METRADOSPLANILLA DE METRADOS - (INFRAESTRUCTURA
TALLERES)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCION
UBICACINCANT.LARGOANCHOALTOPARCIALTOTALUNIDAD03INFRAESTRUCTURA
TALLERES03.01 ESTRUCTURAS03.01.01 TRABAJOS PRELIMINARES03.01.01.01
DEMOLICIN DE AULAS EXISTENTES DE MATERIAL RUSTICO392.01m21.00AREA
=392.01392.0103.01.01.02 LIMPIEZA DE TERRENO
MANUAL470.37m21.0041.0811.45470.3703.01.01.03 TRAZO Y REPLANTEO
PRELIMINAR470.37m21.0041.0811.45470.3703.01.01.04 TRAZO Y REPLANTEO
DURANTE EL PROCESO DE
CONSTRUCCION470.37m21.0041.0811.45470.3703.01.02 MOVIMIENTO DE
TIERRAS03.01.02.01 EXCAVACION ZAPATAS DE 2.00 MTS DE
PROFUNDIDAD174.94m3AULASZAPATA (Z-1)EJES B, C, D, I, J, y KEJE 2 -
26.002.502.301.8563.83ZAPATA (Z-2)EJES B, C, D, I, J, y KEJE 1 -
16.002.101.901.8544.29ZAPATA (Z-3)EJES A-A y L-LEJE 2 -
22.002.001.801.8513.32ZAPATA (Z-4)EJES A-A y L-LEJE 1 -
12.001.801.601.8510.66ZAPATA (Z-5)EJES E-E y H-HEJE 2 -
22.002.001.801.8513.32ZAPATA (Z-6)EJES E-E y H-HEJE 1 -
12.001.801.601.8510.66CAJA DE ESCALERASZAPATA (Z-7)EJES H-H e
I-ITRAMO 1- 24.001.701.501.8518.8703.01.02.02 EXCAVACION PARA VIGA
DE CIMENTACION54.71m3AULASCORTE 1 - 1EJES A-A y L-LTRAMO 1 -
22.004.000.701.407.84EJES E-E y H-HTRAMO 1 -
22.004.000.501.405.54CORTE 2 - 2EJES C-CTRAMO 1 -
21.003.700.701.403.63CORTE 3 - 3 y 4-4EJES 1-1 TRAMO A - B y
K-L2.002.380.701.404.66EJES 2 -2TRAMO A - B y
K-L2.002.080.701.404.07EJES 1-1TRAMO B - C y
J-K2.001.830.701.403.58EJES 2-2TRAMO B - C y
J-K2.001.830.701.403.58EJES 1-1TRAMO C - D e
I-J2.001.830.701.403.58EJES 2-2TRAMO C - D e
I-J2.001.830.701.403.58EJES 1-1TRAMO D - E y
H-I2.001.830.701.403.58EJES 2-2TRAMO D - E y
H-I2.001.830.701.403.58ESCALERACORTE 5 - 5EJES F-FTRAMO 1-
21.002.6.50.501.400.69CORTE 5 - 5EJES G-GTRAMO 1-
21.002.6.50.701.400.98CORTE 3 - 3EJE 1TRAMO F -
G1.002.130.701.402.08CORTE 4 - 4EJE 2TRAMO F -
G1.002.130.701.402.08EN SOLADO0.00AULASCORTE 1-1EJE A-A ,E-E ,H-H y
L-LTRAMO 1-24.004.000.300.100.48CORTE 2-2EJE C-CTRAMO
1-21.003.700.300.100.11CORTE 3-3EJE 1-1 y 2-2TRAMO A-B y
K-L4.002.380.250.100.24EJE 1-1 y 2-2TRAMO B-D e
I-K8.002.230.250.100.45EJE 1-1 y 2-2TRAMO D-E y
H-I4.001.700.250.100.17ESCALERACORTE 5 - 5EJE F y GTRAMO
1'-22.002.650.250.100.13CORTE 4 - 4EJE 2-2TRAMO
F-G1.002.130.250.100.05CORTE 1-1EJE 1-1TRAMO
F-G1.002.130.250.100.0503.01.02.03 EXCAV. PARA CUNETA MAT. SUEL.
H=0.40 M21.16m3CUNETASEJE 3 -3TRAMO A - L1.0041.080.500.408.22EJE
1-1TRAMO A - L1.0039.600.500.407.92EJE 1'-1'TRAMO F -
G1.001.500.500.400.30EJE A-A y L-LTRAMO 1 -
32.009.450.500.403.78EJE F-F y G-GTRAMO 1 -
12.002.350.500.400.9403.01.02.04 RELLENO COMPACTADO CON MATERIAL
PROPIO A MANO136.94m3AULASZAPATA (Z-1)EJES B, D, I y KEJE
2-24.00AREACAD5.141.1523.64ZAPATA (Z-1)EJES C y JEJE
2-22.00AREACAD4.801.1511.04ZAPATA (Z-2)EJES B, D, I y KEJE 1 -
14.00AREACAD3.481.1516.01ZAPATA (Z-2)EJES C y JEJE 1 -
12.00AREACAD3.261.157.50ZAPATA (Z-3)EJES A-A y L-LEJE
2-22.00AREACAD3.061.157.04ZAPATA (Z-4)EJES A-A y L-LEJE 1 -
12.00AREACAD2.391.155.50ZAPATA (Z-5)EJES E-E y H-HEJE
2-22.00AREACAD2.851.156.56ZAPATA (Z-6)EJES E-E y H-HEJE 1 -
12.00AREACAD2.231.155.13CAJA DE ESCALERASZAPATA (Z-7)EJES F-F y
G-GEJE 1'-1' y 2-24.00AREACAD1.981.159.09AULASCORTE 1 - 1EJE A-A y
L-LTRAMO 1-22.004.00AREACAD0.614.842.001.500.050.900.14EJE E-E y
G-GTRAMO 1-22.004.00AREACAD0.292.322.001.500.050.900.14CORTE 2 -
2EJE C-C y J-JTRAMO
1-22.003.70AREACAD0.614.481.002.100.050.900.09CORTE 3 - 3EJES
1-1TRAMO A-B y
J-K2.002.38AREACAD0.723.402.000.680.100.900.122.000.830.100.900.15EJES
2-2TRAMO A-B y
J-K2.002.08AREACAD0.722.972.000.780.100.900.142.001.030.100.900.18EJES
1-1TRAMO B-D e
I-K4.002.23AREACAD0.726.364.000.830.100.900.304.000.830.100.900.30EJES
1-1TRAMO D-E y
H-I2.002.23AREACAD0.723.182.000.830.100.900.152.001.350.100.900.24EJES
2-2TRAMO B-C y
J-K2.000.83AREACAD0.721.182.001.030.100.900.182.001.030.100.900.18EJES
2-2TRAMO D-E y
H-I2.000.41AREACAD0.720.592.001.030.100.900.182.001.550.100.900.28EJES
2-2TRAMO C-D e
I-J2.001.83AREACAD0.722.612.001.030.100.900.182.001.030.100.900.18CORTE
4 - 4EJES 2-2TRAMO B-C y J-K2.001.00AREACAD0.861.71EJES 2-2TRAMO
D-E y H-I2.001.00AREACAD0.861.71ESCALERACORTE 3 - 3EJE 1-1'TRAMO
F-G1.002.13AREACAD0.721.521.001.250.100.900.111.000.630.100.900.06CORTE
4 - 4EJE 2-2TRAMO
F-G1.002.13AREACAD0.861.821.001.250.250.900.281.000.630.250.900.14CORTE
1 - 1EJE F-FTRAMO 1' -
21.002.65AREACAD0.320.832.000.800.100.900.14EJE G-GTRAMO 1' -
21.002.65AREACAD0.721.892.000.800.100.900.1403.01.02.05 RELLENO Y
COMPACTADO CON MATERIAL AFIRMADO C/ EQUIPO LIVIANO30.41m3MAESTRANZA
Y LIMPIEZA, GUARDIANIA, CASA FUERZA Y BOMBAS , DEPOSITO DE MATERIAL
EDUCTAIVO1.008.006.000.104.80CAFETERIA Y
COCINA1.008.006.000.104.80ELECTRICIDAD Y
CARPINTERIA1.0016.256.000.109.75VEREDAS FRONTIS
PRINCIPAL1.0040.082.150.108.62VEREDAS
LATERAL2.006.301.000.101.26VEREDAS
POSTERIOR2.001.351.000.100.272.004.581.000.100.9203.01.02.06
NIVELACION INTERIOR, APISONADO CON EQUIPO304.13m2MAESTRANZA Y
LIMPIEZA, GUARDIANIA, CASA FUERZA Y BOMBAS , DEPOSITO DE MATERIAL
EDUCTAIVO1.008.006.0048.00CAFETERIA Y
COCINA1.008.006.0048.00ELECTRICIDAD Y
CARPINTERIA1.0016.256.0097.50VEREDAS FRONTIS
PRINCIPAL1.0040.082.1586.17VEREDAS LATERAL2.006.301.0012.60VEREDAS
POSTERIOR2.001.351.002.702.004.581.009.1603.01.02.07 ELIMINACION DE
MATERIAL EXCEDENTE + 30% ESPONJ. L=40.00 M. (Carguio a
mano)190.26m3 EXCAVACION ZAPATAS DE 2.00 MTS DE PROFUNDIDAD1.25VOL
=174.94218.67 EXCAVACION PARA VIGA DE CIMENTACION1.25VOL
=54.7168.39 EXCAV. PARA CUNETA MAT. SUEL. H=0.40 M1.25VOL
=21.1626.45 RELLENO COMPACTADO CON MATERIAL PROPIO A MANO-0.90VOL
=136.94-123.2403.01.02.08 ELIMINACION DE MATERIAL EXCEDENTE CON
EQUIPO PESADO190.26m31.00VOL =190.26190.2603.01.03 OBRAS DE
CONCRETO SIMPLE03.01.03.01 SOLADO DE CONCRETO C:H 1:10 E=4" PARA
ZAPATAS Y VIGAS DE CIMENTACION111.38m2AULASZAPATA (Z-1)EJES B, C,
D, I, J, y KEJE 2 - 26.002.502.3034.50ZAPATA (Z-2)EJES B, C, D, I,
J, y KEJE 1 - 16.002.101.9023.94ZAPATA (Z-3)EJES A-A y L-LEJE 2 -
22.002.001.807.20ZAPATA (Z-4)EJES A-A y L-LEJE 1 -
12.001.801.605.76ZAPATA (Z-5)EJES E-E y H-HEJE 2 -
22.002.001.807.20ZAPATA (Z-6)EJES E-E y H-HEJE 1 -
12.001.801.605.76CAJA DE ESCALERASZAPATA (Z-7)EJES H-H e I-ITRAMO
1- 24.001.701.5010.20AULASCORTE 1-1EJE A-A ,E-E ,H-H y L-LTRAMO
1-24.004.000.304.80CORTE 2-2EJE C-CTRAMO 1-21.003.700.301.11CORTE
3-3EJE 1-1 y 2-2TRAMO A-B y K-L4.002.380.252.38EJE 1-1 y 2-2TRAMO
B-D e I-K8.002.230.254.45EJE 1-1 y 2-2TRAMO D-E y
H-I4.001.700.251.70ESCALERACORTE 5 - 5EJE F y GTRAMO
1'-22.002.650.251.33CORTE 4 - 4EJE 2-2TRAMO
F-G1.002.130.250.53CORTE 1-1EJE 1-1TRAMO
F-G1.002.130.250.5303.01.03.02 CONCRETO f'c=140 KG/CM2 EN
CUNETA12.27m3CUNETASEJE 3 -3TRAMO A - L1.0041.08AREA CAD0.124.77EJE
1-1TRAMO A - L1.0039.60AREA CAD0.124.59EJE 1'-1'TRAMO F -
G1.001.50AREA CAD0.120.17EJE A-A y L-LTRAMO 1 - 32.009.45AREA
CAD0.122.19EJE F-F y G-GTRAMO 1 - 12.002.35AREA
CAD0.120.5503.01.03.03 ENCOFRADO Y DESENCOFRADO EN
CUNETA82.51m2CUNETASEJE 3 -3TRAMO A - L1.0041.080.7832.04EJE
1-1TRAMO A - L1.0039.600.7830.89EJE 1'-1'TRAMO F -
G1.001.500.781.17EJE A-A y L-LTRAMO 1 - 32.009.450.7814.74EJE F-F y
G-GTRAMO 1 - 12.002.350.783.6703.01.03.04 FALSO PISO DE 4" (MEZCLA
1:10 CEMENTO : HORMIGON)193.50m2MAESTRANZA Y LIMPIEZA, GUARDIANIA,
CASA FUERZA Y BOMBAS , DEPOSITO DE MATERIAL
EDUCTAIVO1.008.006.0048.00CAFETERIA Y
COCINA1.008.006.0048.00ELECTRICIDAD Y
CARPINTERIA1.0016.256.0097.5003.01.03.05 CONCRETO f'c=140 KG/CM2 EN
VEREDAS10.15m3VEREDAS FRONTIS PRINCIPAL1.0040.082.150.108.62VEREDAS
LATERAL2.006.301.000.101.26VEREDAS
POSTERIOR2.001.351.000.100.2703.01.03.06 ENCOFRADO Y DESENCOFRADO
EN VEREDAS5.54m2VEREDAS FRONTIS PRINCIPAL1.0040.080.104.01VEREDAS
LATERAL2.006.300.101.26VEREDAS POSTERIOR2.001.350.100.2703.01.03.07
FALSA COLUMNA CONCRETO f'c=175 KG/CM2 PARA SOPORTE DE
TUBERIA0.36m3AULAS6.000.150.152.000.27ESCALERA2.000.150.152.000.0903.01.03.08
ENCOFRADO Y DESENCOFRADO FALSA COLUMNA
7.20m2AULAS6.000.452.005.40ESCALERA2.000.452.001.8003.01.03.09
CONCRETO f'c=175 KG/CM2 PARA
GARGOLAS0.02m3PASADIZO4.00VOLUMEN0.010.0203.01.03.10 ENCOFRADO Y
DESENCOFRADO EN GARGOLAS0.75m2PASADIZO4.00AREACAD0.190.7503.01.04
OBRAS DE CONCRETO ARMADO03.01.04.01 ZAPATAS03.01.04.01.01 CONCRETO
f'c=210 KG/CM2 ZAPATA56.74m3AULASZAPATA (Z-1)EJES B, C, D, I, J, y
KEJE 2 - 26.002.502.300.6020.70ZAPATA (Z-2)EJES B, C, D, I, J, y
KEJE 1 - 16.002.101.900.6014.36ZAPATA (Z-3)EJES A-A y L-LEJE 2 -
22.002.001.800.604.32ZAPATA (Z-4)EJES A-A y L-LEJE 1 -
12.001.801.600.603.46ZAPATA (Z-5)EJES E-E y H-HEJE 2 -
22.002.001.800.604.32ZAPATA (Z-6)EJES E-E y H-HEJE 1 -
12.001.801.600.603.46CAJA DE ESCALERASZAPATA (Z-7)EJES H-H e
I-ITRAMO 1- 24.001.701.500.606.1203.01.04.01.02 ACERO fy=4200
KG/CM21395.20kg1.00VER CUADRO DE METRADOS DE
ACERO1395.2003.01.04.02 VIGAS DE CIMENTACION03.01.04.02.01 CONCRETO
f'c=210 KG/CM2 VIGA DE CIMENTACION11.08m3AULASVC-1 (0.30 X
0.50)CORTE 1 - 1EJE A-A ,E-E ,H-H y L-LTRAMO 1 -
24.004.000.300.502.404.000.800.300.250.244.000.700.300.250.21CORTE
2 - 2EJE C-CTRAMO 1 -
21.003.700.300.500.561.001.100.300.250.081.000.700.300.250.05VC-2
(0.25 X 0.50)0.00CORTE 3 - 3EJES 1-1TRAMO A - B y
K-L2.002.380.250.500.592.000.680.250.250.082.000.830.250.250.10EJES
2-2TRAMO A - B y
K-L2.002.080.250.500.522.000.780.250.250.102.001.030.250.250.13EJES
1-1TRAMO B-D e
I-K4.002.230.250.501.114.000.830.250.250.214.000.830.250.250.21EJES
1-1TRAMO D-E y
H-I2.002.230.250.500.562.000.830.250.250.102.001.350.250.250.17EJES
2-2TRAMO B-D e
I-K4.001.830.250.500.914.001.030.250.250.264.001.030.250.250.26EJES
2-2TRAMO D-E y
H-I2.001.300.250.500.332.001.030.250.250.132.001.550.250.250.19ESCALERAVC-2
