FILE NO. STATUS MAKE CAP. LOCATION DATEWISE
RECEIVING
CAUSE OF PENDING
1 461/TPL/249 NOT APP. L&T 110T UTCL ADITYA CEMENT WORKS 08/10/2012 IN PROCESS
2 460/TPL/248 NOT APP. L&T 110T NASIK THERMAL POWER PROJECT 08/10/2012 IN PROCESS
3 459/TPL/247 NOT APP. L&T 110T DHARMA CHANDBALI EXPANSION PROJECT
PHASE -II
08/10/2012 IN PROCESS
4 458/TPL/246 NOT APP. L&T 110T SRISINGAJEE/MALWA THERMAL POWER
STATION
08/10/2012 IN PROCESS
5 457/TPL/245 NOT APP. ELECON 110T RAYALSEEMA,MUDDANUR,AP 08/10/2012 IN PROCESS
6 456/TPL/244 NOT APP. ELECON 110T ADANI POWER RAJASTHAN LIMITED 08/10/2012 IN PROCESS
7 454/TPL/242 NOT APP. McNALLY 110T ROURKELA STEEL PLANT 23/08/2012 IN PROCESS
8 453/TPL/241 NOT APP. McNALLY 110T SATPURA PROJECT MP POWER 23/08/2012 IN PROCESS
9 452/TPL/240 NOT APP. KRUPP 110T MAHAN CAPTIVE POWER PLANT 14/08/2012 IN PROCESS
10 450/TPL/238 NOT APP. L&T 110T TADIPATRI CEMENT WORKS 27/07/2012 IN PROCESS
11 449/TPL/237 NOT APP. L&T 110T AMRAVATI THERMAL POWER PROJECT 04/07/2012 IN PROCESS
12 448/TPL/236 NOT APP. ELECON 110T VICAT SAGAR CEMENT PVT. LTD. 25/06/2012 IN PROCESS
13 447/TPL/235 NOT APP. KRUPP 110T FACOR POWER LTD. 06/06/2012 PENDING DUE TO FIRM
14 444/TPL/233 NOT APP. KRUPP 110T GMR KAMALANGA THERMAL POWER 28/05/2012 PENDING DUE TO FIRM
15 435/TPL/230 NOT APP. ELECON 110T BINA THERMAL POWER STATION 11/05/2012 PENDING DUE TO FIRM
16 431/TPL/226 NOT APP. ELECON 110T PENNA CEMENT INDUSTRIES LTD. 20/04/2012 IN PROCESS
17 424/TPL/225 NOT APP. ELECON 110T LANCO VIDARBHA TPS 19/03/2012 PENDING DUE TO FIRM
18 416/TPL/223 NOT APP. L&T 120T BHUSHAN STEEL LIMITED 28/02/2012 IN PROCESS
19 401/TPL/221 NOT APP. L&T 110T VISA RAIGARH STPP 13/01/2012 PENDING DUE TO FIRM
20 400/TPL/220 NOT APP. L&T 120T ULTRATECH CEMENT RAWAN 13/01/2012 PENDING DUE TO FIRM
21 398/TPL/218 NOT APP. L&T 120T ULTRATECH CEMENT HOTGI 12/01/2012 PENDING DUE TO FIRM
22 397/TPL/217 NOT APP. L&T 120T ULTRATECH CEMENT RAJSHREE 12/01/2012 IN PROCESS
23 392/TPL/213 NOT APP. ELECON 110T M/s GMR-EMCO ENERGY LTD. 16/12/2011 IN PROCESS
24 391/TPL/212 NOT APP. ELECON 110T M/s SAIL/IISCO 16/12/2011 PENDING DUE TO FIRM
WAGON TIPPLER APPROVAL STATUS AS ON 07.01.2013
Page 1 of 3
25 417/TPL/224 NOT APP. METSO 110T JAIPRAKASH A LTD., 23/11/2011 PENDING DUE TO FIRM
26 343/TPL/192 NOT APP. METSO 110T M/s BHILAI STEEL PLANT/EPIL 26/09/2011 IN PROCESS
27 325/TPL/182 NOT APP. TRF 110T NTPC MAUDA NAGPUR 27/06/2011 IN PROCESS
28 374/TPL/203 NOT APP. METSO 110T JAYPEE BALAJI CEMENT, KRISHNA 03/05/2011 PENDING DUE TO FIRM
29 375/TPL/204 NOT APP. METSO 110T MONET ISPAT & ENERGY LTD.,RAIGARH 08/04/2011 IN PROCESS
30 289/TPL/163 NOT APP. WPEW 110T VEDANTA ALUMINIUM LTD.,LANJIGARH 07/04/2011 PENDING DUE TO FIRM
31 341/TPL/190 NOT APP. METSO 110T ROURKELA STEEL PLANT ROURKELA 23/03/2011 PENDING DUE TO FIRM
32 353/TPL/200 NOT APP. L&T 120T JINDAL STEEL POWER LTD. ANGUL 08/02/2011 IN PROCESS
33 351/TPL/198 NOT APP. ELECON 110T SIKKA TPS,GUJARAT SE LTD. 31/01/2011 PENDING DUE TO FIRM
34 344/TPL/193 NOT APP. METSO 110T HEIDELBERG CEMENT LTD./HCIL 04/01/2011 IN PROCESS
35 345/TPL/194 NOT APP. METSO 110T HEIDELBERG CEMENT LTD./HCIL-1 04/01/2011 PENDING DUE TO FIRM
36 349/TPL/196 NOT APP. L&T 110T M/s MAHAN ALUMINIUM 27/12/2010 IN PROCESS
37 350/TPL/197 NOT APP. L&T 110T TIRODA S T P P,NAGPUR 13/12/2010 IN PROCESS
38 339/TPL/188 NOT APP. METSO 110T M/s JAIPRAKASH (A) LTD.,CHURK 30/11/2010 PENDING DUE TO FIRM
39 346/TPL/195 NOT APP. ELECON 110T M/s BIRLA CORP. LTD. 12/11/2010 PENDING DUE TO FIRM
40 324/TPL/181 NOT APP. ELECON 110T M/s MY HOME IND. LTD. 01/06/2010 PENDING DUE TO FIRM
41 290/TPL/164 NOT APP. McNALLY 110T VISAKHAPATNAM STEEL PLANT 18/06/2009 PENDING DUE TO FIRM
42 288/TPL/162 NOT APP. L&T 110T DECCAN CEMENT LTD. 06/04/2009 PENDING DUE TO FIRM
