A M E N I T I E S F L O O R
DISCOVER INNOVATIONIN THE HEART OF DUBLIN
U P T O 2 8 0 , 0 0 0 S F A V A I L A B L E F O R L E A S E
5 2 4 0 B L A Z E R P A R K W AY
PROPERTY DESCRIPTIONNESTLED IN THE HEART OF DUBLIN ALONG BLAZER MEMORIAL PARK-WAY, BLAZER INNOVATION CAMPUS PROVIDES TENANTS WITH WIDE OPEN FLOOR PLATES, MONUMENT AND BUILDING SIGNAGE WITH FREEWAY VISIBILITY FROM I-270, AND FIRST-CLASS AMENITIES, ALL IN A CONVENIENT SUBURBAN SETTING SUPPORTED BY THE DUBLINK FIBER SYSTEM.
ON-SITE AMENITIESFITNESSCENTER
AUDITORIUM
DATACENTER
LOADING DOCK
CAFETERIAMULTIPLE
CONFERENCEROOMS
OUTDOOR PATIO
ARCHITECT Kellam & Foley
GENERAL CONTRACTOR Martin & Nettrour
SITE 23.2641 Acres
BUILDING SIZE 286,000 RSF
NUMBER OF FLOORS 5 Floors
FLOOR SIZE First floor approximately 110,000 RSFFloors 2-5 approximately 44,000 RSF
NUMBER OF ELEVATORS Three (3) passenger
NUMBER OF FREIGHT ELEVATORS
One (1) dedicated freight elevator with 3,500 pound capacity, separated from passenger elevators
TYPE CONSTRUCTION Reinforced concrete flooring/precast exterior/poured concrete stairwells
EXTERIOR FINISH Precast concrete/windows 2- ¼” clear heat strengthened glass with VS-08 on #2 surface with ½” air gap
CEILING 2X4 acoustic tile/ 2x2 classic step tile
CEILING HEIGHT 9’
DOORS Solid Core/ Veneer
DOOR HEIGHT 3’0”X 8’0”, with hollow metal frames
LIGHTS T8 florescent 25 watt
ELECTRICAL 13.2K primary/2-2500KVA transformers (1 spare) all 480V 3 PH
STANDBY POWER 450 KW kohler diesel/480V 3PH/650 gal fuel tank
WINDOW COVERING Mini blinds/Mauve
RESTROOMS Each floor has one main men’s and women’s restroom/1st floor has additional restrooms in gym/café & dining area. 5th floor has an additional management restroom.
AFTER HOURS ACCESS & SECURITY
Card key and key exterior locks
HVAC 1- 500, 700 & 1000 Ton chiller/1- 2800 ton cooling tower2- 60 Hp high pressure boilers3- 225 Hp low pressure boilers/1- 200 hp low pressure boiler130- Vav boxes/various cfm/zone sizes ashrae 62.1
FIRE PROTECTION Fully sprinkled .10 Density/kitchen 2- ansul systems/computer room 1- double interlock pre-action system, 1- novac system, 1- vesda system.
ENERGY CONSERVATION 2 New chillers installed 2006New cooling tower installed with vfd fans and pumps 2004New building fan motors and vfd’s 2003New building vav boxes, 5 floors @ 1 floor per year – start 2007Demand based ventilation upgrade 2007New building management system installed to control the boiler/chiller plant 2016Occupancy sensors, 28 watt, t-8 florescent lighting throughout, can lights are led. The building has an energy star rating including an energy star rating of 90 (scale of 100) for 2014)
CONNECTIVITY The building is located on the dublink fiber system network.The building has cat 5E and cat 6 wiring throughout
DATA CENTER 4,000 Sq. Ft. Raised floor data center containing 5 liebert down draft cooling units and one power conditioner
FURNITURE: Demountable wall systems in place
AMENITIES: 300 Seat cafeteria Generator back-upNearby dining, lodging, shopping and other ancillary services Located on the dublink fiber networkFitness center280 Seat auditoriumNumerous meeting/training/conference roomsDock area for deliveries
B U I L D I N G S P E C I F I C A T I O N S
A M E N I T I E S F L O O R
AV
ER
AG
E D
AIL
Y R
ATE
: 117
,392
CA
RS
YOUR NAME HERE
YOUR NAME HERE
M O N U M E N T/ B U I L D I N G S I G N A G E
A M E N I T I E S F L O O RF I R S T F L O O R - 11 0 , 0 0 0 S F
Data Center Meeting/Conference/Work Rooms Kitchen/Dining/Service AreaAmenities
Outdoor Patio/Seating Area
A M E N I T I E S F L O O R
DISCOVERINNOVATION
TODAY!F O R M O R E
I N F O R M A T I O N , C O N T A C T:
© 2018 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accu-racy or completeness. Any projections, opinions, or estimates are subject to uncertainty. The information may not represent the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the property and verify all informa-tion. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited. PMStudio_July2018
TODD GREINERSenior Vice President
+1 614 430 [email protected]
KATIE ZACHRICHAssociate
+1 614 430 [email protected]
5 2 4 0 B L A Z E R P A R K W AY