(0.25 X 0.50)0.00CORTE 5 - 5EJE F-F y G-GTRAMO 1-
22.002.650.250.500.662.000.650.250.250.082.000.650.250.250.08CORTE
3 - 3EJE 1TRAMO
F-G1.002.130.250.500.271.001.250.250.250.081.000.630.250.250.04CORTE
4 - 4EJE 2TRAMO
F-G1.002.130.250.500.271.001.250.250.250.081.000.630.250.250.0403.01.04.02.02
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION83.93m2AULASVC-1
(0.30 X 0.50)CORTE 1 - 1EJE A-A ,E-E ,H-H y L-LTRAMO 1 -
28.004.000.5016.008.000.800.251.608.000.700.251.40CORTE 2 - 2EJE
C-CTRAMO 1 - 22.003.700.503.702.001.100.250.552.000.700.250.35VC-2
(0.25 X 0.50)CORTE 3 - 3EJES 1-1TRAMO A - B y
K-L4.002.380.504.754.000.680.250.684.000.830.250.83EJES 2-2TRAMO A
- B y K-L4.002.080.504.154.000.780.250.784.001.030.251.03EJES
1-1TRAMO B-D e
I-K8.002.230.508.908.000.830.251.658.000.830.251.65EJES 1-1TRAMO
D-E y H-I4.002.230.504.454.000.830.250.834.001.350.251.35EJES
2-2TRAMO B-D e
I-K8.001.830.507.308.001.030.252.058.001.030.252.05EJES 2-2TRAMO
D-E y
H-I4.001.300.502.604.001.030.251.034.001.550.251.55ESCALERAVC-2
(0.25 X 0.50)CORTE 5 - 5EJE F-F y G-GTRAMO 1-
24.002.650.505.304.000.650.250.654.000.650.250.65CORTE 3 - 3EJE
1TRAMO F-G2.002.130.502.132.001.250.250.632.000.630.250.31CORTE 4 -
4EJE 2TRAMO
F-G2.002.130.502.132.001.250.250.632.000.630.250.3103.01.04.02.03
ACERO fy=4200 KG/CM22528.02kg1.00VER CUADRO DE METRADOS DE
ACERO2528.0203.01.04.03 SOBRECIMIENTO REFORZADO03.01.04.03.01
CONCRETO f'c=175 KG/CM2 EN SOBRECIMIENTO21.73m3AULASCORTE 1-1EJE
A-A ,E-E ,H-H y L-LTRAMO 1 - 24.005.500.251.256.88CORTE 2-2EJES
C-CTRAMO 1 - 21.005.500.251.251.72CORTE 3-3EJES 1-1TRAMO A - B y
K-L2.003.580.151.251.34EJES 2 -2TRAMO A - B y
K-L2.003.580.151.251.34EJES 1-1TRAMO B - C y
J-K2.003.580.151.251.34EJES 2-2TRAMO B - C y
J-K2.002.580.151.250.97EJES 1-1TRAMO C - D e
I-J2.003.580.151.251.34EJES 2-2TRAMO C - D e
I-J2.003.580.151.251.34EJES 1-1TRAMO D - E y
H-I2.003.580.151.251.34EJES 2-2TRAMO D - E y
H-I2.002.580.151.250.97ESCALERACORTE 3 - 3EJE 1-1'TRAMO F -
G1.003.700.151.250.69CORTE 5 - 5EJE F y G TRAMO 1' -
22.003.950.251.252.4703.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL
SOBRECIMIENTO H=1.00 M230.75m2AULASCORTE 1-1EJE A-A ,E-E ,H-H y
L-LTRAMO 1 - 28.005.501.2555.00CORTE 2-2EJES C-CTRAMO 1 -
22.005.501.2513.75CORTE 3-3EJES 1-1TRAMO A - B y
K-L4.003.581.2517.88EJES 2 -2TRAMO A - B y K-L4.003.581.2517.88EJES
1-1TRAMO B - C y J-K4.003.581.2517.88EJES 2-2TRAMO B - C y
J-K4.002.581.2512.88EJES 1-1TRAMO C - D e I-J4.003.581.2517.88EJES
2-2TRAMO C - D e I-J4.003.581.2517.88EJES 1-1TRAMO D - E y
H-I4.003.581.2517.88EJES 2-2TRAMO D - E y H-I4.002.581.2512.88EJE
1-1'TRAMO F - G2.003.701.259.25CORTE 5 - 5EJE F y G TRAMO 1' -
24.003.951.2519.7503.01.04.03.03 ACERO fy=4200
KG/CM2494.51kg1.00VER CUADRO DE METRADOS DE ACERO494.5103.01.04.04
COLUMNAS03.01.04.04.01 CONCRETO f'c=210 KG/CM2 COLUMNAS31.74m31
PISOAULASCOLUMNA(C-1)EJE B, C, D, I, J y KTRAMO 1 -
212.000.250.254.103.0812.000.550.154.104.06COLUMNA(C-2)EJE A-A,
E-E, H-H y L-LTRAMO 1 -
28.000.400.254.103.288.000.150.154.100.74ESCALERACOLUMNA(C-3)EJE
1-1TRAMO F - G2.000.400.254.100.82COLUMNA(C-4)EJE 2-2TRAMO F -
G2.000.400.254.100.821.000.150.154.100.092 PISOAULASCOLUMNA(C-1)EJE
B, C, D, I, J y KTRAMO 1 -
212.000.250.253.002.2512.000.550.153.002.97COLUMNA(C-2)EJE A-A,
E-E, H-H y L-LTRAMO 1 -
28.000.400.253.002.408.000.150.153.000.54ESCALERACOLUMNA(C-3)EJE
1-1TRAMO F - G2.000.400.253.000.60COLUMNA(C-4)EJE 2-2TRAMO F -
G2.000.400.253.000.601.000.150.153.000.073 PISOAULASCOLUMNA(C-1)EJE
B, C, D, I, J y KTRAMO 1 -
212.000.250.253.002.2512.000.550.153.002.97COLUMNA(C-2)EJE A-A,
E-E, H-H y L-LTRAMO 1 -
28.000.400.253.002.408.000.150.153.000.54ESCALERACOLUMNA(C-3)EJE
1-1TRAMO F - G2.000.400.253.000.60COLUMNA(C-4)EJE 2-2TRAMO F -
G2.000.400.253.000.601.000.150.153.000.0703.01.04.04.02 ENCOFRADO Y
DESENCOFRADO NORMAL EN COLUMNAS418.14m21 PISOAULASCOLUMNA(C-1)EJE
B, C, D, I, J y KTRAMO 1 - 212.001.904.1093.48COLUMNA(C-2)EJE A-A,
E-E, H-H y L-LTRAMO 1 - 28.001.604.1052.48ESCALERACOLUMNA(C-3)EJE
1-1TRAMO F - G2.001.304.1010.66COLUMNA(C-4)EJE 2-2TRAMO F -
G2.001.604.1013.122 PISOAULASCOLUMNA(C-1)EJE B, C, D, I, J y KTRAMO
1 - 212.001.903.0068.40COLUMNA(C-2)EJE A-A, E-E, H-H y L-LTRAMO 1 -
28.001.603.0038.40ESCALERACOLUMNA(C-3)EJE 1-1TRAMO F -
G2.001.303.007.80COLUMNA(C-4)EJE 2-2TRAMO F - G2.001.603.009.603
PISOAULASCOLUMNA(C-1)EJE B, C, D, I, J y KTRAMO 1 -
212.001.903.0068.40COLUMNA(C-2)EJE A-A, E-E, H-H y L-LTRAMO 1 -
28.001.603.0038.40ESCALERACOLUMNA(C-3)EJE 1-1TRAMO F -
G2.001.303.007.80COLUMNA(C-4)EJE 2-2TRAMO F -
G2.001.603.009.6003.01.04.04.03 ACERO fy=4200
KG/CM25985.99kg1.00VER CUADRO DE METRADOS DE
ACERO5985.9903.01.04.05 COLUMNETAS03.01.04.05.01 CONCRETO f'c=175
KG/CM2 COLUMNETAS12.32m31 PISOAULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L25.000.150.151.200.68COLUMNA (C-A2) EJE 2-2TRAMO
A-L6.000.150.151.800.24COLUMNA (C-A2) EJE 2-2TRAMO
A-L14.000.150.152.500.79COLUMNA (C-A1) EJE A, C, E ,H y LTRAMO
1-215.000.250.152.301.29ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO
1- 26.000.250.152.300.52COLUMNA (C-A2) EJE 1- 1TRAMO F -
G2.000.150.151.100.052 PISOAULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L16.000.150.151.240.45COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.150.152.000.18COLUMNA (C-A2) EJE 2-2TRAMO
A-L16.000.150.153.001.08COLUMNA (C-A1) EJE A, E ,H y LTRAMO
1-212.000.250.152.951.33EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO
A-G10.000.250.151.250.47ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO
1- 24.000.250.152.900.44EJE F-F y G-GTRAMO 1-
22.000.250.153.330.25COLUMNA (C-A2) EJE 1- 1TRAMO F -
G2.000.150.152.110.09EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO F -
G2.000.250.151.250.093 PISOAULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L16.000.150.151.240.45COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.150.152.000.18COLUMNA (C-A2) EJE 2-2TRAMO
A-L16.000.150.153.001.08COLUMNA (C-A1) EJE A, E ,H y LTRAMO
1-212.000.250.152.951.33EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO
A-G10.000.250.151.250.47ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO
1- 24.000.250.152.900.44EJE F-F y G-GTRAMO 1-
22.000.250.153.330.25COLUMNA (C-A2) EJE 1- 1TRAMO F -
G2.000.150.152.110.09EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO F -
G2.000.250.151.250.0903.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL
EN COLUMNETAS221.15m21 PISO0.00AULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L25.000.301.108.25COLUMNA (C-A2) EJE 2-2TRAMO
A-L6.000.302.304.14COLUMNA (C-A2) EJE 2-2TRAMO
A-L6.000.302.304.14COLUMNA (C-A2) EJE 2-2TRAMO
A-L6.000.452.306.21COLUMNA (C-A1) EJE A, C, E ,H y LTRAMO
1-215.003.002.30103.50EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO
A-L10.000.300.842.52ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO 1-
26.000.302.304.14COLUMNA (C-A2) EJE 1- 1TRAMO F -
G3.000.302.001.802 PISOAULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L16.000.301.256.00COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.302.352.82COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.302.352.82COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.452.354.23COLUMNA (C-A1) EJE A, E ,H y LTRAMO
1-212.000.450.844.54EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO
A-L10.000.801.2510.00ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO 1-
24.000.302.903.48EJE F-F y G-GTRAMO 1- 22.000.303.332.00COLUMNA
(C-A2) EJE 1- 1TRAMO F - G4.000.302.903.48COLUMNA (C-A1) EJE 2 -
2TRAMO F - G2.000.303.101.86EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO F
- G2.000.801.252.003 PISOAULASCOLUMNA (C-A2) EJE 1-1TRAMO
A-L16.000.301.256.00COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.302.352.82COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.302.352.82COLUMNA (C-A2) EJE 2-2TRAMO
A-L4.000.452.354.23COLUMNA (C-A1) EJE A, E ,H y LTRAMO
1-212.000.450.844.54EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO
A-L10.000.801.2510.00ESCALERACOLUMNA (C-A1) EJE F-F y G-GTRAMO 1-
24.000.302.903.48EJE F-F y G-GTRAMO 1- 22.000.303.332.00COLUMNA
(C-A2) EJE 1- 1TRAMO F - G4.000.302.903.48COLUMNA (C-A1) EJE 2 -
2TRAMO F - G2.000.303.101.86EN VOLADOCOLUMNA (C-A1) EJE 3-3TRAMO F
- G2.000.801.252.0003.01.04.05.03 ACERO fy=4200
KG/CM21701.69kg1.00VER CUADRO DE METRADOS DE
ACERO1701.6903.01.04.06 VIGAS03.01.04.06.01 CONCRETO f'c=210 KG/CM2
VIGAS54.76m31 PISOAULASV P 102 (.30 X .50)EJES A-A, E-E, H-H y
L-LTRAMO 1-24.006.300.300.503.78V P 102 (.30 X .50)EJES A-A, E-E,
H-H y L-LTRAMO 2-34.00AREACAD0.720.300.87V P 101 (.30 X .50)EJES B,
C, D, E, I, J y KTRAMO 1-26.006.300.300.505.67V P 101 (.30 X
.50)EJES B, C, D, E, I, J y KTRAMO 2-36.00AREACAD0.720.301.30V S
101 (.25 X .30)EJE 2-2TRAMO A-L8.003.880.250.302.33V S 102 (.25 X
.30)EJE 1-1TRAMO A-L8.003.880.250.302.33DV 101 (.15 X .20)EJE
3-3TRAMO A-L8.003.880.150.200.93ESCALERAV P 103 (.25 X .50)EJES F-F
y G-GTRAMO 1-22.004.950.250.501.24V P 103 (.25 X .50)EJES F-F y
G-GTRAMO 2-32.00AREACAD0.720.250.36V S 101 (.25 X .30)EJE 2-2TRAMO
F-G1.004.000.250.300.30VS 102 (.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.250.300.30DV 101 (.15 X .20)EJE 3-3TRAMO
F-G1.004.000.150.200.122 PISOAULASV P 102 (.30 X .50)EJES A-A, E-E,
H-H y L-LTRAMO 1-24.006.300.300.503.78V P 102 (.30 X .50)EJES A-A,
E-E, H-H y L-LTRAMO 2-34.00AREACAD0.720.300.87V P 101 (.30 X
.50)EJES B, C, D, E, I, J y KTRAMO 1-26.006.300.300.505.67V P 101
(.30 X .50)EJES B, C, D, E, I, J y KTRAMO
2-36.00AREACAD0.720.301.30V S 101 (.25 X .30)EJE 2-2TRAMO
