Download - 5) UBS AT Housing System- 2015 PDF
![Page 1: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/1.jpg)
UBS Advanced Technologies Housing System
![Page 2: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/2.jpg)
UBS ADVANCED TECHNOLOGIES
Speed and simplicity of construction using UBS Advanced Technologies, this system is the Eco friendly building solution for the future. Houses can be completed within days even by semi and even unskilled workers. UBS system is designed to provide permanent , green, Hi Tech, energy efficient accommodation at affordable price. “Build it once and build it right”
![Page 3: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/3.jpg)
UBS ADVANCED TECHNOLOGIES
![Page 4: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/4.jpg)
UBS ADVANCED TECHNOLOGIES
Step1:
Starter bars are wired into the
footings reinforcing steel prior to the foundations concrete being poured.
Starter bars protrude from the footing through the slab, approximately 300mm above slab height.
They are set out to line up with the core holes within our wall blocks where walls are to be built using a template.
![Page 5: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/5.jpg)
UBS ADVANCED TECHNOLOGIES
![Page 6: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/6.jpg)
UBS ADVANCED TECHNOLOGIES
Step 2 : Reinforcing steel and
services such as electrical conduits and water pipes are run through core holes within the wall block as each level of blocks are installed.
All Core Holes are then filled with concrete.
This can be completed at each block Level or at plate height.
![Page 7: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/7.jpg)
UBS ADVANCED TECHNOLOGIES
All Blocks are joined together similar to laying blocks or bricks. (The procedure is similar to how cement is used to lay bricks)
Where blocks are joined steel connection bars join the blocks together tying all columns together, then concrete is poured into the core holes.
![Page 8: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/8.jpg)
UBS ADVANCED TECHNOLOGIES
![Page 9: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/9.jpg)
UBS ADVANCED TECHNOLOGIES
Detail showing block joints.
Open to scrutiny by Engineers or Architects.
The system is far stronger than conventional building systems.
It will withstand high winds and earthquake better than conventional construction methods
![Page 10: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/10.jpg)
UBS ADVANCED TECHNOLOGIES
One level of this display building was completed in 1 hour and 30 minutes by unskilled workers.
The structure is a 4 mtr x 4 mtr room with a 2 mtr x 4 mtr entry and a additional 2 mtr x 2 mtr display wall .
The area of wall built in that time was the same as laying 2170 bricks that have already been rendered.
It is easy to understand if one team was putting the footings and slab down, and another teams where putting the buildings up, how fast these buildings could be completed
![Page 11: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/11.jpg)
UBS ADVANCED TECHNOLOGIES
Step 3 : Specially designed door and
window frames are put into place.
Core holes adjacent to window or door frames have concrete and steel placed in them to completely encase the frame with concrete.
This forms concrete lintels and columns around the frames to further strengthen the structure.
![Page 12: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/12.jpg)
UBS ADVANCED TECHNOLOGIES
![Page 13: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/13.jpg)
UBS ADVANCED TECHNOLOGIES
Step 4: A reinforced bond beam is formed
around the entire structure at plate height.
This ties all the core holes (internal columns) together.
It is also where the next attachments are fitted to secure the roof or second floor to the structure.
If engineers require, bond beams can be formed easily at each 1 meter level of the building tying the internal columns together at every block join.
![Page 14: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/14.jpg)
UBS ADVANCED TECHNOLOGIES
![Page 15: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/15.jpg)
UBS ADVANCED TECHNOLOGIES
Step 5 : Second floor and roof systems
are also tied into the wall system by using steel and concrete,
This is an integrated form work system comprising prefinished blocks and panels.
Its internal core holes and channels provide form work that is filled with concrete and reinforcing steel
![Page 16: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/16.jpg)
UBS ADVANCED TECHNOLOGIES
Construction Panel :
Our construction panel can be used for ceilings roofing, additional floors and decking its fully trafficable and can support the weight of workers with ease.
Floor - roof panel weight is 57kg making them easy to handle and install.
![Page 17: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/17.jpg)
UBS ADVANCED TECHNOLOGIES
Construction panels are internally reinforced with steel tubes and externally reinforced with fiberglass mesh and our special coating covering both sides of the panel.
Steel tubs are used to tie the panels into the structure – run electrical cables through
![Page 18: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/18.jpg)
UBS ADVANCED TECHNOLOGIES
Each Block covers the same area in a building as 232 Vietnamese bricks laid within a double wall thickness and then rendered.
A block takes about 4 minutes install.
Before the concrete and steel is added to each block its weight is only 35kg making them extremely light
and easy to handle.
![Page 19: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/19.jpg)
UBS ADVANCED TECHNOLOGIES
Panels and blocks are coated with a special mixture that is: Fire Proof Water Resistant High impact resistant (2 – 3 times stronger than cement or concrete) Green – environmentally friendly safe
coating Mold Resistant . If damaged it is easy to repair. Extra high thermal qualities (providing
insulation against hot and cold weather) Ideal sound barrier
![Page 20: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/20.jpg)
UBS ADVANCED TECHNOLOGIES
In addition to the many benefits this building system delivers is the way our coating has been applied to the EPS panels ! It is fiberglass mesh reinforced,
this preventing any cracking of the walls and ceiling coatings.
The EPS is specially prepared prior to coating to minimize the chance of delamination
Which means a lot less maintenance to our building structures in the future
![Page 21: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/21.jpg)
UBS ADVANCED TECHNOLOGIES
This section of display wall block has had one side of a block cut away to show why our construction method is second to none.
Walls are tied by steel reinforcing bars into the sub - structure this is then tied together by a bond beam surrounding the entire structure.
![Page 22: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/22.jpg)
UBS ADVANCED TECHNOLOGIES
Our display has been fitted
with a small air-conditioning unit so we can demonstrate the thermal qualities of our system. (Cooling & heating savings due to minimal energy loss)
This building system can be applied to suit all requirements.
With benefits far beyond normal construction systems.
![Page 23: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/23.jpg)
UBS ADVANCED TECHNOLOGIES
UBS Advanced Technology Solutions is a total building system and there are no limits to what our system can be used for in construction.
Industrial & Commercial – Factories, Warehouses , Shopping Centers, Resorts, Hotels etc.
Housing – Every style of housing you can imagine.
Renovations and extensions
![Page 24: 5) UBS AT Housing System- 2015 PDF](https://reader034.vdocument.in/reader034/viewer/2022052509/55d381eabb61eb3f048b46c2/html5/thumbnails/24.jpg)
UBS ADVANCED TECHNOLOGIES
For more Information contact:
Darryl James Heffernan
CEO: Universal Building Solutions
Email : [email protected]
Email : [email protected]
Phone : Vietnam +84944536599
SKYPE Id : darryl_heffernan