Section 3 I Page 1UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

3.1 Single-Core Copper Wire Screened Polymeric Cables3.1.1 Removing the Outer Sheath • Cleanandabradetheoutersheathwithanapprovedabrasivepaperfor150mmbeyond

thesheathremovalpoint.MarktheremovalpointoftheoutersheathasindicatedontherelevantjointinginstructionusingaChinagraphpencil.

• Forcableswithsemi-conductingoutersheaths,eithergraphiteoranextrudedlayer,extracareshouldbetakentoensurethatalltracesofconductivematerialareremoved.

• Useanapprovedtooltoremovethesheath.checkthetoolcuttingwheelissettothecorrectdepthtoavoiddamagingthecopperwirescreensbelow.

• Startingattheremovalpointmakeacircularcutaroundthecable.Cutalongthecabletothepositionofthesheathremovalpoint,andremovethesheath.

UNCONTROLLED

Page 2: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 2 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removethefabricorplastictapewrapfromthescreenwireusinganapprovedknife,takingcarenottodamagethecopperwiresbelow.

• UnwindthecopperwiresandlaythembackalongtheoversheathinthepositionrequiredbythejointbeingmadeandsecurewithPVCtape.Ifpreparingforaterminationalengthofredmasticsealingtapeshouldbeappliedtotheoutersheathfollowingtheappropriateinstruction.

3.1.2 Removing the Bonded Polymeric Screen • Theapprovedbondedscreenstrippingtoolcanbeusedtoleavevariouslengthsofblack

insulationscreenfromtheoutersheathcut.Thismeasurementvariesdependinguponthetypeofjoint:

• Single-Corestraightjoints=40mm.

• Single-Corebranchjoints=80mm.

• Trifurcatingjoints=100mm.

• Potends=80mm.

• Single-Coreterminations=40mm.UNCONTROLLED

Page 3: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 3UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• SmearathincoatingofSiliconegreaseovertheconductingscreenlayer.Startingattheopenendofthecable,setthetooltothecorrectcuttingdepthsothattheentirescreenisremovedwithonlytheminimumamountofinsulation.Itisessentialthatthecoreisasstraightaspossibleforthisoperationotherwisetracesofthescreenmaybeleftbehind.

• Continueturningthetooluntilitbuttsupagainstthestopposition(dependantonthescreenterminationpoint)andcontinuetoturnthetooluntilasmoothrightangledtaperisproduced.Testthetoolfirstlyontheoverlapsectionofthecoreifrequired.

• Theinsulationnowrequirespolishingsmoothwithanappropriatealuminiumoxidegritpaper(minimum150grade)untilsmoothandfreeofridges.Tofinishthisprocess,reversethepaperand'buffup'withthesmoothside.

UNCONTROLLED

Page 4: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage4 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofanyremainingloosematerial.Alwayswipefromtheopencoreendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromtheremainingscreen.

3.1.3 Removing the Polymeric Insulation • UsetheapprovedAlroctoolandsetthe'stopgauge'totheconnectorinsertiondepth.

• Positionthetoolattheopencoreendandadjustthebladetotherequireddepth;justdeepenoughsothebladedoesnotdamagetheconductor.

• Rotatethetoolalongthecoreusingthespiralcutsettinguntilthestopgaugepreventsitfrommovinganyfurther.

UNCONTROLLED

Page 5: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage5UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removethetoolandtheinsulationspiral.Carefullyremovetheremainingconductorscreenusinganapprovedknife.

3.2 Single-Core Lead Covered Cables3.2.1 Removing the Outer Serving or Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Makeacircularcutatthismarkusinganappropriateapprovedtool.Checkthatthecutisonlythreequartersthroughthesheaththickness.

UNCONTROLLED

Page 6: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 6 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Nowmakealengthwisecutalongthesheathtowardsthesheathcutpositiontakingcarenottodamagetheunderlyingleadsheath.