A-L8.003.880.250.302.33V S 102 (.25 X .30)EJE 1-1TRAMO
A-L8.003.880.250.302.33DV 101 (.15 X .20)EJE 3-3TRAMO
A-L8.003.880.150.200.93ESCALERAV P 103 (.25 X .50)EJES F-F y
G-GTRAMO 1-22.004.950.250.501.24V P 103 (.25 X .50)EJES F-F y
G-GTRAMO 2-32.00AREACAD0.720.250.36V S 101 (.25 X .30)EJE 2-2TRAMO
F-G1.004.000.250.300.30VS 102 (.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.250.300.30DV 101 (.15 X .20)EJE 3-3TRAMO
F-G1.004.000.150.200.123 PISOAULASV P 202 (.25 X .40)EJES A-A, E-E,
H-H y L-LTRAMO 1-24.006.680.250.402.67V P 202 (.25 X .40)EJES A-A,
E-E, H-H y L-LTRAMO 2-34.002.200.250.400.88V P 201 (.25 X .40)EJES
B, C, D, E, I, J y KTRAMO 1-26.006.680.250.404.01V P 201 (.25 X
.40)EJES B, C, D, E, I, J y KTRAMO 2-36.002.200.250.401.32V S 201
(.25 X .30)EJES 2-2TRAMO
A-L8.003.880.250.302.332.000.300.250.300.05V S 202 (.25 X .30)EJE
1-1TRAMO A-L8.003.880.250.302.332.000.300.250.300.05ESCALERAV P 202
(.25 X .40)EJES F-F y G-GTRAMO 1-22.005.100.250.401.02V P 202 (.25
X .40)EJES F-F y G-GTRAMO 2-32.002.210.250.400.44V S 201 (.25 X
.30)EJE 2-2TRAMO F-G1.004.000.250.300.301.000.300.250.300.02V S 202
(.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.250.300.301.000.300.250.300.0203.01.04.06.02 ENCOFRADO
Y DESENCOFRADO EN VIGAS435.35m21 PISO0.00AULASV P 102 (.30 X
.50)EJES A-A, E-E, H-H y L-LTRAMO 1-24.006.301.1027.72V P 102 (.30
X .50)EJES A-A, E-E, H-H y L-LTRAMO
2-34.00AREACAD0.722.894.002.150.302.58V P 101 (.30 X .50)EJES B, C,
D, E, I, J y KTRAMO 1-26.006.300.9034.02V P 101 (.30 X .50)EJES B,
C, D, E, I, J y KTRAMO 2-36.00AREACAD0.321.946.002.150.303.87V S
101 (.25 X .30)EJE 2-2TRAMO A-L8.003.880.6520.15V S 102 (.25 X
.30)EJE 1-1TRAMO A-L8.003.880.6520.15DV 101 (.15 X .20)EJE 3-3TRAMO
A-L8.003.880.5517.05ESCALERAV P 103 (.25 X .50)EJES F-F y G-GTRAMO
1-22.004.951.2512.38V P 103 (.25 X .50)EJES F-F y G-GTRAMO
2-32.00AREACAD0.721.452.002.150.301.29V S 101 (.25 X .30)EJE
2-2TRAMO F-G1.004.000.652.60V S 102 (.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.652.60DV 101 (.15 X .20)EJE 3-3TRAMO
F-G1.004.000.552.202 PISO0.00AULASV P 102 (.30 X .50)EJES A-A, E-E,
H-H y L-LTRAMO 1-24.006.301.1027.72V P 102 (.30 X .50)EJES A-A,
E-E, H-H y L-LTRAMO 2-34.00AREACAD0.722.894.002.150.302.58V P 101
(.30 X .50)EJES B, C, D, E, I, J y KTRAMO 1-26.006.300.9034.02V P
101 (.30 X .50)EJES B, C, D, E, I, J y KTRAMO
2-36.00AREACAD0.321.946.002.150.303.87V S 101 (.25 X .30)EJE
2-2TRAMO A-L8.003.880.6520.15V S 102 (.25 X .30)EJE 1-1TRAMO
A-L8.003.880.6520.15DV 101 (.15 X .20)EJE 3-3TRAMO
A-L8.003.880.5517.05ESCALERAV P 103 (.25 X .50)EJES F-F y G-GTRAMO
1-22.004.951.2512.38V P 103 (.25 X .50)EJES F-F y G-GTRAMO
2-32.00AREACAD0.721.452.002.150.301.29V S 101 (.25 X .30)EJE
2-2TRAMO F-G1.004.000.652.60V S 102 (.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.652.60DV 101 (.15 X .20)EJE 3-3TRAMO
F-G1.004.000.552.203 PISO0.00AULASV P 202 (.25 X .40)EJES A-A, E-E,
H-H y L-LTRAMO 1-24.006.700.8823.58V P 202 (.25 X .40)EJES A-A,
E-E, H-H y L-LTRAMO 2-34.002.200.887.74V P 201 (.25 X .40)EJES B,
C, D, E, I, J y KTRAMO 1-26.006.700.7128.54V P 201 (.25 X .40)EJES
B, C, D, E, I, J y KTRAMO 2-36.002.200.719.37V S 201 (.25 X .30)EJE
2-2TRAMO A-L8.003.880.6821.08V S 202 (.25 X .30)EJE 1-1TRAMO
A-L8.003.880.6821.08ESCALERAV P 202 (.25 X .40)EJES F-F y G-GTRAMO
1-22.005.100.888.98V P 202 (.25 X .40)EJES F-F y G-GTRAMO
2-32.002.150.883.78V S 201 (.25 X .30)EJE 2-2TRAMO
F-G1.004.000.682.72V S 201 (.25 X .30)EJE 1- 1TRAMO
F-G1.004.000.682.7203.01.04.06.03 ACERO fy=4200
KG/CM28026.70kg1.00VER CUADRO DE METRADOS DE
ACERO8026.7003.01.04.07 VIGUETAS DE AMARRE03.01.04.07.01 CONCRETO
f'c=175 KG/CM2 VIGUETAS9.42m31 PISOAULASVIGUET. VA -2EJE 1-1TRAMO
A-L8.003.530.150.150.64EJE 2-2TRAMO A-L1.009.140.150.150.21EJE
2-2TRAMO A-L4.003.530.150.150.32VIGUET. VA -1EJES A-A, E-E, H-H y
L-LTRAMO 1-28.005.450.250.151.64ESCALERAVIGUET. VA -1EJES F-F y
G-GTRAMO 1-22.003.700.250.150.282 PISOAULASVIGUET. VA -2EJE
1-1TRAMO A-L8.003.530.150.150.64EJE 2-2TRAMO
A-L4.000.760.150.150.07EJE 2-2TRAMO A-L6.003.530.150.150.48VIGUET.
VA -1EJES A-A, E-E, H-H y L-LTRAMO
1-28.005.450.250.151.64ESCALERAVIGUET. VA -2EJE 1-1TRAMO
F-G1.003.650.150.150.08VIGUET. VA -1EJES F-F y G-GTRAMO
1-22.003.700.250.150.283 PISOAULASVIGUET. VA -2EJE 1-1TRAMO
A-L8.003.530.150.150.64EJE 2-2TRAMO A-L4.000.760.150.150.07EJE
2-2TRAMO A-L6.003.530.150.150.48VIGUET. VA -1EJES A-A, E-E, H-H y
L-LTRAMO 1-28.005.450.250.151.64ESCALERAVIGUET. VA -2EJE 1-1TRAMO
F-G1.003.650.150.150.08VIGUET. VA -1EJES F-F y G-GTRAMO
1-22.003.700.250.150.2803.01.04.07.02 ENCOFRADO Y DESENCOFRADO
NORMAL EN VIGUETAS125.62m21 PISOAULASVIGUET. VA -2EJE 1-1TRAMO
A-L16.003.530.158.47EJE 2-2TRAMO A-L2.009.140.152.74EJE 2-2TRAMO
A-L8.003.530.154.24VIGUET. VA -1EJES A-A, E-E, H-H y L-LTRAMO
1-216.005.450.2521.80ESCALERAVIGUET. VA -1EJES F-F y G-GTRAMO
1-24.003.700.253.702 PISOAULASVIGUET. VA -2EJE 1-1TRAMO
A-L16.003.530.158.47EJE 2-2TRAMO A-L8.000.760.150.91EJE 2-2TRAMO
A-L12.003.530.156.35VIGUET. VA -1EJES A-A, E-E, H-H y L-LTRAMO
1-216.005.450.2521.80ESCALERAVIGUET. VA -2EJE 1-1TRAMO
F-G2.003.650.151.10VIGUET. VA -1EJES F-F y G-GTRAMO
1-24.003.700.253.703 PISOAULASVIGUET. VA -2EJE 1-1TRAMO
A-L16.003.530.158.47EJE 2-2TRAMO A-L8.000.760.150.910.00EJE
2-2TRAMO A-L12.003.530.156.35VIGUET. VA -1EJES A-A, E-E, H-H y
L-LTRAMO 1-216.005.450.2521.80ESCALERAVIGUET. VA -2EJE 1-1TRAMO
F-G2.003.650.151.10VIGUET. VA -1EJES F-F y G-GTRAMO
1-24.003.700.253.7003.01.04.07.03 ACERO fy=4200 KG/CM2
VIGUETAS870.65kg1.00VER CUADRO DE METRADOS DE
ACERO870.6503.01.04.08 VIGA CANAL03.01.04.08.01 CONCRETO f'c=175
KG/CM2 EN VIGA CANAL5.59m3AULASVIGA CANALEJE 1 - 1TRAMO
A-L2.0017.380.700.102.434.000.200.100.300.02VIGA CANALEJE 3 -
3TRAMO A-L2.0017.080.700.102.39ESCALERA2.000.500.100.400.04VIGA
CANALEJE 1-1TRAMO F-G1.004.900.700.100.342.000.200.100.300.01VIGA
CANALEJE 3 - 3TRAMO F-G1.004.900.700.100.3403.01.04.08.02 ENCOFRADO
Y DESENCOFRADO EN VIGA CANAL107.90m2AULASVIGA CANALEJE 1 - 1TRAMO
A-L2.0017.381.2041.704.000.200.700.56VIGA CANALEJE 3 - 3TRAMO
A-L2.0017.081.5051.23ESCALERA2.000.500.900.90VIGA CANALEJE 1-1TRAMO
F-G1.004.901.205.882.000.200.700.28VIGA CANALEJE 3 - 3TRAMO
F-G1.004.901.507.3503.01.04.08.03 ACERO fy=4200 KG/CM2 VIGA
CANAL888.68kg1.00VER CUADRO DE METRADOS DE ACERO888.6803.01.04.09
LOSAS ALIGERADAS03.01.04.09.01 CONCRETO f'c=210 KG/CM2 EN LOSA
ALIGERADA52.43m31 PISOAULASConcreto en losa Aligerada TRAMO A-B y
K-LTRAMO 1-22.003.835.800.052.22TRAMO B-C y J-KTRAMO
1-22.003.835.800.052.22TRAMO C-D e I-JTRAMO
1-22.003.835.800.052.22TRAMO D-E y H-ITRAMO
1-22.003.835.800.052.22TRAMO A-B y K-LTRAMO
2-32.003.832.000.050.77TRAMO B-C y J-KTRAMO
2-32.003.832.000.050.77TRAMO C-D e I-JTRAMO
2-32.003.832.000.050.77TRAMO D-E y H-ITRAMO
2-32.003.832.000.050.77Concreto en viguetasTRAMO A-B y K-LTRAMO
1-215.003.830.100.150.86TRAMO B-C y J-KTRAMO
1-215.003.830.100.150.86TRAMO C-D e I-JTRAMO
1-215.003.830.100.150.86TRAMO D-E y H-ITRAMO
1-215.003.830.100.150.86TRAMO A-B y K-LTRAMO
2-35.003.830.100.150.29TRAMO B-C y J-KTRAMO
2-35.003.830.100.150.29TRAMO C-D e I-JTRAMO
2-35.003.830.100.150.29TRAMO D-E y H-ITRAMO
2-35.003.830.100.150.29ESCALERAConcreto en losaTRAMO F-GTRAMO
2-31.004.002.000.050.40Concreto en viguetasTRAMO F-GTRAMO
2-35.004.000.100.150.302 PISOAULASConcreto en losa Aligerada TRAMO
A-B y K-LTRAMO 1-22.003.835.800.052.22TRAMO B-C y J-KTRAMO
1-22.003.835.800.052.22TRAMO C-D e I-JTRAMO
1-22.003.835.800.052.22TRAMO D-E y H-ITRAMO
1-22.003.835.800.052.22TRAMO A-B y K-LTRAMO
2-32.003.832.000.050.77TRAMO B-C y J-KTRAMO
2-32.003.832.000.050.77TRAMO C-D e I-JTRAMO
2-32.003.832.000.050.77TRAMO D-E y H-ITRAMO
2-32.003.832.000.050.77Concreto en viguetasTRAMO A-B y K-LTRAMO
1-215.003.830.100.150.86TRAMO B-C y J-KTRAMO
1-215.003.830.100.150.86TRAMO C-D e I-JTRAMO
1-215.003.830.100.150.86TRAMO D-E y H-ITRAMO
1-215.003.830.100.150.86TRAMO A-B y K-LTRAMO
2-35.003.830.100.150.29TRAMO B-C y J-KTRAMO
2-35.003.830.100.150.29TRAMO C-D e I-JTRAMO
2-35.003.830.100.150.29TRAMO D-E y H-ITRAMO
2-35.003.830.100.150.29ESCALERAConcreto en losaTRAMO F-GTRAMO
2-31.004.002.000.050.40Concreto en viguetasTRAMO F-GTRAMO
2-35.004.000.100.150.303 PISOAULASConcreto en losa Aligerada TRAMO
A-B y K-LTRAMO 1-22.003.885.800.052.25TRAMO B-C y J-KTRAMO
1-22.003.885.800.052.25TRAMO C-D e I-JTRAMO
1-22.003.885.800.052.25TRAMO D-E y H-ITRAMO
1-22.003.885.800.052.25TRAMO A-B y K-LTRAMO
2-32.003.882.000.050.78TRAMO B-C y J-KTRAMO
2-32.003.882.000.050.78TRAMO C-D e I-JTRAMO
2-32.003.882.000.050.78TRAMO D-E y H-ITRAMO
2-32.003.882.000.050.78Concreto en viguetasTRAMO A-B y K-LTRAMO
1-215.003.880.100.120.70TRAMO B-C y J-KTRAMO
1-215.003.880.100.120.70TRAMO C-D e I-JTRAMO
1-215.003.880.100.120.70TRAMO D-E y H-ITRAMO
1-215.003.880.100.120.70TRAMO A-B y K-LTRAMO
2-35.003.880.100.120.23TRAMO B-C y J-KTRAMO
2-35.003.880.100.120.23TRAMO C-D e I-JTRAMO
2-35.003.880.100.120.23TRAMO D-E y H-ITRAMO
2-35.003.880.100.120.23ESCALERAConcreto en losaTRAMO F-GTRAMO 1-
31.004.454.000.050.89TRAMO F-GTRAMO 2-31.004.002.000.050.40Concreto
en viguetasTRAMO F-GTRAMO 1- 312.004.000.100.120.58TRAMO F-GTRAMO
2-35.004.000.100.120.2403.01.04.09.02 ENCOFRADO Y DESENCOFRADO LOSA
ALIGERADA761.90m21 PISOAULASConcreto en losa Aligerada TRAMO A-B y
K-LTRAMO 1-22.003.835.8044.43TRAMO B-C y J-KTRAMO
1-22.003.835.8044.43TRAMO C-D e I-JTRAMO 1-22.003.835.8044.43TRAMO
D-E y H-ITRAMO 1-22.003.835.8044.43TRAMO A-B y K-LTRAMO
2-32.003.832.0015.32TRAMO B-C y J-KTRAMO 2-32.003.832.0015.32TRAMO
C-D e I-JTRAMO 2-32.003.832.0015.32TRAMO D-E y H-ITRAMO
