![Page 1: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/1.jpg)
31
ACEC/NCDOT Spliced Girder Workshop
Spliced Concrete Girder Projects
Continuous Spans• Bow River Bridge, AB• Main St. Viaduct, Pueblo, CO• Rosebank-Patiki Interchange, NZ• Palm Valley Bridge, FL• Moore Haven Bridge, FL• Route 33 Bridges, West Point, VA
![Page 2: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/2.jpg)
32
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Bow River Bridge, AB• Built in 2002• 4 spans: 2 at 174 ft, 2 at 213 ft• One segment per span• 211 ft beams weighed 268,000 lb.• Beams 9.2 ft deep with 6.9 in. web• 11.65 ft beam spacing• Very high live load requirements• Concrete saved 10% over steel girders
![Page 3: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/3.jpg)
33
ACEC/NCDOT Spliced Girder Workshop
Bow River Bridge, AB
Longest known singlepiece girders shippedby truck at 211 ft long
![Page 4: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/4.jpg)
34
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Main Street Viaduct, Pueblo, CO• Built in 1995• 734 ft spliced girder structure• 5 spans with 174 ft max. span• 7 segments with 154 ft max.• 72 in. deep girder haunched to 96 in. over
2 piers• End block section used over 1 pier
![Page 5: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/5.jpg)
35
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Main Street Viaduct, Pueblo, CO• Erected on falsework & strongbacks• Spliced to achieve greater spans with
restricted pier placement• Very tight schedule and budget• Aesthetics, durability and low
maintenance costs were considered• 8 Girders spaced at 10'-6"• Overall deck width = 80'-0"
![Page 6: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/6.jpg)
36
ACEC/NCDOT Spliced Girder Workshop
Main Street Viaduct, Pueblo, CO
![Page 7: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/7.jpg)
37
ACEC/NCDOT Spliced Girder Workshop
Main Street Viaduct, Pueblo, COConstant depth Weband thickened BottomFlange
![Page 8: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/8.jpg)
38
ACEC/NCDOT Spliced Girder Workshop
Main Street Viaduct, Pueblo, CO
Strongbacks at splicesinstead of towers
![Page 9: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/9.jpg)
39
ACEC/NCDOT Spliced Girder Workshop
Main Street Viaduct, Pueblo, CO
![Page 10: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/10.jpg)
40
ACEC/NCDOT Spliced Girder Workshop
Rosebank-Patiki Interchange, NZ• Built in 1997• 2 - 435 ft spliced girder structures• Curved ramps with 492 ft radius• 4 spans with 138 ft max. span• 6 segments with 2 pier segments• 71 in. deep girders• Integral cap to provide continuity
between sub- and superstructure
Continuous Span Projects
![Page 11: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/11.jpg)
41
ACEC/NCDOT Spliced Girder Workshop
Rosebank-Patiki Interchange, NZ
Spliced Unit
PierSegments
Splice at Pier
![Page 12: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/12.jpg)
42
ACEC/NCDOT Spliced Girder Workshop
Rosebank-Patiki Interchange, NZ
Integral Cap Strongback
![Page 13: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/13.jpg)
43
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Palm Valley Bridge, FL• Built in 2002• 3 spans (210' – 290' – 210' = 710')• 5 segments in each girder line• Designed as spliced girder by
consultant• Barge delivery of segments• Erected on falsework• Full-length post-tensioned
![Page 14: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/14.jpg)
44
ACEC/NCDOT Spliced Girder Workshop
Palm Valley Bridge, FLHaunched pier segment:• Special forms & bed
for 15' depth• 8" web for 3" diam. PT
ducts
Strut for pretensionedstrands in top flange
![Page 15: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/15.jpg)
45
ACEC/NCDOT Spliced Girder Workshop
Palm Valley Bridge, FL
• Haunched pier segment- Variable web depth to 15' total depth at pier- Bottom flange depth varies slightly
![Page 16: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/16.jpg)
46
ACEC/NCDOT Spliced Girder Workshop
• Pier segments: 15' deep, 141' long, 125 tons• End segments: 81" deep, 139' long, 100 tons• Drop-in segment: 96" deep, 148' long, 103 tons• 1'-0" field closure pour between all segments
Palm Valley Bridge, FL
![Page 17: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/17.jpg)
47
ACEC/NCDOT Spliced Girder Workshop
Palm Valley Bridge, FL
To maintain unobstructed channel• Temporary towers in back spans• Strong-backs at splices between segments
![Page 18: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/18.jpg)
48
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Moore Haven Bridge, FL• Built in 2000• 3 spans with 320 ft max. (RECORD)• 5 segments with 15 ft deep haunched
pier segments• Barge delivery of segments• Erected on falsework• Spliced girder selected by contractor
![Page 19: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/19.jpg)
49
ACEC/NCDOT Spliced Girder Workshop
Moore Haven Bridge, FL
3 span unit320'
![Page 20: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/20.jpg)
50
ACEC/NCDOT Spliced Girder Workshop
Continuous Span Projects
Route 33 Bridges, West Point, VA• 2 bridges: Mattaponi and Pamunkey Rivers• Currently under construction• Each bridge has two 4-span units with
200'-240'-240'-200' spans• 8 ft deep girders haunched to 10'-6" deep
at piers• Barge delivery of segments• Erected on falsework supported by footings
![Page 21: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/21.jpg)
51
ACEC/NCDOT Spliced Girder Workshop
Route 33 Bridges at West Point, VA
Seven segments to formthe 4 spansGirders and decks arelightweight concrete
![Page 22: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/22.jpg)
52
ACEC/NCDOT Spliced Girder Workshop
Route 33 Bridges at West Point, VALightweight concrete bulb tee girders
• f'c = 8,000 psi with max. density of 125 pcfLightweight concrete deck
• f'c = 5,000 psi with max. density of 120 pcf
Lightweight concrete was used to reducefoundation loads
• Estimated 10% reduction in piles formain piers
• Also reduced foundation sizeVTRC performing material tests and observingconstruction
![Page 23: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/23.jpg)
53
ACEC/NCDOT Spliced Girder Workshop
NCHRP Report 517 completed October 2003• Download from
http://gulliver.trb.org/publications/nchrp/nchrp_rpt_517.pdf
Selected results of research• List of Spliced Girder Bridges• Design Examples• Proposed revisions to LRFD
Specs
NCHRP Project 12-57Extending Span Ranges of
Precast Prestressed Concrete Girders
![Page 24: 31 Spliced Concrete Girder Projects Continuous Spans Seminars... · Spliced Concrete Girder Projects Continuous Spans ... Splice at Pier. 42 ACEC/NCDOT Spliced Girder Workshop Rosebank](https://reader033.vdocument.in/reader033/viewer/2022051602/5afbc3107f8b9a19548fbbe1/html5/thumbnails/24.jpg)
54
ACEC/NCDOT Spliced Girder Workshop
Initial Findings
Most design options for extending spanranges involve incremental changes tocurrent design methods and materials
• Design options need to be identified• Additional design guidance not required
Spliced girders provide significantlyincreased span ranges for precastprestressed concrete girders
• Information is lacking• Focus of most of the activity in the study
•Continue