• Lifttheedgeofthesheathandunwrapalongitslength,tearingoffatthecircularcutpoint.Theuseofagastorchmayassistthisoperationifnecessary.

3.2.2 Removing the Lead Sheath • Cleananddegreasetheleadsheathusingtheapprovedsolventwipes.Markthelead

sheathattheremovalpointasindicatedontherelevantjointinginstructionusingaChinagraphpencil.

UNCONTROLLED

Page 7: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 7UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Useanapprovedhackknifetomakeanindentedcircularcutaroundtheleadsheath,takingcaretoonlycutpartwaythroughthesheath.

• Cuttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriateapprovedhackknife.TakecarenottodamagetheCopperWoventapebelow.

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

UNCONTROLLED

Page 8: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage8 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.2.3 Removing the Copper Woven Tape (CWT) • UnwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan

approvedknifetoleaveasmoothfinish.

3.2.4 Removing the Insulation Screen • MarkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe

relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint.

• Unwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainstthetwinebinder.Removeanycarbonpaperbelowthescreentothesameterminationposition,followedbytwooftheinsulationpapers.

UNCONTROLLED

Page 9: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 9UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.2.5 Removing the Insulation Papers • Onlyremovethepapersafterfittingthebarriertubingasdescribedinsection4.1.1.

Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointinginstruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersandclearbarriertubetakingcarenottodamagetheconductorbelow.

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

• Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe.

UNCONTROLLED

Page 10: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage10 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3 Three-Core Paper Insulated Cables3.3.1 Removing the Outer Hessian Serving or (PE) Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Wearsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingattheremovalpointandscoreinfrontofthebinderusinganapprovedknife.

• Removetheservingwiththeapprovedknifeandheatfromagastorchifrequiredorinthecaseofapolyethylenesheathusetheapprovedtoolforthisoperation.

3.3.2 Removing the Steel Wire Armour • Placeawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe

relevantjointinginstruction.

UNCONTROLLED

Page 11: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 11UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Usinganapprovedsaw,makeacircularcutaroundthearmoursatthebinderposition.Cutthroughonlyhalfthewidthofthearmourtoavoiddamagingtheleadsheathbelow.

• Wearsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewatatimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards.

• Removethebinderandliftthearmourswithahackknifesotheyare90°tothecable.Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolventwipes.

UNCONTROLLED

Page 12: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 12 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.3 Removing the Inner Bitumen Layer • Wearsuitableglovesforthisoperation.Scorearoundtheinnerbeddinglayerswithan

approvedknifeadjacenttotheverticalarmourstakinggreatcarenottoscoreintotheunderlyingleadsheath.

• Attheopencableendliftthebitumenimpregnatedtextilelayerwithaknifeandunwrapitbacktotheverticalarmourposition,tearingitagainstthescorepreviouslymade.Theuseofagastorchmayassistthisprocess.

• Applymoreheattothefinallayerofbitumenontheleadsheathandarmoursandwipeoffanyremainingtracesofbitumenwithapprovedsolventwipes.Theleadsheathandarmoursshouldbecleanandbrightafterthisprocess.

UNCONTROLLED

Page 13: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 13UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Applytwowrapsofblackmasticsealantaroundtheleadsheathbuttingupagainsttheraisedarmours.

• MakeamarkwithaChinagraphpencil130mmfromtheendoftheoutersheath.Wrapalengthofcoppermesharoundtheleadsheathuptothe130mmmark.

UNCONTROLLED

Page 14: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage14 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Laythearmoursdownoverthemastic,ensuringthatnonearecrossed,andsecurethearmoursoverthecoppermeshareawiththetwowormdriveclipsprovided.

• ApplyalayerofPVCtapetothewormdriveclipstocoveranysharpedges.Positionthearmoursealingsleeve30mmbeyondthearmouredgeandshrinkdownstartingattheleadsheathendbeforeproceedingtowardsthecableover-sheath.