2-32.003.832.0015.32ESCALERAConcreto en losaTRAMO F-GTRAMO
2-31.004.002.008.002 PISOAULASConcreto en losa Aligerada TRAMO A-B
y K-LTRAMO 1-22.003.835.8044.43TRAMO B-C y J-KTRAMO
1-22.003.835.8044.43TRAMO C-D e I-JTRAMO 1-22.003.835.8044.43TRAMO
D-E y H-ITRAMO 1-22.003.835.8044.43TRAMO A-B y K-LTRAMO
2-32.003.832.0015.32TRAMO B-C y J-KTRAMO 2-32.003.832.0015.32TRAMO
C-D e I-JTRAMO 2-32.003.832.0015.32TRAMO D-E y H-ITRAMO
2-32.003.832.0015.32ESCALERAConcreto en losaTRAMO F-GTRAMO
2-31.004.002.008.003 PISOAULASConcreto en losa Aligerada TRAMO A-B
y K-LTRAMO 1-22.003.885.8045.01TRAMO B-C y J-KTRAMO
1-22.003.885.8045.01TRAMO C-D e I-JTRAMO 1-22.003.885.8045.01TRAMO
D-E y H-ITRAMO 1-22.003.885.8045.01TRAMO A-B y K-LTRAMO
2-32.003.882.0015.52TRAMO B-C y J-KTRAMO 2-32.003.882.0015.52TRAMO
C-D e I-JTRAMO 2-32.003.882.0015.52TRAMO D-E y H-ITRAMO
2-32.003.882.0015.52ESCALERAConcreto en losaTRAMO F-GTRAMO 1-
31.004.454.0017.80TRAMO F-GTRAMO 2-31.004.002.008.0003.01.04.09.03
ACERO fy=4200 KG/CM24898.42kg1.00VER CUADRO DE METRADOS DE
ACERO4898.4203.01.04.09.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM
PARA TECHO ALIGERADO4114.89und1 PISOAULASUnd*m2 FONDO DE LOSA
SUPERIORTRAMO A-B y K-LTRAMO 1-21.00AREA44.438.33370.09 FONDO DE
LOSA SUPERIORTRAMO B-C y J-KTRAMO 1-21.00AREA44.438.33370.09 FONDO
DE LOSA SUPERIORTRAMO C-D e I-JTRAMO 1-21.00AREA44.438.33370.09
FONDO DE LOSA SUPERIORTRAMO D-E y H-ITRAMO
1-21.00AREA44.438.33370.09Pasadizo en Aulas FONDO DE LOSA
SUPERIORTRAMO A-B y K-LTRAMO 2-31.00AREA15.328.33127.62 FONDO DE
LOSA SUPERIORTRAMO B-C y J-KTRAMO 2-31.00AREA15.328.33127.62 FONDO
DE LOSA SUPERIORTRAMO C-D e I-JTRAMO 2-31.00AREA15.328.33127.62
FONDO DE LOSA SUPERIORTRAMO D-E y H-ITRAMO
2-31.00AREA15.328.33127.62Pasadizo en Escalera FONDO DE LOSA
SUPERIORTRAMO F-GTRAMO 2-31.00AREA8.008.3366.642 PISOAULASUnd*m2
FONDO DE LOSA SUPERIORTRAMO A-B y K-LTRAMO
1-21.00AREA44.438.33370.09 FONDO DE LOSA SUPERIORTRAMO B-C y
J-KTRAMO 1-21.00AREA44.438.33370.09 FONDO DE LOSA SUPERIORTRAMO C-D
e I-JTRAMO 1-21.00AREA44.438.33370.09 FONDO DE LOSA SUPERIORTRAMO
D-E y H-ITRAMO 1-21.00AREA44.438.33370.09Pasadizo en Aulas FONDO DE
LOSA SUPERIORTRAMO A-B y K-LTRAMO 2-31.00AREA15.328.33127.62 FONDO
DE LOSA SUPERIORTRAMO B-C y J-KTRAMO 2-31.00AREA15.328.33127.62
FONDO DE LOSA SUPERIORTRAMO C-D e I-JTRAMO
2-31.00AREA15.328.33127.62 FONDO DE LOSA SUPERIORTRAMO D-E y
H-ITRAMO 2-31.00AREA15.328.33127.62Pasadizo en Escalera FONDO DE
LOSA SUPERIORTRAMO F-GTRAMO 2-31.00AREA8.008.3366.6403.01.04.09.05
LADRILLO HUECO DE ARCILLA 12X30X30 CM PARA TECHO
ALIGERADO2231.71und3 PISOAULAS FONDO DE LOSA SUPERIORTRAMO A-B y
K-LTRAMO 1-21.00AREA45.018.33374.92 FONDO DE LOSA SUPERIORTRAMO B-C
y J-KTRAMO 1-21.00AREA45.018.33374.92 FONDO DE LOSA SUPERIORTRAMO
C-D e I-JTRAMO 1-21.00AREA45.018.33374.92 FONDO DE LOSA
SUPERIORTRAMO D-E y H-ITRAMO 1-21.00AREA45.018.33374.92Pasadizo en
Aulas FONDO DE LOSA SUPERIORTRAMO A-B y K-LTRAMO
2-31.00AREA15.528.33129.28 FONDO DE LOSA SUPERIORTRAMO B-C y
J-KTRAMO 2-31.00AREA15.528.33129.28 FONDO DE LOSA SUPERIORTRAMO C-D
e I-JTRAMO 2-31.00AREA15.528.33129.28 FONDO DE LOSA SUPERIORTRAMO
D-E y H-ITRAMO 2-31.00AREA15.528.33129.28ESCALERAS FONDO DE LOSA
SUPERIORTRAMO F-GTRAMO 1- 31.00AREA17.808.33148.27Pasadizo en
Escalera FONDO DE LOSA SUPERIORTRAMO F-GTRAMO
2-31.00AREA8.008.3366.6403.01.04.10 ESCALERAS03.01.04.10.01
CONCRETO f'c=210 KG/CM2 EN ESCALERAS12.61m3Cimiento en caja
escalera1.002.000.400.600.48TRAMO 1Losa en Tramo
11.003.052.000.150.92PELDAOS (AREA CAD
TRIANG)10.002.00AREA0.071.42TRAMO 2Losa en Tramo
21.003.402.000.151.02Losa en Tramo 21.004.302.000.151.29PELDAOS
(AREA CAD TRIANG)10.002.00AREA0.071.42TRAMO 3Losa en Tramo
31.003.052.000.150.92PELDAOS (AREA CAD
TRIANG)10.002.00AREA0.071.42TRAMO 4Losa en Tramo
41.003.402.000.151.02Losa en Tramo 41.004.302.000.151.29PELDAOS
(AREA CAD TRIANG)10.002.00AREA0.071.4203.01.04.10.02 ENCOFRADO Y
DESENCOFRADO EN ESCALERAS67.57m2TRAMO 1Fondo de Losa en Tramo
11.003.052.006.10Laterales2.003.170.332.09CONTRAPASOS10.002.000.204.00TRAMO
2Fondo de Losa en Tramo 21.003.402.006.80Fondo de Losa en Tramo
21.004.302.008.60Laterales2.003.320.332.19CONTRAPASOS10.002.000.204.00TRAMO
3Fondo de Losa en Tramo
31.003.052.006.10Laterales2.003.170.332.09CONTRAPASOS10.002.000.204.00TRAMO
4Fondo de Losa en Tramo 41.003.402.006.80Fondo de Losa en Tramo
41.004.302.008.60Laterales2.003.320.332.19CONTRAPASOS10.002.000.204.0003.01.04.10.03
ACERO fy=4200 KG/CM2699.05kg1.00VER CUADRO DE METRADOS DE
ACERO699.0503.01.04.11 PRUEBAS DE LABORATORIO03.01.04.11.01 DISEO
DE MEZCLAS DE CONCRETO KG/CM25.00und5.005.0003.01.04.11.02 PRUEBA
DE CONTROL DE CALIDAD DE CONCRETO (PRUEBA A LA
COMPRESION)25.00und25.0025.0003.02 ARQUITECTURA03.02.01 MUROS DE
LADRILLO DE ARCILLA K.K.03.02.01.01 MURO DE LADRILLO K.K. DE CABEZA
MEZC. C:A 1:5233.94m21 PISOMUROS DE CABEZA AULASEJES A, C, E, H,
LTRAMO 1-25.005.002.3157.75ESCALERAEJES F-F y G-GTRAMO 1-
22.003.752.3117.332 PISOMUROS DE CABEZA AULASEJES A, C, E, H,
LTRAMO 1-24.005.002.3146.20ESCALERAEJES F-F y G-GTRAMO 1-
22.003.752.3117.333 PISOMUROS DE CABEZA AULASEJES A, C, E, H,
LTRAMO 1-24.00AREA CAD17.4269.68ESCALERAEJES F-F y G-GTRAMO 1-
22.00AREA CAD12.8325.6603.02.01.02 MURO DE LADRILLO K.K. DE SOGA
MEZC. C:A 1:5232.25m2MUROS DE SOGA1 PISOMUROS DE SOGAAULASEJE
1-1TRAMO A-L8.003.231.1529.72EJE 2-2TRAMO A-B, C-D, D-E,
J-K1.007.351.6512.13EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.231.6521.32ESCALERAEJES 1'-1'TRAMO F-G1.003.351.103.692
PISOMUROS DE SOGA AULASEJE 1-1TRAMO A-L8.003.231.1028.42EJE
2-2TRAMO D-E y H-I4.000.962.9511.36EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K
y K-L6.003.231.8535.85ESCALERAEJE 1-1TRAMO 1- 21.003.352.117.073
PISOMUROS DE SOGA AULASEJE 1-1TRAMO A-L8.003.231.1028.42EJE
2-2TRAMO D-E y H-I4.000.962.9511.36EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K
y K-L6.003.231.8535.85ESCALERAEJE 1-1TRAMO 1-
21.003.352.117.0703.02.02 REVOQUES ENLUCIDOS Y MOLDURAS03.02.02.01
TARRAJEO MUROS INT. FROTACHADO MEZ C:A: 1:5 E=1.50 CM609.14m2MUROS,
INCL. COLUMNETAS Y VIGUETAS1 PISOAULASEJE 1-1TRAMO
A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D, D-E,
J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A, C, E, H, LTRAMO
1-25.005.502.6673.15ESCALERAEJE 1- 1TRAMO F-G1.003.701.304.81EJE
F-F y G-GTRAMO 1- 22.004.152.6622.082 PISOAULASEJE 1-1TRAMO
A-L8.003.581.2535.75EJE 2-2TRAMO D-E y H-I4.001.293.1015.97EJE
2-2TRAMO A-B,B-C,C-D,I-J,J-K y K-L6.003.582.0042.90EJES A, C, E, H,
LTRAMO 1-24.00AREA CAD18.1672.64ESCALERAEJE 1- 1TRAMO
F-G1.003.701.304.81EJE F-F y G-GTRAMO 1- 22.004.152.6622.083
PISOAULASEJE 1-1TRAMO A-L8.003.581.2535.75EJE 2-2TRAMO D-E y
H-I4.001.293.1015.97EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K y
K-L6.003.582.0042.90EJES A, C, E, H, LTRAMO 1-24.00AREA
CAD18.1672.64ESCALERAEJE 1- 1TRAMO F-G1.003.702.268.36EJE F-F y
G-GTRAMO 1- 22.00AREA CAD13.3326.662.00AREACAD10.0820.1603.02.02.02
TARRAJEO MUROS EXT. FROTACHADO MEZ. C:A 1:5 E=1.50 CM402.02m2MUROS
EXTERIORESMUROS, INCL. COLUMNETAS Y VIGUETAS1 PISOAULASEJE 1-1TRAMO
A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D, D-E,
J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A-ATRAMO 1 - 21.005.502.6614.63EJES
L-LTRAMO 1 - 21.005.502.6614.63EJES E-ETRAMO 1 -
1'1.000.932.662.46EJES H-HTRAMO 1 - 1'1.000.932.662.462
PISOAULASEJE 1-1TRAMO A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D,
D-E, J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A-ATRAMO 1 - 21.005.502.6614.63EJES
L-LTRAMO 1 - 21.005.502.6614.63EJES E-ETRAMO 1 -
1'1.000.932.662.46EJES H-HTRAMO 1 - 1'1.000.932.662.463
PISOAULASEJE 1-1TRAMO A-L8.003.581.2535.75EJE 2-2TRAMO D-E y
H-I4.001.293.1015.97EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K y
K-L6.003.582.0042.90EJES A-ATRAMO 1 - 21.00AREACAD18.1618.16EJES
L-LTRAMO 1 - 21.00AREACAD18.1618.16EJES E-ETRAMO 1 -
1'1.00AREACAD2.842.84EJES H-HTRAMO 1 -
1'1.00AREACAD2.842.84PASADIZOCOLUMNETASAULASEJE 3-3TRAMO
A-L10.000.801.2510.00ESCALERAEJE 3-3TRAMO
F-G2.000.801.252.0003.02.02.03 TARRAJEO EN COLUMNAS MEZ. C:A 1:5
E=1.50 CM302.66m2INTERIORES1 PISOAULASCOLUMNA C-1EJES B, C, D, I, J
y KTRAMO 1 - 212.001.052.8636.04COLUMNA C-2EJE A-A, E-E, H-H y
L-LTRAMO 1 - 28.000.502.8611.44ESCALERAEJE 1- 1TRAMO
F-G2.000.502.862.86EJE 2 - 2TRAMO F-G2.000.402.862.292
PISOAULASCOLUMNA C-1EJES B, C, D, I, J y KTRAMO 1 -
212.001.052.8636.04COLUMNA C-2EJE A-A, E-E, H-H y L-LTRAMO 1 -
28.000.502.8611.44ESCALERAEJE 1- 1TRAMO F-G2.000.502.862.86EJE 2 -
2TRAMO F-G2.000.402.862.293 PISOAULASCOLUMNA C-1EJES B, C, D, I, J
y KTRAMO 1 - 212.001.052.9637.30COLUMNA C-2EJE A-A, E-E, H-H y
L-LTRAMO 1 - 28.000.502.9611.84ESCALERAEJE 1- 1TRAMO
F-G2.000.502.962.96EJE 2 - 2TRAMO F-G2.000.402.962.37EXTERIOR1
PISOAULASCOLUMNA C-1EJES B, C, D, I, J y KTRAMO 1 -
212.000.552.8618.88COLUMNA C-2EJE A-A, E-E, H-H y L-LTRAMO 1 -
26.000.802.8613.732.000.402.862.29ESCALERAEJE 1- 1TRAMO
F-G1.000.802.862.291.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.861.431.000.752.862.152 PISOAULASCOLUMNA C-1EJES B, C,
D, I, J y KTRAMO 1 - 212.000.552.8618.88COLUMNA C-2EJE A-A, E-E,
H-H y L-LTRAMO 1 - 26.000.802.8613.732.000.402.862.29ESCALERAEJE 1-
1TRAMO F-G1.000.802.862.291.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.861.431.000.752.862.153 PISOAULASCOLUMNA C-1EJES B, C,
D, I, J y KTRAMO 1 - 212.001.252.9644.40COLUMNA C-2EJE A-A, E-E,
H-H y L-LTRAMO 1 - 26.000.502.968.882.000.402.962.37ESCALERAEJE 1-
1TRAMO F-G1.000.802.962.371.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.961.481.000.252.960.7403.02.02.04 TARRAJEO VIGAS MEZC.
