Page 29: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/29.jpg)
Contact Information
• Office locations
– Bellefonte, PA
– Mineral Wells, TX
– B t WA – Bremerton, WA
– www.horizontaldrill.com
– 800.239.5950
– Follow DTD on Linkedin/Twitter
– Like DTD on Facebook
![Page 30: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/30.jpg)
Timeline
• May 2014 – Discussed HDD as a remedial option with Maine DEP
• June 2015 – Site walk and Bid Submittal and award
• July 2015 – Propose casing to stabilize bore incase of uncontrolled release (not part of original SOW) of uncontrolled release (not part of original SOW)
• August 5 – Animas River mine failure
• August 13 – Complete setting casing (3 pm), EPA shuts down work on US mine sites pending review
• August 25 – Begin HDD
• September 1 – Demobilize
![Page 31: 2016 International Petroleum Environmental …...2016 International Petroleum Environmental Conference: Mine Tailings Drainage - A Bottoms Up Approach Using HDD Drilling and Installation](https://reader033.vdocument.in/reader033/viewer/2022042911/5f43f8ad3ec938371a03c990/html5/thumbnails/31.jpg)
References
• Tailings Dams Risk of Dangerous Occurrences – Bulletin 121 – ICOLD Committee on Tailings Dams and Waste Lagoons (1995-2001)
• www.tailings.info
• www.fema.gov
• www.klohn.com • www.klohn.com
• US EPA
• OU3 Draft Final Remedial Design Report – 5 December 2014 – prepared by AMEC Environmental & Infrastructure