UNCONTROLLED

Page 15: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage15UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.4 Removing the Lead Sheath • Cleananddegreasetheleadsheathusingapprovedsolventwipes.UseaChinagraph

penciltomarktheleadsheath430mmfromtheoutersheathasindicatedontherelevantjointinginstruction.

• Wearsuitableglovesforthisoperation.Useanapprovedhackknifetomakeacircularindentedringcutaroundtheleadsheathatthepencilmark,takingcaretoonlycutpartwaythroughthesheath.

• Fromtheopencableend,cuttheleadsheathlongitudinallytothecircularcutusingtheappropriateapprovedhackknife.TakecarenottodamagetheCopperWovenTape(CWT)below.

UNCONTROLLED

Page 16: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 16 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

3.3.5 Removing the Copper Woven Tapes (CWT) • UnwindtheCWTandremovethecorefillerscarefullywiththesidecutters.

• RewindtheCWTtightlyaroundthecablecoresatthecrutchpositionforadistanceof20mmfromtheleadsheath,thencutandtieoff.Removeanysurplustapewithinsulatedsidecutters.

UNCONTROLLED

Page 17: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 17UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.6 Removing the Insulation Screen • Usinganapprovedsolventwipe,removeanysurpluscablecompoundfromthescreened

coreinsulation.

• Markthescreenpapersattheremovalpointindicatedintherelevantjointinginstruction.Tieafinewirebinderaroundthescreensatthispoint.

• Carefullyunwrapthefirst50mmofthescreen.Securetheendofthecoreinsulationpaperswithnumberedphasetapematchingthenumeralpaper.Unwindtheremainderofthescreentotheterminationpointandremoveitbyneatlytearingagainsttheappliedbinder.

• Removethenumeralpaperandonelayerofpaperbelowtothesamepointasthescreenpapers,usingthesamemethodandmarkingthecoreswiththematchingnumberedphasetape.

UNCONTROLLED

Page 18: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage18 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Note:Itisimportanttomarkthecoreswiththecorrectphasenumbersimmediatelyaftereach numeralpaperisremoved.

3.3.7 Removing the Insulation Papers • Onlyremovethepapersafterfittingtheclearbarriertubesdescribedinsection4.1.3.

• Marktheclearbarriertubeoverthecorepapersatthepointofremovalasindicatedintheappropriatejointinginstruction.

• Usingasharpknifecutaroundthecoreandthroughthepaperstakingcarenottodamagetheconductorbelow.

UNCONTROLLED

Page 19: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 19UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

• Roundingoftheconductorwithwaterpumporsimilarplierswillassistthisoperationandwillhelppreparetheconductorforinsertionintotheappropriateconnector.

• Unwrapthepaperstothecutpositionandtearoffagainsttheclearbarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe.

UNCONTROLLED

Page 20: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage20 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.4 Three-Core HSL Paper Insulated Cables3.4.1 Removing the Outer Serving or Sheath • Markthepositionoftheservingorsheathterminationasindicatedontherelevantjointing

instruction.

• Wearsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingattheremovalpointandscoreinfrontofthebinderusinganapprovedknife.

• Removetheservingwiththeapprovedknifeandheatfromagastorchifrequired.

UNCONTROLLED

Page 21: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 21UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.4.2 Removing the Steel Wire Armour • Placeawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe

relevantjointinginstruction.

• Usinganapproveddepthguardedorjuniorsawmakeacircularcutaroundthearmoursatthebinderposition.Cutthroughonlyhalfthewidthofthearmourtoavoiddamagingtheleadsheathsbelow.

• Wearsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewatatimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards.

UNCONTROLLED

Page 22: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 22 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Attheopencableendliftthebitumenimpregnatedlayerwithaknifeandunwrapitbacktothearmourcutposition.Removeitatthispoint,takingcarenottodamagetheunderlyingleadsheaths.

• Removethebinderandliftthearmourswithanapprovedhackknifesotheyare90°tothecable.Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolventwipes.