C:A 1:5 E=1.50 CM288.42m21 PISOAULASVP-102 (.30 X .50)EJE A-A, E-E,
H-H y L-LTRAMO 1-2friso int.4.005.800.306.96friso
ext.2.006.300.506.30fondo4.005.800.051.16VP-101 (.30 X .50)EJES B,
D, I y KTRAMO 1-2friso
int.8.005.800.3013.92fondo4.005.800.306.96VP-101 (.30 X .50)EJES
C-C y J-JTRAMO 1-2friso
int.4.005.800.306.96fondo2.005.800.050.58VS-102 (.25 X .30)EJE
1-1TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.3010.07fondo8.003.800.103.04VS-101 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.103.36fondo8.003.800.103.04ESCALERAVP-103 (.25 X
.50)EJES F-F y G - GTRAMO 1- 2friso int.2.004.400.302.64friso
ext.1.004.950.502.48VS-102 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.100.40VS-101 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.251.00PASADIZOVP-102 (.30 X
.50)EJE A-A, E-E, H-H y L-LTRAMO 2-3friso int.4.00AREA
CAD0.321.29friso ext.2.00AREA
CAD0.751.51fondo4.002.150.302.58VP-101 (.30 X .50)EJES B, C, D, I,
J y KTRAMO 2-3friso int.12.00AREA
CAD0.323.87fondo6.002.150.303.87VP-103 (.25 X .50)EJES F-F y G -
GTRAMO 2-3friso int.2.00AREA CAD0.320.65friso ext.1.00AREA
CAD0.750.75fondo2.002.150.251.08DV-101 (.15 X .20)EJE 3 - 3TRAMO
A-L1.0038.130.207.632 PISOAULASVP-102 (.30 X .50)EJE A-A, E-E, H-H
y L-LTRAMO 1-2friso int.4.005.800.306.96friso
ext.2.006.300.506.30fondo4.005.800.051.16VP-101 (.30 X .50)EJES B,
D, I y KTRAMO 1-2friso
int.8.005.800.3013.92fondo4.005.800.306.96VP-101 (.30 X .50)EJES
C-C y J-JTRAMO 1-2friso
int.4.005.800.306.96fondo2.005.800.050.58VS-102 (.25 X .30)EJE
1-1TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.3010.07fondo8.003.800.103.04VS-101 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.103.36fondo8.003.800.103.04ESCALERAVP-103 (.25 X
.50)EJES F-F y G - GTRAMO 1- 2friso int.2.004.400.302.64friso
ext.1.004.950.502.48VS-102 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.100.40VS-101 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.251.00PASADIZOVP-102 (.30 X
.50)EJE A-A, E-E, H-H y L-LTRAMO 2-3friso int.4.00AREA
CAD0.321.29friso ext.2.00AREA
CAD0.751.51fondo4.002.150.302.58VP-101 (.30 X .50)EJES B, C, D, I,
J y KTRAMO 2-3friso int.12.00AREA
CAD0.323.87fondo6.002.150.303.87VP-103 (.25 X .50)EJES F-F y G -
GTRAMO 2-3friso int.2.00AREA CAD0.320.65friso ext.1.00AREA
CAD0.750.75fondo2.002.150.251.08DV-101 (.15 X .20)EJE 3 - 3TRAMO
A-L1.0038.130.207.633 PISOAULASVP-202 (.25 X .40)EJE A-A, E-E, H-H
y L-LTRAMO 1-3friso int.4.007.850.237.22friso
ext.2.008.900.407.12VP-201 (.25 X .40)EJES B, D, I y KTRAMO
1-3friso int.8.007.850.2314.44fondo4.007.850.257.85VP-201 (.25 X
.40)EJES C-C y J-JTRAMO 1-3friso int.4.007.850.237.22VS-202 (.25 X
.30)EJE 1-1TRAMO A - Lfriso int.8.003.880.134.03friso
ext.2.0017.380.3010.43fondo8.003.880.103.10VS-201 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.880.134.04friso
ext.2.0017.380.134.52fondo8.003.880.103.10ESCALERAVP-202 (.25 X
.40)EJES F-F y G-GTRAMO 1- 2friso int.2.006.360.232.93friso
ext.1.007.300.503.65VS-202 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.130.52friso
ext.1.005.550.301.67fondo1.004.000.100.40VS-201 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.130.52friso
ext.1.005.550.301.67fondo1.002.000.250.501.002.000.100.2003.02.02.05
TARRAJEO CON IMPERMEABILIZANTES EN VIGA CANAL, CUNETAS Y
GARGOLAS267.89m2VIGA CANALAULASEJE 1-1TRAMO A-Lfriso
ext.2.0017.380.5017.38friso
int.2.0017.380.5017.38fondo2.0017.380.3010.43EJE 3-3TRAMO A-Lfriso
ext.2.0017.380.7024.33friso
int.2.0017.380.6020.85fondo2.0017.380.3010.43EJE A-ATRAMO 1-2friso
ext.1.008.150.504.08friso
int.1.007.950.503.98fondo1.007.950.302.39EJE F-F y G-GTRAMO 1 -
1friso ext.2.000.800.500.80friso
int.2.000.800.500.80fondo2.000.800.300.48ESCALERAEJE 1- 1TRAMO
F-Gfriso ext.1.005.500.502.75friso
int.1.004.700.502.35fondo1.004.900.301.47EJE 3-3TRAMO F-Gfriso
ext.1.005.500.703.85friso
int.1.004.700.602.82fondo1.004.900.301.47CUNETAS
POSTERIORPERIMETRO1.00104.161.30135.41GARGOLAS8.00AREACAD0.564.4803.02.02.06
TARRAJEO FINO EN PIZARRAS25.20m24.004.201.5025.2003.02.02.07
VESTIDURA DERRAMES PUER,VENT Y VANOS MEZC. C:A 1:5 E=1.50
CM467.32m21 PISOAULASEJE 1-1TRAMO A-Lventana V-18.009.7778.16EJE
2-2TRAMO A-Lventana V-24.008.7835.12puerta4.006.7226.882
PISOAULASEJE 1-1TRAMO A-Lventana V-38.0010.3682.88EJE 2-2TRAMO
A-Lventana V-46.009.2655.56puerta2.006.7213.44ESCALERAEJE 1-1TRAMO
F-Gventana V-51.0011.7011.703 PISOAULASEJE 1-1TRAMO A-Lventana
V-38.0010.3682.88EJE 2-2TRAMO A-Lventana
V-46.009.2655.56puerta2.006.7213.44ESCALERAEJE 1-1TRAMO F-Gventana
V-51.0011.7011.7003.02.02.08 BRUAS DE 1.5 CM757.50mAMBIENTES
(INTERIOR)1 PISOAULAS EJES A, C, E, H y LTRAMO 1-26.0010.6263.72EJE
2-2TRAMO B-C, H-I,I-J y K-L4.003.7014.80TRAMO A-B, C-D, D-E,
J-K4.005.3721.48EJE 1-1TRAMO A-L8.002.8022.40ESCALERASEJES F-F y
G-GTRAMO 1- 22.0011.3022.60EJE 1- 1TRAMO
F-G1.004.284.281.004.504.502 PISOAULAS EJES A, C, H y LTRAMO
1-24.0011.3445.37EJE 2-2TRAMO A-B, B-C, C-D, I-J, J-K, y
K-L6.003.7222.32TRAMO D-E y H-I2.005.7711.54EJE 1-1TRAMO
A-L8.002.2217.76ESCALERASEJES F-F y G-GTRAMO 1- 22.0014.3728.75EJE
1- 1TRAMO F-G1.003.903.90AMBIENTES (EXTERIOR)AULAS EJES A-A y
L-LTRAMO 1-22.0015.9231.84EJE E-E y H-HTRAMO 1-22.004.368.72EJE
2-2TRAMO A-B, B-C, C-D, I-J, J-K, y K-L6.006.9441.64TRAMO D-E y
H-I2.003.837.67EJE 1-1TRAMO A-L8.005.9347.44ESCALERASEJES F-F y
G-GTRAMO 1- 21.0012.1212.123 PISOAULAS EJES A, C, H y LTRAMO
1-24.0011.3445.37EJE 2-2TRAMO A-B, B-C, C-D, I-J, J-K, y
K-L6.003.7222.32TRAMO D-E y H-I2.005.7711.54EJE 1-1TRAMO
A-L8.002.2217.76ESCALERASEJES F-F y G-GTRAMO 1- 22.0014.3728.75EJE
1- 1TRAMO F-G1.003.903.90AMBIENTES (EXTERIOR)AULAS EJES A-A y
L-LTRAMO 1-22.0015.9231.84EJE E-E y H-HTRAMO 1-22.004.368.72EJE
2-2TRAMO A-B, B-C, C-D, I-J, J-K, y K-L6.006.9441.64TRAMO D-E y
H-I2.003.837.67EJE 1-1TRAMO A-L8.005.9347.44ESCALERASEJES F-F y
G-GTRAMO 1- 21.0012.1212.12PIZARRASAULAS4.0011.4045.6003.02.02.09
TARRAJEO EN FALSAS COLUMNAS MEZ. C:A 1:5 E=1.50
CM7.20m2AULAS6.000.452.005.40ESCALERA2.000.452.001.8003.02.03
CIELORRASOS03.02.03.01 CIELORASO CON MEZCLA C:A 1:5 CON CINTAS
E=1.5 CM777.33m21 PISOAULASEJES A-A y L-LTRAMO
1-28.005.803.80176.32PASADIZOEJES A-A y L-LTRAMO
2-38.002.153.8065.36ESCALERAEJES F-F y G-GTRAMO
2-31.002.154.008.602 PISOAULASEJES A-A y L-LTRAMO
1-28.005.803.80176.32PASADIZOEJES A-A y L-LTRAMO
2-38.002.153.8065.36ESCALERAEJES F-F y G-GTRAMO
2-31.002.154.008.603 PISOAULASEJES A-A y L-LTRAMO
1-28.005.963.88184.87EJES A-A y L-LTRAMO
2-38.002.103.8865.22ESCALERAEJES F-F y G-GTRAMO 1-
21.004.574.0018.27EJES F-F y G-GTRAMO 2-31.002.104.008.4203.02.04
PISOS Y PAVIMENTOS03.02.04.01 CONTRAPISO E=40 MM553.40m22
PISOAULASEJE 1-1 y 2-2TRAMO A-E1.0016.256.0097.50TRAMO
H-L1.0016.256.0097.50PASADIZOEJES 2-2 y 3-3TRAMO
A-L1.0038.002.1581.703 PISOAULASEJE 1-1 y 2-2TRAMO
A-E1.0016.256.0097.50TRAMO H-L1.0016.256.0097.50PASADIZOEJES 2-2 y
3-3TRAMO A-L1.0038.002.1581.7003.02.04.02 PISO DE CERAMICO DE ALTO
TRANSITO583.50m21 PISOAULASEJE 1-1 y 2-2TRAMO
A-C1.008.006.0048.00TRAMO C-E1.008.006.0048.00TRAMO
H-L1.0016.256.0097.502 PISOAULASEJE 1-1 y 2-2TRAMO
A-E1.0016.256.0097.50TRAMO H-L1.0016.256.0097.503 PISOAULASEJE 1-1
y 2-2TRAMO A-E1.0016.256.0097.50TRAMO
H-L1.0016.256.0097.5003.02.04.03 PISO DE CEMENTO FROTACHADO Y
BRUADO 325.20m21 2 Y 3 PISOESCALERASTRAMO
Ipeldaos1.004.402.008.80TRAMO IIpeldaos1.004.402.008.80TRAMO
IIIpeldaos1.004.502.009.001 2 Y 3
PISODESCANZO1.002.001.803.60DESCANZO1.002.001.803.60DESCANZO1.002.152.004.30PASADIZOEJES
2-2 y 3-3TRAMO A-L2.0038.002.00152.00VEREDAEJES 2-2 y 3-3 TRAMO
A-L1.0040.002.1586.00EJE 1-1 TRAMO A-E y H-L2.0018.801.0037.60EJE
A-A y L-LTRAMO 1-21.006.301.006.30EJE 1- 1TRAMO
F-G1.005.201.005.2003.02.05 CONTRAZOCALOS03.02.05.01 CONTRAZCALO DE
CERAMICO152.00mINTERIORES4.0019.0076.004.0019.0076.0003.02.06
ZOCALOS03.02.06.01 ZOCALO DE CEMENTO PULIDO H=30 CM MEZCLA 1:5 E=
2.00 CM227.50m2INTERIORESESCALERASTRAMO IPeldaos1.004.404.40TRAMO
IIPeldaos1.004.404.40TRAMO IIIPeldaos1.004.504.50DESCANZOTramo
I1.007.707.70EXTERIORESPASADIZO 2 PISOEJE 2-2TRAMO
A-L2.0022.5545.10PASADIZO 3 PISOEJE 2-2TRAMO A-L2.0022.5545.10EJE
A-A y L-LTRAMO 1-22.006.6013.20EJE E-E y H-LTRAMO
1-22.001.503.00EJE 1-1TRAMO A-L2.0025.3050.60EJE 2-2TRAMO
A-L2.0022.3044.60ESCALERAEJE 1- 2TRAMO F-G1.004.904.9003.02.07
REVESTIMIENTOS EN GRADAS Y ESCALERAS03.02.07.01 REVESTIMIENTO DE
ESCALERAS E= 25 MM38.10m21 2 Y 3 PISOESCALERASTRAMO
Ipeldaos1.004.402.008.80TRAMO IIpeldaos1.004.402.008.80TRAMO
IIIpeldaos1.004.502.009.001 2 Y 3
PISODESCANZO1.002.001.803.60DESCANZO1.002.001.803.60DESCANZO1.002.152.004.3003.02.08
CUBIERTAS03.02.08.01 COBERTURA DE TEJA ANDINA TIPO
ETERNIT339.15m2AULASEJE A-E y H-L TRAMO
1-32.0017.388.75304.06ESCALERAEJE H-H e I-ITRAMO
1-31.004.807.3135.0903.02.08.02 CUMBRERA DE TEJA
ANDINA39.55MLAULASTRAMO A-E y H-L2.0017.3834.75AULASTRAMO
F-G1.004.804.8003.02.08.03 CORREAS DE MADERA TORNILLO DE
2"x2"278.68mAULAS13.0017.38225.88ESCALERA11.004.8052.8003.02.09
CARPINTERIA DE MADERA03.02.09.01 PUERTAS DE MADERA
CONTRAPLACADA25.74m21 PISOP - 13.001.002.868.58P -
21.002.002.865.722 PISO0.00P - 22.001.002.865.723 PISO0.00P -
22.001.002.865.7203.02.10 CARPINTERIA METALICA Y
HERRERIA03.02.10.01 PASAMANOS DE TUBO GALB. SEGUN DISEO H=1.00
M17.12mESCALERA2.008.5617.1203.02.10.02 BARANDA METALICO DE TUBO EN
PASADIZO78.00mAULAS8.003.8831.001.002.002.00AULAS8.003.8831.001.002.002.00ESCALERA2.004.008.002.002.004.0003.02.10.03
CANTONERAS DE ALUMINIO EN ESCALERAS60.00mTRAMO
1Peldaos10.002.0020.00TRAMO 2Peldaos10.002.0020.00TRAMO
3Peldaos10.002.0020.0003.02.11 CERRAJERIA03.02.11.01 BISAGRAS
ALUMINIZADAS TIPO CAPUCHINA DE 4" X 4"32.00undP - 13.004.0012.00P -
25.004.0020.0003.02.11.02 CERRADURA PARA PUERTA PRINCIPAL
PESADA32.00pzaP - 13.004.0012.00P - 25.004.0020.0003.02.12 VIDRIOS,
CRISTALES Y SIMILARES03.02.12.01 VENTANA DE ALUMINIO/VIDRIO ARENADO
DE 6MM1494.99p2V - 124.003.5310.761.361239.76V -
24.003.5310.760.86130.66V - 32.002.2510.761.6579.89V -
42.000.9610.761.1022.78V - 52.000.4610.762.2021.9003.02.12.02
VIDRIO INCOLORO CRUDO SEMIDOBLE106.31p2P - 13.001.0010.760.7624.53P
- 25.002.0010.760.7681.7803.02.13 PINTURA03.02.13.01 PINTURA EN
MUROS INTERIORES C/LATEX LAVABLE 2 MANOS609.14m2MUROS, INCL.