43 270/TPL/152 NOT APP. ELECON 105T M/s ACC LTD.,WADI, KARNATKA 12/12/2008 IN PROCESS
44 271/TPL/153 NOT APP. ELECON 110T DURGA CEMENT WORKS,GUNTUR 11/12/2008 PENDING DUE TO FIRM
45 272/TPL/154 NOT APP. ELECON 105T NCTPP,STAGE-II,NTPC LTD.,UP 28/08/2008 PENDING DUE TO FIRM
46 342/TPL/191 NOT APP. METSO 110T M/s SAIL, BSP-HEC 04/08/2008 PENDING DUE TO FIRM
47 142 NOT APP. L&T 110T DALMIA CEMENT ARIYALUR 30/06/2008 AWAITING DOCUMENT
48 141 NOT APP. ELECON 110T SURATGARH SUPER TPS 28/03/2008 AWAITING DOCUMENT
49 245/TPL NOT APP. METSO 110T BHUSHAN STEEL & STRIPS LTD. 31/01/2008 PENDING DUE TO FIRM
50 239/TPL NOT APP. ELECON 110T JINDAL STAINLESS LTD.,DUBURI 16/11/2007 PENDING DUE TO FIRM
51 238/TPL NOT APP. ELECON 110T MADRAS CEMENT LTD.,CHENNAI 15/11/2007 PENDING DUE TO FIRM
52 237/TPL NOT APP. ELECON 110T RAGHURAM CEMENTS LTD.,HYDERABAD 10/09/2007 PENDING DUE TO FIRM
Page 2 of 3
53 232/TPL NOT APP. ELECON 105T KAHALGAON STPP,NTPC 09/07/2007 PENDING DUE TO FIRM
54 213/TPL/111 NOT APP. TRF 110T PARICHHA THERMAL POWER STATION 18/12/2006 PENDING DUE TO FIRM
55 218/TPL NOT APP. ELECON 110T JSW STEEL LTD.,BELLARY 21/11/2006 PENDING DUE TO FIRM
Page 3 of 3
Sub: Process for RDSO approvals of Tipplers as per G-33/ Rev 1.
Ref:- : (1) G-33/ Rev 1 “Tech. Pamphlet for Requirement of Tippler Installation for
approval by RDSO”
(2) Tippler applications from firms.
(3) RDSO File No.-even.
The current process of wagon tippler installation approvals at Wagon Directorate, RDSO (as per
extant specification G-33/Rev-1) is being streamlined by this office. The modifications in the
procedure for approval are being communicated through this note for your kind information.
Clauses 3.0 & 4.0 of the specification referred at (1) above relate to Design & General
Requirements respectively. Your company has already submitted information, drawings and
documents in the initial stage in the form of tippler proposal referred at (2) above as per G-
33/Rev 1. These conceptual design and general arrangement documents are acknowledged as
duly received and will be kept aside for purpose of record. All doubts/ queries raised in this
regard will be replied by this Directorate in the appropriate manner through clarifications.
Clause 5.0 of the specification referred at (1) above relates to “Safety Requirements”
and has three sections of Construction, Installation and Utilization Stages which are the crucial
proving out stages. All RDSO tippler approvals will be pended until the new tippler has been
installed and the design is proved compliant to safety requirements as laid out in the
specification in real terms on-site after actual installation. An approval in the proforma of
Annexure 1 of the G-33/ Rev-1 spec will then be issued as a type approval for the candidate
conceptual model design of tippler. All subsequent installations of identical design will be
covered by this type approval, subject to location specific approvals by the concerned Zonal
Railway and RDSO need not be approached for case-by-case tippler design approvals for
identical tipplers.
Parallel approvals for project location and siding design etc. as currently done by
concerned Railway divisions/ Zones may continue as before. These must however, be
completed well in time prior to the final approval of tippler by RDSO.
This is issued with the approval of competent authority.
(Director/Wagon)
RDSO/LKO
QSDl@Fax : 91-0522-2452494
Rkkj % *jsyekud* y[kuÅ Telegram : ‘RAILMANAK’ Lucknow
VsyhQksu@Tele: 0522- 2465776
lR;eso t;rs
Hkkjr ljdkj &jsy ea=ky; vuqla/kku vfHkdYi vkSj ekud laxBu
y[kuÅ & 226011 Government of India - Ministry of Railways
Research Designs & Standards Organisation
Lucknow – 226011