3.4.3 Removing the Bitumen Layer • Openoutthethreeleadsheathscarefullyandremovethebitumen/paperlayerandfillers

fromallthreesheathsuptothepointwheretheunderarmourbeddingremains.

UNCONTROLLED

Page 23: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 23UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Applymoreheattothefinallayerofbitumenontheleadsheathsandwipeoffalltracesofbitumenwiththeapprovedsolventwipes.

• Theleadsheathsshouldbefreefrombitumenoncompletionofthistask.

• BuilduptheremaininginnerbeddingusingtheblackmasticfromtheThree-CoretransitionjointandtheHSLmoduletosuitthesupportring’sinnerdiameter.Fitthesupportringoverthebuilduptape,positioningit60mmfromtheupliftedarmours.

UNCONTROLLED

Page 24: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage24 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Wrapthelengthofsuppliedblackmasticbehindthesupportring,buttingitagainstthearmourswires.Laythearmoursdownontotheringandsecurethemwithawirebinder.

3.4.4 Removing the Lead Sheaths • Onlyremovetheleadsheathsafterfirstlyfollowingthenecessarystepsdescribedin

section4.1.5.(HSLmoduleapplication).

• Cleananddegreasetheleadsheathsusingapprovedsolventwipes.UseaChinagraphpenciltomarktheleadsheathsattheremovalpointasindicatedontherelevantjointinginstruction.

• Useanapprovedhackknife,makeacircularindentedringcutaroundtheleadsheathatthepencilmark,takingcaretoonlycutpartwaythroughthesheath.

• Cuttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriateapprovedhackknife.TakecarenottodamagetheCopperWoventapebelow.UNCONTROLL

ED

Page 25: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage25UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Opentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheathagainsttheringcut.

3.4.5 Removing the Copper Woven Tape (CWT) • UnwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan

approvedknifetoleaveasmoothfinish.

3.4.6 Removing the Insulation Screen • MarkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe

relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint.

UNCONTROLLED

Page 26: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 26 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Unwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainstthetwinebinder.Removeanycarbonpaperbelowthescreentothesameterminationposition,followedbytwooftheinsulationpapers.

3.4.7 Removing the Insulation Papers • Onlyremovethepapersafterfittingthebarriertubingasdescribedinsection3.1.2.

Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointinginstruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersandclearbarriertubetakingcarenottodamagetheconductorbelow.

• Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement.

UNCONTROLLED

Page 27: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section 3 I Page 27UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge.

• Cleananysurpluscompoundfromthecableconductorwithanapprovedwipe.

3.5 Moisture Testing on Paper Insulated Cables • Fullpersonalprotectiveequipmentshallbewornatalltimesforthistest.

• Gentlyheattheparaffinwaxcontaineronalowheat,insertthethermometerthroughoneoftherubbergrommetsinthetopandwaituntilthewaxreachesatemperatureof125°C.

• Alwayshandlethepaperstobetestedwithgloves,asmoisturefromyourhandsisenoughtogiveapositivetest.

• Liftoutthebasketandplacethepapertapestobetestedinit.

UNCONTROLLED

Page 28: 33kV Jointing Manual Section 3 - cablejoints.co.uk

Section3IPage28 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

• Thesamplesfromthefollowinglayersshallbetested:

• Innerandouterbeltpapers.

• Paperorstringfillers.

• Innerandoutercorepapers.

• Immersethebasketcompletewithpapersintheparaffinwaxbathandnotetheresults.

• Ifthereisnoreactionfromthewaxoritfrothsslightly,thepapersaredryandthecableisfittobejointed.

• Ifthewaxfrothsexcessivelyandacracklingnoiseisheard,thepapersarewetandthecableshouldnotbejointed.

• Removetheheatfromcontainerandleavetocoolbeforemoving.

• Thewaxcanbere-useduntilitstartstodiscolourandthereisnoneedtodisposeofitaftereachmoisturetest.