COLUMNETAS Y VIGUETAS1 PISOAULASEJE 1-1TRAMO
A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D, D-E,
J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A, C, E, H, LTRAMO
1-25.005.502.6673.15ESCALERAEJE 1- 1TRAMO F-G1.003.701.304.81EJE
F-F y G-GTRAMO 1- 22.004.152.6622.082 PISOAULASEJE 1-1TRAMO
A-L8.003.581.2535.75EJE 2-2TRAMO D-E y H-I4.001.293.1015.97EJE
2-2TRAMO A-B,B-C,C-D,I-J,J-K y K-L6.003.582.0042.90EJES A, C, E, H,
LTRAMO 1-24.00AREA CAD18.1672.64ESCALERAEJE 1- 1TRAMO
F-G1.003.701.304.81EJE F-F y G-GTRAMO 1- 22.004.152.6622.083
PISOAULASEJE 1-1TRAMO A-L8.003.581.2535.75EJE 2-2TRAMO D-E y
H-I4.001.293.1015.97EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K y
K-L6.003.582.0042.90EJES A, C, E, H, LTRAMO 1-24.00AREA
CAD18.1672.64ESCALERAEJE 1- 1TRAMO F-G1.003.702.268.36EJE F-F y
G-GTRAMO 1- 22.00AREA CAD13.3326.662.00AREACAD10.0820.1603.02.13.02
PINTURA EN MUROS EXTERIORES C/LATEX LAVABLE 2 MANOS402.02m2MUROS
EXTERIORESMUROS, INCL. COLUMNETAS Y VIGUETAS1 PISOAULASEJE 1-1TRAMO
A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D, D-E,
J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A-ATRAMO 1 - 21.005.502.6614.63EJES
L-LTRAMO 1 - 21.005.502.6614.63EJES E-ETRAMO 1 -
1'1.000.932.662.46EJES H-HTRAMO 1 - 1'1.000.932.662.462
PISOAULASEJE 1-1TRAMO A-L8.003.581.5042.90EJE 2-2TRAMO A-B, C-D,
D-E, J-K1.007.352.8621.02EJE 2-2TRAMO B-C, H-I, I-J y
K-L4.003.582.0028.60EJES A-ATRAMO 1 - 21.005.502.6614.63EJES
L-LTRAMO 1 - 21.005.502.6614.63EJES E-ETRAMO 1 -
1'1.000.932.662.46EJES H-HTRAMO 1 - 1'1.000.932.662.463
PISOAULASEJE 1-1TRAMO A-L8.003.581.2535.75EJE 2-2TRAMO D-E y
H-I4.001.293.1015.97EJE 2-2TRAMO A-B,B-C,C-D,I-J,J-K y
K-L6.003.582.0042.90EJES A-ATRAMO 1 - 21.00AREACAD18.1618.16EJES
L-LTRAMO 1 - 21.00AREACAD18.1618.16EJES E-ETRAMO 1 -
1'1.00AREACAD2.842.84EJES H-HTRAMO 1 -
1'1.00AREACAD2.842.84PASADIZOCOLUMNETASAULASEJE 3-3TRAMO
A-L10.000.801.2510.00ESCALERAEJE 3-3TRAMO
F-G2.000.801.252.0003.02.13.03 PINTURA EN COLUMNAS C/LATEX
LAVABLE302.66m2INTERIORES1 PISOAULASCOLUMNA C-1EJES B, C, D, I, J y
KTRAMO 1 - 212.001.052.8636.04COLUMNA C-2EJE A-A, E-E, H-H y
L-LTRAMO 1 - 28.000.502.8611.44ESCALERAEJE 1- 1TRAMO
F-G2.000.502.862.86EJE 2 - 2TRAMO F-G2.000.402.862.292
PISOAULASCOLUMNA C-1EJES B, C, D, I, J y KTRAMO 1 -
212.001.052.8636.04COLUMNA C-2EJE A-A, E-E, H-H y L-LTRAMO 1 -
28.000.502.8611.44ESCALERAEJE 1- 1TRAMO F-G2.000.502.862.86EJE 2 -
2TRAMO F-G2.000.402.862.293 PISOAULASCOLUMNA C-1EJES B, C, D, I, J
y KTRAMO 1 - 212.001.052.9637.30COLUMNA C-2EJE A-A, E-E, H-H y
L-LTRAMO 1 - 28.000.502.9611.84ESCALERAEJE 1- 1TRAMO
F-G2.000.502.962.96EJE 2 - 2TRAMO F-G2.000.402.962.37EXTERIOR1
PISOAULASCOLUMNA C-1EJES B, C, D, I, J y KTRAMO 1 -
212.000.552.8618.88COLUMNA C-2EJE A-A, E-E, H-H y L-LTRAMO 1 -
26.000.802.8613.732.000.402.862.29ESCALERAEJE 1- 1TRAMO
F-G1.000.802.862.291.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.861.431.000.752.862.152 PISOAULASCOLUMNA C-1EJES B, C,
D, I, J y KTRAMO 1 - 212.000.552.8618.88COLUMNA C-2EJE A-A, E-E,
H-H y L-LTRAMO 1 - 26.000.802.8613.732.000.402.862.29ESCALERAEJE 1-
1TRAMO F-G1.000.802.862.291.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.861.431.000.752.862.153 PISOAULASCOLUMNA C-1EJES B, C,
D, I, J y KTRAMO 1 - 212.001.252.9644.40COLUMNA C-2EJE A-A, E-E,
H-H y L-LTRAMO 1 - 26.000.502.968.882.000.402.962.37ESCALERAEJE 1-
1TRAMO F-G1.000.802.962.371.000.400.40EJE 2 - 2TRAMO
F-G1.000.502.961.481.000.252.960.7403.02.13.04 PINTURA EN VIGAS
C/LATEX LAVABLE288.42m21 PISOAULASVP-102 (.30 X .50)EJE A-A, E-E,
H-H y L-LTRAMO 1-2friso int.4.005.800.306.96friso
ext.2.006.300.506.30fondo4.005.800.051.16VP-101 (.30 X .50)EJES B,
D, I y KTRAMO 1-2friso
int.8.005.800.3013.92fondo4.005.800.306.96VP-101 (.30 X .50)EJES
C-C y J-JTRAMO 1-2friso
int.4.005.800.306.96fondo2.005.800.050.58VS-102 (.25 X .30)EJE
1-1TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.3010.07fondo8.003.800.103.04VS-101 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.103.36fondo8.003.800.103.04ESCALERAVP-103 (.25 X
.50)EJES F-F y G - GTRAMO 1- 2friso int.2.004.400.302.64friso
ext.1.004.950.502.48VS-102 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.100.40VS-101 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.251.00PASADIZOVP-102 (.30 X
.50)EJE A-A, E-E, H-H y L-LTRAMO 2-3friso int.4.00AREA
CAD0.321.29friso ext.2.00AREA
CAD0.751.51fondo4.002.150.302.58VP-101 (.30 X .50)EJES B, C, D, I,
J y KTRAMO 2-3friso int.12.00AREA
CAD0.323.87fondo6.002.150.303.87VP-103 (.25 X .50)EJES F-F y G -
GTRAMO 2-3friso int.2.00AREA CAD0.320.65friso ext.1.00AREA
CAD0.750.75fondo2.002.150.251.08DV-101 (.15 X .20)EJE 3 - 3TRAMO
A-L1.0038.130.207.632 PISOAULASVP-102 (.30 X .50)EJE A-A, E-E, H-H
y L-LTRAMO 1-2friso int.4.005.800.306.96friso
ext.2.006.300.506.30fondo4.005.800.051.16VP-101 (.30 X .50)EJES B,
D, I y KTRAMO 1-2friso
int.8.005.800.3013.92fondo4.005.800.306.96VP-101 (.30 X .50)EJES
C-C y J-JTRAMO 1-2friso
int.4.005.800.306.96fondo2.005.800.050.58VS-102 (.25 X .30)EJE
1-1TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.3010.07fondo8.003.800.103.04VS-101 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.800.103.04friso
ext.2.0016.780.103.36fondo8.003.800.103.04ESCALERAVP-103 (.25 X
.50)EJES F-F y G - GTRAMO 1- 2friso int.2.004.400.302.64friso
ext.1.004.950.502.48VS-102 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.100.40VS-101 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.100.40friso
ext.1.004.500.301.35fondo1.004.000.251.00PASADIZOVP-102 (.30 X
.50)EJE A-A, E-E, H-H y L-LTRAMO 2-3friso int.4.00AREA
CAD0.321.29friso ext.2.00AREA
CAD0.751.51fondo4.002.150.302.58VP-101 (.30 X .50)EJES B, C, D, I,
J y KTRAMO 2-3friso int.12.00AREA
CAD0.323.87fondo6.002.150.303.87VP-103 (.25 X .50)EJES F-F y G -
GTRAMO 2-3friso int.2.00AREA CAD0.320.65friso ext.1.00AREA
CAD0.750.75fondo2.002.150.251.08DV-101 (.15 X .20)EJE 3 - 3TRAMO
A-L1.0038.130.207.633 PISOAULASVP-202 (.25 X .40)EJE A-A, E-E, H-H
y L-LTRAMO 1-3friso int.4.007.850.237.22friso
ext.2.008.900.407.12VP-201 (.25 X .40)EJES B, D, I y KTRAMO
1-3friso int.8.007.850.2314.44fondo4.007.850.257.85VP-201 (.25 X
.40)EJES C-C y J-JTRAMO 1-3friso int.4.007.850.237.22VS-202 (.25 X
.30)EJE 1-1TRAMO A - Lfriso int.8.003.880.134.03friso
ext.2.0017.380.3010.43fondo8.003.880.103.10VS-201 (.25 X .30)EJE
2-2TRAMO A - Lfriso int.8.003.880.134.04friso
ext.2.0017.380.134.52fondo8.003.880.103.10ESCALERAVP-202 (.25 X
.40)EJES F-F y G-GTRAMO 1- 2friso int.2.006.360.232.93friso
ext.1.007.300.503.65VS-202 (.25 X .30)EJE 1- 1TRAMO F-Gfriso
int.1.004.000.130.52friso
ext.1.005.550.301.67fondo1.004.000.100.40VS-201 (.25 X .30)EJE 2 -
2TRAMO F-Gfriso int.1.004.000.130.52friso
ext.1.005.550.301.67fondo1.002.000.250.501.002.000.100.2003.02.13.05
PINTURA EN PIZARRAS25.20m24.004.201.5025.2003.02.13.06 PINTURA EN
DERRAMES C/LATEX LAVABLE467.32m1 PISOAULASEJE 1-1TRAMO A-Lventana
V-18.009.7778.16EJE 2-2TRAMO A-Lventana
V-24.008.7835.12puerta4.006.7226.882 PISOAULASEJE 1-1TRAMO
A-Lventana V-38.0010.3682.88EJE 2-2TRAMO A-Lventana
V-46.009.2655.56puerta2.006.7213.44ESCALERAEJE 1-1TRAMO F-Gventana
V-51.0011.7011.703 PISOAULASEJE 1-1TRAMO A-Lventana
V-38.0010.3682.88EJE 2-2TRAMO A-Lventana
V-46.009.2655.56puerta2.006.7213.44ESCALERAEJE 1-1TRAMO F-Gventana
V-51.0011.7011.7003.02.13.07 PINTURA EN BRUAS CON ESMALTE
SINTETICO757.50mAMBIENTES (INTERIOR)1 PISOAULAS EJES A, C, E, H y
LTRAMO 1-26.0010.6263.72EJE 2-2TRAMO B-C, H-I,I-J y
K-L4.003.7014.80TRAMO A-B, C-D, D-E, J-K4.005.3721.48EJE 1-1TRAMO
A-L8.002.8022.40ESCALERASEJES F-F y G-GTRAMO 1- 22.0011.3022.60EJE
1- 1TRAMO F-G1.004.284.281.004.504.502 PISOAULAS EJES A, C, H y
LTRAMO 1-24.0011.3445.37EJE 2-2TRAMO A-B, B-C, C-D, I-J, J-K, y
K-L6.003.7222.32TRAMO D-E y H-I2.005.7711.54EJE 1-1TRAMO
A-L8.002.2217.76ESCALERASEJES F-F y G-GTRAMO 1- 22.0014.3728.75EJE
1- 1TRAMO F-G1.003.903.90AMBIENTES (EXTERIOR)AULAS EJES A-A y
L-LTRAMO 1-22.0015.9231.84EJE E-E y H-HTRAMO 1-22.004.368.72EJE
2-2TRAMO A-B, B-C, C-D, I-J, J-K, y K-L6.006.9441.64TRAMO D-E y
H-I2.003.837.67EJE 1-1TRAMO A-L8.005.9347.44ESCALERASEJES F-F y
G-GTRAMO 1- 21.0012.1212.123 PISOAULAS EJES A, C, H y LTRAMO
1-24.0011.3445.37EJE 2-2TRAMO A-B, B-C, C-D, I-J, J-K, y
K-L6.003.7222.32TRAMO D-E y H-I2.005.7711.54EJE 1-1TRAMO
A-L8.002.2217.76ESCALERASEJES F-F y G-GTRAMO 1- 22.0014.3728.75EJE
1- 1TRAMO F-G1.003.903.90AMBIENTES (EXTERIOR)AULAS EJES A-A y
L-LTRAMO 1-22.0015.9231.84EJE E-E y H-HTRAMO 1-22.004.368.72EJE
2-2TRAMO A-B, B-C, C-D, I-J, J-K, y K-L6.006.9441.64TRAMO D-E y
H-I2.003.837.67EJE 1-1TRAMO A-L8.005.9347.44ESCALERASEJES F-F y
G-GTRAMO 1- 21.0012.1212.12PIZARRASAULAS4.0011.4045.6003.02.13.08
PINTURA CIELORRASOS 2 MANOS777.33m21 PISOAULASEJES A-A y L-LTRAMO
1-28.005.803.80176.32PASADIZOEJES A-A y L-LTRAMO
2-38.002.153.8065.36ESCALERAEJES F-F y G-GTRAMO
2-31.002.154.008.602 PISOAULASEJES A-A y L-LTRAMO
1-28.005.803.80176.32PASADIZOEJES A-A y L-LTRAMO
2-38.002.153.8065.36ESCALERAEJES F-F y G-GTRAMO
2-31.002.154.008.603 PISOAULASEJES A-A y L-LTRAMO
1-28.005.963.88184.87EJES A-A y L-LTRAMO
2-38.002.103.8865.22ESCALERAEJES F-F y G-GTRAMO 1-
21.004.574.0018.27EJES F-F y G-GTRAMO
2-31.002.104.008.4203.02.13.09 PINTURA BARNIZ EN CARPINTERIA DE
MADERA25.74m21 PISO0.00P - 13.001.002.868.58P - 21.002.002.865.722
PISO0.00P - 22.001.002.865.723 PISO0.00P -
22.001.002.865.7203.02.13.10 PINTURA ESMALTE EN ZOCALO
227.50mINTERIORESESCALERASTRAMO IPeldaos1.004.404.40TRAMO
IIPeldaos1.004.404.40TRAMO IIIPeldaos1.004.504.50DESCANZOTramo
I1.007.707.70EXTERIORESPASADIZO 2 PISOEJE 2-2TRAMO
A-L2.0022.5545.10PASADIZO 3 PISOEJE 2-2TRAMO A-L2.0022.5545.10EJE
A-A y L-LTRAMO 1-22.006.6013.20EJE E-E y H-LTRAMO
1-22.001.503.00EJE 1-1TRAMO A-L2.0025.3050.60EJE 2-2TRAMO
A-L2.0022.3044.60ESCALERAEJE 1- 2TRAMO F-G1.004.904.9003.02.13.11
PINTURA ANTICORROSIVA EN PASAMANOS Y BARANDA H=1.00
M95.12mESCALERA2.008.5617.12AULAS8.003.8831.001.002.002.00AULAS8.003.8831.001.002.002.00ESCALERA2.004.008.002.002.004.0003.02.13.12
PINTURA EN FALSAS COLUMNAS C/LATEX
LAVABLE7.20m2AULAS6.000.452.005.40ESCALERA2.000.452.001.8003.02.14
VARIOS03.02.14.01 JUNTAS ASFALTICAS39.50mEntre Ejes 2-2 y 3-3 TRAMO
A-L10.002.1521.50EJE 1-1 y 1- 1TRAMO A-L10.001.0010.00EJES A-A,
F-F, G-G y L-LTRAMO 1-38.001.008.0003.02.14.02 JUNTAS DE DILATACION
CON TECKNOPORT13.80mEntre F-F y G-GTRAMO 1-
22.006.9013.8003.02.14.03 JUNTA DE DILATACION CON ESPUMA
PLASTICA417.60m1 PISOAULASEJES A, C, E, H y LTRAMO
1-210.002.9029.00EJES 1-1 Y 2-2TRAMO A-L32.002.9092.80ESCALERAEJES
F-F y G-GTRAMO 1- 24.002.9011.60EJES 1TRAMO H-I2.002.905.802
PISOAULASEJES A, C, E, H y LTRAMO 1-210.002.9029.00EJES 1-1 Y
2-2TRAMO A-G32.002.9092.80ESCALERAEJES H-H e I-ITRAMO 1-
24.002.9011.60EJES 1TRAMO H-I2.002.905.803 PISOAULASEJES A, C, E, H
y LTRAMO 1-210.002.9029.00EJES 1-1 Y 2-2TRAMO
A-G32.002.9092.80ESCALERAEJES H-H e I-ITRAMO 1- 24.002.9011.60EJES
1TRAMO H-I2.002.905.8003.03 INSTALACIONES ELECTRICAS03.03.01 SALIDA
PARA ELECTRICIDAD Y FUERZA03.03.01.01 SALIDA PARA CENTROS DE
LUZ126.00pto1 PISO31.0031.00PASADIZO 9.009.002
PISO32.0032.00PASADIZO 9.009.00ESCALERADESCANZO2.002.003
PISO32.0032.00PASADIZO 9.009.00ESCALERADESCANZO2.002.0003.03.01.02
SALIDA PARA INTERRUPTOR DOBLE3.00pto1 PISO1.001.002
PISO2.002.0003.03.01.03 SALIDA PARA INTERRUPTOR SIMPLE15.00pto1
PISO9.009.002 PISO2.002.00ESCALERA1.001.003
PISO2.002.00ESCALERA1.001.0003.03.02 SALIDA PARA
TOMACORRIENTES03.03.02.01 TOMACORRIENTES BIPOLARES DOBLES74.00pto1
PISO22.0022.00PASADIZO 4.004.002 PISO20.0020.00PASADIZO 4.004.003
PISO20.0020.00PASADIZO 4.004.0003.03.03 CANALIZACIONES Y/O
TUBERIAS03.03.03.01 TUBO PVC SAP 3/4" 928.68m1
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.70INTERRUPTORES8.002.9223.362.003.266.52TOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.002
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.701.005.055.051.002.002.00INTERRUPTORES2.002.925.842.003.266.521.007.207.20TOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.003
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.701.005.055.051.002.002.00INTERRUPTORES2.002.925.842.003.266.521.007.207.20TOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.0003.03.03.02
TUBO PCV SAP DE 1" PARA CABLE NYY101.05m1.00101.05101.0503.03.04
CONDUCTORES Y/O CABLES03.03.04.01 CONDUCTOR 4 MM2 TW
(TOMACORRIENTES)431.40m1
PISOTOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.002
PISOTOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.003
PISOTOMACORRIENTES2.0025.0850.162.0022.3244.642.0024.5049.0003.03.04.02
CONDUCTOR 2.5 MM2 TW (ALUMBRADO)497.28m1
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.70INTERRUPTORES8.002.9223.362.003.266.522
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.701.005.055.051.002.002.00INTERRUPTORES2.002.925.842.003.266.521.007.207.203
PISOALUMBRADO2.002.454.904.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.002.194.384.003.1012.402.001.943.882.003.857.7010.003.8538.502.004.358.701.005.055.051.002.002.00INTERRUPTORES2.002.925.842.003.266.521.007.207.2003.03.04.03
CONDUCTOR ELECTRICO 2NYYx35mm2 +
1NYYx10mm2101.05m1.00101.05101.0503.03.04.04 EXCAVACION DE ZANJAS
PARA CONDUCTOR TIPO NYY 4.28m3De Medidor a
TG-011.007.600.300.300.68de TG-01 a
TD-011.0040.000.300.303.6003.03.04.05 RELLENO DE ZANJAS DE
CONDUCTOR NYY CON MATERIAL PROPIO4.28m3De Medidor a
TG-011.007.600.300.300.68de TG-01 a
TD-011.0040.000.300.303.6003.03.05 ARTEFACTOS ELECTRICOS03.03.05.01
FLUORESCENTE RECTO 2X40w INCLUYE EQUIPO126.00und1
PISO31.0031.00PASADIZO 9.009.002 PISO32.0032.00PASADIZO
9.009.00ESCALERADESCANZO2.002.003 PISO32.0032.00PASADIZO
9.009.00ESCALERADESCANZO2.002.0003.03.06 TABLEROS Y
CUCHILLAS03.03.06.01 TABLERO DE DISTRIBUCION T-D CAJA METALICA PARA
4 CIRCUITOS 3.00pza3.003.0003.04 SISTEMA DE AGUA DE LLUVIA03.04.01
TUBERIAS Y ACCESORIOS03.04.01.01 TUBERIA PVC SAL PARA DESAGUE
PLUVIAL DE 3"82.40m8.0010.3082.4003.04.01.02 CODO PVC SAP 3"
X9024.00pza24.0024.00
ACER ZAPATASPLANILLA DE METRADOS ACERO ZAPATAS
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.01.02 ACERO
fy=4200 KG/CM2AULASZ - 1TIPO - 1HORZ. 5/8"2.2011.006.00145.20VERT.
5/8"2.4012.006.00172.80Z - 2TIPO - 2HORZ.
5/8"1.809.006.0097.20VERT. 5/8"2.0010.006.00120.00Z - 3TIPO -
3HORZ. 5/8"1.709.002.0030.60VERT. 5/8"1.9010.002.0038.00Z - 4TIPO -
4HORZ. 5/8"1.508.002.0024.00VERT. 5/8"1.709.002.0030.60Z - 5TIPO -
5HORZ. 5/8"1.709.002.0030.60VERT. 5/8"1.9010.002.0038.00Z - 6TIPO -
6HORZ. 5/8"1.508.002.0024.00VERT. 5/8"1.709.002.0030.60ESCALERAZ -
7 y Z - 8 TIPO - 7 y 8HORZ. 5/8"1.407.004.0039.20VERT.
5/8"1.608.004.0051.20TOTAL (ML)0.000.00872.000.000.000.00TOTAL
(KG)4.042.261.601.020.580.250.000.001,395.200.000.000.001,395.20
ACER. VIGAS DE CIM.PLANILLA DE METRADOS ACERO VIGAS DE
CIMENTACION (ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS
SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO
INDUSTRIAL PERENE, EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE
PERENE, PROVINCIA DE CHANCHAMAYO, REGION JUNIN" Hoja
:INFRAESTRUCTURA DE TALLERESRegion: JUNINRespon.: MUNICIPALIDAD
DISTRITAL DE PERENEProvincia: CHANCHAMAYOFecha: MARZO DEL
2015Distrito: PERENEHecho PorLocalidad: VILLA
PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE ELEMENTOSN DE
VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.02.03 ACERO fy=4200
KG/CM2TIPO VIGAS DE CIMENTACIONAULASVC-1 (0.30 X 0.50)EJE
A-LTIPOSUPERIOR 3/4"6.703.004.0080.40INFERIOR
3/4"6.702.004.0053.60INTERMEDIO 3/8"6.482.004.0051.84ESTRIBOS
3/8"1.5829.004.00183.28VC-1 (0.30 X 0.50)EJE A-LTIPOSUPERIOR
3/4"6.703.004.0080.40INFERIOR 3/4"6.702.004.0053.60INTERMEDIO
3/8"6.482.004.0051.84ESTRIBOS 3/8"1.5829.004.00183.28VC-2 (0.25 X
0.50)EJE 1-1 Y 2-2SUPERIOR 3/4"26.662.004.00213.28INFERIOR
5/8"26.662.004.00213.28INTERMEDIO 3/8"25.902.004.00207.20ESTRIBOS
3/8"1.48131.004.00775.52ESCALERASVC-2 (0.25 X 0.50)EJE 1-1 Y
2-2TIPOSUPERIOR 3/4"4.752.002.0019.00INFERIOR
5/8"4.752.002.0019.00INTERMEDIO 3/8"4.552.002.0018.20ESTRIBOS
3/8"1.4823.002.0068.08VC-2 (0.25 X 0.50)EJE F - GSUPERIOR
3/4"5.202.002.0020.80INFERIOR 5/8"5.202.002.0020.80INTERMEDIO
3/8"4.952.002.0019.80ESTRIBOS 3/8"1.4824.002.0071.04TOTAL
(ML)0.00521.08253.080.001,630.080.00TOTAL
(KG)4.042.261.601.020.580.250.001,177.64404.930.00945.450.002,528.02
ACER. SOBRECIMIENTO REFORZADOPLANILLA DE METRADOS ACERO
SOBRECIMIENTO REFORZADO (ESTRUCTURAS)Proyecto "MEJORAMIENTO Y
AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA
INTEGRADO INDUSTRIAL PERENE, EN LA LOCALIDAD DE VILLA PERENE,
DISTRITO DE PERENE, PROVINCIA DE CHANCHAMAYO, REGION JUNIN" Hoja
:INFRAESTRUCTURA DE TALLERESRegion: JUNINRespon.: MUNICIPALIDAD
DISTRITAL DE PERENEProvincia: CHANCHAMAYOFecha: MARZO DEL
2015Distrito: PERENEHecho PorLocalidad: VILLA
PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE ELEMENTOSN DE
VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.03.03 ACERO fy=4200
KG/CM2SOBRECIMIENTO REFORZADOAULASEJE A-A, E-E, H-H y L-LTRAMO
1-2LONGITUDINAL 3/8"5.154.004.0082.40VERTICAL
3/8"1.4021.004.00117.60EJE C-C y J-JTRAMO 1-2LONGITUDINAL
3/8"5.154.002.0041.20VERTICAL 3/8"1.4021.002.0058.80EJE 1-1TRAMO
A-LTIPOLONGITUDINAL 3/8"3.234.008.00103.20VERTICAL
3/8"1.4013.008.00145.60EJE 2-2TIPOLONGITUDINAL
3/8"3.234.004.0051.60VERTICAL 3/8"1.4013.004.0072.80EJE
2-2TIPOLONGITUDINAL 3/8"0.964.008.0030.80VERTICAL
3/8"1.404.008.0044.80ESCALERAEJES F-F y G-GTRAMO
1'-2TIPOLONGITUDINAL 3/8"3.604.002.0028.80VERTICAL
3/8"1.4015.002.0042.00EJE 1'-1'TRAMO F-GTIPOLONGITUDINAL
3/8"3.354.001.0013.40VERTICAL 3/8"1.4014.001.0019.60TOTAL
(ML)0.000.000.000.00852.600.00TOTAL
(KG)4.042.261.601.020.580.250.000.000.000.00494.510.00494.51
ACER COLUMNAPLANILLA DE METRADOS ACERO COLUMNAS
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.04.03 ACERO
fy=4200 KG/CM2AULASCOLUMNA C-1 TIPOEJE 1 - 1
1/2"12.008.006.00576.00 5/8"12.004.006.00288.00ESTRIBOS
3/8"2.4071.006.001,022.40COLUMNA C-1 TIPOEJE 2 - 2
1/2"12.198.006.00585.09 5/8"12.194.006.00292.54ESTRIBOS
3/8"2.4072.006.001,036.80COLUMNA C-2EJE 1 - 1
1/2"12.006.004.00288.00 5/8"12.004.004.00192.00ESTRIBOS
3/8"2.0771.004.00587.88COLUMNA C-2EJE 2 - 2 1/2"12.196.004.00292.54
5/8"12.194.004.00195.03ESTRIBOS 3/8"2.0772.004.00596.16CAJA
ESCALERACOLUMNA C-3 TIPOEJE F - G ; EJE 2 -2 3/4"12.192.002.0048.76
5/8"12.194.002.0097.51ESTRIBOS 3/8"1.2071.002.00170.40COLUMNA
C-4TIPOEJE F - G ; EJE 1'-1' 1/2"12.0010.002.00240.00ESTRIBOS
3/8"2.0771.002.00293.94TOTAL
(ML)0.0048.761,065.091,981.633,707.580.00TOTAL
(KG)4.042.261.601.020.580.250.00110.191,704.142,021.262,150.400.005,985.99
ACER COLUMNETAPLANILLA DE METRADOS ACERO COLUMNETA
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.05.03 ACERO
fy=4200 KG/CM21 PISOTIPO CA-1COLUMNETA CA-1 (0.15x0.25)TIPOEJE
A-C-E-H-L EN MUROS 3/8"4.304.0015.00258.00ESTRIBOS
1/4"0.6514.0015.00136.50TIPO CA-2COLUMNETA CA-2 (0.15x0.15)TIPOEJE
1-1 EN MUROS 3/8"3.104.0016.00198.40ESTRIBOS
1/4"0.458.0016.0057.60COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"3.604.008.00115.20ESTRIBOS
1/4"0.4511.008.0039.60COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"4.304.0016.00275.20ESTRIBOS 1/4"0.4511.0016.0079.20CAJA
ESCALERATIPO CA-01COLUMNETA CA-01 (0.15x0.25)TIPOEJE F-G, TRAMO 1-2
3/8"3.504.006.0084.00ESTRIBOS 1/4"0.6511.006.0042.90COLUMNETA CA-02
(0.15x0.15)TIPOEJE 1-1, TRAMO F-G 3/8"3.004.002.0024.00ESTRIBOS
1/4"0.457.002.006.302 PISOTIPO CA-1COLUMNETA CA-1
(0.15x0.25)TIPOEJE A-E-H-L EN MUROS 3/8"4.304.0012.00206.40ESTRIBOS
1/4"0.6514.0012.00109.20TIPO CA-2COLUMNETA CA-2 (0.15x0.15)TIPOEJE
1-1 EN MUROS 3/8"3.104.0016.00198.40ESTRIBOS
1/4"0.458.0016.0057.60COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"3.604.0012.00172.80ESTRIBOS
1/4"0.4511.0012.0059.40COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"4.304.008.00137.60ESTRIBOS 1/4"0.4511.008.0039.60CAJA
ESCALERATIPO CA-01COLUMNETA CA-01 (0.15x0.25)TIPO
3/8"3.504.006.0084.00ESTRIBOS 1/4"0.6511.006.0042.90COLUMNETA CA-02
(0.15x0.15)TIPOEJE 1-1, TRAMO F-G 3/8"3.004.002.0024.00ESTRIBOS
1/4"0.457.002.006.303 PISOTIPO CA-1COLUMNETA CA-1
(0.15x0.25)TIPOEJE A-E-H-L EN MUROS 3/8"3.404.0012.00163.20ESTRIBOS
1/4"0.6511.0012.0085.80TIPO CA-2COLUMNETA CA-2 (0.15x0.15)TIPOEJE
1-1 EN MUROS 3/8"2.054.0016.00131.20ESTRIBOS
1/4"0.4511.0016.0079.20COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"2.804.0012.00134.40ESTRIBOS
1/4"0.4511.0012.0059.40COLUMNETA CA-2 (0.15x0.15)TIPOEJE 2-2 EN
MUROS 3/8"3.004.008.0096.00ESTRIBOS 1/4"0.4511.008.0039.60EN
VOLADOTIPO COLUMNETA CA-1 (0.15x0.25)TIPOEJE 3 - 3
3/8"1.704.0010.0068.00ESTRIBOS 1/4"0.657.0010.0045.50CAJA
ESCALERATIPO CA-01COLUMNETA CA-01 (0.15x0.25)TIPOEJE F-G, TRAMO 1-2
3/8"3.304.006.0079.20ESTRIBOS 1/4"0.6511.006.0042.90COLUMNETA CA-02
(0.15x0.15)TIPOEJE 1-1, TRAMO F-G 3/8"2.304.002.0018.40ESTRIBOS
1/4"0.4511.002.009.90EN VOLADOTIPO COLUMNETA CA-1
(0.15x0.25)TIPOEJE 3 - 3 3/8"1.704.002.0013.60ESTRIBOS
1/4"0.657.002.009.10TOTAL (ML)0.000.000.000.002,482.001,048.50TOTAL
(KG)4.042.261.601.020.580.250.000.000.000.001,439.56262.131,701.69
ACE VIGAPLANILLA DE METRADOS ACERO VIGAS (ESTRUCTURAS)Proyecto
"MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA
INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE, EN LA LOCALIDAD
DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE CHANCHAMAYO,
REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.06.03 ACERO
fy=4200 KG/CM21 PISOAULASVP - 102 (0.30 X 0.50)EJE A-E-H-LTRAMO
1-3Acero superior 3/4"8.952.004.0071.60refuerzo
5/8"2.601.004.0010.40refuerzo 3/4"4.501.004.0018.00Acero inferior
5/8"8.902.004.0071.20Estribos 3/8"1.5058.004.00348.00VP - 101 (0.30
X 0.50)EJE B-C-D-I-J-KTRAMO 1-3Acero superior
3/4"8.952.006.00107.40refuerzo 3/4"2.602.006.0031.20refuerzo
5/8"4.501.006.0027.00Acero inferior 5/8"8.902.006.00106.80refuerzo
5/8"2.501.006.0015.00Estribos 3/8"1.5058.006.00522.00VS - 102 (0.25
X 0.30)EJE 1TRAMO A-LAcero superior 5/8"26.652.002.00106.60Acero
inferior 5/8"26.652.002.00106.60Estribos 3/8"1.0527.008.00226.80VS
- 101 (0.25 X 0.30)EJE 2TRAMO A-LAcero superior
5/8"26.652.002.00106.60Acero inferior
5/8"26.652.002.00106.60Estribos 3/8"1.0527.008.00226.80DV - 101
(0.15 X 0.20)AULASEJE 3TRAMO A-LAcero superior
3/8"26.002.002.00104.00Acero inferior
3/8"26.002.002.00104.00Estribos 1/4"0.6024.008.00115.20ESCALERAVP -
103 (0.25 X 0.50)EJE F-GTRAMO 1- 3Acero superior
5/8"7.302.002.0029.20refuerzo 5/8"4.051.002.008.10Acero inferior
5/8"7.302.002.0029.20Estribos 3/8"1.4050.002.00140.00VS - 101 (0.25
X 0.30)EJE 2TRAMO F-GAcero superior 5/8"4.702.001.009.40Acero
inferior 5/8"4.702.001.009.40Estribos 3/8"1.0529.001.0030.45VS -
102 (0.25 X 0.30)EJE 1TRAMO F-GAcero superior
5/8"4.702.001.009.40Acero inferior 5/8"4.702.001.009.40Estribos
3/8"1.0529.001.0030.45DV - 101 (0.15 X 0.20)AULASEJE 3TRAMO
A-LAcero superior 3/8"4.602.002.0018.40Acero inferior
3/8"4.602.002.0018.40Estribos 1/4"0.6025.002.0030.002 PISOAULASVP -
102 (0.30 X 0.50)EJE A-E-H-LTRAMO 1-3Acero superior
3/4"8.952.004.0071.60refuerzo 5/8"2.601.004.0010.40refuerzo
3/4"4.501.004.0018.00Acero inferior 5/8"8.902.004.0071.20Estribos
3/8"1.5058.004.00348.00VP - 101 (0.30 X 0.50)EJE B-C-D-I-J-KTRAMO
1-3Acero superior 3/4"8.952.006.00107.40refuerzo
3/4"2.602.006.0031.20refuerzo 5/8"4.501.006.0027.00Acero inferior
5/8"8.902.006.00106.80refuerzo 5/8"2.501.006.0015.00Estribos
3/8"1.5058.006.00522.00VS - 102 (0.25 X 0.30)EJE 1TRAMO A-LAcero
superior 5/8"26.652.002.00106.60Acero inferior
5/8"26.652.002.00106.60Estribos 3/8"1.0527.008.00226.80VS - 101
(0.25 X 0.30)EJE 2TRAMO A-LAcero superior
5/8"26.652.002.00106.60Acero inferior
5/8"26.652.002.00106.60Estribos 3/8"1.0527.008.00226.80DV - 101
(0.15 X 0.20)AULASEJE 3TRAMO A-LAcero superior
3/8"26.002.002.00104.00Acero inferior
3/8"26.002.002.00104.00Estribos 1/4"0.6024.008.00115.20ESCALERAVP -
103 (0.25 X 0.50)EJE F-GTRAMO 1- 3Acero superior
5/8"7.302.002.0029.20refuerzo 5/8"4.051.002.008.10Acero inferior
5/8"7.302.002.0029.20Estribos 3/8"1.4050.002.00140.00VS - 101 (0.25
X 0.30)EJE 2TRAMO F-GAcero superior 5/8"4.702.001.009.40Acero
inferior 5/8"4.702.001.009.40Estribos 3/8"1.0529.001.0030.45VS -
102 (0.25 X 0.30)EJE 1TRAMO F-GAcero superior
5/8"4.702.001.009.40Acero inferior 5/8"4.702.001.009.40Estribos
3/8"1.0529.001.0030.45DV - 101 (0.15 X 0.20)AULASEJE 3TRAMO
A-LAcero superior 3/8"4.602.002.0018.40Acero inferior
3/8"4.602.002.0018.40Estribos 1/4"0.6025.002.0030.003 PISOAULASVP -
202 (0.25 X 0.40)EJE A-E-H-LTRAMO 1-3Acero superior
5/8"5.222.004.0041.76Acero superior 5/8"6.502.004.0052.00refuerzo
5/8"1.401.004.005.60refuerzo 5/8"3.151.004.0012.60Acero inferior
5/8"9.152.004.0073.20Estribos 3/8"1.2559.004.00295.00VP - 201 (0.25
X 0.40)EJE B-C-D-I-J-KTRAMO 1-3Acero superior
5/8"5.222.006.0062.64Acero superior 5/8"6.502.006.0078.00refuerzo
5/8"1.401.006.008.40refuerzo 5/8"3.151.006.0018.90Acero inferior
5/8"9.152.006.00109.80Estribos 3/8"1.2559.006.00442.50VS - 202
(0.25 X 0.30)EJE 1TRAMO A-LAcero superior
5/8"27.152.002.00108.60Acero inferior
5/8"27.152.002.00108.60Estribos 3/8"1.0527.008.00226.80
3/8"1.053.002.006.30VS - 201 (0.25 X 0.30)EJE 2TRAMO A-LAcero
superior 5/8"27.152.002.00108.60Acero inferior
5/8"27.152.002.00108.60Estribos 3/8"1.0527.008.00226.80
3/8"1.053.002.006.30ESCALERAVP - 202 (0.25 X 0.40)EJE F-GTRAMO 1-
3Acero superior 5/8"4.212.002.0016.84Acero superior
5/8"5.502.002.0022.00refuerzo 5/8"2.971.002.005.94Acero inferior
5/8"7.552.002.0030.20Estribos 3/8"1.2552.002.00130.00VS - 201 (0.25
X 0.30)EJE 1TRAMO F-GAcero superior 5/8"5.252.001.0010.50Acero
inferior 5/8"5.252.001.0010.50Estribos 3/8"1.0532.001.0033.60VS -
202 (0.25 X 0.30)EJE 2TRAMO F-GAcero superior
5/8"5.252.001.0010.50Acero inferior 5/8"5.252.001.0010.50Estribos
3/8"1.0532.001.0033.60TOTAL
(ML)0.00456.402,536.080.004,939.50290.40TOTAL
(KG)4.042.261.601.020.580.250.001,031.464,057.730.002,864.9172.608,026.70
ACE VIGUETAPLANILLA DE METRADOS ACERO VIGUETAS
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.07.03 ACERO
fy=4200 KG/CM2 VIGUETAS1 PISOAULASVA-2 (0.15 X 0.15) POSTERIOREJE
1-1TRAMO A-Lsuperior 3/8"3.802.008.0060.80inferior
3/8"3.802.008.0060.80Estribos 1/4"0.5018.008.0072.00VA-2 (0.15 X
0.15) FRONTALEJE 2-2TRAMO A-Lsuperior 3/8"3.802.004.0030.40inferior
3/8"3.802.004.0030.40Estribos 1/4"0.5018.004.0036.00EJE 2-2TRAMO
A-Lsuperior 3/8"1.562.008.0025.00inferior
3/8"1.562.008.0025.00Estribos 1/4"0.505.004.0010.00VA -1 (0.15 X
0.25) LATERALEJE A-C-E-H-LTRAMO 1-2superior
3/8"5.502.005.0055.00inferior 3/8"5.502.005.0055.00Estribos
1/4"0.7027.005.0094.50ESCALERAVA -1 (0.15 X 0.25) LATERALEJE
F-GTRAMO 1'-2superior 3/8"4.302.002.0017.20inferior
3/8"4.302.002.0017.20Estribos 1/4"0.7020.002.0028.002 PISOAULASVA-2
(0.15 X 0.15) POSTERIOREJE 1-1TRAMO A-Lsuperior
3/8"3.802.008.0060.80inferior 3/8"3.802.008.0060.80Estribos
1/4"0.5018.008.0072.00VA-2 (0.15 X 0.15) FRONTALEJE 2-2TRAMO
A-Lsuperior 3/8"3.802.006.0045.60inferior
3/8"3.802.006.0045.60Estribos 1/4"0.5018.006.0054.00EJE 2-2TRAMO
A-Lsuperior 3/8"1.562.004.0012.50inferior
3/8"1.562.004.0012.50Estribos 1/4"0.505.002.005.00VA -1 (0.15 X
0.25) LATERALEJE A-C-E-H-LTRAMO 1-2superior
3/8"5.502.005.0055.00inferior 3/8"5.502.005.0055.00Estribos
1/4"0.7027.005.0094.50ESCALERAVA-2 (0.15 X 0.15) POSTERIOREJE
1-1TRAMO F-Gsuperior 3/8"3.802.001.007.60inferior
3/8"3.802.001.007.60Estribos 1/4"0.5017.001.008.50VA -1 (0.15 X
0.25) LATERALEJE A-C-E-H-LTRAMO 1-2superior
3/8"4.302.002.0017.20inferior 3/8"4.302.002.0017.20Estribos
1/4"0.7020.002.0028.003 PISOAULASVA-2 (0.15 X 0.15) POSTERIOREJE
1-1TRAMO A-Lsuperior 3/8"3.802.008.0060.80inferior
3/8"3.802.008.0060.80Estribos 1/4"0.5018.008.0072.00VA-2 (0.15 X
0.15) FRONTALEJE 2-2TRAMO A-Lsuperior 3/8"3.802.006.0045.60inferior
3/8"3.802.006.0045.60Estribos 1/4"0.5018.006.0054.00EJE 2-2TRAMO
A-Lsuperior 3/8"1.562.004.0012.50inferior
3/8"1.562.004.0012.50Estribos 1/4"0.505.002.005.00VA -1 (0.15 X
0.25) LATERALEJE A-C-E-H-LTRAMO 1-2superior
3/8"5.502.005.0055.00inferior 3/8"5.502.005.0055.00Estribos
1/4"0.7027.005.0094.50ESCALERAVA-2 (0.15 X 0.15) POSTERIOREJE
1-1TRAMO F-Gsuperior 3/8"3.802.001.007.60inferior
3/8"3.802.001.007.60Estribos 1/4"0.5017.001.008.50VA -1 (0.15 X
0.25) LATERALEJE A-C-E-H-LTRAMO 1-2superior
3/8"4.302.002.0017.20inferior 3/8"4.302.002.0017.20Estribos
1/4"0.7020.002.0028.00TOTAL (ML)0.000.000.000.001,171.60764.50TOTAL
(KG)4.042.261.601.020.580.250.000.000.000.00679.53191.13870.65
ACE VIGA CANALPLANILLA DE METRADOS ACERO EN VIGA CANAL
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.08.03 ACERO
fy=4200 KG/CM2 VIGA CANALVIGA CANALAULASEJE 1-1 TRAMO A-Lsuperior
(TRANS.) 3/8"1.00173.002.00346.00superior (LONG.)
3/8"25.904.002.00207.20EJE 2-2TRAMO A-Lsuperior (TRANS.)
3/8"1.40173.002.00484.40superior (LONG.)
3/8"25.907.002.00362.60ESCALERAEJE 1-1TRAMO H-Isuperior (TRANS.)
3/8"1.0035.001.0035.00superior (LONG.) 3/8"5.204.001.0020.80EJE
2-2TRAMO H-Isuperior (TRANS.) 3/8"1.0037.001.0037.00superior
(LONG.) 3/8"5.607.001.0039.20TOTAL
(ML)0.000.000.000.001,532.200.00TOTAL
(KG)4.042.261.601.020.580.250.000.000.000.00888.680.00888.68
ACE ALIGPLANILLA DE METRADOS ACERO ALIGERADO
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.09.03 ACERO
fy=4200 KG/CM21 PISOAULASacero inferior
1/2"33.551.0015.00503.25superior EJE A-L
1/2"1.554.0015.0093.00superior EJE B-C-D-I-J-K
1/2"2.706.0015.00243.00Temperatura (transv.)
1/4"5.8019.008.00881.60VOLADOacero inferior
5/8"33.551.005.00167.75superior EJE A-L
1/2"1.554.005.0031.00superior EJE B-C-D-I-J-K
5/8"2.706.005.0081.00Temperatura (transv.)
1/4"2.0019.008.00304.00ESCALERAacero inferior
5/8"4.401.005.0022.00superior EJE F - G
1/2"1.652.005.0016.50Temperatura (transv.) 1/4"2.0020.001.0040.002
PISOAULASacero inferior 1/2"33.551.0015.00503.25superior EJE A-L
1/2"1.554.0015.0093.00superior EJE B-C-D-I-J-K
1/2"2.706.0015.00243.00Temperatura (transv.)
1/4"5.8019.008.00881.60VOLADOacero inferior
5/8"33.551.005.00167.75superior EJE A-L
1/2"1.554.005.0031.00superior EJE B-C-D-I-J-K
5/8"2.706.005.0081.00Temperatura (transv.)
1/4"2.0019.008.00304.00ESCALERAacero inferior
5/8"4.401.005.0022.00superior EJE F - G
1/2"1.652.005.0016.50Temperatura (transv.) 1/4"2.0020.001.0040.003
PISOAULASacero inferior 1/2"33.551.0015.00503.25superior EJE A-L
1/2"1.554.0015.0093.00superior EJE B-C-D-I-J-K
1/2"2.706.0015.00243.00Temperatura (transv.)
1/4"5.8519.008.00889.20VOLADOacero inferior
1/2"33.551.005.00167.75superior EJE A-G
1/2"1.554.005.0031.00superior EJE B-C-D-E-F
1/2"2.706.005.0081.00Temperatura (transv.)
1/4"2.1019.008.00319.20ESCALERAacero inferior
1/2"4.401.0012.0052.80superior EJE F-G
1/2"1.652.0012.0039.60Temperatura (transv.)
1/4"4.5520.001.0091.00VOLADOacero inferior
1/2"4.401.005.0022.00superior EJE F-G
1/2"1.652.005.0016.50Temperatura (transv.)
1/4"2.1020.001.0042.00TOTAL
(ML)0.000.00541.503,023.400.003,792.60TOTAL
(KG)4.042.261.601.020.580.250.000.00866.403,083.870.00948.154,898.42-
0
ace escalePLANILLA DE METRADOS ACERO ES ESCALERA
(ESTRUCTURAS)Proyecto "MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS
EDUCATIVOS DE LA INSTITUCION EDUCATIVA INTEGRADO INDUSTRIAL PERENE,
EN LA LOCALIDAD DE VILLA PERENE, DISTRITO DE PERENE, PROVINCIA DE
CHANCHAMAYO, REGION JUNIN" Hoja :INFRAESTRUCTURA DE TALLERESRegion:
JUNINRespon.: MUNICIPALIDAD DISTRITAL DE PERENEProvincia:
CHANCHAMAYOFecha: MARZO DEL 2015Distrito: PERENEHecho PorLocalidad:
VILLA PERENEITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE
ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"03.01.04.10.03 ACERO
fy=4200 KG/CM21 PISOTRAMO 1inferior (long)
3/8"3.0010.001.0030.00inferior (long)
1/2"4.4011.001.0048.40inferior (long)
1/2"2.1511.001.0023.65inferior (long)
3/8"3.0510.001.0030.50inferior (trans) 3/8"2.0049.001.0098.00TRAMO
2superior (long) 1/2"6.1011.001.0067.10superior (long)
1/2"1.6511.001.0018.15superior (long)
3/8"2.7010.001.0027.00superior (long)
3/8"1.4010.001.0014.00inferior (long)
1/2"2.2510.001.0022.50inferior (trans) 3/8"2.0052.001.00104.002
PISOTRAMO 1inferior (long) 3/8"3.0010.001.0030.00inferior (long)
1/2"4.4011.001.0048.40inferior (long)
1/2"2.1511.001.0023.65inferior (long)
3/8"3.0510.001.0030.50inferior (trans) 3/8"2.0049.001.0098.00TRAMO
2superior (long) 1/2"6.1011.001.0067.10superior (long)
1/2"1.6511.001.0018.15superior (long)
3/8"2.7010.001.0027.00superior (long)
3/8"1.4010.001.0014.00inferior (long)
1/2"2.2510.001.0022.50inferior (trans) 3/8"2.0052.001.00104.00TOTAL
(ML)0.000.000.00314.60652.000.00TOTAL
(KG)4.042.261.601.020.580.250.000.000.00320.89378.160.00699.05-
0